SlideShare a Scribd company logo
1 of 1
Download to read offline
FrameworkYOUR QUARTERLY NEWSLETTER FROM DEESIDE TIMBERFRAME
Palace Studio Management Limited awarded
Deeside with the contract in January 2015
to design, supply and erect the timber frame
for Palace Studios, to transform the historic
building into student accommodation in the
heart of Huddersfield. This unique project
involved creating a timer frame structure
within the existing building to maximise space
and design layouts whilst staying true to the
We are delighted to work again with Wates Living Space at their new development in Newton
Mearns, East Renfrewshire. With over 40 apartments this development is ideal for our timber
frame solutions to meet budgets and on site deadlines. We are providing our Ecotf closed panel
fast track build system on site and full installation process for QSH’s flagship development.
Look out for our case study on this project coming soon.
DeesideTimberframearecontinuingto
makeprogressthrough2015despite
thechallengingconditionsandpressure
frommaterialandlabourincreases.We
havesecuredanumberofnewcustomers
inthefirsthalfofthisyearwhichwill
augmentourexistingloyalcustomerbase
acrossScotlandandnorthernEngland
whichourdedicatedteamsatStonehaven
andThroskworkhardtomaintain.
Wemustrecognisethatthemarketplace
ischallengingandthatgovernmentand
industrybodieshavetofurthertheir
effortstohelpusmaintainourpositions.
Thank you to all our customers
and suppliers for their support
and business throughout 2015
and also a warm welcome to our
new staff members. Our enhanced
team reinforces our commitment
to customer service and continued
business growth.
We wish you an enjoyable Christmas
and prosperous New Year.
WELCOME TO FRAMEWORK -
DEESIDE TIMBERFRAME’S
QUARTERLY NEWSLETTER TO
KEEP YOU UP-TO-DATE WITH
OUR LATEST NEWS, PRODUCT
DEVELOPMENT AND INDUSTRY
ADVANCEMENTS.
Deeside
News
The Perfect Restoration
Wates Living Space
Issue 07
SPECIAL
PROJECT
John Wright
Managing Director
Merry Christmas and a
Happy New Year from Deeside
£8.5mDEVELOPMENT
110 units,
over 6 storeys,
each 980 sqm.
fabric of the current building. We supplied
and erected all internal walls, fire stops to all
panels, stairwells, and staircases. A feature of
this project were the cassette floors which
all had to be craned in using a tower crane
in specific sequence and guided between
existing steel purling’s and Mayvis structural
tie system. Look out for our case study on
this project coming soon.
We continue to work with some of Scotland’s most recognised house builders to deliver a range
of high quality specification homes, delivering timber frame solutions for large luxury detached,
semi-detached and terraced homes and apartment blocks.
Building Homes in Scotland
CALA HOMES, ABERDEEN
•	 Dubford - 65 units of 2 	
	 storey, 4 & 5 bed homes
•	 Balgownie - 39 units, 	
	 mix of 3 - 5 bed homes, 3 	
	 bed affordable and 3 storey 	
	apartments
•	 Cults - 98 units 4 & 5 bed 	
	 homes and 12 apartments
SCOTIA, (NORTH)
ABERDEEN
•	 Dubford - 115 units of 71 	
	 houses and 44 apartments
•	 Charleston - 251 units 	
	 of 127 houses and 124 	
	apartments
ALLANWATER
DEVELOPMENTS
•	 Carnock Rd, Dunfermline 	
	 - 43 units of 2, 3, 4, & 5 	
	 bedroom homes
•	 Oaktree Gardens, Alloa
	 - 77 units of 2, 3, 4, & 5 	
	 bedroom homes
FIND US ONLINE:
Deeside
Team News
We would like to welcome our new staff
to the team at Deeside. We have created
new roles within design, sales and
accounts and extend a special welcome
to our two new apprentices at Deeside
which highlights our commitment to
attracting and developing young talent
into the business and industry.
Chris Smollet
Trainee Surveyor
& Estimator
Nick Ball
Business Development
Manager South & M62
Neil Rennie
Apprentice Design
Technician
Marie McCusker
Accounts Assistant
Cameron Halliday
Apprentice Design
Technician
Martin Johnston
Design Technician
George McQueen
Self Build Sales
The Deeside team is pleased to continue our
working relationship with Cruden Building &
Renewals at Ogilvie St in Glasgow and Fernhill
Road, Rutherglen, supplying full structural
timber frame packages and installation on site.
The Ogilvie St development in Glasgow started
in March ‘15 and comprises of 45 apartments
within 3 storey blocks.
Developing With Cruden
Fernhill St, Rutherglen is a development of 50
semi-detached and terraced homes for South
Lanarkshire Council, started in March ‘15.
We are on track for completion and will update
you in our next newsletter issue.
We celebrated our 40 year anniversary in
October at The Aberdeen Beach Ballroom,
a fitting venue with historic architecture.
The full Bancon Group attended with over
300 guests.
Celebrating
40 Years
In Style
Search ‘Deeside Timberframe Ltd’www.deesidetimberframe.com
We value your opinion and feedback
so please stay in touch and offer
any feedback on any of our
products or latest news. Email David
Jamieson at david.jamieson@
deesidetimberframe.com or call
01569 767123 or 07501 466575.
Want to discover more?
Visit our website to download our
company profile, latest Case Studies
and read more about the key benefits
of timber frame. Visit
www.deesidetimberframe.com
Stay In
Touch
Deeside Timberframe supplied and erected 2 of the blocks for the 165 room development
in Newcastle with Brims Construction. Working alongside the contractor and architect we
have provided full structural design, supply and erect package to include fire mitigation.
We have worked closely with the development team to design, manufacture and erect
our timber frame solution, including erecting large panels via cranes on site.
Student Living in Newcastle
The build of a cutting edge new school in Braidwood, Motherwell commenced in January ‘15,
with timber kit erection in July ‘15 and kit completion in September ‘15. Deeside supplied and
installed specialised FJI wall panels and Glulam beams whilst the roof construction consisted of
metal web cassettes, which were craned onto site.
New Build School
Narrow Lane, Gwynedd in Wales is set to be
completed in January 2016. The site is being
built by Beech Developments and consists of 2,
3 and 4 bedroom detached and semi-detached
homes. Working closely with the architects and
client we ensured delivery of 6 units per month
ready for sale, across 10 different house types.
The kit, including open web joist cassettes were
manufactured at our Stirling factory. Installation
by the DTL Team took place on site.
Build on track
in Wales
UPDATE
FROM
ISSUE 06

More Related Content

What's hot (8)

Brainridge2
Brainridge2Brainridge2
Brainridge2
 
Abergeldie Marine
Abergeldie MarineAbergeldie Marine
Abergeldie Marine
 
Brick Masonry Commercial Construction Stilwell Kansas 816-500-4198
Brick Masonry Commercial Construction Stilwell Kansas 816-500-4198Brick Masonry Commercial Construction Stilwell Kansas 816-500-4198
Brick Masonry Commercial Construction Stilwell Kansas 816-500-4198
 
This is Thorverton Stone Company
This is Thorverton Stone CompanyThis is Thorverton Stone Company
This is Thorverton Stone Company
 
Barn Sweet Home--Customkit Buildings
Barn Sweet Home--Customkit BuildingsBarn Sweet Home--Customkit Buildings
Barn Sweet Home--Customkit Buildings
 
HISTORIC FOUNTAIN RESTORATION COMPANY MEMPHIS TN
HISTORIC FOUNTAIN RESTORATION COMPANY MEMPHIS TNHISTORIC FOUNTAIN RESTORATION COMPANY MEMPHIS TN
HISTORIC FOUNTAIN RESTORATION COMPANY MEMPHIS TN
 
Queens University Project Showreel
Queens University Project ShowreelQueens University Project Showreel
Queens University Project Showreel
 
Scott Resume
Scott ResumeScott Resume
Scott Resume
 

Viewers also liked

SUN-AIR In-flight magazine-no_3_2016
SUN-AIR In-flight magazine-no_3_2016SUN-AIR In-flight magazine-no_3_2016
SUN-AIR In-flight magazine-no_3_2016Mette Bertelsen
 
10_Pittsburgh_Mercy_Pulse_October_2015_Vol._ 6,_No_10
10_Pittsburgh_Mercy_Pulse_October_2015_Vol._ 6,_No_1010_Pittsburgh_Mercy_Pulse_October_2015_Vol._ 6,_No_10
10_Pittsburgh_Mercy_Pulse_October_2015_Vol._ 6,_No_10Terrence Brown
 
Sun-air technic 6 sider 21x21 cm_17_05
Sun-air technic 6 sider 21x21 cm_17_05Sun-air technic 6 sider 21x21 cm_17_05
Sun-air technic 6 sider 21x21 cm_17_05Mette Bertelsen
 
Genre The Slave TradeFinal
Genre  The Slave TradeFinalGenre  The Slave TradeFinal
Genre The Slave TradeFinalVera Saunders
 
Shine My Life
Shine My LifeShine My Life
Shine My LifeSakir7860
 

Viewers also liked (10)

SUN-AIR In-flight magazine-no_3_2016
SUN-AIR In-flight magazine-no_3_2016SUN-AIR In-flight magazine-no_3_2016
SUN-AIR In-flight magazine-no_3_2016
 
10_Pittsburgh_Mercy_Pulse_October_2015_Vol._ 6,_No_10
10_Pittsburgh_Mercy_Pulse_October_2015_Vol._ 6,_No_1010_Pittsburgh_Mercy_Pulse_October_2015_Vol._ 6,_No_10
10_Pittsburgh_Mercy_Pulse_October_2015_Vol._ 6,_No_10
 
Marie-Claire Shayes
Marie-Claire ShayesMarie-Claire Shayes
Marie-Claire Shayes
 
Sun-air technic 6 sider 21x21 cm_17_05
Sun-air technic 6 sider 21x21 cm_17_05Sun-air technic 6 sider 21x21 cm_17_05
Sun-air technic 6 sider 21x21 cm_17_05
 
Genre The Slave TradeFinal
Genre  The Slave TradeFinalGenre  The Slave TradeFinal
Genre The Slave TradeFinal
 
Shine My Life
Shine My LifeShine My Life
Shine My Life
 
Mision sena
Mision senaMision sena
Mision sena
 
Babar -1
Babar -1Babar -1
Babar -1
 
CaseStudy-Beech
CaseStudy-BeechCaseStudy-Beech
CaseStudy-Beech
 
CaseStudy-Brimms
CaseStudy-BrimmsCaseStudy-Brimms
CaseStudy-Brimms
 

Similar to 16386 DEESIDE NEWSLETTER 24.11.15

Mastercrafts residential portfolio
Mastercrafts residential portfolioMastercrafts residential portfolio
Mastercrafts residential portfolioMicheál O'Kane
 
High-end refurbishment contractor in London.
High-end refurbishment contractor in London.High-end refurbishment contractor in London.
High-end refurbishment contractor in London.Mariusz Gawecki
 
2014-6 Colorado Group Project Profile
2014-6 Colorado Group Project Profile2014-6 Colorado Group Project Profile
2014-6 Colorado Group Project ProfileDavid Hunt
 
Angelo_Hellawell_CV_January 15
Angelo_Hellawell_CV_January 15Angelo_Hellawell_CV_January 15
Angelo_Hellawell_CV_January 15Angelo Hellawell
 
STANDOUT_PROJECTS - QLD email
STANDOUT_PROJECTS - QLD emailSTANDOUT_PROJECTS - QLD email
STANDOUT_PROJECTS - QLD emailLyndrea McGregor
 
Lascocrete Concrete Solutions
Lascocrete Concrete Solutions Lascocrete Concrete Solutions
Lascocrete Concrete Solutions NelonPty
 
Lascocrete product brochure_2020_digital
Lascocrete product brochure_2020_digitalLascocrete product brochure_2020_digital
Lascocrete product brochure_2020_digitalNelonPty
 
Macdonell Williams - Architecture, sustainability & design
Macdonell Williams - Architecture, sustainability & designMacdonell Williams - Architecture, sustainability & design
Macdonell Williams - Architecture, sustainability & designMacdonellWilliams
 
SCA BROCHURE 2016
SCA BROCHURE 2016SCA BROCHURE 2016
SCA BROCHURE 2016Nic Raath
 
Joinery. Some of our recent prestige projects.
Joinery. Some of our recent prestige projects.Joinery. Some of our recent prestige projects.
Joinery. Some of our recent prestige projects.Micheál O'Kane
 
May Newsletter 2016
May Newsletter 2016May Newsletter 2016
May Newsletter 2016Chris Lamb
 
Wabi Cabins & Villas
Wabi Cabins & VillasWabi Cabins & Villas
Wabi Cabins & VillasGretaMack
 
Combination Club_Redrow_Oct 15
Combination Club_Redrow_Oct 15Combination Club_Redrow_Oct 15
Combination Club_Redrow_Oct 15Ron O'Connor
 
PS Presentation April 16
PS Presentation April 16PS Presentation April 16
PS Presentation April 16Damian McColgan
 
Octink interiors & shopfitting
Octink interiors & shopfittingOctink interiors & shopfitting
Octink interiors & shopfittingRoss Hodgson
 
Yorkshire Presentation
Yorkshire PresentationYorkshire Presentation
Yorkshire Presentationsebasquinteros
 

Similar to 16386 DEESIDE NEWSLETTER 24.11.15 (20)

Mastercrafts residential portfolio
Mastercrafts residential portfolioMastercrafts residential portfolio
Mastercrafts residential portfolio
 
High-end refurbishment contractor in London.
High-end refurbishment contractor in London.High-end refurbishment contractor in London.
High-end refurbishment contractor in London.
 
JG Molloy Brochure - Building On Our Reputation
JG Molloy Brochure - Building On Our ReputationJG Molloy Brochure - Building On Our Reputation
JG Molloy Brochure - Building On Our Reputation
 
2014-6 Colorado Group Project Profile
2014-6 Colorado Group Project Profile2014-6 Colorado Group Project Profile
2014-6 Colorado Group Project Profile
 
Pure Fitout 2019 Brochure
Pure Fitout 2019 BrochurePure Fitout 2019 Brochure
Pure Fitout 2019 Brochure
 
Angelo_Hellawell_CV_January 15
Angelo_Hellawell_CV_January 15Angelo_Hellawell_CV_January 15
Angelo_Hellawell_CV_January 15
 
STANDOUT_PROJECTS - QLD email
STANDOUT_PROJECTS - QLD emailSTANDOUT_PROJECTS - QLD email
STANDOUT_PROJECTS - QLD email
 
Lascocrete Concrete Solutions
Lascocrete Concrete Solutions Lascocrete Concrete Solutions
Lascocrete Concrete Solutions
 
Lascocrete product brochure_2020_digital
Lascocrete product brochure_2020_digitalLascocrete product brochure_2020_digital
Lascocrete product brochure_2020_digital
 
Qube B&M
Qube B&MQube B&M
Qube B&M
 
Macdonell Williams - Architecture, sustainability & design
Macdonell Williams - Architecture, sustainability & designMacdonell Williams - Architecture, sustainability & design
Macdonell Williams - Architecture, sustainability & design
 
Newsletter - Connect Sep15
Newsletter - Connect Sep15Newsletter - Connect Sep15
Newsletter - Connect Sep15
 
SCA BROCHURE 2016
SCA BROCHURE 2016SCA BROCHURE 2016
SCA BROCHURE 2016
 
Joinery. Some of our recent prestige projects.
Joinery. Some of our recent prestige projects.Joinery. Some of our recent prestige projects.
Joinery. Some of our recent prestige projects.
 
May Newsletter 2016
May Newsletter 2016May Newsletter 2016
May Newsletter 2016
 
Wabi Cabins & Villas
Wabi Cabins & VillasWabi Cabins & Villas
Wabi Cabins & Villas
 
Combination Club_Redrow_Oct 15
Combination Club_Redrow_Oct 15Combination Club_Redrow_Oct 15
Combination Club_Redrow_Oct 15
 
PS Presentation April 16
PS Presentation April 16PS Presentation April 16
PS Presentation April 16
 
Octink interiors & shopfitting
Octink interiors & shopfittingOctink interiors & shopfitting
Octink interiors & shopfitting
 
Yorkshire Presentation
Yorkshire PresentationYorkshire Presentation
Yorkshire Presentation
 

16386 DEESIDE NEWSLETTER 24.11.15

  • 1. FrameworkYOUR QUARTERLY NEWSLETTER FROM DEESIDE TIMBERFRAME Palace Studio Management Limited awarded Deeside with the contract in January 2015 to design, supply and erect the timber frame for Palace Studios, to transform the historic building into student accommodation in the heart of Huddersfield. This unique project involved creating a timer frame structure within the existing building to maximise space and design layouts whilst staying true to the We are delighted to work again with Wates Living Space at their new development in Newton Mearns, East Renfrewshire. With over 40 apartments this development is ideal for our timber frame solutions to meet budgets and on site deadlines. We are providing our Ecotf closed panel fast track build system on site and full installation process for QSH’s flagship development. Look out for our case study on this project coming soon. DeesideTimberframearecontinuingto makeprogressthrough2015despite thechallengingconditionsandpressure frommaterialandlabourincreases.We havesecuredanumberofnewcustomers inthefirsthalfofthisyearwhichwill augmentourexistingloyalcustomerbase acrossScotlandandnorthernEngland whichourdedicatedteamsatStonehaven andThroskworkhardtomaintain. Wemustrecognisethatthemarketplace ischallengingandthatgovernmentand industrybodieshavetofurthertheir effortstohelpusmaintainourpositions. Thank you to all our customers and suppliers for their support and business throughout 2015 and also a warm welcome to our new staff members. Our enhanced team reinforces our commitment to customer service and continued business growth. We wish you an enjoyable Christmas and prosperous New Year. WELCOME TO FRAMEWORK - DEESIDE TIMBERFRAME’S QUARTERLY NEWSLETTER TO KEEP YOU UP-TO-DATE WITH OUR LATEST NEWS, PRODUCT DEVELOPMENT AND INDUSTRY ADVANCEMENTS. Deeside News The Perfect Restoration Wates Living Space Issue 07 SPECIAL PROJECT John Wright Managing Director Merry Christmas and a Happy New Year from Deeside £8.5mDEVELOPMENT 110 units, over 6 storeys, each 980 sqm. fabric of the current building. We supplied and erected all internal walls, fire stops to all panels, stairwells, and staircases. A feature of this project were the cassette floors which all had to be craned in using a tower crane in specific sequence and guided between existing steel purling’s and Mayvis structural tie system. Look out for our case study on this project coming soon. We continue to work with some of Scotland’s most recognised house builders to deliver a range of high quality specification homes, delivering timber frame solutions for large luxury detached, semi-detached and terraced homes and apartment blocks. Building Homes in Scotland CALA HOMES, ABERDEEN • Dubford - 65 units of 2 storey, 4 & 5 bed homes • Balgownie - 39 units, mix of 3 - 5 bed homes, 3 bed affordable and 3 storey apartments • Cults - 98 units 4 & 5 bed homes and 12 apartments SCOTIA, (NORTH) ABERDEEN • Dubford - 115 units of 71 houses and 44 apartments • Charleston - 251 units of 127 houses and 124 apartments ALLANWATER DEVELOPMENTS • Carnock Rd, Dunfermline - 43 units of 2, 3, 4, & 5 bedroom homes • Oaktree Gardens, Alloa - 77 units of 2, 3, 4, & 5 bedroom homes FIND US ONLINE: Deeside Team News We would like to welcome our new staff to the team at Deeside. We have created new roles within design, sales and accounts and extend a special welcome to our two new apprentices at Deeside which highlights our commitment to attracting and developing young talent into the business and industry. Chris Smollet Trainee Surveyor & Estimator Nick Ball Business Development Manager South & M62 Neil Rennie Apprentice Design Technician Marie McCusker Accounts Assistant Cameron Halliday Apprentice Design Technician Martin Johnston Design Technician George McQueen Self Build Sales The Deeside team is pleased to continue our working relationship with Cruden Building & Renewals at Ogilvie St in Glasgow and Fernhill Road, Rutherglen, supplying full structural timber frame packages and installation on site. The Ogilvie St development in Glasgow started in March ‘15 and comprises of 45 apartments within 3 storey blocks. Developing With Cruden Fernhill St, Rutherglen is a development of 50 semi-detached and terraced homes for South Lanarkshire Council, started in March ‘15. We are on track for completion and will update you in our next newsletter issue. We celebrated our 40 year anniversary in October at The Aberdeen Beach Ballroom, a fitting venue with historic architecture. The full Bancon Group attended with over 300 guests. Celebrating 40 Years In Style Search ‘Deeside Timberframe Ltd’www.deesidetimberframe.com We value your opinion and feedback so please stay in touch and offer any feedback on any of our products or latest news. Email David Jamieson at david.jamieson@ deesidetimberframe.com or call 01569 767123 or 07501 466575. Want to discover more? Visit our website to download our company profile, latest Case Studies and read more about the key benefits of timber frame. Visit www.deesidetimberframe.com Stay In Touch Deeside Timberframe supplied and erected 2 of the blocks for the 165 room development in Newcastle with Brims Construction. Working alongside the contractor and architect we have provided full structural design, supply and erect package to include fire mitigation. We have worked closely with the development team to design, manufacture and erect our timber frame solution, including erecting large panels via cranes on site. Student Living in Newcastle The build of a cutting edge new school in Braidwood, Motherwell commenced in January ‘15, with timber kit erection in July ‘15 and kit completion in September ‘15. Deeside supplied and installed specialised FJI wall panels and Glulam beams whilst the roof construction consisted of metal web cassettes, which were craned onto site. New Build School Narrow Lane, Gwynedd in Wales is set to be completed in January 2016. The site is being built by Beech Developments and consists of 2, 3 and 4 bedroom detached and semi-detached homes. Working closely with the architects and client we ensured delivery of 6 units per month ready for sale, across 10 different house types. The kit, including open web joist cassettes were manufactured at our Stirling factory. Installation by the DTL Team took place on site. Build on track in Wales UPDATE FROM ISSUE 06