OUTLINES
BRIEF HISTORY OF COMPANY
AREA OF PARTICIPATION
OBSERVATION
CONTRIBUTION
KNOWLEDGE ACQUIRED
RELEVANCE OF TRAINING TO COURSE OF STUDY
FUTURE CAREER
RECOMMENDATION
CONCLUSION
brief history of the company
Kubwa business unit is next after the headquarters at zone
4, Wuse,Abuja. It was established in June 2006 located at
plot 146, GadoNasko road, kubwa, Abuja, with great focus
on effective distribution of electricity to consumers,
maintenance, repair and operation of distribution network
and collection of payment for electricity bills
The basic organizational structure of Kubwa business unit is
 listed below:
 Administrative department
 Marketing department
 Finance and account department
 Technical department
Area of participation/work done
During my SIWES period I worked under:
 Services centre
 Injection substation
 Protection, control and metering
 Planning and construction
I participated in the mentioned activities below:
 Installation of transformer
 Mounting of concrete and wooden poles
 General maintenance on 33kv and 11kv lines
 Installation of single phase meter
 Opening and closing of feeder
 Pre-commissioning and confirmatory test on transformer
 Calculation of capacity test of a new transformer
 Involved in system load shedding and local load shedding
 Amending burnt up-riser and jumper cut
 Involved in calculating rated load of a j and p fuse
 Preparation of sanction list
Observations
 I observed that three disc insulator are used on 33kv line
while one disc insulator is used on 11kv line
 While in PC&M, I observed the value of earth test ranges
from (0-5)ohms
 I also observed that 11kv lightning arrestor is different
from 33kv lightning arrestor
 I observed in the switch yard at injection substation,
gang isolator are in between the power transformer and
circuit breaker
 I also observed that a voltage transformer is used in
metering the voltage coming into the injection substation
from the transmission station
The diagram of 11kv and 33kv
lightning arrestor
diagram of 11kv and 33kv pot and
disc insulator
Power transformer
contributions
 I used to help them in patrolling the feeder lines
 I partook in local load shedding on 3 different substation
 I did in reconnection of disconnected service cables
 I was involve separating twisted wire on low tension
lines
 I was also involve in testing of transformer at field work
 I partook in digging of earth pit and designing of earth
mat
 I was involve in recording of incoming voltage at hour
interval
 I was involve in Installation of a new transformer
 I partook in opening and restoring of feeders
Image of trainee during SIWES
knowledge acquired
I learnt how to calculate the capacity of a
transformer
I learnt about how voltage is been
breakdown from the generation to the
distribution
I learnt about common fault on both low
tension line and high tension line
I learnt about various equipment and
materials used for installation of transformer
I learnt about system load shedding
diagram of earth test and
insulation test
Relevance of training to course of
study
The experience acquired during industrial
training has contributed tremendously to my
life by upgrading my technical skills. However, it
is of no doubt that the training I received is very
relevant to my course which is
physics/electronics. The theory that I learnt
from school would have been a waste of time
without the knowledge obtained from the
industrial training
Future career
The experience acquired during industrial
training has empowered me in self
entrepreneur in the establishment of power
monitoring and correction station in injection
substation.
recommendations
ITF should make monthly allowance available
for student, so as to put an end to financial
difficulties that may arise as a result of
transport challenges.
Institution and ITF should help student to get
a place of attachment so that the program
may commence as planned
Student should take the SIWES period
importantly and try as much as possible to
learn practical and not just theoretical
conclusion
I acquired skills in power system mostly in
transformer installation, testing of
transformer etc. and have had the
opportunity to experience the application
of theoretical knowledge acquired in the
classroom to solve real life problems, this
SIWES has been a success, because I
have gained knowledge that ordinarily
wouldn’t been obtained in the lecture hall
THANK
YOU
FOR
LISTENING

More Related Content

Similar to 026

Okoro godwin report
Okoro godwin reportOkoro godwin report
Okoro godwin report
AzubuikeChidi
 
DIESEL LOCOMOTIVE WORKS VARANASI, Summer Training Report
DIESEL LOCOMOTIVE WORKS VARANASI, Summer Training ReportDIESEL LOCOMOTIVE WORKS VARANASI, Summer Training Report
DIESEL LOCOMOTIVE WORKS VARANASI, Summer Training Report
Rahul Kumar
 
Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Holland Kendall
 
220 kv Sub- Station By Akshit Jain Majhola Moradabad .docx
220 kv Sub- Station By Akshit Jain Majhola Moradabad .docx220 kv Sub- Station By Akshit Jain Majhola Moradabad .docx
220 kv Sub- Station By Akshit Jain Majhola Moradabad .docx
Akshit Jain
 
Report writing
Report writingReport writing
Report writing
SamuelAyamdoo
 
UET30812 Certificate III in ESI – Distribution Cable Jointing. Australian Qua...
UET30812 Certificate III in ESI – Distribution Cable Jointing. Australian Qua...UET30812 Certificate III in ESI – Distribution Cable Jointing. Australian Qua...
UET30812 Certificate III in ESI – Distribution Cable Jointing. Australian Qua...
Thorne & Derrick International
 
Presentation review1 bses.pptx
Presentation review1 bses.pptxPresentation review1 bses.pptx
Presentation review1 bses.pptx
Hashim222217
 
Engineering Practice Report
Engineering Practice ReportEngineering Practice Report
Engineering Practice ReportPaul Soko
 
Siwes report
Siwes reportSiwes report
Siwes report
Abiodun Adewoyin
 
NAVEEN inter.pdf
NAVEEN inter.pdfNAVEEN inter.pdf
NAVEEN inter.pdf
AchunalaDeeksha
 
CV - SEISMIC BISWAS -new - Copy
CV - SEISMIC BISWAS -new - CopyCV - SEISMIC BISWAS -new - Copy
CV - SEISMIC BISWAS -new - CopySeismic Biswas
 
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))MOHAMMAD KHALID MUSTAFA
 
ngum denise ambe CV the most recent 2016
ngum  denise ambe CV the most recent 2016ngum  denise ambe CV the most recent 2016
ngum denise ambe CV the most recent 2016Ngum Ambe
 
Automatic Phase Changer
Automatic Phase ChangerAutomatic Phase Changer
Automatic Phase Changer
Bhanu Bhawesh
 

Similar to 026 (20)

Okoro godwin report
Okoro godwin reportOkoro godwin report
Okoro godwin report
 
Maurice Kariuki
Maurice KariukiMaurice Kariuki
Maurice Kariuki
 
DIESEL LOCOMOTIVE WORKS VARANASI, Summer Training Report
DIESEL LOCOMOTIVE WORKS VARANASI, Summer Training ReportDIESEL LOCOMOTIVE WORKS VARANASI, Summer Training Report
DIESEL LOCOMOTIVE WORKS VARANASI, Summer Training Report
 
Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1
 
Jose_resume 1
Jose_resume 1Jose_resume 1
Jose_resume 1
 
220 kv Sub- Station By Akshit Jain Majhola Moradabad .docx
220 kv Sub- Station By Akshit Jain Majhola Moradabad .docx220 kv Sub- Station By Akshit Jain Majhola Moradabad .docx
220 kv Sub- Station By Akshit Jain Majhola Moradabad .docx
 
Justin Horsburgh Resume
Justin Horsburgh ResumeJustin Horsburgh Resume
Justin Horsburgh Resume
 
CV ENGLISH Feb2016 - Copy
CV ENGLISH Feb2016 - CopyCV ENGLISH Feb2016 - Copy
CV ENGLISH Feb2016 - Copy
 
Report writing
Report writingReport writing
Report writing
 
UET30812 Certificate III in ESI – Distribution Cable Jointing. Australian Qua...
UET30812 Certificate III in ESI – Distribution Cable Jointing. Australian Qua...UET30812 Certificate III in ESI – Distribution Cable Jointing. Australian Qua...
UET30812 Certificate III in ESI – Distribution Cable Jointing. Australian Qua...
 
Presentation review1 bses.pptx
Presentation review1 bses.pptxPresentation review1 bses.pptx
Presentation review1 bses.pptx
 
Engineering Practice Report
Engineering Practice ReportEngineering Practice Report
Engineering Practice Report
 
JEPCO
JEPCOJEPCO
JEPCO
 
Siwes report
Siwes reportSiwes report
Siwes report
 
Internship report
Internship reportInternship report
Internship report
 
NAVEEN inter.pdf
NAVEEN inter.pdfNAVEEN inter.pdf
NAVEEN inter.pdf
 
CV - SEISMIC BISWAS -new - Copy
CV - SEISMIC BISWAS -new - CopyCV - SEISMIC BISWAS -new - Copy
CV - SEISMIC BISWAS -new - Copy
 
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
 
ngum denise ambe CV the most recent 2016
ngum  denise ambe CV the most recent 2016ngum  denise ambe CV the most recent 2016
ngum denise ambe CV the most recent 2016
 
Automatic Phase Changer
Automatic Phase ChangerAutomatic Phase Changer
Automatic Phase Changer
 

026

  • 1. PRESENTATION ON STUDENT INDUSTRIAL WORK EXPERIENCE SCHEME BY DARAMOLA AYOBAMI DANIEL MATRIC NUMBER: 100409026 WHICH HELD AT POWER HOLDING COMPANY OF NIGERIA PLC, KUBWA BUSINESS UNIT PLOT 146, PHASE 2 SITE 2 ALONG GADA NASCO ROAD KUBWA ABUJA MAY , 2014.
  • 2. OUTLINES BRIEF HISTORY OF COMPANY AREA OF PARTICIPATION OBSERVATION CONTRIBUTION KNOWLEDGE ACQUIRED RELEVANCE OF TRAINING TO COURSE OF STUDY FUTURE CAREER RECOMMENDATION CONCLUSION
  • 3. brief history of the company Kubwa business unit is next after the headquarters at zone 4, Wuse,Abuja. It was established in June 2006 located at plot 146, GadoNasko road, kubwa, Abuja, with great focus on effective distribution of electricity to consumers, maintenance, repair and operation of distribution network and collection of payment for electricity bills The basic organizational structure of Kubwa business unit is  listed below:  Administrative department  Marketing department  Finance and account department  Technical department
  • 4. Area of participation/work done During my SIWES period I worked under:  Services centre  Injection substation  Protection, control and metering  Planning and construction I participated in the mentioned activities below:  Installation of transformer  Mounting of concrete and wooden poles  General maintenance on 33kv and 11kv lines  Installation of single phase meter  Opening and closing of feeder  Pre-commissioning and confirmatory test on transformer  Calculation of capacity test of a new transformer
  • 5.  Involved in system load shedding and local load shedding  Amending burnt up-riser and jumper cut  Involved in calculating rated load of a j and p fuse  Preparation of sanction list
  • 6. Observations  I observed that three disc insulator are used on 33kv line while one disc insulator is used on 11kv line  While in PC&M, I observed the value of earth test ranges from (0-5)ohms  I also observed that 11kv lightning arrestor is different from 33kv lightning arrestor  I observed in the switch yard at injection substation, gang isolator are in between the power transformer and circuit breaker  I also observed that a voltage transformer is used in metering the voltage coming into the injection substation from the transmission station
  • 7. The diagram of 11kv and 33kv lightning arrestor
  • 8. diagram of 11kv and 33kv pot and disc insulator
  • 10. contributions  I used to help them in patrolling the feeder lines  I partook in local load shedding on 3 different substation  I did in reconnection of disconnected service cables  I was involve separating twisted wire on low tension lines  I was also involve in testing of transformer at field work  I partook in digging of earth pit and designing of earth mat  I was involve in recording of incoming voltage at hour interval  I was involve in Installation of a new transformer  I partook in opening and restoring of feeders
  • 11. Image of trainee during SIWES
  • 12. knowledge acquired I learnt how to calculate the capacity of a transformer I learnt about how voltage is been breakdown from the generation to the distribution I learnt about common fault on both low tension line and high tension line I learnt about various equipment and materials used for installation of transformer I learnt about system load shedding
  • 13. diagram of earth test and insulation test
  • 14. Relevance of training to course of study The experience acquired during industrial training has contributed tremendously to my life by upgrading my technical skills. However, it is of no doubt that the training I received is very relevant to my course which is physics/electronics. The theory that I learnt from school would have been a waste of time without the knowledge obtained from the industrial training
  • 15. Future career The experience acquired during industrial training has empowered me in self entrepreneur in the establishment of power monitoring and correction station in injection substation.
  • 16. recommendations ITF should make monthly allowance available for student, so as to put an end to financial difficulties that may arise as a result of transport challenges. Institution and ITF should help student to get a place of attachment so that the program may commence as planned Student should take the SIWES period importantly and try as much as possible to learn practical and not just theoretical
  • 17. conclusion I acquired skills in power system mostly in transformer installation, testing of transformer etc. and have had the opportunity to experience the application of theoretical knowledge acquired in the classroom to solve real life problems, this SIWES has been a success, because I have gained knowledge that ordinarily wouldn’t been obtained in the lecture hall