After test, oil is drained & external fittings & accessories (bushings, coolers,
conservators etc) are disassembled
TRANSPORT MODES
 Oil Filled
 Nitrogen Gas filled
 When oil filling would exceed the permissible or economical maximum transport weight or
if specifically demanded by the customer
 Filled with dry nitrogen at a positive pressure of 0.175 kg/sq cm( 2.5 psi) before dispatch.
CHECKS FOR TRANSPORTATION
 Prevent the transformer from sliding during transport.
 The positions of lifters, hauling to be used as anchoring points
Dismantling & Transport
2
© 2021 Hitachi Energy. All rightsreserved.
HANDLING DURING LOADING, AND ON SITE LIFTING TRANSFORMERS
 Hydraulic hoists to be used at the jacking pads provided (see outline drawing).
 Lifting to be carried out simultaneously and uniformly for at least two adjoining
jacking pads.
Note: Never use Pipe flanges and valves as lifting or support points.
Dismantling & Transport
3
© 2021 Hitachi Energy. All rightsreserved.
SUSPENDING TRANSFORMERS
The transformer must be suspended from points shown in the outline drawing.
The ropes must never form smaller angle than 60 degrees to the horizontal.
Thus, dimension “L” must be equal to or larger than dimension “M”
Dismantling & Transport
4
© 2021 Hitachi Energy. All rightsreserved.
SHIPPING
 Large Power Transformers are normally shipped on special low bed trailors.
 Accessories dispatched separately by road, oil drums by road.
 Regular check of tank pressure during shipping and storage times necessary to ensure that there is
no leakage.
Dismantling & Transport
5
© 2021 Hitachi Energy. All rightsreserved.
Transformer shipping showing tie-rods and blocking
Dismantling & Transport
6
© 2021 Hitachi Energy. All rightsreserved.
ARRESTING TRANSFORMER MOVEMENT ON TRAILOR BED
Dismantling & Transport
7
© ABB India
© 2021 Hitachi EnerJ
ga
n
yu
.a
Ar
yl2
l5
r,
i2
g0
h2
3
ts|Srelidsee8rved.
Transformers
Receiving Inspection &
Arrival at Site
8
© 2021 Hitachi Energy. All rightsreserved.
Inspection to be carried out:
 Measurement of core insulation resistance to ground.
(Min. Acceptable value : 500K when measured at 1000V DC, corrected
to 20oC.)
 All tie rods must be undamaged and nuts and cables must be tight
 Is all blocking tight and in good condition?
 Any evidence of load shifting in transit
 Does the impact recorder indicate any impacts beyond the acceptance zones?
 Indications of external damage : broken glass on gauges, broken welds etc.
 Paint finish damage
 Whether attached fittings are still in place and undamaged (see the outline drgs)
Receiving Inspection & Arrival On Site
9
© 2021 Hitachi Energy. All rightsreserved.
 Evidence of oil leakage around valves, fittings, flanges and tank seams
 Damages to Bushings : Porcelain chipping
 Bushing Oil level
 Delivery of all major components and accessory boxes as per packing list
 Do crates or boxes show evidence of damage or moisture ingress?
 Temporary shipping silica gel breather desiccant color
 Detached radiators, coolers and pumps must have openings closed with blind
flanges and plugs.
 Any pressure loss in gas filled transformer tanks must be included in the
acceptance report.
 Excess pressure of 0.05 bar should be maintained as minimum.
Receiving Inspection & Arrival On Site
10
© 2021 Hitachi Energy. All rightsreserved.
-20 -10 0 10 20 30
Temperature O
C
30
20
Pressure kPa
10
0
Pressure variation w.r.t. temperature
Receiving Inspection & Arrival On Site
11
© 2021 Hitachi Energy. All rightsreserved.
Receiving Inspection & Arrival On Site
12
© 2021 Hitachi Energy. All rightsreserved.
INTERNAL INSPECTION
 Necessary if transport damage is suspected.
 Avoid internal inspections to the extent possible. If necessary carry out inspection only in the presence of
transformer manufacturer.
 Before removing the tank cover or any other cover, ensure there is no overpressure in the tank.
 Do not leave tools or other objects inside the tank, they can cause short-circuits and failure of transformer.
Receiving Inspection & Arrival On Site
13
© 2021 Hitachi Energy. All rightsreserved.
Unloading, Moving & Storing
14
© 2021 Hitachi Energy. All rightsreserved.
UNLOADING
 Use suitable overhead crane.
 Raise transformer from the car bed with jacks and then skid or roll in to the desired
position. Jacking should be done at designated jacking pads only.
Unloading, Moving & Storing
15
© 2021 Hitachi Energy. All rightsreserved.
MOVING TRANSFORMERS
 Special Moving devices
 Skids
 Sliding surfaces (with the aid of lubricants) can be used.
 Armored rollers can be placed under the transformer
List of tools & Equipment needed for moving, available in the instruction Manual
Unloading, Moving & Storing
16
© 2021 Hitachi Energy. All rightsreserved.
STORAGE
STORING INDOORS IN A DRY ROOM
 Insulating material such as paper, pressboard, Bakelite, wood, cottons tape etc.
 Insulated items as paper insulated conductors, pressboard insulated shielding body etc.
 Chemicals as solvents, glues, varnishes, hardners etc.
 Breathers and drying agents
 Terminal boxes, connection boxes, control cabinets
 Turrets with built in current transformers.
Unloading, Moving & Storing
17
© 2021 Hitachi Energy. All rightsreserved.
 Gas relays, oil-level indicators, thermometers, pressure valves etc.
 Pipes to oil conservator, pipes to radiators, pipes to turrets etc.
 Bushings
 Marshalling box, OLTC motor drive, fans, pumps, instruments and fittings
 Control cabinets
( If Heating elements provided, they shall be connected to supply)
Unloading, Moving & Storing
18
© 2021 Hitachi Energy. All rightsreserved.
STORING OUTDOORS
 Main transformer with mounted accessories.
 Oil conservator with blanking plates for all openings.
 Radiators and coolers with blanking plates for all openings.
 Structures, A frames, pipe supports, oil conservator supports, radiators, control cabinets etc.
Unloading, Moving & Storing
19
© 2021 Hitachi Energy. All rightsreserved.
LONG DURATION STORAGE
TRANSFORMER DISASSEMBLED : WITH LOWERED OIL LEVEL
A transformer with lowered oil level (i.e. the entire insulation of the core and coil
assembly has to be completely covered with oil) must be provided with a
dehydrating breather during storage, in order to avoid the ingress of humid air in
the transformer tank.
In case heating elements are installed in the motor drive cabinet, and control
cabinet, they must be connected to a power supply system to prevent the
formation of condensation water. The heating elements shall be checked at
regular intervals.
Unloading, Moving & Storing
20
© 2021 Hitachi Energy. All rightsreserved.
The silica-gel content of the dehydrating breathers is to be checked every
2 weeks. When more than 2/3 of the blue silica gel filling have turned light,
the filling has to be exchanged. However, it can be reused after having
been dried at 120 °C (24 hrs.).
At the same time the tank has to be examined for oil traces. Should any
leakage be detected, they have to be sealed immediately. Before
commissioning and after a long storage the oil is to be checked for
moisture content. Motor drive cabinet and control cabinet have be checked
for Condensation of water.
Unloading, Moving & Storing
21
© 2021 Hitachi Energy. All rightsreserved.
TRANSFORMER WITH DRY-GAS FILLING
In case it is not possible to store the transformer completely mounted or with oil filling, the transformer is to be filled
with dry gas in order to prevent the ingress of moisture during storage.
After the transformer has been filled with dry gas/ air, one or several gas cylinder attached to the tank has to be
connected. In order to provide a constant positive pressure in the transformer tank, the gas cylinders are connected
via pressure reducing and pressure relief valve. The valves have been adjusted to maintain a positive pressure in
the tank i.e. approx. 0.25 bar. The pressure is to be checked every two weeks.
pressure must not fall below 0.05 bar.
Unloading, Moving & Storing
22
© 2021 Hitachi Energy. All rightsreserved.
The condition of the silica gel content in the dehydrating breathers has to be
checked every 2 weeks. Should more than 2/3 of the blue silica gel filling have
turned light, the filling must be exchanged. However, it can be reused after drying
at 120 °C (24 hrs.). At the same time it is necessary to check the oil level in the
conservator, and to examine the tank for oil traces. Should any leakage be
detected, they have to be taken care of immediately. Before commissioning and
after long storage the oil is to be checked for humidity.
Unloading, Moving & Storing
23
© 2021 Hitachi Energy. All rightsreserved.
ACCESSORIES
The accessories shall be stored in compliance with the printed-on storage instructions and the hints
given in the brochures for the individual accessory parts. In principle the accessories should be stored
in their respective transport packing in dry rooms. Possibly, desiccant bags have to be enclosed in the
crates.
All accessories shall be protected against damages.
Unloading, Moving & Storing
24
© 2021 Hitachi Energy. All rightsreserved.
CHECKLIST FOR PACKAGE
Time periods
SUBJECT CHECK YEAR MONTH REMARKS
Insulating oil Dielectric
Moisture content
strength 1
Oil level Conservator 1
Oil tightness Tank 1 1
Conservator, piping, 1
Buchholz relay, Bushings 1
Earthing Tank 6
Fans Test run 3 1 Hr.
Control cabinet Heating 1
Oil circulation pumps Trial run 3 1 Hr.
Silica gel breathers Silica gel 1
Unloading, Moving & Storing
25
26
27

More Related Content

Similar to 11 Potential transformer_Storage and transportation

Caterpillar Cat DP25N Forklift Lift Trucks Service Repair Manual SN:T18C-5000...
Caterpillar Cat DP25N Forklift Lift Trucks Service Repair Manual SN:T18C-5000...Caterpillar Cat DP25N Forklift Lift Trucks Service Repair Manual SN:T18C-5000...
Caterpillar Cat DP25N Forklift Lift Trucks Service Repair Manual SN:T18C-5000...jseiodksmem
 
Caterpillar Cat GP30N Forklift Lift Trucks Service Repair Manual SN:T13F-3001...
Caterpillar Cat GP30N Forklift Lift Trucks Service Repair Manual SN:T13F-3001...Caterpillar Cat GP30N Forklift Lift Trucks Service Repair Manual SN:T13F-3001...
Caterpillar Cat GP30N Forklift Lift Trucks Service Repair Manual SN:T13F-3001...jkejdkm
 
Caterpillar cat gc15 k forklift lift trucks service repair manual snat81e 000...
Caterpillar cat gc15 k forklift lift trucks service repair manual snat81e 000...Caterpillar cat gc15 k forklift lift trucks service repair manual snat81e 000...
Caterpillar cat gc15 k forklift lift trucks service repair manual snat81e 000...ofpsdjksemmds
 
Caterpillar cat gc20 k forklift lift trucks service repair manual snat82d 000...
Caterpillar cat gc20 k forklift lift trucks service repair manual snat82d 000...Caterpillar cat gc20 k forklift lift trucks service repair manual snat82d 000...
Caterpillar cat gc20 k forklift lift trucks service repair manual snat82d 000...fjjskekkdkoepll
 
Caterpillar cat gc15 k forklift lift trucks service repair manual snat81d 000...
Caterpillar cat gc15 k forklift lift trucks service repair manual snat81d 000...Caterpillar cat gc15 k forklift lift trucks service repair manual snat81d 000...
Caterpillar cat gc15 k forklift lift trucks service repair manual snat81d 000...fjskekdmmse
 
Caterpillar cat gc15 k forklift lift trucks service repair manual sn at81c 00...
Caterpillar cat gc15 k forklift lift trucks service repair manual sn at81c 00...Caterpillar cat gc15 k forklift lift trucks service repair manual sn at81c 00...
Caterpillar cat gc15 k forklift lift trucks service repair manual sn at81c 00...jksjdmd
 
Caterpillar cat gc25 k hp forklift lift trucksservice repair manual sn:at82c ...
Caterpillar cat gc25 k hp forklift lift trucksservice repair manual sn:at82c ...Caterpillar cat gc25 k hp forklift lift trucksservice repair manual sn:at82c ...
Caterpillar cat gc25 k hp forklift lift trucksservice repair manual sn:at82c ...hjsemmmd
 
Caterpillar cat gc20 k forklift lift trucks service repair manual snat82c 000...
Caterpillar cat gc20 k forklift lift trucks service repair manual snat82c 000...Caterpillar cat gc20 k forklift lift trucks service repair manual snat82c 000...
Caterpillar cat gc20 k forklift lift trucks service repair manual snat82c 000...jkskjdkm
 
Caterpillar cat gc25 k forklift lift trucks service repair manual snat82e 000...
Caterpillar cat gc25 k forklift lift trucks service repair manual snat82e 000...Caterpillar cat gc25 k forklift lift trucks service repair manual snat82e 000...
Caterpillar cat gc25 k forklift lift trucks service repair manual snat82e 000...fjjsekwsxkdmmem
 
Caterpillar cat gc25 k forklift lift trucks service repair manual snat82d 000...
Caterpillar cat gc25 k forklift lift trucks service repair manual snat82d 000...Caterpillar cat gc25 k forklift lift trucks service repair manual snat82d 000...
Caterpillar cat gc25 k forklift lift trucks service repair manual snat82d 000...fjskemdzaqmme
 
Caterpillar cat gc30 k forklift lift trucks service repair manual sn:at83c 00...
Caterpillar cat gc30 k forklift lift trucks service repair manual sn:at83c 00...Caterpillar cat gc30 k forklift lift trucks service repair manual sn:at83c 00...
Caterpillar cat gc30 k forklift lift trucks service repair manual sn:at83c 00...jksejkmds
 
Caterpillar cat gc20 k forklift lift trucks service repair manual snat82c 000...
Caterpillar cat gc20 k forklift lift trucks service repair manual snat82c 000...Caterpillar cat gc20 k forklift lift trucks service repair manual snat82c 000...
Caterpillar cat gc20 k forklift lift trucks service repair manual snat82c 000...ufsiekdolskek
 
Caterpillar cat gc15 k forklift lift trucks service repair manual snat81d 000...
Caterpillar cat gc15 k forklift lift trucks service repair manual snat81d 000...Caterpillar cat gc15 k forklift lift trucks service repair manual snat81d 000...
Caterpillar cat gc15 k forklift lift trucks service repair manual snat81d 000...jksjmdmd
 
Caterpillar cat gc30 k forklift lift trucks service repair manual sn:at83e 00...
Caterpillar cat gc30 k forklift lift trucks service repair manual sn:at83e 00...Caterpillar cat gc30 k forklift lift trucks service repair manual sn:at83e 00...
Caterpillar cat gc30 k forklift lift trucks service repair manual sn:at83e 00...jkjsekmd
 
Caterpillar cat gc18 k forklift lift trucks service repair manual snat81e 000...
Caterpillar cat gc18 k forklift lift trucks service repair manual snat81e 000...Caterpillar cat gc18 k forklift lift trucks service repair manual snat81e 000...
Caterpillar cat gc18 k forklift lift trucks service repair manual snat81e 000...ufsikkdjskemds
 
Caterpillar cat gc18 k forklift lift trucks service repair manual snat81e 000...
Caterpillar cat gc18 k forklift lift trucks service repair manual snat81e 000...Caterpillar cat gc18 k forklift lift trucks service repair manual snat81e 000...
Caterpillar cat gc18 k forklift lift trucks service repair manual snat81e 000...jksjekmd
 
Caterpillar cat gc18 k forklift lift trucks service repair manual snat81d 000...
Caterpillar cat gc18 k forklift lift trucks service repair manual snat81d 000...Caterpillar cat gc18 k forklift lift trucks service repair manual snat81d 000...
Caterpillar cat gc18 k forklift lift trucks service repair manual snat81d 000...fksepdksejdmm
 
Caterpillar cat gc20 k forklift lift trucks service repair manual snat82e 000...
Caterpillar cat gc20 k forklift lift trucks service repair manual snat82e 000...Caterpillar cat gc20 k forklift lift trucks service repair manual snat82e 000...
Caterpillar cat gc20 k forklift lift trucks service repair manual snat82e 000...fisdkjekemms
 
Caterpillar Cat GC25K HP Forklift Lift Trucks Service Repair Manual SN:AT82C-...
Caterpillar Cat GC25K HP Forklift Lift Trucks Service Repair Manual SN:AT82C-...Caterpillar Cat GC25K HP Forklift Lift Trucks Service Repair Manual SN:AT82C-...
Caterpillar Cat GC25K HP Forklift Lift Trucks Service Repair Manual SN:AT82C-...jkdmuy
 
Caterpillar cat gc25 k forklift lift trucks service repair manual snat82c 000...
Caterpillar cat gc25 k forklift lift trucks service repair manual snat82c 000...Caterpillar cat gc25 k forklift lift trucks service repair manual snat82c 000...
Caterpillar cat gc25 k forklift lift trucks service repair manual snat82c 000...jfjedkmsmem
 

Similar to 11 Potential transformer_Storage and transportation (20)

Caterpillar Cat DP25N Forklift Lift Trucks Service Repair Manual SN:T18C-5000...
Caterpillar Cat DP25N Forklift Lift Trucks Service Repair Manual SN:T18C-5000...Caterpillar Cat DP25N Forklift Lift Trucks Service Repair Manual SN:T18C-5000...
Caterpillar Cat DP25N Forklift Lift Trucks Service Repair Manual SN:T18C-5000...
 
Caterpillar Cat GP30N Forklift Lift Trucks Service Repair Manual SN:T13F-3001...
Caterpillar Cat GP30N Forklift Lift Trucks Service Repair Manual SN:T13F-3001...Caterpillar Cat GP30N Forklift Lift Trucks Service Repair Manual SN:T13F-3001...
Caterpillar Cat GP30N Forklift Lift Trucks Service Repair Manual SN:T13F-3001...
 
Caterpillar cat gc15 k forklift lift trucks service repair manual snat81e 000...
Caterpillar cat gc15 k forklift lift trucks service repair manual snat81e 000...Caterpillar cat gc15 k forklift lift trucks service repair manual snat81e 000...
Caterpillar cat gc15 k forklift lift trucks service repair manual snat81e 000...
 
Caterpillar cat gc20 k forklift lift trucks service repair manual snat82d 000...
Caterpillar cat gc20 k forklift lift trucks service repair manual snat82d 000...Caterpillar cat gc20 k forklift lift trucks service repair manual snat82d 000...
Caterpillar cat gc20 k forklift lift trucks service repair manual snat82d 000...
 
Caterpillar cat gc15 k forklift lift trucks service repair manual snat81d 000...
Caterpillar cat gc15 k forklift lift trucks service repair manual snat81d 000...Caterpillar cat gc15 k forklift lift trucks service repair manual snat81d 000...
Caterpillar cat gc15 k forklift lift trucks service repair manual snat81d 000...
 
Caterpillar cat gc15 k forklift lift trucks service repair manual sn at81c 00...
Caterpillar cat gc15 k forklift lift trucks service repair manual sn at81c 00...Caterpillar cat gc15 k forklift lift trucks service repair manual sn at81c 00...
Caterpillar cat gc15 k forklift lift trucks service repair manual sn at81c 00...
 
Caterpillar cat gc25 k hp forklift lift trucksservice repair manual sn:at82c ...
Caterpillar cat gc25 k hp forklift lift trucksservice repair manual sn:at82c ...Caterpillar cat gc25 k hp forklift lift trucksservice repair manual sn:at82c ...
Caterpillar cat gc25 k hp forklift lift trucksservice repair manual sn:at82c ...
 
Caterpillar cat gc20 k forklift lift trucks service repair manual snat82c 000...
Caterpillar cat gc20 k forklift lift trucks service repair manual snat82c 000...Caterpillar cat gc20 k forklift lift trucks service repair manual snat82c 000...
Caterpillar cat gc20 k forklift lift trucks service repair manual snat82c 000...
 
Caterpillar cat gc25 k forklift lift trucks service repair manual snat82e 000...
Caterpillar cat gc25 k forklift lift trucks service repair manual snat82e 000...Caterpillar cat gc25 k forklift lift trucks service repair manual snat82e 000...
Caterpillar cat gc25 k forklift lift trucks service repair manual snat82e 000...
 
Caterpillar cat gc25 k forklift lift trucks service repair manual snat82d 000...
Caterpillar cat gc25 k forklift lift trucks service repair manual snat82d 000...Caterpillar cat gc25 k forklift lift trucks service repair manual snat82d 000...
Caterpillar cat gc25 k forklift lift trucks service repair manual snat82d 000...
 
Caterpillar cat gc30 k forklift lift trucks service repair manual sn:at83c 00...
Caterpillar cat gc30 k forklift lift trucks service repair manual sn:at83c 00...Caterpillar cat gc30 k forklift lift trucks service repair manual sn:at83c 00...
Caterpillar cat gc30 k forklift lift trucks service repair manual sn:at83c 00...
 
Caterpillar cat gc20 k forklift lift trucks service repair manual snat82c 000...
Caterpillar cat gc20 k forklift lift trucks service repair manual snat82c 000...Caterpillar cat gc20 k forklift lift trucks service repair manual snat82c 000...
Caterpillar cat gc20 k forklift lift trucks service repair manual snat82c 000...
 
Caterpillar cat gc15 k forklift lift trucks service repair manual snat81d 000...
Caterpillar cat gc15 k forklift lift trucks service repair manual snat81d 000...Caterpillar cat gc15 k forklift lift trucks service repair manual snat81d 000...
Caterpillar cat gc15 k forklift lift trucks service repair manual snat81d 000...
 
Caterpillar cat gc30 k forklift lift trucks service repair manual sn:at83e 00...
Caterpillar cat gc30 k forklift lift trucks service repair manual sn:at83e 00...Caterpillar cat gc30 k forklift lift trucks service repair manual sn:at83e 00...
Caterpillar cat gc30 k forklift lift trucks service repair manual sn:at83e 00...
 
Caterpillar cat gc18 k forklift lift trucks service repair manual snat81e 000...
Caterpillar cat gc18 k forklift lift trucks service repair manual snat81e 000...Caterpillar cat gc18 k forklift lift trucks service repair manual snat81e 000...
Caterpillar cat gc18 k forklift lift trucks service repair manual snat81e 000...
 
Caterpillar cat gc18 k forklift lift trucks service repair manual snat81e 000...
Caterpillar cat gc18 k forklift lift trucks service repair manual snat81e 000...Caterpillar cat gc18 k forklift lift trucks service repair manual snat81e 000...
Caterpillar cat gc18 k forklift lift trucks service repair manual snat81e 000...
 
Caterpillar cat gc18 k forklift lift trucks service repair manual snat81d 000...
Caterpillar cat gc18 k forklift lift trucks service repair manual snat81d 000...Caterpillar cat gc18 k forklift lift trucks service repair manual snat81d 000...
Caterpillar cat gc18 k forklift lift trucks service repair manual snat81d 000...
 
Caterpillar cat gc20 k forklift lift trucks service repair manual snat82e 000...
Caterpillar cat gc20 k forklift lift trucks service repair manual snat82e 000...Caterpillar cat gc20 k forklift lift trucks service repair manual snat82e 000...
Caterpillar cat gc20 k forklift lift trucks service repair manual snat82e 000...
 
Caterpillar Cat GC25K HP Forklift Lift Trucks Service Repair Manual SN:AT82C-...
Caterpillar Cat GC25K HP Forklift Lift Trucks Service Repair Manual SN:AT82C-...Caterpillar Cat GC25K HP Forklift Lift Trucks Service Repair Manual SN:AT82C-...
Caterpillar Cat GC25K HP Forklift Lift Trucks Service Repair Manual SN:AT82C-...
 
Caterpillar cat gc25 k forklift lift trucks service repair manual snat82c 000...
Caterpillar cat gc25 k forklift lift trucks service repair manual snat82c 000...Caterpillar cat gc25 k forklift lift trucks service repair manual snat82c 000...
Caterpillar cat gc25 k forklift lift trucks service repair manual snat82c 000...
 

Recently uploaded

Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information SystemsAnge Felix NSANZIYERA
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxNANDHAKUMARA10
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxMustafa Ahmed
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptAfnanAhmad53
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...josephjonse
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)ChandrakantDivate1
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...ppkakm
 
Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257subhasishdas79
 

Recently uploaded (20)

Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information Systems
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257
 

11 Potential transformer_Storage and transportation

  • 1. © 2021 HitachiEnergy. All rightsreserved. Power Transformer- Transportation Receiving Inspection & Storage 2021-11-10 1
  • 2. © 2021 Hitachi Energy. All rightsreserved. After test, oil is drained & external fittings & accessories (bushings, coolers, conservators etc) are disassembled TRANSPORT MODES  Oil Filled  Nitrogen Gas filled  When oil filling would exceed the permissible or economical maximum transport weight or if specifically demanded by the customer  Filled with dry nitrogen at a positive pressure of 0.175 kg/sq cm( 2.5 psi) before dispatch. CHECKS FOR TRANSPORTATION  Prevent the transformer from sliding during transport.  The positions of lifters, hauling to be used as anchoring points Dismantling & Transport 2
  • 3. © 2021 Hitachi Energy. All rightsreserved. HANDLING DURING LOADING, AND ON SITE LIFTING TRANSFORMERS  Hydraulic hoists to be used at the jacking pads provided (see outline drawing).  Lifting to be carried out simultaneously and uniformly for at least two adjoining jacking pads. Note: Never use Pipe flanges and valves as lifting or support points. Dismantling & Transport 3
  • 4. © 2021 Hitachi Energy. All rightsreserved. SUSPENDING TRANSFORMERS The transformer must be suspended from points shown in the outline drawing. The ropes must never form smaller angle than 60 degrees to the horizontal. Thus, dimension “L” must be equal to or larger than dimension “M” Dismantling & Transport 4
  • 5. © 2021 Hitachi Energy. All rightsreserved. SHIPPING  Large Power Transformers are normally shipped on special low bed trailors.  Accessories dispatched separately by road, oil drums by road.  Regular check of tank pressure during shipping and storage times necessary to ensure that there is no leakage. Dismantling & Transport 5
  • 6. © 2021 Hitachi Energy. All rightsreserved. Transformer shipping showing tie-rods and blocking Dismantling & Transport 6
  • 7. © 2021 Hitachi Energy. All rightsreserved. ARRESTING TRANSFORMER MOVEMENT ON TRAILOR BED Dismantling & Transport 7
  • 8. © ABB India © 2021 Hitachi EnerJ ga n yu .a Ar yl2 l5 r, i2 g0 h2 3 ts|Srelidsee8rved. Transformers Receiving Inspection & Arrival at Site 8
  • 9. © 2021 Hitachi Energy. All rightsreserved. Inspection to be carried out:  Measurement of core insulation resistance to ground. (Min. Acceptable value : 500K when measured at 1000V DC, corrected to 20oC.)  All tie rods must be undamaged and nuts and cables must be tight  Is all blocking tight and in good condition?  Any evidence of load shifting in transit  Does the impact recorder indicate any impacts beyond the acceptance zones?  Indications of external damage : broken glass on gauges, broken welds etc.  Paint finish damage  Whether attached fittings are still in place and undamaged (see the outline drgs) Receiving Inspection & Arrival On Site 9
  • 10. © 2021 Hitachi Energy. All rightsreserved.  Evidence of oil leakage around valves, fittings, flanges and tank seams  Damages to Bushings : Porcelain chipping  Bushing Oil level  Delivery of all major components and accessory boxes as per packing list  Do crates or boxes show evidence of damage or moisture ingress?  Temporary shipping silica gel breather desiccant color  Detached radiators, coolers and pumps must have openings closed with blind flanges and plugs.  Any pressure loss in gas filled transformer tanks must be included in the acceptance report.  Excess pressure of 0.05 bar should be maintained as minimum. Receiving Inspection & Arrival On Site 10
  • 11. © 2021 Hitachi Energy. All rightsreserved. -20 -10 0 10 20 30 Temperature O C 30 20 Pressure kPa 10 0 Pressure variation w.r.t. temperature Receiving Inspection & Arrival On Site 11
  • 12. © 2021 Hitachi Energy. All rightsreserved. Receiving Inspection & Arrival On Site 12
  • 13. © 2021 Hitachi Energy. All rightsreserved. INTERNAL INSPECTION  Necessary if transport damage is suspected.  Avoid internal inspections to the extent possible. If necessary carry out inspection only in the presence of transformer manufacturer.  Before removing the tank cover or any other cover, ensure there is no overpressure in the tank.  Do not leave tools or other objects inside the tank, they can cause short-circuits and failure of transformer. Receiving Inspection & Arrival On Site 13
  • 14. © 2021 Hitachi Energy. All rightsreserved. Unloading, Moving & Storing 14
  • 15. © 2021 Hitachi Energy. All rightsreserved. UNLOADING  Use suitable overhead crane.  Raise transformer from the car bed with jacks and then skid or roll in to the desired position. Jacking should be done at designated jacking pads only. Unloading, Moving & Storing 15
  • 16. © 2021 Hitachi Energy. All rightsreserved. MOVING TRANSFORMERS  Special Moving devices  Skids  Sliding surfaces (with the aid of lubricants) can be used.  Armored rollers can be placed under the transformer List of tools & Equipment needed for moving, available in the instruction Manual Unloading, Moving & Storing 16
  • 17. © 2021 Hitachi Energy. All rightsreserved. STORAGE STORING INDOORS IN A DRY ROOM  Insulating material such as paper, pressboard, Bakelite, wood, cottons tape etc.  Insulated items as paper insulated conductors, pressboard insulated shielding body etc.  Chemicals as solvents, glues, varnishes, hardners etc.  Breathers and drying agents  Terminal boxes, connection boxes, control cabinets  Turrets with built in current transformers. Unloading, Moving & Storing 17
  • 18. © 2021 Hitachi Energy. All rightsreserved.  Gas relays, oil-level indicators, thermometers, pressure valves etc.  Pipes to oil conservator, pipes to radiators, pipes to turrets etc.  Bushings  Marshalling box, OLTC motor drive, fans, pumps, instruments and fittings  Control cabinets ( If Heating elements provided, they shall be connected to supply) Unloading, Moving & Storing 18
  • 19. © 2021 Hitachi Energy. All rightsreserved. STORING OUTDOORS  Main transformer with mounted accessories.  Oil conservator with blanking plates for all openings.  Radiators and coolers with blanking plates for all openings.  Structures, A frames, pipe supports, oil conservator supports, radiators, control cabinets etc. Unloading, Moving & Storing 19
  • 20. © 2021 Hitachi Energy. All rightsreserved. LONG DURATION STORAGE TRANSFORMER DISASSEMBLED : WITH LOWERED OIL LEVEL A transformer with lowered oil level (i.e. the entire insulation of the core and coil assembly has to be completely covered with oil) must be provided with a dehydrating breather during storage, in order to avoid the ingress of humid air in the transformer tank. In case heating elements are installed in the motor drive cabinet, and control cabinet, they must be connected to a power supply system to prevent the formation of condensation water. The heating elements shall be checked at regular intervals. Unloading, Moving & Storing 20
  • 21. © 2021 Hitachi Energy. All rightsreserved. The silica-gel content of the dehydrating breathers is to be checked every 2 weeks. When more than 2/3 of the blue silica gel filling have turned light, the filling has to be exchanged. However, it can be reused after having been dried at 120 °C (24 hrs.). At the same time the tank has to be examined for oil traces. Should any leakage be detected, they have to be sealed immediately. Before commissioning and after a long storage the oil is to be checked for moisture content. Motor drive cabinet and control cabinet have be checked for Condensation of water. Unloading, Moving & Storing 21
  • 22. © 2021 Hitachi Energy. All rightsreserved. TRANSFORMER WITH DRY-GAS FILLING In case it is not possible to store the transformer completely mounted or with oil filling, the transformer is to be filled with dry gas in order to prevent the ingress of moisture during storage. After the transformer has been filled with dry gas/ air, one or several gas cylinder attached to the tank has to be connected. In order to provide a constant positive pressure in the transformer tank, the gas cylinders are connected via pressure reducing and pressure relief valve. The valves have been adjusted to maintain a positive pressure in the tank i.e. approx. 0.25 bar. The pressure is to be checked every two weeks. pressure must not fall below 0.05 bar. Unloading, Moving & Storing 22
  • 23. © 2021 Hitachi Energy. All rightsreserved. The condition of the silica gel content in the dehydrating breathers has to be checked every 2 weeks. Should more than 2/3 of the blue silica gel filling have turned light, the filling must be exchanged. However, it can be reused after drying at 120 °C (24 hrs.). At the same time it is necessary to check the oil level in the conservator, and to examine the tank for oil traces. Should any leakage be detected, they have to be taken care of immediately. Before commissioning and after long storage the oil is to be checked for humidity. Unloading, Moving & Storing 23
  • 24. © 2021 Hitachi Energy. All rightsreserved. ACCESSORIES The accessories shall be stored in compliance with the printed-on storage instructions and the hints given in the brochures for the individual accessory parts. In principle the accessories should be stored in their respective transport packing in dry rooms. Possibly, desiccant bags have to be enclosed in the crates. All accessories shall be protected against damages. Unloading, Moving & Storing 24
  • 25. © 2021 Hitachi Energy. All rightsreserved. CHECKLIST FOR PACKAGE Time periods SUBJECT CHECK YEAR MONTH REMARKS Insulating oil Dielectric Moisture content strength 1 Oil level Conservator 1 Oil tightness Tank 1 1 Conservator, piping, 1 Buchholz relay, Bushings 1 Earthing Tank 6 Fans Test run 3 1 Hr. Control cabinet Heating 1 Oil circulation pumps Trial run 3 1 Hr. Silica gel breathers Silica gel 1 Unloading, Moving & Storing 25