© 2008 Prentice-Hall, Inc.
Chapter 7
To accompany
Quantitative Analysis for Management, Tenth Edition,
by Render, Stair, and Hanna
Power Point slides created by Jeff Heyl
Linear Programming Models:
Graphical and Computer
Methods
© 2009 Prentice-Hall, Inc.
© 2009 Prentice-Hall, Inc. 7 – 2
Introduction
 Many management decisions involve trying to
make the most effective use of limited resources
 Machinery, labor, money, time, warehouse space, raw
materials
 Linear programming (LP) is a widely used
mathematical modeling technique designed to
help managers in planning and decision making
relative to resource allocation
 Belongs to the broader field of mathematical
programming
 In this sense, programming refers to modeling and
solving a problem mathematically
© 2009 Prentice-Hall, Inc. 7 – 3
Requirements of a Linear
Programming Problem
 LP has been applied in many areas over the past
50 years
 All LP problems have 4 properties in common
1. All problems seek to maximize or minimize some
quantity (the objective function)
2. The presence of restrictions or constraints that limit the
degree to which we can pursue our objective
3. There must be alternative courses of action to choose
from
4. The objective and constraints in problems must be
expressed in terms of linear equations or inequalities
© 2009 Prentice-Hall, Inc. 7 – 4
LP Properties and Assumptions
PROPERTIES OF LINEAR PROGRAMS
1. One objective function
2. One or more constraints
3. Alternative courses of action
4. Objective function and constraints are linear
ASSUMPTIONS OF LP
1. Certainty
2. Proportionality
3. Additivity
4. Divisibility
5. Nonnegative variables
Table 7.1
© 2009 Prentice-Hall, Inc. 7 – 5
Basic Assumptions of LP
 We assume conditions of certainty exist and
numbers in the objective and constraints are
known with certainty and do not change during
the period being studied
 We assume proportionality exists in the objective
and constraints
 We assume additivity in that the total of all
activities equals the sum of the individual
activities
 We assume divisibility in that solutions need not
be whole numbers
 All answers or variables are nonnegative
© 2009 Prentice-Hall, Inc. 7 – 6
Formulating LP Problems
 Formulating a linear program involves developing
a mathematical model to represent the managerial
problem
 The steps in formulating a linear program are
1. Completely understand the managerial
problem being faced
2. Identify the objective and constraints
3. Define the decision variables
4. Use the decision variables to write
mathematical expressions for the objective
function and the constraints
© 2009 Prentice-Hall, Inc. 7 – 7
Formulating LP Problems
 One of the most common LP applications is the
product mix problem
 Two or more products are produced using
limited resources such as personnel, machines,
and raw materials
 The profit that the firm seeks to maximize is
based on the profit contribution per unit of each
product
 The company would like to determine how
many units of each product it should produce
so as to maximize overall profit given its limited
resources
© 2009 Prentice-Hall, Inc. 7 – 8
Flair Furniture Company
 The Flair Furniture Company produces
inexpensive tables and chairs
 Processes are similar in that both require a certain
amount of hours of carpentry work and in the
painting and varnishing department
 Each table takes 4 hours of carpentry and 2 hours
of painting and varnishing
 Each chair requires 3 of carpentry and 1 hour of
painting and varnishing
 There are 240 hours of carpentry time available
and 100 hours of painting and varnishing
 Each table yields a profit of $70 and each chair a
profit of $50
© 2009 Prentice-Hall, Inc. 7 – 9
Flair Furniture Company
 The company wants to determine the best
combination of tables and chairs to produce to
reach the maximum profit
HOURS REQUIRED TO
PRODUCE 1 UNIT
DEPARTMENT
(T)
TABLES
(C)
CHAIRS
AVAILABLE HOURS
THIS WEEK
Carpentry 4 3 240
Painting and varnishing 2 1 100
Profit per unit $70 $50
Table 7.2
© 2009 Prentice-Hall, Inc. 7 – 10
Flair Furniture Company
 The objective is to
Maximize profit
 The constraints are
1. The hours of carpentry time used cannot
exceed 240 hours per week
2. The hours of painting and varnishing time
used cannot exceed 100 hours per week
 The decision variables representing the actual
decisions we will make are
T = number of tables to be produced per week
C = number of chairs to be produced per week
© 2009 Prentice-Hall, Inc. 7 – 11
Flair Furniture Company
 We create the LP objective function in terms of T
and C
Maximize profit = $70T + $50C
 Develop mathematical relationships for the two
constraints
 For carpentry, total time used is
(4 hours per table)(Number of tables produced)
+ (3 hours per chair)(Number of chairs produced)
 We know that
Carpentry time used ≤ Carpentry time available
4T + 3C ≤ 240 (hours of carpentry time)
© 2009 Prentice-Hall, Inc. 7 – 12
Flair Furniture Company
 Similarly
Painting and varnishing time used
≤ Painting and varnishing time available
2 T + 1C ≤ 100 (hours of painting and varnishing time)
This means that each table produced
requires two hours of painting and
varnishing time
 Both of these constraints restrict production
capacity and affect total profit
© 2009 Prentice-Hall, Inc. 7 – 13
Flair Furniture Company
 The values for T and C must be nonnegative
T ≥ 0 (number of tables produced is greater
than or equal to 0)
C ≥ 0 (number of chairs produced is greater
than or equal to 0)
 The complete problem stated mathematically
Maximize profit = $70T + $50C
subject to
4T + 3C ≤ 240 (carpentry constraint)
2T + 1C ≤ 100 (painting and varnishing constraint)
T, C ≥ 0 (nonnegativity constraint)
© 2009 Prentice-Hall, Inc. 7 – 14
Cycle Trends is introducing two new lightweight bicycle
frames, the Deluxe and the Professional, to be made from
aluminum and steel alloys. The anticipated unit profits are $10
for the Deluxe and $15 for the Professional.
The number of pounds of each alloy needed per frame is
summarized on the table. A supplier delivers 100 pounds of the
aluminum alloy and 80 pounds of the steel alloy weekly. How
many Deluxe and Professional frames should Cycle Trends
produce each week?
Pounds of each alloy needed per frame
1- Example: LP Formulation
Aluminum Alloy Steel Alloy
Deluxe 2 3
Professional 4 2
© 2009 Prentice-Hall, Inc. 7 – 15
Montana Wood Products manufacturers two-
high quality products, tables and chairs. Its profit is
$15 per chair and $21 per table. Weekly production is
constrained by available labor and wood. Each chair
requires 4 labor hours and 8 board feet of wood while
each table requires 3 labor hours and 12 board feet of
wood. Available wood is 2400 board feet and available
labor is 920 hours. Management also requires at least
40 tables and at least 4 chairs be produced for every
table produced. To maximize profits, how many chairs
and tables should be produced?
2- Example: LP Formulation
© 2009 Prentice-Hall, Inc. 7 – 16
The Sureset Concrete Company produces
concrete. Two ingredients in concrete are sand (costs
$6 per ton) and gravel (costs $8 per ton). Sand and
gravel together must make up exactly 75% of the
weight of the concrete. Also, no more than 40% of the
concrete can be sand and at least 30% of the concrete
be gravel. Each day 2000 tons of concrete are
produced. To minimize costs, how many tons of gravel
and sand should be purchased each day?
3- Example: LP Formulation
© 2009 Prentice-Hall, Inc. 7 – 17
A company produces two products that are processed on two
assembly lines. Assembly line 1 has 100 available hours, and
assembly line 2 has 42 available hours. Each product requires
10 hours of processing time on line 1, while on line 2 product
1 requires 7 hours and product 2 requires 3 hours. The profit
for product 1 is $6 per unit, and the profit for product 2 is $4
per unit.
Formulate a linear programming model for this problem.
4- Example: LP Formulation
© 2009 Prentice-Hall, Inc. 7 – 18
A California grower has a 50-acre farm on which to plant
strawberries and tomatoes. The grower has available 300 hours of
labor per week and 800 tons of fertilizer, and he has contracted for
shipping space for a maximum of 26 acres' worth of strawberries
and 37 acres' worth of tomatoes. An acre of strawberries requires
10 hours of labor and 8 tons of fertilizer, whereas an acre of
tomatoes requires 3 hours of labor and 20 tons of fertilizer. The
profit from an acre of strawberries is $400, and the profit from an
acre of tomatoes is $300. The farmer wants to know the number of
acres of strawberries and tomatoes to plant to maximize profit.
Formulate a linear programming model for this problem.
5- Example: LP Formulation

More Related Content

What's hot

Queuing model
Queuing model Queuing model
Queuing model goyalrama
 
History of Operations Research
History of Operations ResearchHistory of Operations Research
History of Operations ResearchKarishma Chaudhary
 
Linear programming - Model formulation, Graphical Method
Linear programming  - Model formulation, Graphical MethodLinear programming  - Model formulation, Graphical Method
Linear programming - Model formulation, Graphical MethodJoseph Konnully
 
HURST, AMY. THE MAKER REVOLUTION-! DIY ASSISTIVE TECHNOLOGY AND MAKING “MAKI...
HURST, AMY.  THE MAKER REVOLUTION-! DIY ASSISTIVE TECHNOLOGY AND MAKING “MAKI...HURST, AMY.  THE MAKER REVOLUTION-! DIY ASSISTIVE TECHNOLOGY AND MAKING “MAKI...
HURST, AMY. THE MAKER REVOLUTION-! DIY ASSISTIVE TECHNOLOGY AND MAKING “MAKI...Alex Goldstein
 
Operation research and its application
Operation research and its applicationOperation research and its application
Operation research and its applicationpriya sinha
 
Curves And Surfaces Representation And Application
Curves And Surfaces Representation And ApplicationCurves And Surfaces Representation And Application
Curves And Surfaces Representation And ApplicationDiaa ElKott
 
11 Operation System Design And Planning
11 Operation System Design And Planning11 Operation System Design And Planning
11 Operation System Design And PlanningDhimas kasep
 
Transportation Modelling - Quantitative Analysis and Discrete Maths
Transportation Modelling - Quantitative Analysis and Discrete MathsTransportation Modelling - Quantitative Analysis and Discrete Maths
Transportation Modelling - Quantitative Analysis and Discrete MathsKrupesh Shah
 
Business Process Re-Engineering by ADITI WALIA
Business Process Re-Engineering by ADITI WALIABusiness Process Re-Engineering by ADITI WALIA
Business Process Re-Engineering by ADITI WALIAAditi Walia
 
applications of operation research in business
applications of operation research in businessapplications of operation research in business
applications of operation research in businessraaz kumar
 
Work study and method study
Work study and method studyWork study and method study
Work study and method studyNitin Gulgulia
 
Operation research (definition, phases)
Operation research (definition, phases)Operation research (definition, phases)
Operation research (definition, phases)DivyaKS12
 
Brown and gibson model sv
Brown and gibson model svBrown and gibson model sv
Brown and gibson model svSai Vinod
 
Industrial Engineering unit 5. Facility Design Notes by badebhau.
Industrial Engineering unit 5. Facility Design Notes by badebhau.Industrial Engineering unit 5. Facility Design Notes by badebhau.
Industrial Engineering unit 5. Facility Design Notes by badebhau.Er. Bade Bhausaheb
 
Industrial engineering and management
Industrial engineering and managementIndustrial engineering and management
Industrial engineering and managementShaikh Zubair
 
Operation research techniques
Operation research techniquesOperation research techniques
Operation research techniquesRodixon94
 

What's hot (20)

Queuing model
Queuing model Queuing model
Queuing model
 
History of Operations Research
History of Operations ResearchHistory of Operations Research
History of Operations Research
 
Goal Programming
Goal ProgrammingGoal Programming
Goal Programming
 
Linear programming - Model formulation, Graphical Method
Linear programming  - Model formulation, Graphical MethodLinear programming  - Model formulation, Graphical Method
Linear programming - Model formulation, Graphical Method
 
HURST, AMY. THE MAKER REVOLUTION-! DIY ASSISTIVE TECHNOLOGY AND MAKING “MAKI...
HURST, AMY.  THE MAKER REVOLUTION-! DIY ASSISTIVE TECHNOLOGY AND MAKING “MAKI...HURST, AMY.  THE MAKER REVOLUTION-! DIY ASSISTIVE TECHNOLOGY AND MAKING “MAKI...
HURST, AMY. THE MAKER REVOLUTION-! DIY ASSISTIVE TECHNOLOGY AND MAKING “MAKI...
 
Operation research and its application
Operation research and its applicationOperation research and its application
Operation research and its application
 
6. assignment problems
6. assignment problems6. assignment problems
6. assignment problems
 
Curves And Surfaces Representation And Application
Curves And Surfaces Representation And ApplicationCurves And Surfaces Representation And Application
Curves And Surfaces Representation And Application
 
11 Operation System Design And Planning
11 Operation System Design And Planning11 Operation System Design And Planning
11 Operation System Design And Planning
 
Transportation Modelling - Quantitative Analysis and Discrete Maths
Transportation Modelling - Quantitative Analysis and Discrete MathsTransportation Modelling - Quantitative Analysis and Discrete Maths
Transportation Modelling - Quantitative Analysis and Discrete Maths
 
Business Process Re-Engineering by ADITI WALIA
Business Process Re-Engineering by ADITI WALIABusiness Process Re-Engineering by ADITI WALIA
Business Process Re-Engineering by ADITI WALIA
 
applications of operation research in business
applications of operation research in businessapplications of operation research in business
applications of operation research in business
 
Work study and method study
Work study and method studyWork study and method study
Work study and method study
 
Operation research (definition, phases)
Operation research (definition, phases)Operation research (definition, phases)
Operation research (definition, phases)
 
Earned Value Analysis
Earned Value AnalysisEarned Value Analysis
Earned Value Analysis
 
Brown and gibson model sv
Brown and gibson model svBrown and gibson model sv
Brown and gibson model sv
 
Industrial Engineering unit 5. Facility Design Notes by badebhau.
Industrial Engineering unit 5. Facility Design Notes by badebhau.Industrial Engineering unit 5. Facility Design Notes by badebhau.
Industrial Engineering unit 5. Facility Design Notes by badebhau.
 
Industrial engineering and management
Industrial engineering and managementIndustrial engineering and management
Industrial engineering and management
 
Maximisation problem
Maximisation problemMaximisation problem
Maximisation problem
 
Operation research techniques
Operation research techniquesOperation research techniques
Operation research techniques
 

Similar to 2 linear programming

Graphical Method_LPP(QA-Render-052021) (1).pptx
Graphical Method_LPP(QA-Render-052021) (1).pptxGraphical Method_LPP(QA-Render-052021) (1).pptx
Graphical Method_LPP(QA-Render-052021) (1).pptxdhakalgopal
 
Productivity,competitiveness,strategy
Productivity,competitiveness,strategyProductivity,competitiveness,strategy
Productivity,competitiveness,strategyRaffaelChristopherCa
 
Exam 3 Extra Problems1 Formulating the Production Planning.docx
Exam 3 Extra Problems1 Formulating the Production Planning.docxExam 3 Extra Problems1 Formulating the Production Planning.docx
Exam 3 Extra Problems1 Formulating the Production Planning.docxcravennichole326
 
Operation research ppt chapter two mitku
Operation research ppt   chapter two mitkuOperation research ppt   chapter two mitku
Operation research ppt chapter two mitkumitku assefa
 
Dye House Projectonly
Dye House ProjectonlyDye House Projectonly
Dye House ProjectonlySanjaya Khs
 
Mba i qt unit-1.3_linear programming in om
Mba i qt unit-1.3_linear programming in omMba i qt unit-1.3_linear programming in om
Mba i qt unit-1.3_linear programming in omRai University
 
Bba 3274 qm week 8 linear programming
Bba 3274 qm week 8 linear programmingBba 3274 qm week 8 linear programming
Bba 3274 qm week 8 linear programmingStephen Ong
 
Linear programming
Linear programmingLinear programming
Linear programminggoogle
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraintsEka Darmadi
 

Similar to 2 linear programming (20)

$$Chapter 7 BD
$$Chapter 7 BD$$Chapter 7 BD
$$Chapter 7 BD
 
Graphical Method_LPP(QA-Render-052021) (1).pptx
Graphical Method_LPP(QA-Render-052021) (1).pptxGraphical Method_LPP(QA-Render-052021) (1).pptx
Graphical Method_LPP(QA-Render-052021) (1).pptx
 
Productivity,competitiveness,strategy
Productivity,competitiveness,strategyProductivity,competitiveness,strategy
Productivity,competitiveness,strategy
 
Exam 3 Extra Problems1 Formulating the Production Planning.docx
Exam 3 Extra Problems1 Formulating the Production Planning.docxExam 3 Extra Problems1 Formulating the Production Planning.docx
Exam 3 Extra Problems1 Formulating the Production Planning.docx
 
_LPP.pdf
_LPP.pdf_LPP.pdf
_LPP.pdf
 
Operation research ppt chapter two mitku
Operation research ppt   chapter two mitkuOperation research ppt   chapter two mitku
Operation research ppt chapter two mitku
 
Decision Making Process
Decision Making ProcessDecision Making Process
Decision Making Process
 
DonnerCompany
DonnerCompanyDonnerCompany
DonnerCompany
 
Dye House Projectonly
Dye House ProjectonlyDye House Projectonly
Dye House Projectonly
 
Chap002t.ppt
Chap002t.pptChap002t.ppt
Chap002t.ppt
 
Mba i qt unit-1.3_linear programming in om
Mba i qt unit-1.3_linear programming in omMba i qt unit-1.3_linear programming in om
Mba i qt unit-1.3_linear programming in om
 
Pomppt
PompptPomppt
Pomppt
 
Lecture27 linear programming
Lecture27 linear programmingLecture27 linear programming
Lecture27 linear programming
 
Bba 3274 qm week 8 linear programming
Bba 3274 qm week 8 linear programmingBba 3274 qm week 8 linear programming
Bba 3274 qm week 8 linear programming
 
LINEAR OPTIMIZATION
LINEAR OPTIMIZATIONLINEAR OPTIMIZATION
LINEAR OPTIMIZATION
 
Linear programming
Linear programmingLinear programming
Linear programming
 
Slides for ch07
Slides for ch07Slides for ch07
Slides for ch07
 
Linear programming
Linear programmingLinear programming
Linear programming
 
Ees 300
Ees 300Ees 300
Ees 300
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 

More from Dronak Sahu

Simplex method concept,
Simplex method concept,Simplex method concept,
Simplex method concept,Dronak Sahu
 
Farm credit appraisal techniques,
Farm credit appraisal techniques,Farm credit appraisal techniques,
Farm credit appraisal techniques,Dronak Sahu
 
3 R's OF CREDIT ANALYSIS
3 R's OF CREDIT ANALYSIS3 R's OF CREDIT ANALYSIS
3 R's OF CREDIT ANALYSISDronak Sahu
 
RURAL MARKETING
RURAL MARKETING RURAL MARKETING
RURAL MARKETING Dronak Sahu
 
SUPPLY CHAIN MANAGEMENT
SUPPLY CHAIN MANAGEMENTSUPPLY CHAIN MANAGEMENT
SUPPLY CHAIN MANAGEMENTDronak Sahu
 
CROP INSURANCE SCHEME
CROP INSURANCE SCHEMECROP INSURANCE SCHEME
CROP INSURANCE SCHEMEDronak Sahu
 
Natural resources 1
Natural resources 1Natural resources 1
Natural resources 1Dronak Sahu
 
Market failures in natural resource management
Market failures in natural resource managementMarket failures in natural resource management
Market failures in natural resource managementDronak Sahu
 
case study of agricultural project
case study of agricultural project case study of agricultural project
case study of agricultural project Dronak Sahu
 
VALUATION OF RENEWABLE NATURAL RESOURES
VALUATION OF RENEWABLE NATURAL RESOURESVALUATION OF RENEWABLE NATURAL RESOURES
VALUATION OF RENEWABLE NATURAL RESOURESDronak Sahu
 
SELF HELF GROUP
SELF HELF GROUP SELF HELF GROUP
SELF HELF GROUP Dronak Sahu
 

More from Dronak Sahu (20)

Simplex method concept,
Simplex method concept,Simplex method concept,
Simplex method concept,
 
Farm credit appraisal techniques,
Farm credit appraisal techniques,Farm credit appraisal techniques,
Farm credit appraisal techniques,
 
3 R's OF CREDIT ANALYSIS
3 R's OF CREDIT ANALYSIS3 R's OF CREDIT ANALYSIS
3 R's OF CREDIT ANALYSIS
 
RURAL MARKETING
RURAL MARKETING RURAL MARKETING
RURAL MARKETING
 
DECISION MAKING
DECISION MAKINGDECISION MAKING
DECISION MAKING
 
GAME THEORY
GAME THEORYGAME THEORY
GAME THEORY
 
SUPPLY CHAIN MANAGEMENT
SUPPLY CHAIN MANAGEMENTSUPPLY CHAIN MANAGEMENT
SUPPLY CHAIN MANAGEMENT
 
CROP INSURANCE SCHEME
CROP INSURANCE SCHEMECROP INSURANCE SCHEME
CROP INSURANCE SCHEME
 
Nabard
NabardNabard
Nabard
 
Oligopoly
OligopolyOligopoly
Oligopoly
 
Nabard
NabardNabard
Nabard
 
National income
National incomeNational income
National income
 
game THEORY ppt
game THEORY pptgame THEORY ppt
game THEORY ppt
 
NABARD
NABARDNABARD
NABARD
 
Natural resources 1
Natural resources 1Natural resources 1
Natural resources 1
 
National income
National incomeNational income
National income
 
Market failures in natural resource management
Market failures in natural resource managementMarket failures in natural resource management
Market failures in natural resource management
 
case study of agricultural project
case study of agricultural project case study of agricultural project
case study of agricultural project
 
VALUATION OF RENEWABLE NATURAL RESOURES
VALUATION OF RENEWABLE NATURAL RESOURESVALUATION OF RENEWABLE NATURAL RESOURES
VALUATION OF RENEWABLE NATURAL RESOURES
 
SELF HELF GROUP
SELF HELF GROUP SELF HELF GROUP
SELF HELF GROUP
 

Recently uploaded

Log your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignLog your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignHenry Tapper
 
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Roomdivyansh0kumar0
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfGale Pooley
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfAdnet Communications
 
Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]Commonwealth
 
How Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of ReportingHow Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of ReportingAggregage
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptxFinTech Belgium
 
Quarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingQuarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingMaristelaRamos12
 
The Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfThe Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfGale Pooley
 
Malad Call Girl in Services 9892124323 | ₹,4500 With Room Free Delivery
Malad Call Girl in Services  9892124323 | ₹,4500 With Room Free DeliveryMalad Call Girl in Services  9892124323 | ₹,4500 With Room Free Delivery
Malad Call Girl in Services 9892124323 | ₹,4500 With Room Free DeliveryPooja Nehwal
 
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikHigh Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...ssifa0344
 
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...Suhani Kapoor
 
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...ssifa0344
 
Instant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School DesignsInstant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School Designsegoetzinger
 
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Pooja Nehwal
 
Q3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesQ3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesMarketing847413
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptxFinTech Belgium
 

Recently uploaded (20)

Log your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignLog your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaign
 
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
 
The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdf
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdf
 
Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]
 
How Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of ReportingHow Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of Reporting
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx
 
Quarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingQuarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of Marketing
 
The Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfThe Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdf
 
Malad Call Girl in Services 9892124323 | ₹,4500 With Room Free Delivery
Malad Call Girl in Services  9892124323 | ₹,4500 With Room Free DeliveryMalad Call Girl in Services  9892124323 | ₹,4500 With Room Free Delivery
Malad Call Girl in Services 9892124323 | ₹,4500 With Room Free Delivery
 
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikHigh Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
 
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
 
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
 
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
 
Instant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School DesignsInstant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School Designs
 
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
 
Q3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesQ3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast Slides
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx
 

2 linear programming

  • 1. © 2008 Prentice-Hall, Inc. Chapter 7 To accompany Quantitative Analysis for Management, Tenth Edition, by Render, Stair, and Hanna Power Point slides created by Jeff Heyl Linear Programming Models: Graphical and Computer Methods © 2009 Prentice-Hall, Inc.
  • 2. © 2009 Prentice-Hall, Inc. 7 – 2 Introduction  Many management decisions involve trying to make the most effective use of limited resources  Machinery, labor, money, time, warehouse space, raw materials  Linear programming (LP) is a widely used mathematical modeling technique designed to help managers in planning and decision making relative to resource allocation  Belongs to the broader field of mathematical programming  In this sense, programming refers to modeling and solving a problem mathematically
  • 3. © 2009 Prentice-Hall, Inc. 7 – 3 Requirements of a Linear Programming Problem  LP has been applied in many areas over the past 50 years  All LP problems have 4 properties in common 1. All problems seek to maximize or minimize some quantity (the objective function) 2. The presence of restrictions or constraints that limit the degree to which we can pursue our objective 3. There must be alternative courses of action to choose from 4. The objective and constraints in problems must be expressed in terms of linear equations or inequalities
  • 4. © 2009 Prentice-Hall, Inc. 7 – 4 LP Properties and Assumptions PROPERTIES OF LINEAR PROGRAMS 1. One objective function 2. One or more constraints 3. Alternative courses of action 4. Objective function and constraints are linear ASSUMPTIONS OF LP 1. Certainty 2. Proportionality 3. Additivity 4. Divisibility 5. Nonnegative variables Table 7.1
  • 5. © 2009 Prentice-Hall, Inc. 7 – 5 Basic Assumptions of LP  We assume conditions of certainty exist and numbers in the objective and constraints are known with certainty and do not change during the period being studied  We assume proportionality exists in the objective and constraints  We assume additivity in that the total of all activities equals the sum of the individual activities  We assume divisibility in that solutions need not be whole numbers  All answers or variables are nonnegative
  • 6. © 2009 Prentice-Hall, Inc. 7 – 6 Formulating LP Problems  Formulating a linear program involves developing a mathematical model to represent the managerial problem  The steps in formulating a linear program are 1. Completely understand the managerial problem being faced 2. Identify the objective and constraints 3. Define the decision variables 4. Use the decision variables to write mathematical expressions for the objective function and the constraints
  • 7. © 2009 Prentice-Hall, Inc. 7 – 7 Formulating LP Problems  One of the most common LP applications is the product mix problem  Two or more products are produced using limited resources such as personnel, machines, and raw materials  The profit that the firm seeks to maximize is based on the profit contribution per unit of each product  The company would like to determine how many units of each product it should produce so as to maximize overall profit given its limited resources
  • 8. © 2009 Prentice-Hall, Inc. 7 – 8 Flair Furniture Company  The Flair Furniture Company produces inexpensive tables and chairs  Processes are similar in that both require a certain amount of hours of carpentry work and in the painting and varnishing department  Each table takes 4 hours of carpentry and 2 hours of painting and varnishing  Each chair requires 3 of carpentry and 1 hour of painting and varnishing  There are 240 hours of carpentry time available and 100 hours of painting and varnishing  Each table yields a profit of $70 and each chair a profit of $50
  • 9. © 2009 Prentice-Hall, Inc. 7 – 9 Flair Furniture Company  The company wants to determine the best combination of tables and chairs to produce to reach the maximum profit HOURS REQUIRED TO PRODUCE 1 UNIT DEPARTMENT (T) TABLES (C) CHAIRS AVAILABLE HOURS THIS WEEK Carpentry 4 3 240 Painting and varnishing 2 1 100 Profit per unit $70 $50 Table 7.2
  • 10. © 2009 Prentice-Hall, Inc. 7 – 10 Flair Furniture Company  The objective is to Maximize profit  The constraints are 1. The hours of carpentry time used cannot exceed 240 hours per week 2. The hours of painting and varnishing time used cannot exceed 100 hours per week  The decision variables representing the actual decisions we will make are T = number of tables to be produced per week C = number of chairs to be produced per week
  • 11. © 2009 Prentice-Hall, Inc. 7 – 11 Flair Furniture Company  We create the LP objective function in terms of T and C Maximize profit = $70T + $50C  Develop mathematical relationships for the two constraints  For carpentry, total time used is (4 hours per table)(Number of tables produced) + (3 hours per chair)(Number of chairs produced)  We know that Carpentry time used ≤ Carpentry time available 4T + 3C ≤ 240 (hours of carpentry time)
  • 12. © 2009 Prentice-Hall, Inc. 7 – 12 Flair Furniture Company  Similarly Painting and varnishing time used ≤ Painting and varnishing time available 2 T + 1C ≤ 100 (hours of painting and varnishing time) This means that each table produced requires two hours of painting and varnishing time  Both of these constraints restrict production capacity and affect total profit
  • 13. © 2009 Prentice-Hall, Inc. 7 – 13 Flair Furniture Company  The values for T and C must be nonnegative T ≥ 0 (number of tables produced is greater than or equal to 0) C ≥ 0 (number of chairs produced is greater than or equal to 0)  The complete problem stated mathematically Maximize profit = $70T + $50C subject to 4T + 3C ≤ 240 (carpentry constraint) 2T + 1C ≤ 100 (painting and varnishing constraint) T, C ≥ 0 (nonnegativity constraint)
  • 14. © 2009 Prentice-Hall, Inc. 7 – 14 Cycle Trends is introducing two new lightweight bicycle frames, the Deluxe and the Professional, to be made from aluminum and steel alloys. The anticipated unit profits are $10 for the Deluxe and $15 for the Professional. The number of pounds of each alloy needed per frame is summarized on the table. A supplier delivers 100 pounds of the aluminum alloy and 80 pounds of the steel alloy weekly. How many Deluxe and Professional frames should Cycle Trends produce each week? Pounds of each alloy needed per frame 1- Example: LP Formulation Aluminum Alloy Steel Alloy Deluxe 2 3 Professional 4 2
  • 15. © 2009 Prentice-Hall, Inc. 7 – 15 Montana Wood Products manufacturers two- high quality products, tables and chairs. Its profit is $15 per chair and $21 per table. Weekly production is constrained by available labor and wood. Each chair requires 4 labor hours and 8 board feet of wood while each table requires 3 labor hours and 12 board feet of wood. Available wood is 2400 board feet and available labor is 920 hours. Management also requires at least 40 tables and at least 4 chairs be produced for every table produced. To maximize profits, how many chairs and tables should be produced? 2- Example: LP Formulation
  • 16. © 2009 Prentice-Hall, Inc. 7 – 16 The Sureset Concrete Company produces concrete. Two ingredients in concrete are sand (costs $6 per ton) and gravel (costs $8 per ton). Sand and gravel together must make up exactly 75% of the weight of the concrete. Also, no more than 40% of the concrete can be sand and at least 30% of the concrete be gravel. Each day 2000 tons of concrete are produced. To minimize costs, how many tons of gravel and sand should be purchased each day? 3- Example: LP Formulation
  • 17. © 2009 Prentice-Hall, Inc. 7 – 17 A company produces two products that are processed on two assembly lines. Assembly line 1 has 100 available hours, and assembly line 2 has 42 available hours. Each product requires 10 hours of processing time on line 1, while on line 2 product 1 requires 7 hours and product 2 requires 3 hours. The profit for product 1 is $6 per unit, and the profit for product 2 is $4 per unit. Formulate a linear programming model for this problem. 4- Example: LP Formulation
  • 18. © 2009 Prentice-Hall, Inc. 7 – 18 A California grower has a 50-acre farm on which to plant strawberries and tomatoes. The grower has available 300 hours of labor per week and 800 tons of fertilizer, and he has contracted for shipping space for a maximum of 26 acres' worth of strawberries and 37 acres' worth of tomatoes. An acre of strawberries requires 10 hours of labor and 8 tons of fertilizer, whereas an acre of tomatoes requires 3 hours of labor and 20 tons of fertilizer. The profit from an acre of strawberries is $400, and the profit from an acre of tomatoes is $300. The farmer wants to know the number of acres of strawberries and tomatoes to plant to maximize profit. Formulate a linear programming model for this problem. 5- Example: LP Formulation