SlideShare a Scribd company logo
24 Hour Clock -- Overview
1
1:00
AM
00:00
3:00
AM
2:00
AM
5:00
AM
4:00
AM
7:00
AM
6:00
AM
9:00
AM
8:00
AM
11:00
AM
10:00
AM
1:00
PM
12:00
PM
3:00
PM
2:00
PM
5:00
PM
4:00
PM
7:00
PM
6:00
PM
8:00
PM
10:00
PM
9:00
PM
12:00
AM
11:00
PM
DSE
Iterative Processing
Meter Data, Validation, MRA EOD
Validation, Estimation, Reports, NPM
Post EOD
TOU Bin Estimation, Billing Extracts
Iterative Processing
Meter Data, Validation, MRA
Nightly
Hand Held Reads
Iterative Processing
Meter Data, Validation
MRA
Sample Daily Processing Schedule
2
© Landis+Gyr
MDMS Daily Processing
 Modular and component-based to facilitate building a processing
schedule that will fit the objectives required.
 The primary objective is to operate the MDMS in a continuous
fashion to publish data in the quickest manner possible (example:
billing determinants and customer presentment).
 A key driver in determining the schedule is the billing cut-off time.
 The schedule should also provide time for users to resolve critical
VEE exceptions in time for billing.
3
© Landis+Gyr
24-hour Clock
4
1:00
AM
00:00
3:00
AM
2:00
AM
5:00
AM
4:00
AM
7:00
AM
6:00
AM
9:00
AM
8:00
AM
11:00
AM
10:00
AM
1:00
PM
12:00
PM
3:00
PM
2:00
PM
5:00
PM
4:00
PM
7:00
PM
6:00
PM
8:00
PM
10:00
PM
9:00
PM
12:00
AM
11:00
PM
DSE
Iterative Processing
Meter Data, Validation, MRA
EOD
Meter Data, Validation,
MRA, Reports, NPM
Post EOD
TOU Bin Estimation, Billing Cycle Usage
Iterative Processing
Meter Data, Validation, MRA
HH MRA
Iterative Processing
Meter Data, Validation, MRA
© Landis+Gyr
MDMS Core Processes
Data Synchronization Engine Components:
Consist of jobs that run to update the MDMS with Master data (i.e.
current account and meter information) and with other systems (i.e.
SAP)
 MAINT: Daily updates/changes to meters and modules based on
updates provided from other systems (i.e. CIS).
− Adds, updates, deletes
 SYNC: Weekly sync for audit logging purposes only.
− Entire population
5
© Landis+Gyr
Published Reading Service (PRS)
Published Reading Service
– Meter Installation
− The IN reading is used by the Meter Exchange logic within the DSE Process to
set the starting “first good read” for the meter deployment.
– Meter Removal
− Transaction latency will result in missing reads for a number of days, which will
be estimated by the MDMS.
− Estimated usage beyond the removal date/time of the meter is obviously not
correct.
− When the transaction is received, the removal read(s) are used to “true up” the
estimated reads back to the point of removal, and straight-line the post-
removal estimates at 0 (zero) usage.
− Implied removals will be processed without a removal read(s) (Sync Mode
Only).
6
© Landis+Gyr
24-hour Clock - Optimization
24-hour Clock optimization is installation specific
Optimization is achieved as an iterative process of experimentation with respect
given to:
 Business Rules
 CIS timing requirements
 Hours when VEE exceptions are manually cleared
 Head end capability
You must find the optimal read/VEE schedule to:
 Minimize the daily VEE exception workload by eliminating unnecessary
exceptions
 Eliminate recovery reads that negate exception workload/efforts
 Ensure that best data set is presented daily to billing function
7
© Landis+Gyr
Breakdown of an End of Day Read
Check reads count
(checks consumption
effectiveness)
EMED/Create Missing WAVE
LP Sync Complete iWAVE
Exception
Management
MRA meter read
fact processing
8
© Landis+Gyr
Dashboard
9
© Landis+Gyr
Dashboard
10
© Landis+Gyr
Reports
11

More Related Content

Similar to 24-HourClock.pdf

Getting Started: What Should My Enterprise Do in the First 90 Days?
Getting Started: What Should My Enterprise Do in the First 90 Days?Getting Started: What Should My Enterprise Do in the First 90 Days?
Getting Started: What Should My Enterprise Do in the First 90 Days?
Amazon Web Services
 
MDR Brochure
MDR BrochureMDR Brochure
MDR Brochure
saproles
 
Top Signs You May Have Outgrown Your Legacy ERP system
Top Signs You May Have Outgrown Your Legacy ERP systemTop Signs You May Have Outgrown Your Legacy ERP system
Top Signs You May Have Outgrown Your Legacy ERP system
Jessica Primanzon, MBA
 
Top Signs You May Have Outgrown Your Legacy ERP System
Top Signs You May Have Outgrown Your Legacy ERP SystemTop Signs You May Have Outgrown Your Legacy ERP System
Top Signs You May Have Outgrown Your Legacy ERP System
Unanet
 
3 types of monitoring for 2020
3 types of monitoring for 20203 types of monitoring for 2020
3 types of monitoring for 2020
T. Alexander Lystad
 
AWS re:Invent 2016: Start Your Cost Optimization Program: Learning from Intui...
AWS re:Invent 2016: Start Your Cost Optimization Program: Learning from Intui...AWS re:Invent 2016: Start Your Cost Optimization Program: Learning from Intui...
AWS re:Invent 2016: Start Your Cost Optimization Program: Learning from Intui...
Amazon Web Services
 
Supply Chain Management Workshop
Supply Chain Management WorkshopSupply Chain Management Workshop
Supply Chain Management Workshop
Tom Sauder, P.Eng.
 
AssetsHub Pitch Deck
AssetsHub Pitch DeckAssetsHub Pitch Deck
AssetsHub Pitch Deck
AssetsHub
 
Control m customers using big data
Control m customers using big dataControl m customers using big data
Control m customers using big data
Juliette Smit
 
Concept to production Nationwide Insurance BigInsights Journey with Telematics
Concept to production Nationwide Insurance BigInsights Journey with TelematicsConcept to production Nationwide Insurance BigInsights Journey with Telematics
Concept to production Nationwide Insurance BigInsights Journey with Telematics
Seeling Cheung
 
Sql azure cluster dashboard public.ppt
Sql azure cluster dashboard public.pptSql azure cluster dashboard public.ppt
Sql azure cluster dashboard public.ppt
Qingsong Yao
 
Gide financial modelling software
Gide financial modelling softwareGide financial modelling software
Gide financial modelling software
Michael Stimson
 
Simplifying SAP Plant Maintenance
Simplifying SAP Plant MaintenanceSimplifying SAP Plant Maintenance
Simplifying SAP Plant Maintenance
DeeDee Kato
 
Benefits of Collecting OEE Data with Production Tracking Software
Benefits of Collecting OEE Data with Production Tracking SoftwareBenefits of Collecting OEE Data with Production Tracking Software
Benefits of Collecting OEE Data with Production Tracking Software
Wintriss Controls Group, LLC
 
Usage Trend Reporting
Usage Trend Reporting Usage Trend Reporting
Usage Trend Reporting
Gainsight
 
Netspend: Maintaining "High Operations Tempo" via Multidomain MDM
Netspend: Maintaining "High Operations Tempo" via Multidomain MDMNetspend: Maintaining "High Operations Tempo" via Multidomain MDM
Netspend: Maintaining "High Operations Tempo" via Multidomain MDM
Orchestra Networks
 
8 Signs You’ve Outgrown Quickbooks!
8 Signs You’ve Outgrown Quickbooks!8 Signs You’ve Outgrown Quickbooks!
8 Signs You’ve Outgrown Quickbooks!
Unanet
 
Active directory solutions brochure
Active directory solutions brochureActive directory solutions brochure
Active directory solutions brochure
Zoho Corporation
 
SAP FICO Interview Questions By Garudatrainings
SAP FICO Interview Questions By GarudatrainingsSAP FICO Interview Questions By Garudatrainings
SAP FICO Interview Questions By Garudatrainings
piyushchawala
 

Similar to 24-HourClock.pdf (20)

Getting Started: What Should My Enterprise Do in the First 90 Days?
Getting Started: What Should My Enterprise Do in the First 90 Days?Getting Started: What Should My Enterprise Do in the First 90 Days?
Getting Started: What Should My Enterprise Do in the First 90 Days?
 
MDR Brochure
MDR BrochureMDR Brochure
MDR Brochure
 
Top Signs You May Have Outgrown Your Legacy ERP system
Top Signs You May Have Outgrown Your Legacy ERP systemTop Signs You May Have Outgrown Your Legacy ERP system
Top Signs You May Have Outgrown Your Legacy ERP system
 
Top Signs You May Have Outgrown Your Legacy ERP System
Top Signs You May Have Outgrown Your Legacy ERP SystemTop Signs You May Have Outgrown Your Legacy ERP System
Top Signs You May Have Outgrown Your Legacy ERP System
 
3 types of monitoring for 2020
3 types of monitoring for 20203 types of monitoring for 2020
3 types of monitoring for 2020
 
AWS re:Invent 2016: Start Your Cost Optimization Program: Learning from Intui...
AWS re:Invent 2016: Start Your Cost Optimization Program: Learning from Intui...AWS re:Invent 2016: Start Your Cost Optimization Program: Learning from Intui...
AWS re:Invent 2016: Start Your Cost Optimization Program: Learning from Intui...
 
Supply Chain Management Workshop
Supply Chain Management WorkshopSupply Chain Management Workshop
Supply Chain Management Workshop
 
AssetsHub Pitch Deck
AssetsHub Pitch DeckAssetsHub Pitch Deck
AssetsHub Pitch Deck
 
Control m customers using big data
Control m customers using big dataControl m customers using big data
Control m customers using big data
 
Concept to production Nationwide Insurance BigInsights Journey with Telematics
Concept to production Nationwide Insurance BigInsights Journey with TelematicsConcept to production Nationwide Insurance BigInsights Journey with Telematics
Concept to production Nationwide Insurance BigInsights Journey with Telematics
 
Sql azure cluster dashboard public.ppt
Sql azure cluster dashboard public.pptSql azure cluster dashboard public.ppt
Sql azure cluster dashboard public.ppt
 
Gide financial modelling software
Gide financial modelling softwareGide financial modelling software
Gide financial modelling software
 
Simplifying SAP Plant Maintenance
Simplifying SAP Plant MaintenanceSimplifying SAP Plant Maintenance
Simplifying SAP Plant Maintenance
 
Benefits of Collecting OEE Data with Production Tracking Software
Benefits of Collecting OEE Data with Production Tracking SoftwareBenefits of Collecting OEE Data with Production Tracking Software
Benefits of Collecting OEE Data with Production Tracking Software
 
Usage Trend Reporting
Usage Trend Reporting Usage Trend Reporting
Usage Trend Reporting
 
Netspend: Maintaining "High Operations Tempo" via Multidomain MDM
Netspend: Maintaining "High Operations Tempo" via Multidomain MDMNetspend: Maintaining "High Operations Tempo" via Multidomain MDM
Netspend: Maintaining "High Operations Tempo" via Multidomain MDM
 
Supply Chain Workshop Demo
Supply Chain Workshop DemoSupply Chain Workshop Demo
Supply Chain Workshop Demo
 
8 Signs You’ve Outgrown Quickbooks!
8 Signs You’ve Outgrown Quickbooks!8 Signs You’ve Outgrown Quickbooks!
8 Signs You’ve Outgrown Quickbooks!
 
Active directory solutions brochure
Active directory solutions brochureActive directory solutions brochure
Active directory solutions brochure
 
SAP FICO Interview Questions By Garudatrainings
SAP FICO Interview Questions By GarudatrainingsSAP FICO Interview Questions By Garudatrainings
SAP FICO Interview Questions By Garudatrainings
 

Recently uploaded

一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
yhkoc
 
一比一原版(RUG毕业证)格罗宁根大学毕业证成绩单
一比一原版(RUG毕业证)格罗宁根大学毕业证成绩单一比一原版(RUG毕业证)格罗宁根大学毕业证成绩单
一比一原版(RUG毕业证)格罗宁根大学毕业证成绩单
vcaxypu
 
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
Timothy Spann
 
一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理
一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理
一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理
g4dpvqap0
 
Malana- Gimlet Market Analysis (Portfolio 2)
Malana- Gimlet Market Analysis (Portfolio 2)Malana- Gimlet Market Analysis (Portfolio 2)
Malana- Gimlet Market Analysis (Portfolio 2)
TravisMalana
 
My burning issue is homelessness K.C.M.O.
My burning issue is homelessness K.C.M.O.My burning issue is homelessness K.C.M.O.
My burning issue is homelessness K.C.M.O.
rwarrenll
 
一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理
slg6lamcq
 
Best best suvichar in gujarati english meaning of this sentence as Silk road ...
Best best suvichar in gujarati english meaning of this sentence as Silk road ...Best best suvichar in gujarati english meaning of this sentence as Silk road ...
Best best suvichar in gujarati english meaning of this sentence as Silk road ...
AbhimanyuSinha9
 
Influence of Marketing Strategy and Market Competition on Business Plan
Influence of Marketing Strategy and Market Competition on Business PlanInfluence of Marketing Strategy and Market Competition on Business Plan
Influence of Marketing Strategy and Market Competition on Business Plan
jerlynmaetalle
 
一比一原版(CBU毕业证)不列颠海角大学毕业证成绩单
一比一原版(CBU毕业证)不列颠海角大学毕业证成绩单一比一原版(CBU毕业证)不列颠海角大学毕业证成绩单
一比一原版(CBU毕业证)不列颠海角大学毕业证成绩单
nscud
 
一比一原版(YU毕业证)约克大学毕业证成绩单
一比一原版(YU毕业证)约克大学毕业证成绩单一比一原版(YU毕业证)约克大学毕业证成绩单
一比一原版(YU毕业证)约克大学毕业证成绩单
enxupq
 
The affect of service quality and online reviews on customer loyalty in the E...
The affect of service quality and online reviews on customer loyalty in the E...The affect of service quality and online reviews on customer loyalty in the E...
The affect of service quality and online reviews on customer loyalty in the E...
jerlynmaetalle
 
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
axoqas
 
FP Growth Algorithm and its Applications
FP Growth Algorithm and its ApplicationsFP Growth Algorithm and its Applications
FP Growth Algorithm and its Applications
MaleehaSheikh2
 
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
mbawufebxi
 
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
ewymefz
 
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
ahzuo
 
Predicting Product Ad Campaign Performance: A Data Analysis Project Presentation
Predicting Product Ad Campaign Performance: A Data Analysis Project PresentationPredicting Product Ad Campaign Performance: A Data Analysis Project Presentation
Predicting Product Ad Campaign Performance: A Data Analysis Project Presentation
Boston Institute of Analytics
 
一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理
一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理
一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理
dwreak4tg
 
Sample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdf
Sample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdfSample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdf
Sample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdf
Linda486226
 

Recently uploaded (20)

一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
 
一比一原版(RUG毕业证)格罗宁根大学毕业证成绩单
一比一原版(RUG毕业证)格罗宁根大学毕业证成绩单一比一原版(RUG毕业证)格罗宁根大学毕业证成绩单
一比一原版(RUG毕业证)格罗宁根大学毕业证成绩单
 
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
 
一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理
一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理
一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理
 
Malana- Gimlet Market Analysis (Portfolio 2)
Malana- Gimlet Market Analysis (Portfolio 2)Malana- Gimlet Market Analysis (Portfolio 2)
Malana- Gimlet Market Analysis (Portfolio 2)
 
My burning issue is homelessness K.C.M.O.
My burning issue is homelessness K.C.M.O.My burning issue is homelessness K.C.M.O.
My burning issue is homelessness K.C.M.O.
 
一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理
 
Best best suvichar in gujarati english meaning of this sentence as Silk road ...
Best best suvichar in gujarati english meaning of this sentence as Silk road ...Best best suvichar in gujarati english meaning of this sentence as Silk road ...
Best best suvichar in gujarati english meaning of this sentence as Silk road ...
 
Influence of Marketing Strategy and Market Competition on Business Plan
Influence of Marketing Strategy and Market Competition on Business PlanInfluence of Marketing Strategy and Market Competition on Business Plan
Influence of Marketing Strategy and Market Competition on Business Plan
 
一比一原版(CBU毕业证)不列颠海角大学毕业证成绩单
一比一原版(CBU毕业证)不列颠海角大学毕业证成绩单一比一原版(CBU毕业证)不列颠海角大学毕业证成绩单
一比一原版(CBU毕业证)不列颠海角大学毕业证成绩单
 
一比一原版(YU毕业证)约克大学毕业证成绩单
一比一原版(YU毕业证)约克大学毕业证成绩单一比一原版(YU毕业证)约克大学毕业证成绩单
一比一原版(YU毕业证)约克大学毕业证成绩单
 
The affect of service quality and online reviews on customer loyalty in the E...
The affect of service quality and online reviews on customer loyalty in the E...The affect of service quality and online reviews on customer loyalty in the E...
The affect of service quality and online reviews on customer loyalty in the E...
 
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
 
FP Growth Algorithm and its Applications
FP Growth Algorithm and its ApplicationsFP Growth Algorithm and its Applications
FP Growth Algorithm and its Applications
 
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
 
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
 
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
 
Predicting Product Ad Campaign Performance: A Data Analysis Project Presentation
Predicting Product Ad Campaign Performance: A Data Analysis Project PresentationPredicting Product Ad Campaign Performance: A Data Analysis Project Presentation
Predicting Product Ad Campaign Performance: A Data Analysis Project Presentation
 
一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理
一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理
一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理
 
Sample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdf
Sample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdfSample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdf
Sample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdf
 

24-HourClock.pdf

  • 1. 24 Hour Clock -- Overview 1 1:00 AM 00:00 3:00 AM 2:00 AM 5:00 AM 4:00 AM 7:00 AM 6:00 AM 9:00 AM 8:00 AM 11:00 AM 10:00 AM 1:00 PM 12:00 PM 3:00 PM 2:00 PM 5:00 PM 4:00 PM 7:00 PM 6:00 PM 8:00 PM 10:00 PM 9:00 PM 12:00 AM 11:00 PM DSE Iterative Processing Meter Data, Validation, MRA EOD Validation, Estimation, Reports, NPM Post EOD TOU Bin Estimation, Billing Extracts Iterative Processing Meter Data, Validation, MRA Nightly Hand Held Reads Iterative Processing Meter Data, Validation MRA
  • 3. © Landis+Gyr MDMS Daily Processing  Modular and component-based to facilitate building a processing schedule that will fit the objectives required.  The primary objective is to operate the MDMS in a continuous fashion to publish data in the quickest manner possible (example: billing determinants and customer presentment).  A key driver in determining the schedule is the billing cut-off time.  The schedule should also provide time for users to resolve critical VEE exceptions in time for billing. 3
  • 4. © Landis+Gyr 24-hour Clock 4 1:00 AM 00:00 3:00 AM 2:00 AM 5:00 AM 4:00 AM 7:00 AM 6:00 AM 9:00 AM 8:00 AM 11:00 AM 10:00 AM 1:00 PM 12:00 PM 3:00 PM 2:00 PM 5:00 PM 4:00 PM 7:00 PM 6:00 PM 8:00 PM 10:00 PM 9:00 PM 12:00 AM 11:00 PM DSE Iterative Processing Meter Data, Validation, MRA EOD Meter Data, Validation, MRA, Reports, NPM Post EOD TOU Bin Estimation, Billing Cycle Usage Iterative Processing Meter Data, Validation, MRA HH MRA Iterative Processing Meter Data, Validation, MRA
  • 5. © Landis+Gyr MDMS Core Processes Data Synchronization Engine Components: Consist of jobs that run to update the MDMS with Master data (i.e. current account and meter information) and with other systems (i.e. SAP)  MAINT: Daily updates/changes to meters and modules based on updates provided from other systems (i.e. CIS). − Adds, updates, deletes  SYNC: Weekly sync for audit logging purposes only. − Entire population 5
  • 6. © Landis+Gyr Published Reading Service (PRS) Published Reading Service – Meter Installation − The IN reading is used by the Meter Exchange logic within the DSE Process to set the starting “first good read” for the meter deployment. – Meter Removal − Transaction latency will result in missing reads for a number of days, which will be estimated by the MDMS. − Estimated usage beyond the removal date/time of the meter is obviously not correct. − When the transaction is received, the removal read(s) are used to “true up” the estimated reads back to the point of removal, and straight-line the post- removal estimates at 0 (zero) usage. − Implied removals will be processed without a removal read(s) (Sync Mode Only). 6
  • 7. © Landis+Gyr 24-hour Clock - Optimization 24-hour Clock optimization is installation specific Optimization is achieved as an iterative process of experimentation with respect given to:  Business Rules  CIS timing requirements  Hours when VEE exceptions are manually cleared  Head end capability You must find the optimal read/VEE schedule to:  Minimize the daily VEE exception workload by eliminating unnecessary exceptions  Eliminate recovery reads that negate exception workload/efforts  Ensure that best data set is presented daily to billing function 7
  • 8. © Landis+Gyr Breakdown of an End of Day Read Check reads count (checks consumption effectiveness) EMED/Create Missing WAVE LP Sync Complete iWAVE Exception Management MRA meter read fact processing 8