SlideShare a Scribd company logo
Vision Building Solutions
Modular Construction Advantages
• Lower Interest costs. The cost of interest on a builders construction loan,which is passed
along to the ultimate buyer, can be substantial when added to the price of the structure.
Obviously, the longer the money is out before a permanent mortgage is established for the
buyer the greater the cost to the builder and ultimately the customer. Modular construction’s
timesaving versus more conventional methods of construction keeps these interest costs low.
• Modular buildings are relocatable and easily expanded. Since all modular buildings are
built and are easily transported and joined together they can be moved or expanded more easily
than more conventionally built structures.
• Faster use, faster income. Obviously, the quicker a building can be opened for use as a profit
center, the faster the owner will be receiving income from the property.
• Fewer mistakes, less costly corrections. With factory building potential errors in
construction are caught and corrected in the in the approval and manufacturing process before
they reach the jobsite.
• Optimization of materials. Due to high utilization of computer design in manufacturing,
errors in calculations and design are eliminated for optimal use of construction materials.
• Guaranteed prices. Unlike most conventional construction projects that inherently maintain
some degree of cost overruns, modular construction projects give the ultimate customers a
guaranteed package price up front when an order is formally accepted.
• Better quality materials. Even though such materials as drywall and dimensional lumber
shipped to a factory may be the same as shipped to most conventional construction job sites, on
entering the manufacturing plant, the materials are inspected for quality and stored inside until
needed.
• Guaranteed supplies. Because of the large purchasing power of manufacturing plants, when
shortages do develop in a given line of materials, the larger buyers generally get preference
over smaller ones.
Vision Building Solutions
Modular Construction Advantages
• Less pilferage. Whereas at most conventional construction sites, some material theft occurs,
with modular construction it is a bit more difficult to walk off with an entire module..
• Less weather damage. Because structures, regardless of there factory origin can be “closed-
up” or “weathered-in” much faster than site built construction, thereby reducing and often
eliminating weather damage to the structure.
• Less danger of fire. Job site construction fires continue to to cost builders millions of dollars
and higher fire insurance costs. With factory construction even a critical use of welders torches
is conducted under highly controlled conditions inside a manufacturing facility thereby
eliminating costly fire damages.
• Better Security. Job site security with modular construction also costs less because the time
before occupancy is sliced to a fraction of that with site construction. Also, a modular building
structure is “closed up” and locked faster than site built construction.
Vision Building Solutions
Modular Construction Advantages
• Less costly vandalism exposure. With modular buildings, construction time is diminished
and the buildings are constructed in secured facilities, thereby reducing the the opportunity of
costly vandalism.
• Less costly clean-up. Because the majority of the “messy jobs” are handled under controlled
conditions at the manufacturing facility, there isn’t much waste materials to dispose of at the
site.
• Less costly site inspections. Building inspectors appreciate being able to cut their site
inspection time to a minimum. With modular construction the major inspection process occur at
the manufacturing facility. With standardized methods and components, inspections of modular
buildings takes less time once again saving money for the end user,
• Tax advantages. Since modular buildings have the unique capability of being leased as
equipment instead of “fixed site” real estate, they can be depreciated over several years instead
of mortgaged property..
Vision Building Solutions
Modular Construction Advantages
• Less costly design and engineering. Because of trained architects, engineers and technicians
are utilized to help modular builders and buyers design structures utilizing computers, the high
cost of both design and engineering is cut to hours instead of days or weeks.
• Less costly materials handling. Instead of having higher wage craftsmen handle their own
materials, in a factory the materials are fed to craftsmen at each workstation along the
production line. This provides for the fastest possible installation thus saving money for the
customer.
• Less costly workers compensation and liability insurance. Fewer men at a more dangerous
site means much less cost for workers and site insurance.
•Less costly accounting and bookkeeping. The factory maintains inventory costing and
production labor accounting systems thus saving time needed by site builders who must keep
itemized details of the literally thousands of items that go into a typical structure.
Vision Building Solutions
Modular Construction Advantages
• Better Quality. Modular Builders utilize precision cutting equipment and fastening systems
which provide workmanship that is light years ahead of what can be done at the job sites. Also,
every operation in the manufacturing facility is inspected, checked for quality control, and
inspected once again by a third party inspector. Corrections are made long before the building
reaches the job site.
•There is a good secondary market for modular buildings. Since modular buildings are
relocatable and can be leased, there is good potential to re-sell or re-lease modular buildings
over the life of the structure. This allows for a greater return on investment opportunity than
most conventional structures.
Vision Building Solutions
Modular Construction Advantages
Vision Building Solutions
Floor Plan
VESTIBULE
PHONE
DATA
LOBBY
HVAC
HVAC
SALES
MANAGER
SALES
SALES
SALES
SALES
CNAC
MANAGER
LOAN
CLOSING
CNAC
VESTIBULE
CNAC
GENERAL
OFFICE
Modular partition
walls byowner
28'
6'10
21'2
66'
10"
9'4
9'4
9'4
8'6
9'4
11'2
8'2
66'
9'4 10' 4'4 5'10 11'4 6'1 5'11 12'4
10"
28'
13'8
4'
9'
Vision Building Solutions
Building Specifications
Size and Code:
27’4” x 66’
1,848 Square Feet
Type VI, Unprotected, Unsprinkled
Business Use
2002 FBC – 140 MPH Wind Code
Florida Dept. of Community Affairs
Frame:
Perimeter Steel 12” Jr. “I” Beams
Removable Hitch, Axles and Tires
Floor:
Metal Floor Joists – Sized as Required
.040 Simplex Bottom Board
Single Layer - ¾” Viroc Sub Floor
R-11 Un-Faced Insulation
1/8” Vinyl Composition Tile
26oz. Commercial Level Loop Carpet
4” Vinyl Cove Base
Exterior Walls:
2”x4” Wood Studs @ 16” On Center
Single Bottom and Double Top Plates
½” CDX Plywood Sheathing
Vinyl Housewrap Vapor Barrier
R-11 Kraft Faced Insulation
Pleko Synthetic Stucco over Hardi-Panel
Exterior Finish
1”x4” Hardi-Panel Trim
Interior Walls:
½” Vinyl Covered Gypsum Finish
w/battens throughout
R-11 Un-Faced Insulation
Roof:
¾” CDX Plywood Mateline Beams
w/20’ Maximum Span
2” x 8” Wood Rafters @ 16” On Center
½” Dens Deck Sheathing over
5/8” CDX Plywood
45mil EPDM Black Rubber Membrane
Roof Sheds to Rear for Drainage
Exposed Gutters and Downspouts
Parapet Wall of Front and Both Sides
8’ x 8’ Modular Tower above Entry Area
9’ Ceiling Height
R-19 Kraft Faced Insulation
Suspended 24” x 24” Acoustical Ceiling
Exterior Doors:
(2) 72” x 84” Commercial Storefront
(1) 36” x 84” Commercial Storefront
(1) 36” x 80” 18ga Commercial Type
Hollow Metal Door and Frame
White Finish Frames with Tinted Glass
All Locksets and Closers
Interior Doors
(8) 36” x 80” Pre-Hung Solid Core Wood
w/ Metal Frames
(4) 5” x 30” Tempered Glass View Block
All Locksets
Windows:
(6) 72” x 36” Storefront Glass
(2) 48” x 36” Storefront Glass
(1) 36” x 36” Cashier Window
¼” Tempered Glass w/White Frames
Electrical:
200amp Load Center
3 Wire 120/240V Single Phase
Copper Romex
24” x 48” 4 Tube Lay In Fluorescents
w/Parabolic Lenses
(3) Double Headed Exterior Floors
110V/15amp/20amp Receptacles
GFI Receptacles as Required
110V/20amp Switches
Dedicated Circuits – Phone/Copier
J-Boxes for Exterior Signs
J-Boxes for Data/Phones/Fire
Plumbing:
(2) Tank Type Handicap Water Closet
(2) Wall Hung Handicap Lavatory
(2) EEMAX Instant Water Heater
Stainless Steel Single Bowl Sink
Hi/Low Handicap Water Cooler
Toilet Paper Holders
In Wall Trash Receptacles
Handicap Grab Bars per Code
One Piece Fiberglass Service Sink
Exterior Hose Bibs
CPVC Supply Piping
Schedule 40 PVC DWV Piping
HVAC:
(2) 3.5 Ton Wall Hung Package Units
10 KW Heat Strips
Fiberglass Ducts w/24” x 24” Diffusers
Plenum Walls Width of Module
Manual Change Digital Thermostat
Fan/Light Combination for Restrooms
Millwork:
6’ Base/Upper Cabinets w/Countertop
10’ “L” Countertop w/2-16” Drawer Banks
3’ 18” Counter at Cashier Window
JDByriderCD.ppt
JDByriderCD.ppt
JDByriderCD.ppt
JDByriderCD.ppt
JDByriderCD.ppt
JDByriderCD.ppt
JDByriderCD.ppt
JDByriderCD.ppt
JDByriderCD.ppt
JDByriderCD.ppt
JDByriderCD.ppt
JDByriderCD.ppt
JDByriderCD.ppt
JDByriderCD.ppt
JDByriderCD.ppt
JDByriderCD.ppt
JDByriderCD.ppt
JDByriderCD.ppt
JDByriderCD.ppt
JDByriderCD.ppt
JDByriderCD.ppt
JDByriderCD.ppt

More Related Content

Similar to JDByriderCD.ppt

Offsite Construction fro Developers and Builders
Offsite Construction fro Developers and BuildersOffsite Construction fro Developers and Builders
Offsite Construction fro Developers and Builders
Matthew Egan
 
Panel Built Catalog 2015
Panel Built Catalog 2015Panel Built Catalog 2015
Panel Built Catalog 2015
Panel Built
 
Modular construction for_low_cost_housing_in_india
Modular construction for_low_cost_housing_in_indiaModular construction for_low_cost_housing_in_india
Modular construction for_low_cost_housing_in_india
Nikhil Gadkar
 
Landon mertz cerion nanomaterials
Landon mertz   cerion nanomaterialsLandon mertz   cerion nanomaterials
Landon mertz cerion nanomaterials
The Advanced Materials Show
 
System Seals Inc Mining Brochure
System Seals Inc Mining BrochureSystem Seals Inc Mining Brochure
System Seals Inc Mining BrochureJulian Webster-Gigg
 
Cut & bend rebars
Cut & bend rebarsCut & bend rebars
Cut & bend rebars
Param Saxena
 
Modern Construction Technologies
Modern Construction TechnologiesModern Construction Technologies
Modern Construction Technologies
Rahul Saraswat
 
Concrete homes intl_english_20130130(1)
Concrete homes intl_english_20130130(1)Concrete homes intl_english_20130130(1)
Concrete homes intl_english_20130130(1)TSC Global
 
Introduction to Panel Built
Introduction to Panel BuiltIntroduction to Panel Built
Introduction to Panel BuiltPanel Built
 
Accelerated Hybrid Construction for Education Facilities
Accelerated Hybrid Construction for Education FacilitiesAccelerated Hybrid Construction for Education Facilities
Accelerated Hybrid Construction for Education Facilities
Innovative Modular Solutions
 
Principle - Design Principles of Modularisation
Principle - Design Principles of ModularisationPrinciple - Design Principles of Modularisation
Principle - Design Principles of Modularisation
Principle Global
 
Koch Modular's CURT (Construction Users Round Table) Presentation
Koch Modular's CURT (Construction Users Round Table) PresentationKoch Modular's CURT (Construction Users Round Table) Presentation
Koch Modular's CURT (Construction Users Round Table) Presentation
Koch Modular Process Systems, LLC.
 
EPC world magazine oct 2014
EPC world magazine oct 2014EPC world magazine oct 2014
EPC world magazine oct 2014Param Saxena
 
Design for Manufacturability Guidelines Every Designer should Follow
Design for Manufacturability Guidelines Every Designer should FollowDesign for Manufacturability Guidelines Every Designer should Follow
Design for Manufacturability Guidelines Every Designer should Follow
DFMPro
 
Innovation technique in construction
Innovation technique in constructionInnovation technique in construction
Innovation technique in construction
School of Planning and Architecture, new delhi
 
Modular construction ppt
Modular construction pptModular construction ppt
Modular construction ppt
vaibhav Nautiyal
 
System Seals Inc Company Overview Brochure
System Seals Inc Company Overview BrochureSystem Seals Inc Company Overview Brochure
System Seals Inc Company Overview BrochureJulian Webster-Gigg
 

Similar to JDByriderCD.ppt (20)

Offsite Construction fro Developers and Builders
Offsite Construction fro Developers and BuildersOffsite Construction fro Developers and Builders
Offsite Construction fro Developers and Builders
 
Panel Built Catalog 2015
Panel Built Catalog 2015Panel Built Catalog 2015
Panel Built Catalog 2015
 
Modular construction for_low_cost_housing_in_india
Modular construction for_low_cost_housing_in_indiaModular construction for_low_cost_housing_in_india
Modular construction for_low_cost_housing_in_india
 
Landon mertz cerion nanomaterials
Landon mertz   cerion nanomaterialsLandon mertz   cerion nanomaterials
Landon mertz cerion nanomaterials
 
System Seals Inc Mining Brochure
System Seals Inc Mining BrochureSystem Seals Inc Mining Brochure
System Seals Inc Mining Brochure
 
System Seals Inc Mining Brochure
System Seals Inc Mining BrochureSystem Seals Inc Mining Brochure
System Seals Inc Mining Brochure
 
Cut & bend rebars
Cut & bend rebarsCut & bend rebars
Cut & bend rebars
 
Modern Construction Technologies
Modern Construction TechnologiesModern Construction Technologies
Modern Construction Technologies
 
Concrete homes intl_english_20130130(1)
Concrete homes intl_english_20130130(1)Concrete homes intl_english_20130130(1)
Concrete homes intl_english_20130130(1)
 
Introduction to Panel Built
Introduction to Panel BuiltIntroduction to Panel Built
Introduction to Panel Built
 
The Merits of Structural Steelwork
The Merits of Structural SteelworkThe Merits of Structural Steelwork
The Merits of Structural Steelwork
 
Accelerated Hybrid Construction for Education Facilities
Accelerated Hybrid Construction for Education FacilitiesAccelerated Hybrid Construction for Education Facilities
Accelerated Hybrid Construction for Education Facilities
 
Principle - Design Principles of Modularisation
Principle - Design Principles of ModularisationPrinciple - Design Principles of Modularisation
Principle - Design Principles of Modularisation
 
Koch Modular's CURT (Construction Users Round Table) Presentation
Koch Modular's CURT (Construction Users Round Table) PresentationKoch Modular's CURT (Construction Users Round Table) Presentation
Koch Modular's CURT (Construction Users Round Table) Presentation
 
EPC world magazine oct 2014
EPC world magazine oct 2014EPC world magazine oct 2014
EPC world magazine oct 2014
 
Design for Manufacturability Guidelines Every Designer should Follow
Design for Manufacturability Guidelines Every Designer should FollowDesign for Manufacturability Guidelines Every Designer should Follow
Design for Manufacturability Guidelines Every Designer should Follow
 
Innovation technique in construction
Innovation technique in constructionInnovation technique in construction
Innovation technique in construction
 
SSI Steel Brochure
SSI Steel BrochureSSI Steel Brochure
SSI Steel Brochure
 
Modular construction ppt
Modular construction pptModular construction ppt
Modular construction ppt
 
System Seals Inc Company Overview Brochure
System Seals Inc Company Overview BrochureSystem Seals Inc Company Overview Brochure
System Seals Inc Company Overview Brochure
 

Recently uploaded

projectreportnew-170307082323 nnnnnn(1).pdf
projectreportnew-170307082323 nnnnnn(1).pdfprojectreportnew-170307082323 nnnnnn(1).pdf
projectreportnew-170307082323 nnnnnn(1).pdf
farazahmadas6
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
fabianavillanib
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
smpc3nvg
 
Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
PlanitIsrael
 
Mohannad Abdullah portfolio _ V2 _22-24
Mohannad Abdullah  portfolio _ V2 _22-24Mohannad Abdullah  portfolio _ V2 _22-24
Mohannad Abdullah portfolio _ V2 _22-24
M. A. Architect
 
Research 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdfResearch 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdf
ameli25062005
 
vernacular architecture in response to climate.pdf
vernacular architecture in response to climate.pdfvernacular architecture in response to climate.pdf
vernacular architecture in response to climate.pdf
PrabhjeetSingh219035
 
White wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva TschoppWhite wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva Tschopp
Mansi Shah
 
Exploring the Future of Smart Garages.pdf
Exploring the Future of Smart Garages.pdfExploring the Future of Smart Garages.pdf
Exploring the Future of Smart Garages.pdf
fastfixgaragedoor
 
Let's Summon Demons Shirt Let's Summon Demons Shirt
Let's Summon Demons Shirt Let's Summon Demons ShirtLet's Summon Demons Shirt Let's Summon Demons Shirt
Let's Summon Demons Shirt Let's Summon Demons Shirt
TeeFusion
 
Can AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI preludeCan AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI prelude
Alan Dix
 
Portfolio.pdf
Portfolio.pdfPortfolio.pdf
Portfolio.pdf
garcese
 
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
7sd8fier
 
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Mansi Shah
 
Expert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting ServicesExpert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting Services
ResDraft
 
Book Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for DesignersBook Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for Designers
Confidence Ago
 
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
9a93xvy
 
Transforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting ProfitabilityTransforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting Profitability
aaryangarg12
 
Common Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid themCommon Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid them
madhavlakhanpal29
 
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
7sd8fier
 

Recently uploaded (20)

projectreportnew-170307082323 nnnnnn(1).pdf
projectreportnew-170307082323 nnnnnn(1).pdfprojectreportnew-170307082323 nnnnnn(1).pdf
projectreportnew-170307082323 nnnnnn(1).pdf
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
 
Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
 
Mohannad Abdullah portfolio _ V2 _22-24
Mohannad Abdullah  portfolio _ V2 _22-24Mohannad Abdullah  portfolio _ V2 _22-24
Mohannad Abdullah portfolio _ V2 _22-24
 
Research 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdfResearch 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdf
 
vernacular architecture in response to climate.pdf
vernacular architecture in response to climate.pdfvernacular architecture in response to climate.pdf
vernacular architecture in response to climate.pdf
 
White wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva TschoppWhite wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva Tschopp
 
Exploring the Future of Smart Garages.pdf
Exploring the Future of Smart Garages.pdfExploring the Future of Smart Garages.pdf
Exploring the Future of Smart Garages.pdf
 
Let's Summon Demons Shirt Let's Summon Demons Shirt
Let's Summon Demons Shirt Let's Summon Demons ShirtLet's Summon Demons Shirt Let's Summon Demons Shirt
Let's Summon Demons Shirt Let's Summon Demons Shirt
 
Can AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI preludeCan AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI prelude
 
Portfolio.pdf
Portfolio.pdfPortfolio.pdf
Portfolio.pdf
 
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
 
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
 
Expert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting ServicesExpert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting Services
 
Book Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for DesignersBook Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for Designers
 
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
 
Transforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting ProfitabilityTransforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting Profitability
 
Common Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid themCommon Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid them
 
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
 

JDByriderCD.ppt

  • 1. Vision Building Solutions Modular Construction Advantages • Lower Interest costs. The cost of interest on a builders construction loan,which is passed along to the ultimate buyer, can be substantial when added to the price of the structure. Obviously, the longer the money is out before a permanent mortgage is established for the buyer the greater the cost to the builder and ultimately the customer. Modular construction’s timesaving versus more conventional methods of construction keeps these interest costs low. • Modular buildings are relocatable and easily expanded. Since all modular buildings are built and are easily transported and joined together they can be moved or expanded more easily than more conventionally built structures. • Faster use, faster income. Obviously, the quicker a building can be opened for use as a profit center, the faster the owner will be receiving income from the property. • Fewer mistakes, less costly corrections. With factory building potential errors in construction are caught and corrected in the in the approval and manufacturing process before they reach the jobsite.
  • 2. • Optimization of materials. Due to high utilization of computer design in manufacturing, errors in calculations and design are eliminated for optimal use of construction materials. • Guaranteed prices. Unlike most conventional construction projects that inherently maintain some degree of cost overruns, modular construction projects give the ultimate customers a guaranteed package price up front when an order is formally accepted. • Better quality materials. Even though such materials as drywall and dimensional lumber shipped to a factory may be the same as shipped to most conventional construction job sites, on entering the manufacturing plant, the materials are inspected for quality and stored inside until needed. • Guaranteed supplies. Because of the large purchasing power of manufacturing plants, when shortages do develop in a given line of materials, the larger buyers generally get preference over smaller ones. Vision Building Solutions Modular Construction Advantages
  • 3. • Less pilferage. Whereas at most conventional construction sites, some material theft occurs, with modular construction it is a bit more difficult to walk off with an entire module.. • Less weather damage. Because structures, regardless of there factory origin can be “closed- up” or “weathered-in” much faster than site built construction, thereby reducing and often eliminating weather damage to the structure. • Less danger of fire. Job site construction fires continue to to cost builders millions of dollars and higher fire insurance costs. With factory construction even a critical use of welders torches is conducted under highly controlled conditions inside a manufacturing facility thereby eliminating costly fire damages. • Better Security. Job site security with modular construction also costs less because the time before occupancy is sliced to a fraction of that with site construction. Also, a modular building structure is “closed up” and locked faster than site built construction. Vision Building Solutions Modular Construction Advantages
  • 4. • Less costly vandalism exposure. With modular buildings, construction time is diminished and the buildings are constructed in secured facilities, thereby reducing the the opportunity of costly vandalism. • Less costly clean-up. Because the majority of the “messy jobs” are handled under controlled conditions at the manufacturing facility, there isn’t much waste materials to dispose of at the site. • Less costly site inspections. Building inspectors appreciate being able to cut their site inspection time to a minimum. With modular construction the major inspection process occur at the manufacturing facility. With standardized methods and components, inspections of modular buildings takes less time once again saving money for the end user, • Tax advantages. Since modular buildings have the unique capability of being leased as equipment instead of “fixed site” real estate, they can be depreciated over several years instead of mortgaged property.. Vision Building Solutions Modular Construction Advantages
  • 5. • Less costly design and engineering. Because of trained architects, engineers and technicians are utilized to help modular builders and buyers design structures utilizing computers, the high cost of both design and engineering is cut to hours instead of days or weeks. • Less costly materials handling. Instead of having higher wage craftsmen handle their own materials, in a factory the materials are fed to craftsmen at each workstation along the production line. This provides for the fastest possible installation thus saving money for the customer. • Less costly workers compensation and liability insurance. Fewer men at a more dangerous site means much less cost for workers and site insurance. •Less costly accounting and bookkeeping. The factory maintains inventory costing and production labor accounting systems thus saving time needed by site builders who must keep itemized details of the literally thousands of items that go into a typical structure. Vision Building Solutions Modular Construction Advantages
  • 6. • Better Quality. Modular Builders utilize precision cutting equipment and fastening systems which provide workmanship that is light years ahead of what can be done at the job sites. Also, every operation in the manufacturing facility is inspected, checked for quality control, and inspected once again by a third party inspector. Corrections are made long before the building reaches the job site. •There is a good secondary market for modular buildings. Since modular buildings are relocatable and can be leased, there is good potential to re-sell or re-lease modular buildings over the life of the structure. This allows for a greater return on investment opportunity than most conventional structures. Vision Building Solutions Modular Construction Advantages
  • 7. Vision Building Solutions Floor Plan VESTIBULE PHONE DATA LOBBY HVAC HVAC SALES MANAGER SALES SALES SALES SALES CNAC MANAGER LOAN CLOSING CNAC VESTIBULE CNAC GENERAL OFFICE Modular partition walls byowner 28' 6'10 21'2 66' 10" 9'4 9'4 9'4 8'6 9'4 11'2 8'2 66' 9'4 10' 4'4 5'10 11'4 6'1 5'11 12'4 10" 28' 13'8 4' 9'
  • 8. Vision Building Solutions Building Specifications Size and Code: 27’4” x 66’ 1,848 Square Feet Type VI, Unprotected, Unsprinkled Business Use 2002 FBC – 140 MPH Wind Code Florida Dept. of Community Affairs Frame: Perimeter Steel 12” Jr. “I” Beams Removable Hitch, Axles and Tires Floor: Metal Floor Joists – Sized as Required .040 Simplex Bottom Board Single Layer - ¾” Viroc Sub Floor R-11 Un-Faced Insulation 1/8” Vinyl Composition Tile 26oz. Commercial Level Loop Carpet 4” Vinyl Cove Base Exterior Walls: 2”x4” Wood Studs @ 16” On Center Single Bottom and Double Top Plates ½” CDX Plywood Sheathing Vinyl Housewrap Vapor Barrier R-11 Kraft Faced Insulation Pleko Synthetic Stucco over Hardi-Panel Exterior Finish 1”x4” Hardi-Panel Trim Interior Walls: ½” Vinyl Covered Gypsum Finish w/battens throughout R-11 Un-Faced Insulation Roof: ¾” CDX Plywood Mateline Beams w/20’ Maximum Span 2” x 8” Wood Rafters @ 16” On Center ½” Dens Deck Sheathing over 5/8” CDX Plywood 45mil EPDM Black Rubber Membrane Roof Sheds to Rear for Drainage Exposed Gutters and Downspouts Parapet Wall of Front and Both Sides 8’ x 8’ Modular Tower above Entry Area 9’ Ceiling Height R-19 Kraft Faced Insulation Suspended 24” x 24” Acoustical Ceiling Exterior Doors: (2) 72” x 84” Commercial Storefront (1) 36” x 84” Commercial Storefront (1) 36” x 80” 18ga Commercial Type Hollow Metal Door and Frame White Finish Frames with Tinted Glass All Locksets and Closers Interior Doors (8) 36” x 80” Pre-Hung Solid Core Wood w/ Metal Frames (4) 5” x 30” Tempered Glass View Block All Locksets Windows: (6) 72” x 36” Storefront Glass (2) 48” x 36” Storefront Glass (1) 36” x 36” Cashier Window ¼” Tempered Glass w/White Frames Electrical: 200amp Load Center 3 Wire 120/240V Single Phase Copper Romex 24” x 48” 4 Tube Lay In Fluorescents w/Parabolic Lenses (3) Double Headed Exterior Floors 110V/15amp/20amp Receptacles GFI Receptacles as Required 110V/20amp Switches Dedicated Circuits – Phone/Copier J-Boxes for Exterior Signs J-Boxes for Data/Phones/Fire Plumbing: (2) Tank Type Handicap Water Closet (2) Wall Hung Handicap Lavatory (2) EEMAX Instant Water Heater Stainless Steel Single Bowl Sink Hi/Low Handicap Water Cooler Toilet Paper Holders In Wall Trash Receptacles Handicap Grab Bars per Code One Piece Fiberglass Service Sink Exterior Hose Bibs CPVC Supply Piping Schedule 40 PVC DWV Piping HVAC: (2) 3.5 Ton Wall Hung Package Units 10 KW Heat Strips Fiberglass Ducts w/24” x 24” Diffusers Plenum Walls Width of Module Manual Change Digital Thermostat Fan/Light Combination for Restrooms Millwork: 6’ Base/Upper Cabinets w/Countertop 10’ “L” Countertop w/2-16” Drawer Banks 3’ 18” Counter at Cashier Window