The document is a concrete test report from The Scott Center at Western Kentucky University. It details concrete testing done for a new WKU parking structure project. The report provides information on the concrete batch including the supplier, mix design strength, slump, air content, temperature, and unit weight. It also includes field data collected by students on concrete cylinder tests at 7 and 28 days, including load, cylinder weight and dimensions, and failure type. The summary describes The Scott Center's involvement in monitoring concrete quality for 3 major civil engineering projects at WKU, including the parking structure, utilizing both students and new faculty for design, field work, and reporting.