TEC INDUSTRY PROGRESS REPORT FOR ORESUNDSVERKET PROJECT                                                                         Friday.October.19. 2007 / C.W. # 42
TECHNOS P.O. 151947-23942-11.May.2007                                                                                          Rotec I.O. 27064-25.May.2007
                                                                         CONTRACT TIME         START TIME       STOP TIME      1400 TWIN CTCS
      FLOW-SHEET FOR A TWIN 1400 C.T.C.S.
No
                                                                                              25 May 2007    30.September.07            %
                                                                                                                                                            ROTEC
      COMPLETE CONDENSER TUBE CLEANING SYSTEM                              No of Days =

 1    SOFT -WORK PREPARATION:                                                  14                cw # 22         cw # 23              100
      FABRICATION PLANNING                                                                                                            100
      WELDING BOOK                                                         TECHNOS CONFIRMATION                  cw # 25              100                  Friday,06.22.07
      QUALITY CONTROL PLAN                                                                                                            100
      3.1.B CERTIFICATES FOR SHELLS RAW-MATERIAL                                                 cw # 22         cw # 26              100                  Friday,06.29.07
      3.1.B CERTIFICATES FOR FLANGES RAW-MATERIAL                                                cw # 22         cw # 26              100                  Friday,06.29.07
      Rubber linning data sheet from Anticorosiv                                                                 cw # 25              100                  Friday,06.22.07
      Painting specification from Technos to Rotec                                                                                    100
                                                                                                                               ND1400       ND1400
 2    HARD -WORK PERFORMANCE:                                                  60              20.06.2007      28.08.2007
      TWIN N.D. 1400MM BALL-STRAINERS(SHELLS IN CARBON-STEEL)                                                                   %            %
 I    SHELLS FABRICATION:                                                                      20.06.2007      28.08.2007       100          100
      SHELL CUTTING-OFF TO SIZE                                                                 cw # 25         cw # 27         100          100
      SHELLS PREPARATION:     ROLLING                                                           cw # 27                         100          100
      SHELLS LONGITUDINAL TACK-WELD                                                                                             100          100
      SHELLS LONGITUDINAL CONTINUOUS-WELD                                                                                       100          100
      SHELLS CALIBRATION                                                                                                        100          100
      SHELLS N.D.T. BY 10% X-RAY EXAMINATION                                                                                    100          100       Acc. to the last Report
      FLANGES FABRICATION :                                                                                                     100          100
      FLANGE-SEGMENTS CUTTING-OFF                                                                cw # 25         cw # 27        100          100
      FLANGE-SEGMENTS-MACHINING                                                                                                 100          100
      FLANGE-SEGMENTS-WELDING                                                                                                   100          100
      FLANGES-FLATTENING + STRESS RELEAVING                                                                                     100          100
      FLANGES N.D.T. BY U. S. -EXAMINATION                                                                                      100          100       Acc. to the last Report
 3 SHELLS + FLANGES: TACK + COMPLETE-WELDING,STRESS RELEAVING                                                                   100          100
      FLANGES TACK-WELDED ON SHELLS                                                                                             100          100
      FLANGES COMPLETELY WELDED ON SHELLS                                                                                       100          100
      OVERALL STRESS RELEAVING                                                                                                  100          100
 4 C.N.C. -1 -FOR FLANGES + SHELLS:                                                                                             100          100
      C.N.C. -1   -FOR FLANGE HOLES : MARKING, INDEXING, DRILLING,                                                              100          100
                  -FOR SHELL -HOLLES : MARKING, DRILLING , BORING                                                               100          100
 5 MACHINING EXTERNALS + INTERNALS                                                                                              100          100
      WELDING     EXTERNALS + INTERNALS                                                                                         100          100
 6 C.N.C. -2 - FOR BOSSES                           -REAMING                                    cw # 30          cw # 31        100          100
   WELDS CORRECTIONS + .Q.C. BY D.P.-N.D.T                                                                                      100          100
      TECHNOS' S. S. FREE ISSUED ITEMS AT 30 DAYS AFTER P. O.             MGS-S.S. F.I.I.     June 21 2007       cw # 27        100          100        Departure from France
 7 HYDROTEST                                                                                                                    100          100          Mo.9/10/2007
      INTERNAL BLASTING                                                                                                         100          100
 8 RUBBER-LINNING + RUBBER-TEST IN ANTICOROSIV 3mm                                                                              100          100          Rubber Test
      EXTERNAL BLASTING                                                                                                         100          100      Fri.9/28/2007.cw39
 9 OUTSIDE PAINTING                                                                                                             100          100       Primer-coat only
      TECHNOS' FREE ISSUED ITEMS AT 45 DAYS BEFORE F. INSP.              Grids + Vortex       June 30 2007       cw # 32        100          100        Departure from France
10 ASSEMBLING INTERNALS + EXTERNALS: S.S.GRIDS+VORTEX, S.S.PIPES                                                                100          100             C.W. # 41
II    RECIRCULATION UNIT FABRICATION:
      BASE-PLATE CUTTING-OFF: STEEL-SHEET + PROFILES                                                                                  100
      LIFTING-LUGS MACHINING + WELDING                                                                                                100
      BASE-PLATE BLASTING                                                                                                             100
      BASE-PLATE PAINTING                                                Rotec request for                                            100            Technos accept for black-colour

III   BALL-COLLECTOR FABRICATION:                                                                                                     100
      BALL-COLLECTOR CUTTING-OFF                       N.D.250 mm                                                                     100
      BALL-COLLECTOR MACHINING                                                                                                        100
      BALL-COLLECTOR TACK, COMPLETE WELDING                                                                                           100
      BALL-COLLECTOR X-RAY N.D.T.EXAM                                                                                                 100
      BALL-COLLECTOR HYDROTEST                      INTERNAL BLASTING                                                                 100                Mo.9/10/2007
      BALL-COLLECTOR INTERNAL RUBBER LINNING 3mm                                                                                      100                 Rubber Test
      BALL-COLLECTOR EXTERNAL PAINTING                                                                                                100             Fri.9/28/2007.cw39
      BALL-COLLECTOR ASSEMBLING                                                                                                       100
      RECIRCULATION UNIT ASSEMBLING WITH BALL-COLLECTOR + F. I. I.                                                                    100                    C.W. # 41
IV BALL-DISTRIBUTOR FABRICATION:                                                                                                      100
      BALL-DISTRIBUTOR CUTTING-OFF, MACHINING, WELDING                                                                                100
      BALL-DISTRIBUTOR HYDROSTATIC TEST, BLASTING ( 1-4"+ 2-3" )                                                                      100                Mo.9/10/2007
      BALL-DISTRIBUTOR INTERNAL RUBBER-LINNING 3mm                                                                                    100                 Rubber Test
      BALL-DISTRIBUTOR EXTERNAL BLASTING, PAINTING                                                                                    100             Fri.9/28/2007.cw39
V     BALL-INJECTORS PREPARATION:                                                                                                     100
      BALL-INJECTORS : WELDING S.S. FLANGES ON S.S. TUBES                                                                             100
      GENERAL ASSEMBLING FOR F. R. T.                                                                                                 100
      FACTORY RUNNING TEST -                HOLD POINT IN Q. C. P.      Alain Monseur        October.15.2007 October.19.2007   Client Inspection      Th10/18/2007.cw42
      FINAL WORKSHOP INSPECTION -END OF MANUFACTURING REPORT                                                                           100
      PACKING, MARKING, LABELLING                                                                                                      50
      EX-WORKS -DELIVERY                             -PLANNED DATE                                                                      0            Tuesday,Oct.23.2007,c.w.#43
      F. CA. DELIVERY                                                                                                                   0
      TEC ASSISTANCE IN ROTEC :
#20. C. W.#42. Tec Rep.For. Technos

More Related Content

Viewers also liked

الفصل الخامس بريد الكتروني
الفصل الخامس بريد الكترونيالفصل الخامس بريد الكتروني
الفصل الخامس بريد الكتروني
Waleed Fawzy Elgendy
 
Understanding Arjuna's Analytical Ability
Understanding Arjuna's Analytical Ability Understanding Arjuna's Analytical Ability
Understanding Arjuna's Analytical Ability
MobiTrolley
 
Sunview 3 trung tâm gò vấp chỉ 614tr căn LH 0989.707.653
Sunview 3 trung tâm gò vấp chỉ 614tr căn LH 0989.707.653Sunview 3 trung tâm gò vấp chỉ 614tr căn LH 0989.707.653
Sunview 3 trung tâm gò vấp chỉ 614tr căn LH 0989.707.653
ngoisaonho3124
 
Risalah ahlussunah wal jamaah
Risalah ahlussunah wal jamaahRisalah ahlussunah wal jamaah
Risalah ahlussunah wal jamaah
Kampus Menyan
 
The avengers
The avengersThe avengers
The avengersSosaia01
 
0610 s13 qp_63
0610 s13 qp_630610 s13 qp_63
0610 s13 qp_63King Ali
 
Fractured Dreams
Fractured DreamsFractured Dreams
Fractured Dreams
kateyabbott
 
Vinpho - Take a pic. Upload it. Get paid - Pitch script
Vinpho - Take a pic. Upload it. Get paid - Pitch scriptVinpho - Take a pic. Upload it. Get paid - Pitch script
Vinpho - Take a pic. Upload it. Get paid - Pitch scriptCarmen Alfonso Rico
 
Día de los muertos
Día de los muertosDía de los muertos
Día de los muertos
lehines
 
Ppt sim (bab iii)
Ppt sim (bab iii)Ppt sim (bab iii)
Ppt sim (bab iii)Ema_Pertiwi
 
Unit 5 capstone assignment
Unit 5 capstone assignmentUnit 5 capstone assignment
Unit 5 capstone assignmentGabe Wigington
 
Coleções ker art
Coleções ker artColeções ker art
Coleções ker artjeanfonseca
 
Christmas in Iceland
Christmas in IcelandChristmas in Iceland
Christmas in IcelandIva Golec
 

Viewers also liked (15)

الفصل الخامس بريد الكتروني
الفصل الخامس بريد الكترونيالفصل الخامس بريد الكتروني
الفصل الخامس بريد الكتروني
 
Understanding Arjuna's Analytical Ability
Understanding Arjuna's Analytical Ability Understanding Arjuna's Analytical Ability
Understanding Arjuna's Analytical Ability
 
Sunview 3 trung tâm gò vấp chỉ 614tr căn LH 0989.707.653
Sunview 3 trung tâm gò vấp chỉ 614tr căn LH 0989.707.653Sunview 3 trung tâm gò vấp chỉ 614tr căn LH 0989.707.653
Sunview 3 trung tâm gò vấp chỉ 614tr căn LH 0989.707.653
 
Risalah ahlussunah wal jamaah
Risalah ahlussunah wal jamaahRisalah ahlussunah wal jamaah
Risalah ahlussunah wal jamaah
 
The avengers
The avengersThe avengers
The avengers
 
0610 s13 qp_63
0610 s13 qp_630610 s13 qp_63
0610 s13 qp_63
 
Fractured Dreams
Fractured DreamsFractured Dreams
Fractured Dreams
 
Vinpho - Take a pic. Upload it. Get paid - Pitch script
Vinpho - Take a pic. Upload it. Get paid - Pitch scriptVinpho - Take a pic. Upload it. Get paid - Pitch script
Vinpho - Take a pic. Upload it. Get paid - Pitch script
 
Instrucciones
InstruccionesInstrucciones
Instrucciones
 
Día de los muertos
Día de los muertosDía de los muertos
Día de los muertos
 
Ppt sim (bab iii)
Ppt sim (bab iii)Ppt sim (bab iii)
Ppt sim (bab iii)
 
Elysium
ElysiumElysium
Elysium
 
Unit 5 capstone assignment
Unit 5 capstone assignmentUnit 5 capstone assignment
Unit 5 capstone assignment
 
Coleções ker art
Coleções ker artColeções ker art
Coleções ker art
 
Christmas in Iceland
Christmas in IcelandChristmas in Iceland
Christmas in Iceland
 

Recently uploaded

Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
zechu97
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 

Recently uploaded (20)

Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 

#20. C. W.#42. Tec Rep.For. Technos

  • 1. TEC INDUSTRY PROGRESS REPORT FOR ORESUNDSVERKET PROJECT Friday.October.19. 2007 / C.W. # 42 TECHNOS P.O. 151947-23942-11.May.2007 Rotec I.O. 27064-25.May.2007 CONTRACT TIME START TIME STOP TIME 1400 TWIN CTCS FLOW-SHEET FOR A TWIN 1400 C.T.C.S. No 25 May 2007 30.September.07 % ROTEC COMPLETE CONDENSER TUBE CLEANING SYSTEM No of Days = 1 SOFT -WORK PREPARATION: 14 cw # 22 cw # 23 100 FABRICATION PLANNING 100 WELDING BOOK TECHNOS CONFIRMATION cw # 25 100 Friday,06.22.07 QUALITY CONTROL PLAN 100 3.1.B CERTIFICATES FOR SHELLS RAW-MATERIAL cw # 22 cw # 26 100 Friday,06.29.07 3.1.B CERTIFICATES FOR FLANGES RAW-MATERIAL cw # 22 cw # 26 100 Friday,06.29.07 Rubber linning data sheet from Anticorosiv cw # 25 100 Friday,06.22.07 Painting specification from Technos to Rotec 100 ND1400 ND1400 2 HARD -WORK PERFORMANCE: 60 20.06.2007 28.08.2007 TWIN N.D. 1400MM BALL-STRAINERS(SHELLS IN CARBON-STEEL) % % I SHELLS FABRICATION: 20.06.2007 28.08.2007 100 100 SHELL CUTTING-OFF TO SIZE cw # 25 cw # 27 100 100 SHELLS PREPARATION: ROLLING cw # 27 100 100 SHELLS LONGITUDINAL TACK-WELD 100 100 SHELLS LONGITUDINAL CONTINUOUS-WELD 100 100 SHELLS CALIBRATION 100 100 SHELLS N.D.T. BY 10% X-RAY EXAMINATION 100 100 Acc. to the last Report FLANGES FABRICATION : 100 100 FLANGE-SEGMENTS CUTTING-OFF cw # 25 cw # 27 100 100 FLANGE-SEGMENTS-MACHINING 100 100 FLANGE-SEGMENTS-WELDING 100 100 FLANGES-FLATTENING + STRESS RELEAVING 100 100 FLANGES N.D.T. BY U. S. -EXAMINATION 100 100 Acc. to the last Report 3 SHELLS + FLANGES: TACK + COMPLETE-WELDING,STRESS RELEAVING 100 100 FLANGES TACK-WELDED ON SHELLS 100 100 FLANGES COMPLETELY WELDED ON SHELLS 100 100 OVERALL STRESS RELEAVING 100 100 4 C.N.C. -1 -FOR FLANGES + SHELLS: 100 100 C.N.C. -1 -FOR FLANGE HOLES : MARKING, INDEXING, DRILLING, 100 100 -FOR SHELL -HOLLES : MARKING, DRILLING , BORING 100 100 5 MACHINING EXTERNALS + INTERNALS 100 100 WELDING EXTERNALS + INTERNALS 100 100 6 C.N.C. -2 - FOR BOSSES -REAMING cw # 30 cw # 31 100 100 WELDS CORRECTIONS + .Q.C. BY D.P.-N.D.T 100 100 TECHNOS' S. S. FREE ISSUED ITEMS AT 30 DAYS AFTER P. O. MGS-S.S. F.I.I. June 21 2007 cw # 27 100 100 Departure from France 7 HYDROTEST 100 100 Mo.9/10/2007 INTERNAL BLASTING 100 100 8 RUBBER-LINNING + RUBBER-TEST IN ANTICOROSIV 3mm 100 100 Rubber Test EXTERNAL BLASTING 100 100 Fri.9/28/2007.cw39 9 OUTSIDE PAINTING 100 100 Primer-coat only TECHNOS' FREE ISSUED ITEMS AT 45 DAYS BEFORE F. INSP. Grids + Vortex June 30 2007 cw # 32 100 100 Departure from France 10 ASSEMBLING INTERNALS + EXTERNALS: S.S.GRIDS+VORTEX, S.S.PIPES 100 100 C.W. # 41 II RECIRCULATION UNIT FABRICATION: BASE-PLATE CUTTING-OFF: STEEL-SHEET + PROFILES 100 LIFTING-LUGS MACHINING + WELDING 100 BASE-PLATE BLASTING 100 BASE-PLATE PAINTING Rotec request for 100 Technos accept for black-colour III BALL-COLLECTOR FABRICATION: 100 BALL-COLLECTOR CUTTING-OFF N.D.250 mm 100 BALL-COLLECTOR MACHINING 100 BALL-COLLECTOR TACK, COMPLETE WELDING 100 BALL-COLLECTOR X-RAY N.D.T.EXAM 100 BALL-COLLECTOR HYDROTEST INTERNAL BLASTING 100 Mo.9/10/2007 BALL-COLLECTOR INTERNAL RUBBER LINNING 3mm 100 Rubber Test BALL-COLLECTOR EXTERNAL PAINTING 100 Fri.9/28/2007.cw39 BALL-COLLECTOR ASSEMBLING 100 RECIRCULATION UNIT ASSEMBLING WITH BALL-COLLECTOR + F. I. I. 100 C.W. # 41 IV BALL-DISTRIBUTOR FABRICATION: 100 BALL-DISTRIBUTOR CUTTING-OFF, MACHINING, WELDING 100 BALL-DISTRIBUTOR HYDROSTATIC TEST, BLASTING ( 1-4"+ 2-3" ) 100 Mo.9/10/2007 BALL-DISTRIBUTOR INTERNAL RUBBER-LINNING 3mm 100 Rubber Test BALL-DISTRIBUTOR EXTERNAL BLASTING, PAINTING 100 Fri.9/28/2007.cw39 V BALL-INJECTORS PREPARATION: 100 BALL-INJECTORS : WELDING S.S. FLANGES ON S.S. TUBES 100 GENERAL ASSEMBLING FOR F. R. T. 100 FACTORY RUNNING TEST - HOLD POINT IN Q. C. P. Alain Monseur October.15.2007 October.19.2007 Client Inspection Th10/18/2007.cw42 FINAL WORKSHOP INSPECTION -END OF MANUFACTURING REPORT 100 PACKING, MARKING, LABELLING 50 EX-WORKS -DELIVERY -PLANNED DATE 0 Tuesday,Oct.23.2007,c.w.#43 F. CA. DELIVERY 0 TEC ASSISTANCE IN ROTEC :