18 0 0 . 7 8 2 . 1 5 0 0 | W I L L S C O T. C O M
Modular Building Solutions
Turn-key space solutions that revolve around you.
2 M O D U L A R B U I L D I N G S O L U T I O N S
Williams Scotsman has been a leader in modular
construction, transforming the industry and changing
the way buildings are constructed. With industry-leading
experts empowered with a global perspective, a focus on
high quality and a commitment to exceptional customer
service, Williams Scotsman delivers turn-key space
solutions that revolve around you.
For more than 50 years
Marysville School District
MARYSVILLE, WASHINGTON
2 M O D U L A R B U I L D I N G S O L U T I O N S
38 0 0 . 7 8 2 . 1 5 0 0 | W I L L S C O T. C O M
Local Presence, Global Scale
“ We chose Williams Scotsman based on
their get-it-done attitude, experience,
and level of professionalism. I have
recommended Williams Scotsman to
several other people without hesitation.”
ART STONE, FACILITIES COORDINATOR
Prestonwood Christian Academy
3
Williams Scotsman offers modular space solutions for the
construction, education, energy, industrial, commercial/retail,
healthcare, and government markets, with operations in
the United States, Mexico, and Canada. We serve our
customer’s needs for space through a network of nearly
100 branch locations. In addition to our core leasing business,
our Modular Building group manages and develops large
permanent modular construction projects from concept
to completion.
Williams Scotsman is part of Algeco Scotsman, a leading
global business services provider focused on modular
space and portable storage solutions. The group operates
a fleet of more than 340,000 units in 38 countries, making
it the global leader for mobile space, modular buildings,
storage containers, and rental accommodations.
Our combined legacy is grounded in product innovation,
our commitment to customers, effective management of
business operations, and our ability to attract and retain
the industry’s most talented staff and management team.
Balancing these core values, we focus on service to
customers, professional growth of colleagues, and the
profitability and financial health of our company.
4 M O D U L A R B U I L D I N G S O L U T I O N S
Modular Versus Traditional Construction
Across all industries, developers must find innovative ways to meet space needs cost-effectively and within strict timeframes.
Whether you seek to expand current facilities or add new standalone structures to accommodate shifting space requirements,
modular construction is an outstanding and increasingly popular choice. Modular means easier and faster construction.
And when you can occupy your building faster than with conventional construction methods, it means you start producing
revenue more quickly.
Concurrent Construction™ Traditional Construction
Concurrent Construction™ enables occupancy up to
50% faster than conventional construction, since the
construction stages occur simultaneously
Linear construction requires each stage of the construction
process to be complete prior to proceeding
Controlled manufacturing processes and superior
workmanship result in superior quality
Potential for inconsistent quality due to weather delays and
variances in workmanship
Decreased on-site construction reduces overall disruption
to your business
On-going construction activities for the extended life of a
site built project
Temporary and permanent applications Permanent applications
Same construction materials and building code compliance Same construction materials and building code compliance
Design and pricing teams work closely, reducing the
propensity for change orders
Separate architects handling pricing and design creates a
potential for multiple change orders
The Benefits
of Modular
Construction
SPEED
1
QUALITY
2
FLEXIBILITY
3
SUSTAINABILITY
4
4
58 0 0 . 7 8 2 . 1 5 0 0 | W I L L S C O T. C O M
DESIGN ENGINEERING SITE PREPARATION CONSTRUCTION
DESIGN ENGINEERING SITE PREPARATION UP TO 50% TIME SAVINGS
FABRICATION INSTALLATION
Traditional Construction
Concurrent Construction™ - Nearly Half the Time
The Concurrent Construction™ Process
Our Concurrent Construction™ process is an accelerated construction method that allows you to occupy your building faster, saving time and money. Unlike the linear process used with
conventional construction, Concurrent Construction enables construction stages to occur simultaneously rather than in sequence. As a result, site work and off-site construction of the building
happen at the same time, which cuts the construction timeline in half.
DAY 1 DAY 40 DAY 70 DAY 110
6 M O D U L A R B U I L D I N G S O L U T I O N S
Educational facilities span a broad range of building types
– from classrooms, libraries and laboratories to childcare
centers, administrative offices and college residence halls.
Modular buildings provide flexibility and can help create an
academic environment at a fraction of the cost and time
of conventional construction methods. Whether you’re
faced with accommodating growing student populations
or require a new high-tech computer center, we have the
solution.
Education
1. High Tech High Chula Vista, MBI Award Winner 2010
2. Shoreline, MBI Award Winner 2009
3. Grove Elementary School
4. Funtime Childhood Development Center, MBI Award Winner 2010
Projects
1
2
3
4
78 0 0 . 7 8 2 . 1 5 0 0 | W I L L S C O T. C O M
Revenue generation is critical to any business. The faster
you occupy your space, the faster you generate revenue.
Our modular space solutions give you the retail space you
need, when you need it- providing improved cash flow
and better service to customers. In addition, modular
construction provides the flexibility to expand, downsize
or relocate centers as needs change. Whether you need
to open a fully equipped banking center, a new commer-
cial office, or to establish a franchise coffee house location,
our Concurrent Construction™ process affords the flex-
ibility to build a wide range of commercial applications.
Commercial Retail
1. Potomac Shores Welcome Center, MBI Award Winner 2014
2. Potomac Shores Welcome Center, MBI Award Winner 2014
3. John Wieland Homes, Inc, MBI Award Winner 2010
4. Bramasole Properties Temporary Office
Projects
1
2
3
4
8 M O D U L A R B U I L D I N G S O L U T I O N S
Modular construction helps healthcare providers expand and
offer uninterrupted services to their patients. Whether it’s
providing temporary swing space while existing facilities
are being renovated or creating permanent outpatient
clinics on campus, our experience in the design, con-
struction and installation of healthcare facilities spans a
broad variety of building types. From dialysis facilities to
diagnostic imaging centers, emergency rooms to critical
access centers, we incorporate best practices in therapeutic
environmental design. Our healthcare facilities meet the
ever-changing needs of the healthcare community by
providing fast, flexible solutions.
Healthcare
1. WIC Center, MBI Award Winner 2011
2. South Cameron Memorial Hospital, MBI Award Winner 2009
3. Davita Dialysis Treatment Center
4. National Naval Medical Center, MBI Award Winner 2010
Projects
1
2
3
4
98 0 0 . 7 8 2 . 1 5 0 0 | W I L L S C O T. C O M
Research and development efforts require considerable
investments of time, talent and funding. That’s why it’s
essential the space you dedicate to RD is up to the task.
You can depend on our expertise to provide the highly
specialized, fully equipped facilities critical to the success of
your RD efforts. Whether you need a modular laboratory
for clinical testing, a clean room for your research facility
or a pharmaceutical facility that meets rigorous government
standards, our modular space solutions allow you to
quickly and cost-effectively establish a state-of-the-art
RD facility.
Research and Development
1. NIEHS, MBI Award Winner 2009
2. NIEHS, MBI Award Winner 2009
3. Ortho Pharmaceuticals
4. E.I. DuPont
Projects
1
2
3
4
10 M O D U L A R B U I L D I N G S O L U T I O N S
We understand the federal government’s demands for
a quality space solution that adheres to strict budget and
time constraints. Our team has the experience and industry
expertise to fully meet federal agencies’ space needs
during expansion, new building construction or disaster
relief. Whether accommodating the needs of service
members and their families or restoring vital community
facilities in the aftermath of a natural disaster, our modular
buildings provide a solution that result in a faster time to
occupancy and provides maximum flexibility. Our modular
space solutions are available under the General Services
Administration Federal Supply contract to help simplify
procurement.
Federal Government
1. VA Polytrauma Center
2. Fort Stewart Unit Operations Facility
3. Camp Pendleton, MBI Award Winner 2011
4. Fort Belvoir Government Office, MBI Award Winner 2006
Projects
1
2
3
4
118 0 0 . 7 8 2 . 1 5 0 0 | W I L L S C O T. C O M
State/Local government space requirements truly run the
gamut – from establishing a multi-story law enforcement
headquarters or fire department to creating a state-of-
the-art public library. Our modular buildings are an ideal
solution for new government construction, building
renovations or expansions because they utilize an innova-
tive accelerated building process to meet crucial timelines
quickly and affordably. Whether you need space to support
infrastructure and transportation projects or need to
establish additional public safety buildings, we have a long
history of providing modular facilities to state government
and local municipalities for a variety of civic applications.
Local Government
1. Trenton Police Department, MBI Award Winner 2008
2. Philomath Police Department
3. Ocean Shores Fire Department
4. County of Walla Walla Public Safety Building
Projects
1
2
3
4
12 M O D U L A R B U I L D I N G S O L U T I O N S
From the level of overall design, to custom interior
finishes and exterior profiles, each of our buildings are as
unique as the client we build them for. Industry leaders
such as Pfizer, Boeing, General Motors, Northrop Grum-
man and Dupont have all turned to Williams Scotsman for
building solutions.
We’re easy to do business with.
High Tech High Chula Vista
SAN DIEGO, CALIFORNIA
12 M O D U L A R B U I L D I N G S O L U T I O N S
138 0 0 . 7 8 2 . 1 5 0 0 | W I L L S C O T. C O M
“ The Williams Scotsman team made me feel
as if our project was a priority and exceeded
the project’s stated goals.”
CHRISTOPHER GERBER, DIRECTOR OF FACILITIES
High Tech High Chula Vista
In-house project management: We’re able to serve
as the general contractor on your job to make sure all
project details are closely monitored from initial site work
to occupancy.
Turn-key construction services: Our staff is expe-
rienced in providing turn-key services that allow you
to quickly and easily occupy your building with minimal
disruption to your daily operations.
Space planning: Our team has broad experience planning
highly efficient work spaces, which can save you both time
and money on costly engineering fees.
Consultation: We have extensive expertise and will
guide you on ways to maximize the visual and practical
appeal of your modular building while complementing
other existing structures in the surrounding area.
Permit expediting: Our long-standing experience in
the industry means we have the permitting knowledge to
navigate the regulatory agencies to get the job done.
Data communications, fire and security: We’ll work
with you to assess all data communications requirements
as well as the specific fire safety and security features for
your building.
Excavating, paving and landscaping: We’ll assist
in the work required to prepare the site for your new
modular building, including ingress/egress issues, parking
planning, grading recommendations and landscape ideas.
Complete design flexibility: Our design/CADD
professionals will work with you to create the perfect
floor plan and assure optimal creativity in design as well
as sustainability.
Assurance: We are licensed general contractors
in several states and are held to a higher standard.
This ensures your modular building meets or exceeds
all applicable codes and standards.
Financing options: We’ll help you evaluate your indi-
vidual space and financial requirements and determine
the best solution for you.
Our experienced staff offers a variety of services throughout the entire construction process:
13
Turn-key space solutions that revolve around you.
800.782.1500 | willscot.com
W I LLI A M S SCO T S M A N, I NC. CO R PO R AT E HE A DQUARTERS
901 S Bond Street Suite 600 • Baltimore, MD • 21231

14-0002030_2014_MB_Brochure (3)

  • 1.
    18 0 0. 7 8 2 . 1 5 0 0 | W I L L S C O T. C O M Modular Building Solutions Turn-key space solutions that revolve around you.
  • 2.
    2 M OD U L A R B U I L D I N G S O L U T I O N S Williams Scotsman has been a leader in modular construction, transforming the industry and changing the way buildings are constructed. With industry-leading experts empowered with a global perspective, a focus on high quality and a commitment to exceptional customer service, Williams Scotsman delivers turn-key space solutions that revolve around you. For more than 50 years Marysville School District MARYSVILLE, WASHINGTON 2 M O D U L A R B U I L D I N G S O L U T I O N S
  • 3.
    38 0 0. 7 8 2 . 1 5 0 0 | W I L L S C O T. C O M Local Presence, Global Scale “ We chose Williams Scotsman based on their get-it-done attitude, experience, and level of professionalism. I have recommended Williams Scotsman to several other people without hesitation.” ART STONE, FACILITIES COORDINATOR Prestonwood Christian Academy 3 Williams Scotsman offers modular space solutions for the construction, education, energy, industrial, commercial/retail, healthcare, and government markets, with operations in the United States, Mexico, and Canada. We serve our customer’s needs for space through a network of nearly 100 branch locations. In addition to our core leasing business, our Modular Building group manages and develops large permanent modular construction projects from concept to completion. Williams Scotsman is part of Algeco Scotsman, a leading global business services provider focused on modular space and portable storage solutions. The group operates a fleet of more than 340,000 units in 38 countries, making it the global leader for mobile space, modular buildings, storage containers, and rental accommodations. Our combined legacy is grounded in product innovation, our commitment to customers, effective management of business operations, and our ability to attract and retain the industry’s most talented staff and management team. Balancing these core values, we focus on service to customers, professional growth of colleagues, and the profitability and financial health of our company.
  • 4.
    4 M OD U L A R B U I L D I N G S O L U T I O N S Modular Versus Traditional Construction Across all industries, developers must find innovative ways to meet space needs cost-effectively and within strict timeframes. Whether you seek to expand current facilities or add new standalone structures to accommodate shifting space requirements, modular construction is an outstanding and increasingly popular choice. Modular means easier and faster construction. And when you can occupy your building faster than with conventional construction methods, it means you start producing revenue more quickly. Concurrent Construction™ Traditional Construction Concurrent Construction™ enables occupancy up to 50% faster than conventional construction, since the construction stages occur simultaneously Linear construction requires each stage of the construction process to be complete prior to proceeding Controlled manufacturing processes and superior workmanship result in superior quality Potential for inconsistent quality due to weather delays and variances in workmanship Decreased on-site construction reduces overall disruption to your business On-going construction activities for the extended life of a site built project Temporary and permanent applications Permanent applications Same construction materials and building code compliance Same construction materials and building code compliance Design and pricing teams work closely, reducing the propensity for change orders Separate architects handling pricing and design creates a potential for multiple change orders The Benefits of Modular Construction SPEED 1 QUALITY 2 FLEXIBILITY 3 SUSTAINABILITY 4 4
  • 5.
    58 0 0. 7 8 2 . 1 5 0 0 | W I L L S C O T. C O M DESIGN ENGINEERING SITE PREPARATION CONSTRUCTION DESIGN ENGINEERING SITE PREPARATION UP TO 50% TIME SAVINGS FABRICATION INSTALLATION Traditional Construction Concurrent Construction™ - Nearly Half the Time The Concurrent Construction™ Process Our Concurrent Construction™ process is an accelerated construction method that allows you to occupy your building faster, saving time and money. Unlike the linear process used with conventional construction, Concurrent Construction enables construction stages to occur simultaneously rather than in sequence. As a result, site work and off-site construction of the building happen at the same time, which cuts the construction timeline in half. DAY 1 DAY 40 DAY 70 DAY 110
  • 6.
    6 M OD U L A R B U I L D I N G S O L U T I O N S Educational facilities span a broad range of building types – from classrooms, libraries and laboratories to childcare centers, administrative offices and college residence halls. Modular buildings provide flexibility and can help create an academic environment at a fraction of the cost and time of conventional construction methods. Whether you’re faced with accommodating growing student populations or require a new high-tech computer center, we have the solution. Education 1. High Tech High Chula Vista, MBI Award Winner 2010 2. Shoreline, MBI Award Winner 2009 3. Grove Elementary School 4. Funtime Childhood Development Center, MBI Award Winner 2010 Projects 1 2 3 4
  • 7.
    78 0 0. 7 8 2 . 1 5 0 0 | W I L L S C O T. C O M Revenue generation is critical to any business. The faster you occupy your space, the faster you generate revenue. Our modular space solutions give you the retail space you need, when you need it- providing improved cash flow and better service to customers. In addition, modular construction provides the flexibility to expand, downsize or relocate centers as needs change. Whether you need to open a fully equipped banking center, a new commer- cial office, or to establish a franchise coffee house location, our Concurrent Construction™ process affords the flex- ibility to build a wide range of commercial applications. Commercial Retail 1. Potomac Shores Welcome Center, MBI Award Winner 2014 2. Potomac Shores Welcome Center, MBI Award Winner 2014 3. John Wieland Homes, Inc, MBI Award Winner 2010 4. Bramasole Properties Temporary Office Projects 1 2 3 4
  • 8.
    8 M OD U L A R B U I L D I N G S O L U T I O N S Modular construction helps healthcare providers expand and offer uninterrupted services to their patients. Whether it’s providing temporary swing space while existing facilities are being renovated or creating permanent outpatient clinics on campus, our experience in the design, con- struction and installation of healthcare facilities spans a broad variety of building types. From dialysis facilities to diagnostic imaging centers, emergency rooms to critical access centers, we incorporate best practices in therapeutic environmental design. Our healthcare facilities meet the ever-changing needs of the healthcare community by providing fast, flexible solutions. Healthcare 1. WIC Center, MBI Award Winner 2011 2. South Cameron Memorial Hospital, MBI Award Winner 2009 3. Davita Dialysis Treatment Center 4. National Naval Medical Center, MBI Award Winner 2010 Projects 1 2 3 4
  • 9.
    98 0 0. 7 8 2 . 1 5 0 0 | W I L L S C O T. C O M Research and development efforts require considerable investments of time, talent and funding. That’s why it’s essential the space you dedicate to RD is up to the task. You can depend on our expertise to provide the highly specialized, fully equipped facilities critical to the success of your RD efforts. Whether you need a modular laboratory for clinical testing, a clean room for your research facility or a pharmaceutical facility that meets rigorous government standards, our modular space solutions allow you to quickly and cost-effectively establish a state-of-the-art RD facility. Research and Development 1. NIEHS, MBI Award Winner 2009 2. NIEHS, MBI Award Winner 2009 3. Ortho Pharmaceuticals 4. E.I. DuPont Projects 1 2 3 4
  • 10.
    10 M OD U L A R B U I L D I N G S O L U T I O N S We understand the federal government’s demands for a quality space solution that adheres to strict budget and time constraints. Our team has the experience and industry expertise to fully meet federal agencies’ space needs during expansion, new building construction or disaster relief. Whether accommodating the needs of service members and their families or restoring vital community facilities in the aftermath of a natural disaster, our modular buildings provide a solution that result in a faster time to occupancy and provides maximum flexibility. Our modular space solutions are available under the General Services Administration Federal Supply contract to help simplify procurement. Federal Government 1. VA Polytrauma Center 2. Fort Stewart Unit Operations Facility 3. Camp Pendleton, MBI Award Winner 2011 4. Fort Belvoir Government Office, MBI Award Winner 2006 Projects 1 2 3 4
  • 11.
    118 0 0. 7 8 2 . 1 5 0 0 | W I L L S C O T. C O M State/Local government space requirements truly run the gamut – from establishing a multi-story law enforcement headquarters or fire department to creating a state-of- the-art public library. Our modular buildings are an ideal solution for new government construction, building renovations or expansions because they utilize an innova- tive accelerated building process to meet crucial timelines quickly and affordably. Whether you need space to support infrastructure and transportation projects or need to establish additional public safety buildings, we have a long history of providing modular facilities to state government and local municipalities for a variety of civic applications. Local Government 1. Trenton Police Department, MBI Award Winner 2008 2. Philomath Police Department 3. Ocean Shores Fire Department 4. County of Walla Walla Public Safety Building Projects 1 2 3 4
  • 12.
    12 M OD U L A R B U I L D I N G S O L U T I O N S From the level of overall design, to custom interior finishes and exterior profiles, each of our buildings are as unique as the client we build them for. Industry leaders such as Pfizer, Boeing, General Motors, Northrop Grum- man and Dupont have all turned to Williams Scotsman for building solutions. We’re easy to do business with. High Tech High Chula Vista SAN DIEGO, CALIFORNIA 12 M O D U L A R B U I L D I N G S O L U T I O N S
  • 13.
    138 0 0. 7 8 2 . 1 5 0 0 | W I L L S C O T. C O M “ The Williams Scotsman team made me feel as if our project was a priority and exceeded the project’s stated goals.” CHRISTOPHER GERBER, DIRECTOR OF FACILITIES High Tech High Chula Vista In-house project management: We’re able to serve as the general contractor on your job to make sure all project details are closely monitored from initial site work to occupancy. Turn-key construction services: Our staff is expe- rienced in providing turn-key services that allow you to quickly and easily occupy your building with minimal disruption to your daily operations. Space planning: Our team has broad experience planning highly efficient work spaces, which can save you both time and money on costly engineering fees. Consultation: We have extensive expertise and will guide you on ways to maximize the visual and practical appeal of your modular building while complementing other existing structures in the surrounding area. Permit expediting: Our long-standing experience in the industry means we have the permitting knowledge to navigate the regulatory agencies to get the job done. Data communications, fire and security: We’ll work with you to assess all data communications requirements as well as the specific fire safety and security features for your building. Excavating, paving and landscaping: We’ll assist in the work required to prepare the site for your new modular building, including ingress/egress issues, parking planning, grading recommendations and landscape ideas. Complete design flexibility: Our design/CADD professionals will work with you to create the perfect floor plan and assure optimal creativity in design as well as sustainability. Assurance: We are licensed general contractors in several states and are held to a higher standard. This ensures your modular building meets or exceeds all applicable codes and standards. Financing options: We’ll help you evaluate your indi- vidual space and financial requirements and determine the best solution for you. Our experienced staff offers a variety of services throughout the entire construction process: 13
  • 14.
    Turn-key space solutionsthat revolve around you. 800.782.1500 | willscot.com W I LLI A M S SCO T S M A N, I NC. CO R PO R AT E HE A DQUARTERS 901 S Bond Street Suite 600 • Baltimore, MD • 21231