A to Z with KAreenA KApoor
royal Live Like a King




                           JUNE / JULY 2008 | rs.50
                                                            Live Like a King




                           Steamy
                           Pictorial
                           with
                           supermodel
                           giselle                          the art of
                           uyuni                         sculpting
                                                            beauty
                           Fernanda                        the menace
                           Ferrari                          of stray
   JUNE / JULY ‘08 rs.50




                                                               dogs
                           on Fire                             PLUS
                                                               GaminG
                           the world’s                       GroominG
                           richest                            GadGets
                           indians                          www.royalmag.in
SERENADE
    Dual Time Zones Automatic, Patented GV- AOASE Movement
   18K White Gold. Louisiana Crocodile. Limited Edition: 50 Pieces

www.gevril.com
royal                         Live Like a King
                                                      Letter from editor-in-Chief
JUNE /JULY 2008 | rs.50                               Dear Readers,

Editor-in-Chief                                           It is time for us to celebrate the fabulous women in the Hindi
ronak V. Vyas                                         film industry and what better way of doing that than by carrying a
                                                      mesmerizing pictorial and interview of Bollywood’s reigning queen
Media Partner                                         diva, Kareena Kapoor. To her fans she has come to epitomize the
Prashanth r                                           oomph factor. In the year 2000 she made a sizzling debut with the film Refugee and since then
Editor                                                she has never looked back. In her latest film Tashan she turns on the heat with her flirtatious lime
Anoop Verma                                           green bikini and tiny boy shorts. Her interview gives fascinating insights into the career and life of
                                                      one of India’s most famous personalities.
Advertising & Events                                      Pictures of beautiful women do inspire feelings of intense desire. Our cover model is Brazilian
Atul Prabhu                                           / Italian bombshell, Fernanda Ferrari, who has perfected the art of executing spunky poses in
Business Manager                                      revealing lingerie. She has a thing for adrenalin pumping rides in fast cars, but a girl with Ferrari
Manjunath Amashi                                      in her name is expected to live her life in the fast lane. Then there is the statuesque beauty
                                                      Arsha Tahir, whose performances on the catwalk have started creating ripples in the modeling
Design & Layout                                       world. Curvaceous and long-limbed, Giselle Uyuni’s spellbinding appeal makes her omnipresent
ranjit Joseph                                         in everyone’s fantasies.
Advertising                                               Indeed, it is intrinsic to human nature to pursue good looks, whether it is in our clothes, cars,
Ankur Vyas                                            homes, environment, or within ourselves. In an article titled, The Art of Sculpting Beauty, we take
                                                      you on a ride through the world of plastic surgery. While plastic surgery primarily remains the
Consultant                                            domain of women, the number of men going under the scalpel is steadily on the rise. There are so
Jayesh Pandya                                         many obvious benefits, but what about the pitfalls! We bring you both sides of the story.
Cartoonist                                                From beautiful bodies to beautiful destinations! When you find yourself yearning for a truly
Dan Thompson                                          majestic holiday, then it is time to pack your bags, grab your girlfriend and go for an extended trip
                                                      to the St. James’s Club! Antigua’s prime holiday destination is a hot spot for celebrities, socialites,
Contributors                                          party goers, and anyone else with a high standard of living. Another great destination for this
Chand Kishore Patro,                                  summer is China’s legendary hot-spot Macau. Billed as the Las Vegas of the Orient, Macau offers
Debjani Choudhuri, Vijay Sai, Ashwin                  myriad opportunities for high-octane gambling. We take you on a whirlwind tour of Macau’s most
Satyanarayana, Steve Badger,                          luxurious hotel & casino, the fabled Mandarin Oriental.
Mikhail Chuklai                                           The World’s Richest Indians article throws light on how it is “raining wealth” on the biggest
Web Design                                            Indian tycoons. What an average person makes within a year these honchos make in a minute.
MAC Technology                                        With rising bank balances comes expectations of better living, but there are a host of societal
                                                      problems such as the stray dog population. It is disconcerting that as pets, the dogs can bring us
To Subscribe                                          so much happiness, but as strays they end up being a menace to society. We explore this emotive
subscribe@royalmag.net                                issue in our article titled, The Menace of Stray Dogs. On a lighter note, the power of invention
Advertising                                           never ceases to amaze us. Check out our feature on a car that can drive on water and then
advertising@royalmag.net                              submerse itself and move around like a submarine. If that is not impressive enough how about a
                                                      boat that can fly and then touch down either on water or land!
Website                                               Plus there are the usual articles on gadgets, games, movies, cars and motorcycles!
www.royalmag.in                                       Do email me with your opinions and suggestions at rvyas@royalmag.net
Printed at Tholasi Prints India Pvt Ltd.
                                                      Ronak Vyas
#4, Platform road, Sheshadripuram,
                                                      Editor-in-Chief
Bangalore - 560 020

                                                                    PhoTo CrEDiTS
Cover page - Fernanda Ferrari | Cartoons by Dan Thompson | Arsha Tahir - Photos courtesy of Porter Photography and O.S. Photography | Mandarin Oriental
Macau - Photos courtesy of Mandarin Oriental | Ibn Battuta Mall - Photos copyright by Nakheel Media Center | Rinspeed sQuba - Photos copyright by Rinspeed |
Giselle Uyuni - Photos courtesy of Juan Zambrano | Kenneth Cole - Photos copyright by House of Fraser Press | Usher Fragrance - Copyright by Clifford/Bratskeir Public
Relations | Fernanda Ferrari - Photos courtesy of Fernanda Ferrari | Lamborghini - Photos copyright by Lamborghini Press | Suzuki - Photos copyright by Suzuki Press
| Yamaha - Photos copyright by Yamaha Press | Over Her Dead Body - Copyright by New Line Cinema Movie Publicity | Flight of the Living Dead - Copyright by New
Line Cinema Movie Publicity | Krazzy 4 - Copyright by Eros Entertainment | St. James’s Club - Photos copyright by Elite Island Resorts
                                                                      Buying guiDE
Panasonic Massage Chair - www.panasonic.com | Crepax Kadhorna Cabinet - www.mossonline.com | BODIE and FOU Cognac Glasses - www.bodieandfou.com
| Norm 69 Pendant Light - www.bodieandfou.com | Sky Boats - www.opulentitems.com | Globe Workstation - www.opulentitems.com | Logitech Z Cinema
- www.logitech.com | Strada Navigation System - www.panasonic.com | Sony Vaio - www.sony.com | Diamond TV - www.opulentitems.com | Gateway FX
Series - www.gateway.com | Logitech Zebra Mouse - www.logitech.com | LG Prada - www.lge.com | Sony Camcorder - www.sony.com | LG LU20 - www.lge.
com | Hugo Boss Bag - www.hugoboss.com | Belkin Bag - www.belkin.com | Diesel Bag - www.houseoffraser.co.uk | Linea Bag - www.houseoffraser.co.uk | Ted
Baker Bag - www.houseoffraser.co.uk | Pangea - www.pangeaorganics.com | Lucky Tiger - www.getluckytiger.com | Redken - www.redken.com | TNA Impact
- www.tnagame.com | Nintendo Kart Wii - www.nintendo.com/wii | Mass Effect - http://masseffect.bioware.com | Spore - www.spore.com | Boom Blox - www.
ea.com/boomblox | Pirates of the Revolution - http://piratesonline.station.sony.com | Legend of Norrath - http://legendsofnorrath.station.sony.com | Sim City
Societies - http://simcitysocieties.ea.com | Guitar Hero III - www.guitarherogame.com
COnTEnTS
 JUNE / JULY 2008




                                                                    26
                                                                         Rinspeed sQuba
                                                                         With the Rinspeed sQuba emulating James Bond
                                                                         becomes a notch easier. Drive it on land as a
                                                                         normal vehicle and when you reach a water body
                                                                         don’t be afraid to just drive in. The sQuba is capable
                                                                         of achieving a top speed of 75mph on land, 4mph on
                                                                         water and 2mph below the surface. Just the right
                                                                         speed to make for a great escape.

                                                                         13	      Mandarin	Oriental	Macau
                                                                         16	      The	Essence	of	Being	Cool
                                                                         18	      Ibn	Battuta	Mall
                                                                         22	      Indian	Cricket	Team:		


28 Uyuni
                                                                         	        Staying	at	the	Top
                                                                         24		     Home	Improvement

Giselle
Originally from Bolivia and now based in San Francisco, Giselle
is determined to set the world afire with her high-octane
sexuality. In a striking pictorial you’ll see why her curvaceous
body and mesmerizing eyes make men go weak in the knees.
                                                                   47
36	     Q	&	A	with	Dr.Pyar
37	     Featured	Designer:	Kenneth	Cole
42	     Gadgets	




                                                                   The World’s Richest
                                                                   Indians
                                                                   They could make the legendary Midas feel jealous. The
                                                                   combined worth of the top 10 richest Indians is worth more
                                                                   than the GDP of entire nations. They are the uber-rich
                                                                   Indian entrepreneurs, hungry for new ways to demonstrate
                                                                   their wealth. Their eclectic shopping list is peppered with
                                                                   items like billion dollar global companies, fancy cars,
                                                                   corporate jets, plush mansions and everything else that
                                                                   money can buy.
COnTEnTS
46	      Jokes
51	      The	Art	of	Sculpting	Beauty
55	      Fashion:	Grooming,	Bags
68	      Cars
71	      Bikes
72	      Gaming
77		     Movies




57
                                                               60
A to Z with Kareena Kapoor
Kareena Kapoor has perfected the art of making the silver
screen sizzle through an enticing blend of sexuality and
histrionics. Her fans consider her to be the sexiest heroine
in Bollywood. Coupled with her bold statements, and clever
answers, the actress is definitely at the top of her game.


82	      All	about	Poker	Tournaments
85	      Calculating	Pot	Odds
                                                               Fernanda Ferrari
                                                               Fernanda Ferrari is a ravishing mix of Italian and
86	      The	Menace	of	Stray	Dogs                              Brazilian. A supermodel who loves the thrill of speed, is
                                                               every man’s fantasy woman. But what kind of man does
                                                               Fernanda like? Without hesitation she responds stating
                                                               she likes the quiet, rugged type like Akshay Kumar.




                                                               St. James’s Club

                                                      78
                                                               Located in Antigua’s lush tropical playground,
                                                               St. James’s Club spans across a 100-acre estate
                                                               boasting of breathtaking ocean views, two white sand
                                                               beaches, a regally appointed casino, excellent set of
                                                               bars, restaurants and accommodations fit for a king.
Facts & statsnOWing!!!
                              OW OFF K
                            THAT YOU CAN sH
                                                               >>>1
                                                               The great Roman Emperor Julius Caeser suffered
                                                               from epilepsy.


                                                              >>>2
                                                              Bangalore has
                                                              the highest
                                                              number of pubs
                                                              in India.



                                                                >>>3
                                                                every hour the Universe expands by a billion
                                                                miles in all directions.

                                                                     >>>4
                                                                     the call of the humpback whale is
                                                                     louder than a Concorde and can be
                                                                     heard from 500 miles away.                e it
                                                                                                          sHaK !!
                                                                                                              Y!
                                                                                                           BaB
                                                               >>>5
                                                               Humans and dolphins
                                                               are the only species
                                                               that have sex for
                                                               pleasure.


                                                                  >>>8
                                                                  india has never invaded
                                                                  any country in her last 100,000 years of history.

                     >>>6                                         >>>9
                     despite its omnipresence in movies
                                                                  The four religions born in India - Hinduism,
                     and in popular culture the modern
                                                                  Buddhism, Jainism, and Sikhism, are followed
                     bikini is only about 62 years old.
                                                                  by 25% of the world’s population.
ROyAL




                     >>>7                                     >>>10
                     there are men in Guam whose job is       the Vishnu temple in the city of tirupathi built in
08 JUnE / JULy ’08




                     to travel the countryside and deflower   the 10th century, is the world’s largest religious
                     young virgins, who pay them for the      pilgrimage destination. Larger than either Vatican
                     privilege of having sex for the first    City or Mecca, an average of 30,000 visitors donate
                     time.                                    $6 million (US) to the temple everyday.
ROyAL JUnE / JULy ’08   09
   of the month
babe




                    TAHIR
                  ARSHA
A
                rsha Tahir is hot; hotter than most
                models that you will come across.
                She has what it takes to make men
                turn their heads and do a double take
                - flawless skin, chiseled features,
                flowing dark locks, an hourglass
                figure. Her personality seems to
subsume the best attributes of two divergent worlds.
While her beauty is evocative of the sun-kissed Fijian
landscape, where she was born, her style is wholly
western, with Canada being the country where she
was raised.
     She has always been passionate about modeling,
because she loves the challenges that are intrinsic
to this profession. And what could those challenges
be! What else, but the exciting routine of traveling
around the world on photo shoots and meeting
interesting people. But it is also a fact that she
takes immense joy in executing sultry poses for the
camera. Even though she is only 23 years old, she
is already on her way to becoming Canada’s most
in demand model. Now it is only a question of time
before Hollywood beckons. But if she has her way,
then it is quite likely that Bollywood will be her first
move to acting. She confesses that she harbors an
incredible crush on Dino Morea and Shahid Kapoor.
If she were called upon to do a steamy love scene in
any movie, then she would prefer it to be with either
of these two guys.
babe
                          of the month




      I just love

Dino Morea          and

    Shahid Kapoor.
                                         ROyAL JUnE / JULy ’08
                                         11
babe
                     of the month




                                                             Aside from the Bollywood hunks, who else is
                                                             capable of turning her on? This is how she
                                                             describes the Casanova who might win her
                                                             heart, “He has to be the confident type, but
                                                             he cannot afford to be cocky. He has to be
                                                             open-minded, adventurous, versed in the art of
                                                             cracking funny jokes and he should be game
                                                             enough for being challenged by a girl.” So now
                                                             you know what sort of avatar to pick up if you
                                                             are planning to make inroads into Arsha’s heart
                                                             and mind.
                                                                 But there is another ethereal side to her
                                                             personality, one that makes her appreciate
                                                             the beauty and vibrancy of nature’s every
                                                             creature. She is clearly in love with the natural
                                                             environment. She talks about missing the pet
                                                             horse that her grandfather kept back in Fiji.
                                                             She says that if God had decided to make her
                                                             an animal then she would like to be a horse.
                                                             Is it possible that her energetic lifestyle gets
                                                             inspired from her favorite creature.




                                    I like a guy who isn’t

                     afraid
ROyAL




                                           to be

                        challenged.
12 JUnE / JULy ’08
Mandarin
                            Oriental
                             Macau
                                              by v deepti




A
                 ttached to the bottom of Mainland China, on the banks of the picturesque Pearl River, there
                 lies a famous peninsula called Macau. Billed as a paradise seeped in history, culture and en-
                 tertainment, this place presents the unique facet of being traditional and yet so modern. For
                 many centuries Macau had been the prized jewel in the crown of Portuguese empire and to
this day its landscape continues to be dotted with buildings and churches built in inimitable Portuguese style
of architecture. Of these, the seventeenth-century Jesuit Church of Madre de Deus, better known as Sao
Paolo, is probably the finest Christian monument in the Far East.
   It was only in 1999 that Mainland China regained control of Macau under previous treaty agreements with
                                                                                                                  ROyAL JUnE / JULy ’08




the Portuguese establishment. Under Chinese tutelage there came growth at a scorching pace. In a matter
of few years, Macau transmogrified itself into orient’s answer to the fabled Las Vegas. Its casinos and resorts
attract thrill seekers in droves. The nights turn out to be brighter than the day, as animated billboards and
marquees advertising myriad gambling hotspots light up the streets. Limousines carry the rich for their tryst
with casinos of their choice. Beautiful women who can balance themselves precariously on their high-heels
offer tantalizing prospects for romance and seduction.
                                                                                                                  13
There are 388 rooms and
                                                                                                28 suites waiting for you
                                                                                                to take your pick from and
                                                                                                have the time of your life.
                                                                                                Whether you choose to stay
                                                                                                in a room or a suite, you are
                                                                                                bound to discover that luxury
                                                                                                comes standard at mandarin
                                                                                                Oriental.


                                                                                                                 with its carved teak staircase and an
                                                                                                                 ecclesiastical window looking down upon
                                                                                                                 it, creates an impression of a Portuguese
                                                                                                                 Palacio. Wherever you look, your eyes
                                                                                                                 are greeted by incredible opulence - the
                                                                                                                 sitting arrangements, the elevators, the
                                                                                                                 bars, restaurants, landscaped swimming
                                                                                                                 pools and the casino.
                                                                                                                    Chandeliers, tapestries, and artwork
                                                                                                                 embellish every inch of the lobby.
                                                                                                                 Even the guest rooms are decorated in
                                                                                                                 Portuguese fabrics and natural teak.
                                                                                                                 Whether you choose to stay in a room
                                                                                                                 or a suite, you are bound to discover
                                                                                                                 that luxury comes standard at Mandarin
                     A Gambling Paradise                          types of slot machines. Roulette and           Oriental. If you yearn to indulge in some
                        Amongst all the casinos of Macau, it is   blackjack are hot favorites, and so are        sightseeing without going through the
                     the Mandarin Oriental that turns out to      games of local origin going by fanciful        rigmarole of stepping out of your plush
                     be the most prestigious. If anything, the    names like Mahjong Baccarat, Mahjong           room, then you can go in for the Superior
                     hotel is built with a casino in mind and     Paikao and Taiwan Paikao. As the casino        City View Rooms and Deluxe City View
                     that is just one of the reasons why it can   is part of a sprawling hotel, that makes it    Rooms that offer magnificent views of
                     boast of such a fine playing environment     a perfect place where you can fuel your        South China Sea or the historic Guia
                     within its premises. Out here Baccarat       gambling fire, while still enjoying quality    Fortress. Even greater delight lies in the
                     enjoys the distinction of being the most     time with your loved ones. In fact, the        Club Floor City View Rooms that offer
                     popular table game. Even on the most         Mandarin Oriental Casino & Hotel is            views of the city and the famous Macau
                     tranquil day it will be easy for you to      included in Forbes’ list of the best casinos   Grand Prix Race Track.
                     find baccarat tables surrounded with         in the world.                                     There are 388 rooms and 28 suites
                     gamblers cheering for a win. Everyone is                                                    waiting for you to take your pick from
                     trying to get a touch of the sacred green    The Aesthetics of                              and have the time of your life. The
                     felt and strike it rich. It is a popular     Mandarin                                       truth is that the vibrant environment of
                     saying in Macau that gamblers come to           The magnificent structure of the hotel      Mandarin Hotel is especially conducive
                     Las Vegas solely to be entertained, but      exudes an aura that is a unique blend          for romantic interludes. After all, where
                     over here, gamblers, especially those        of Portuguese heritage, the traditional        else can love blossom if not in a setting
ROyAL




                     of Chinese origin, step into casinos to      cultures of the Orient and the futuristic      such as this. Just imagine the feeling
                     challenge their destiny. The casino is       spirit of Las Vegas. Once you walk into        of you and your girlfriend enjoying a
                     open 24 hours a day, thus enabling its       its air-conditioned portal, you can’t          champagne breakfast in your room even
14 JUnE / JULy ’08




                     patrons to challenge their destiny round     escape the feeling of being in a mythical      as the city around you is still awakening
                     the clock.                                   land, so luxurious and artistic that it        from the mists of the night.
                        Other than Baccarat, the sumptuous        seems far removed from anything that
                     spread of Mandarin Oriental’s casino         you have ever seen or experienced.             Restaurants and Bars
                     offers 11 types of table games and 59        The immaculately proportioned lobby,             From the broad range of fashionable
restaurants located within                                                                           you can get them from the Tennis
the Mandarin, it is easy to                                                                          Pro Shop. If you need to polish
choose one that suits your                                                                           your playing style, an instructor
needs and your tastes. The                                                                           is also available. A squash court is
most romantic restaurant is                                                                          available on the third floor of the
Mezzaluna, located on the 2nd                                                                        hotel for those who really want to
floor; this elegant restaurant                                                                       sweat it out. You don’t even have
offers Italian cuisine in stylish                                                                    to go out looking for a mountain
surroundings. Inspired by a                                                                          in order to indulge in rock
renovated Tuscan villa, the                                                                          climbing. The Mandarin has a 10-
restaurant features a wine                                                                           metre high, 360-degree modular
room with a global collection                                                                        rock tower, which is capable
of vintage wine. The open                                                                            of offering a truly adventurous
kitchen with wood-burning                                                                            holiday experience.
oven only adds to the charm.                                                                            For shopping addicts the
   For       aficionados       of                                                                    Mandarin Oriental Shopping
Cantonese cuisine, there is                                                                          Arcade represents a vista of
no alternative to Tunk Yee Heen which          choice of cakes and pastries, all baked       unparalleled opportunities. Situated on
offers Cantonese a-la-carte menus, as          freshly on the premises.                      the lobby floor, the shopping arcade is
well as stylish Chinese banquets. Then           The memory and the spirit of the            home to almost every major brand in
there is the Naam Thai restaurant,             legendary Portuguese maritime explorer        the world - Cartier, Emporio Armani,
famous for its top class Thai menu in          Vasco Da Gama lives on in the restaurant      Burberry, Ermenegildo Zegna, Louis
Macau. Strategically located at a spot         called Vasco. Out here irresistible local     Vuitton, Hugo Boss, Salvatore Ferragamo,
where it overlooks a vibrant swimming          tapa-style treats, exquisite high tea and     Dunhill, Hermes, Omega and Dior. One
pool and luxuriant tropical gardens, this      a vast repertoire of creative cocktails       thing is for sure, if you are staying at
intimate 60-seat restaurant is bright,         await you. But the main attraction of         Mandarin, you won’t have to travel far
casual and contemporary. Out here you          the Vasco lies in the live band that is       in order to buy an appropriate gift for
can try some of the most delicious Thai        often billed as Macau’s best nightly          your girlfriend or wife. But the world
dishes cooked from the freshest produce        entertainment. Looking for a more laid        of Mandarin is as enchanting outside
and the finest herbs and spices.               back type restaurant? Try The Veranda,        the building as it is inside it. Stepping
   Then there is the Café Bela Vista that      a poolside spot to enjoy al fresco dining,    out of the hotel and taking peek at the
carries all the splendor and charm of the      where you can savor grilled seafood and       local culture can be an unforgettable
historic Hotel Bela Vista and remains          exotic cocktails.                             experience by itself.
open 24 hours a day. Breakfast, lunch                                                          You only need to take a five-minute
and dinner buffets - you can depend on         Leisure Facilities                            walk to reach the famous Macau
this charming restaurant to keep you              Other than the sprawling casino, the       Fisherman’s Wharf that covers an area of
supplied with the tastiest morsels at          Mandarin Hotel boasts of a host of other      over 93,000 square metres and is home
all times of the day. If cakes are your        facilities to let you have the time of your   to all kinds of entertainment and retail
weakness then The Cake Shop is the             life. If it is peace and relaxation you are   facilities. The Nam Van Lake Cybernautic
place to hang out. Located on the 2nd          seeking, then check out the in-house spa.     Fountain is a man-made lake that gushes
floor, this shop is famous for its extensive   Designed like a tropical garden, the spa      with 86 waterspouts, some of which
                                               boasts of an outdoor swimming pool            are up to 80 meters high. At night the
                                               and a picturesque waterfall. Teams of         waterspouts are a sight to behold when
For aficionados                                highly trained professional therapists        288 colorful spotlights illuminate them.
                                               pamper and rejuvenate every inch of           The Taipa Houses and the Macau Tower
of Cantonese                                   your body through their massages, body        are important landmarks that showcase
cuisine, there is no                           treatments, facials, manicures, pedicures     the best aspects of local culture. Then

alternative to tunk                            and much else. An added plus are the
                                               new therapies for relaxation like the
                                                                                             there is the Wine Museum where wine
                                                                                             aficionados can discover over 1,115
Yee Heen which offers
                                                                                                                                            ROyAL JUnE / JULy ’08




                                               Comfort Zone treatments, which use the        labels.
Cantonese a-la-                                marriage of science and nature to leave         Mandarin Oriental Macau is a
                                               your body and spirit in a state of bliss.     microcosm of an unique paradise on
carte menus, as well                              Mandarin Hotel makes it easy for you       earth that every human being needs to
as stylish Chinese                             to have a knockabout on a round of            experience at least once. n
                                               energetic sports. There are three tennis
banquets.                                      courts available for guests. No problem if      www.mandarinoriental.com/macau/
                                               you don’t have your own racket and balls,
                                                                                                                                            15
The
                     Essence of
Being Cool
                     T
                                      here once was a man named Adam.          up — in general, he became a much more attractive
                                      He was a nice enough fellow — he         man. He became the forbidden fruit. Only it’s much
                                      didn’t really know any better — and      more complex than that. Most of the women didn’t
                                      he had a woman, food, plenty of sex      know he was dating someone else. Part of it was
                                      and nudity, more pets than a zoo, and    because he was happy and confident, but he’d been
                     lived an idyllic life. Only one thing — he couldn’t eat   happy and confident alone before, without this
                     one particular fruit. Other than that, he could do        change coming. What was going on?
                     whatever he wanted. So what did he do? Obviously,            The forbidden fruit is the obvious and easy little
                     he ate the fruit. Thus began a long tradition in all      trick we can watch humanity fall for. But there is an
                     humanity; we want what we can’t have.                     opposite corollary; we don’t want what we can have.
                        Psychologists have a name for this, given to us        Theories for this abound. Some people think it’s
                     by that early Adam. It’s the forbidden fruit complex,     because our unconscious mind is triggered to think
ROyAL




                     and almost everyone has it to one degree or another.      ourselves better than those who are desperate to be
                     Women have a name for this too. It is called playing      with us. Some people just find it boring — where’s
                     hard-to-get. Now, some significant time later, there      the thrill? The chase? The get-to-know-you game?
16 JUnE / JULy ’08




                     was another Adam. The poor guy didn’t really know         Maybe it smacks of self-consciousness and a lack of
                     what he was doing with women, and he rarely had           confidence — why do you need me so much? What’s
                     successful dates. Finally, through blind luck, he         wrong with you? Maybe it’s the insult of skin-deep
                     found himself in a relationship. Overnight the world      lust. Hey, some women enjoy one-night-stands as
                     changed — ladies smiled at him, some chatted him          much as the next guy, but outside of the porn industry,
You don’t need to tell her
few women want to be viewed as                how much you want her.                                      you try and pet her,
just a body. And if you want it so          And more importantly, don’t                                   you’ll never catch up to
bad in such a short amount of time,
well, you don’t truly know her so we
                                            show her. Really, this is the                                 her. But act chill around
                                                                                                          cats — even ignore
know what you really want. Maybe             definition of cool. You may                                  them — and you’ll have
it makes no logical sense at all, and
                                             think you’re playing it cool                                 them crawling all over
it’s useless to analyze.                                                                                  you.
   What we can do, though, is                and not telegraphing your                                       This is the way of life.
recognize it for the pattern it is,          intentions, but guess what                                   It is one of the most
and learn from it. Just as you were                                                                       important        concepts
turned off by that nerdy girl in high
                                            — if the intentions are there,                                you’ll ever learn when it
school who had the crush on you,                  you probably are.                                       comes to attraction and
attractive women are turned off                                                                           dating. Act with ulterior
by drooling dorks. But now we’ve                                                                          motives and she’ll
got a problem. If women don’t like                                                                        know, guaranteed, and
men who obviously like them, and we         too close, you fidget with buttons,          you’ve lost all hope with her.
only want to be with women we like,         you laugh about things that aren’t              Act with no expectations and it’s a
then this easily turns into a nightmare     funny, you awkwardly get in position         fair bet she’ll see a bit of the forbidden
scenario of hopelessness.                   for a handhold. And about 2000 more.         fruit in you. This is what people mean
   This paradox is probably the cause       If you were a yogini you might be            when they say to just be yourself. If
of something like 95% of the world’s        able to approach a woman with her            you can simply enjoy being you and
loneliness. It’s a pity our emotional       attractiveness front and center in your      living your life around women without
brain — the part of the mind that is        brain and control all the little tics that   chasing them, it works. It says you are
responsible for attraction — is such a      give you away as a bundle of nervous         an interesting, confident guy who might
mess. But that’s the way it is.             sexual energy. Of course, if you were        enjoy being with a particular woman,
   I guess we should all get used to it     a yogini, you probably wouldn’t be           but you don’t need that woman. Unlike
and prepare for a life of marriage to       interested in this, but that’s another       modifying your behavior around
someone we settle for, not someone          story. No, there is a much easier way to     her, which smacks of insecurity and
we want. Right? Understand this is the      deal with this, to eliminate all the signs   weakness. So what do you need to do to
way it usually happens. It’s not the way    that say ‘I want you’. The simple answer     eliminate yearning in your interactions
it has to happen. We’ve said before that    is - relax. The longer answer is don’t       with attractive women?
attractive women assume as a matter of      try. Pretend she’s your sister. Pretend         Convince yourself you’re too busy for
course that all men want them. It might     she’s a character in a video game.           her anyway. Or, better yet, too good for
not always be true — maybe not every        Pretend she’s a practice conversation        her. Or only talk to women within areas
bum sitting outside the library with an     for some imaginary future.                   that have easy access to cold showers.
upside down hat in front of them wants         Whatever you do, don’t think about           Whatever you need to do to get
your quarter — but it’s true enough that    going back to your place with her.           yourself in the right frame of mind, do
it’s a useful rule in her daily life. She   Really, you don’t need to pretend, you       it. Remember, she’s just practice. This
knows how to deal with men when she         can simply make the conversation             is a simple concept, really, but hard to
knows what they want. So what do you        practice. With every woman. From             put into, ahem, practice. You’ll probably
need to do?                                 now till forever. You just can’t show a      hold your head well for a bit before a
                                            girl your cards early on. It’s death to      situation turns promising and you think
  Nothing.                                  attraction. It transmits all the wrong       you’re in, and the magic ends. You lose
                                            things. Sure, you might get away with        it — just for a second — and you may
  You don’t need to tell her how much       it now and again, but not usually, and       never recover.
you want her. And more importantly,         never with extremely attractive women           Of course, just standing around not
                                                                                                                                        ROyAL JUnE / JULy ’08




don’t show her. Really, this is the         in high demand. And until you realize        wanting women isn’t enough. You need
definition of cool. You may think you’re    that, you should treat all women as          to know how to go up to them, talk to
playing it cool and not telegraphing        practice with that bit of knowledge.         them, trigger attraction in them, and
your intentions, but guess what — if        Because it’s never going anywhere            eventually seal the deal. Happy dating!
the intentions are there, you probably      otherwise. Once you do realize it, you’ll    n
are. There are literally thousands of       see that you just need to do what you’ve
physical clues that set off a woman’s       been doing, treating a lady as a practice    For more great articles on this topic
radar. You lean in too far or approach      conversation with no aim. Like a cat, if     check out www.pualife.net
                                                                                                                                        17
by pinki ShrivaStava




                     T
                                     raveling to far-off lands like any           concept of a shopping mall.
                                     intrepid globetrotter is what many of us       It is possible for you to retrace Ibn Battuta’s famous
                                     constantly fantasize about, but only few     journey without undergoing the hardships that the
                                     amongst us possess the determination         legendary traveler faced during his lifetime. You
                                     or the resources to give full vent to our    navigate in the cool and plush environs of a shopping
                     fanciful flights of wanderlust. Ibn Battuta, was one such    mall and still manage to catch a glimpse of myriad
ROyAL




                     intrepid traveler, who set off on his legendary journey      cultures from all over the world. The place where you
                     more than 700 years ago, when the fastest means of           can experience such a sense of adventure happens to
                     transportation were the human feet, and only those           be the eponymous Ibn Battuta Mall, located in Dubai,
18 JUnE / JULy ’08




                     that were blessed by fortune could hope for the luxury       where the possibilities tend to get limitless. Billed as
                     of traveling on a camel, horse or a ship. The account of     world’s largest themed mall, this place is embellished
                     his journey across many continents continues to be the       by six elaborately designed courts that throw fanciful
                     inspiration for many books, movies, TV serials and now       visions of places that Ibn Battuta visited and wrote about
                     for the first time it is being glorified in the design and   - Tunisia, China, Egypt, India, Persia and Andalusia.
guess its importance from the fact that this
                                                                                                          place boasts of the only IMAX theatre in the
                                                                                                          United Arab Emirates and it also offers a 21-
                                                                                                          screen Cinema Megaplex, which is located in
                                                                                                          the China Court area of the mall. So the next
                                                                                                          time you are here don’t be surprised to find
                                                                                                          your favorite Bollywood movie running on any
                                                                                                          one of the screens at the Megaplex. In fact,
                                                                                                          Bollywood movies are a huge draw at the mall
                                                                                                          and so are flicks from Hollywood.
                                                                                                            Spread across an area of 5.4 million square
                                                                                                          feet, the place is larger than most malls in the
                                                                                                                                      world. It includes 10
                                                                                                                                      car parks that can
                                                                                                                                      jointly accommodate
                                                                                            the ibn Battuta                           more than 5000 cars.
                                                                                                                                      The retail area alone
                                                                                         mall is like a bridge                        is spread across an
                                                                                         between the present                          astonishing 67,500
                                                                                         and the past, a place                        square meters and
                                                                                                                                      it has 275 retail
                                                                                            where the most                            outlets,         while
                                                                                         modern appliances,                           the      well-planned
                                                                                             artifacts and                            Food Courts span
                                                                                                                                      across 3,800 square
                                                                                          entertainments get                          meters. Some of
                                                                                          juxtaposed with an                          the best brands
                                                                                         environment that is                          in the world are
                                                                                                                                      represented      here
                                                                                          decidedly from the                          - Betsey Johnson,
                                                                                         14th century world.                          H&M,         TopShop,
                                                                                                                                      Forever 21, Ginger
                                                                                                                                      & Lace, Lacoste,
                                                                                                          Next, Pierrie Cardin, Gucci, Omega, Versace,
                                                                                                          Banana Republic and many others. Then
                                                                                                          there is the children’s play zone packed with
                                                                                                          all sorts of amusements and thrills.
                                                                                                            It is quite natural that walking up and down
                                                                                                          this mega mall is going to stimulate your
                                                                                                          appetite. But there is ample scope out here
                                                                                                          to take care of that need. On both ends of the
                                                                                                          mall two large food courts are located and
                                                                                                          that is in addition to the several coffee shops,
                     an enchanted world                                                scattered throughout its entire length. If you are an aficionado
                       Don’t be amazed if a visit to the Ibn Battuta mall evokes the   for cuisine from all over the world then you are not going to be
                     surreal feeling that you have been transported to the enchanted   disappointed. Along with the best concoctions from the world
                     world of 14th century. You will be wooed by the splendor of the   of western food, here you will also find enough opportunities
                     Arabic wind towers, and swept off your feet by the magnificence   to titillate your palate with relishing dishes of Chinese origin,
ROyAL




                     of Indian domes. The lavish architecture of medieval China        sumptuous Indian fare, Tunisian food, and lip smacking treats
                     will awe you and the picturesque beauty of Tunisia will           from Egypt.
                     have a soothing effect. The Ibn Battuta mall is like a bridge
20 JUnE / JULy ’08




                     between the present and the past, a place where most modern       the Place for edutainment
                     appliances, artifacts and entertainments get juxtaposed with        The most outstanding appeal of the mall lies in its
                     an environment that is decidedly from the 14th century world.     edutainment features, which combine features of education
                       Located on Dubai’s Sheikh Zayed Road, the mall was              and entertainment. There are numerous storytelling tours that
                     developed by Nakheel Properties Group in early 2005. You can      provide an exciting opportunity for visitors to better understand
the historical perspectives that can be gleaned
from the life of Ibn Battuta. Then there are the
numerous exhibits of ancient technological
inventions, especially from the Middle East.
The modern full-size working reproduction of
an elephant clock is particularly interesting. It
is basically an invention of Islamic origin that
consists of a water-powered clock developed in
the form of an elephant.
   Another piece of everlasting appeal is the re-
creation of a 25-metre Chinese sea faring junk
that happens to be a replica of an ancient boat on
which Ibn Battuta is said to have sailed through
the Indian Ocean. The mirror maze located in
the Chinese court is great fun and many visitors
                                                                        Landmarks of Dubai
can’t have enough of it. Another interesting item                       Year-round sunshine and a culture that is eminently lavish
is the virtual aquarium that enables visitors to                        pose enough reasons to make Dubai an enormously popular
observe many different types of marine life, including great            holiday and shopping destination.
white sharks. There is also a sand sculpture, created by world-
renowned artist Jenny Rossen, based on different mosques of             Burj Al Arab
the Middle East.                                                                If there is any structure that succinctly epitomizes the
   For book lovers a tryst with the famous Magrudy’s bookstore                     bustling, bright and cosmopolitan character of the city
is a must. Located right next to it is a toy store. Even Géant, which                of Dubai, it is the Burj Al Arab. The name translates
holds the distinction of being the largest French supermarket                          into english as “Tower of Arabs”. Since it’s opening
chain, has a store here. When you tire of sightseeing and                                date in 1999, the Burj Al Arab quickly gained the
shopping, then it is time for rest & relaxation. What can be a                            status of being Dubai’s iconic symbol. It is the
better place for that than a luxurious spa or a state of the art                           world’s most luxurious seven-star hotel, and its
gym! Try it and chances are that you will be able to recharge                              opulence is unparalleled anywhere else on the
you batteries for another round of adventures at this mall.                                  planet.
   If anything, the Ibn Battuta mall is certainly worth a visit, not                           Even those who are not staying here, flock
just for the shopping and entertainment experience, but also                                   to this hotel because a trip to Dubai is never
for the fantastic design and concept. But before you venture            complete unless your eyes have basked the beauty of Burj Al
inside this place make sure you have a full wallet and a pair of        Arab’s sail like shape soaring into the sky. At 321 meters,
comfortable walking shoes on. It is really big, so big that you         this hotel is one of the tallest in the world. It even has its own
have to become an explorer to fully appreciate its grandeur. n          helipad. It is furnished throughout in opulent Arabic style, and
                                                                        an astounding 8,600 pieces of 22-carat gold have been used
                                                                        in its construction.

                                                                        Sheikh Zayed Road
                                                                        The Sheikh Zayed Road is a landmark by itself. This road
                                                                        happens to be the home to some of the tallest buildings in
                                                                        the world, including the magnificent 355m-high Emirates
                                                                        Towers, which is the tallest building in all of Middle East and
                                                                        Europe. Many tourists board the glass elevators that take you
                                                                        to a viewing deck on the top which offers unforgettable views
                                                                        of Jumeria coast.

                                                                        Creekside Park
                                                                        Even though Dubai enjoys the reputation of being the city of
                                                                        high-rises and beaches, it does have a fair number of parks
                                                                        where you can chill out. the One such oasis is the Creekside
                                                                        Park that lies in Umm Hurair area of Dubai. The park contains
                                                                        over 280 botanical species, as well as a mass of green areas,
                                                                        leafy paths for roller-skating and jogging, three jetties for
                                                                        fishing, a mini-golf course and a 30m high cable car.
by chand kiShore patro




   Staying                                       What the
                                               Indian Cricket Team
at the
       top                                   W
                                                                         Should Do
                                                       hen the young guns of the Indian team roistered
                                                       after the historic win in the first Twenty20 World
                                                       Cup, the writing was clear on the wall – a youthful
                                      Team India is emerging as a new force to reckon with. The
                                   amalgamation of valuable experience and spirited youth is proving to
                                  be a sure recipe for success. Now it is only a question of time before we
                                make it to the top in other versions of the game– ODI, and test cricket.
                                 There is a glut of talent knocking the doors of the selection committee.
                            Promising bowlers like Balaji sit out because of injury and we don’t even miss
                      him, as an Ishant Sharma or a Praveen Kumar are there to chip in with memorable
                   performances. These are great days for Indian cricket, when we can keep a player of
                   Virendra Sehwag’s or V V S Laxman’s caliber out of the team for not being in form and
                   yet win matches in trot.
                             The saying of a famous tennis champion comes to mind – it’s easier
                         reaching the top than remaining there. So now that India has reached a pivotal
                           position what should it do to remain there? Here are a few tips that can be
                             employed:

                             Right Attitude:      There is no doubt that an aggressive attitude from
                            team members is a precondition for winning games. But the dosage of
                            aggression has been increasing dangerously during the last few months. In
                            South Africa and Australia players like Bhajji and Sreesanth demonstrated
                            in no uncertain terms that they will not take any nonsense from anybody.
                            That’s a beautiful attitude, despite a penalty here and a reprimand there
                              by cricketing governing bodies. But it becomes a problem if these players
lose self-control. The recent
slapgate incident, where Bhajji
slapped Sreesanth, tarnished
the images of both the players.
Additionally, it has now put
pressure on the whole team
to prove that it’s aggression is
well within reasonable sportive
limits. Players need to be
counseled so that they don’t
break into fits of anger.

Two Teams and Two
Captains:
The talented youngster, Dhoni,
has ample cricketing acumen.
He is capable of leading the
test team, as well as a one-day
or a T20 team. But he shouldn’t be overburdened with test          Calendar
                                                                   Allowing for Rest                 Cricket,	
                                                                                              despite	being	a	
captaincy. With the amount of cricket he is playing he will
be lucky if he can last for 5 years. Being a wicket keeper-        and Relaxation:
                                                                                               glorious	game	
captain, he has to be busy, mentally and physically all through       Its time for us
the game. Adding the burden of test captaincy will be a sure       to admit – India is
recipe for shortening Dhoni’s career. So let’s stick to the two
teams, two captains policy. It’s working fine.
                                                                   witnessing a virtual
                                                                   deluge of cricket.          of	uncertainty	
Guard against the Ganguly Syndrome:
                                                                   Players have been
                                                                                              follows	certain	
                                                                                                    patterns.
                                                                   complaining of stress
  Ganguly came in as the captain when Sachin buckled               resulting from packed
under the pressure of leading the team. Ganguly exuded             schedules. Now with
rare confidence and mental toughness. He led the Indian            the T20 version of
team to many memorable victories and there was a time              the game having made its debut, there is bound to be extra
when everybody was singing paeans on his name. But with            pressure on highly rated players who are expected to take part
Jagmohan Dalmiya at the helm of the affairs he took his            in all the versions of the game: Dhoni, Yuvraj Singh, Virendra
position for granted and developed a group of sycophants           Sehwag etc. The calendar should be designed so that it allows
around him. In future, no player or captain should be allowed      enough time for rest and rejuvenation of players.
to become bigger than the team.                                       Cricket, despite being a glorious game of uncertainty
                                                                   follows certain patterns.
Maintain a Healthy Balance:                                        And great teams like
  Bowlers like Ishant Sharma, Sreesanth, Praveen Kumar,            Australia that stayed at
and Balaji have off-set the imbalance in the Indian team           the acme of international
composition that comprised of mostly batsmen. In addition to       cricket for considerable
Zaheer Khan, Irfan Pathan, and R P Singh, these bowlers form       period have established
a robust group that offers selectors a plethora of choice. The     the unwritten formula
ratio of bowlers to batsmen availability is healthy now and this   of retaining the prime
balance should be retained.                                        position. Luckily we have
                                                                   the privilege of imbibing
Kick Favoritism Out of the Window:                                 some of their methods
  This means players like Ajit Agarkar shouldn’t be in the         and mix them with some of
contracted player’s list. Given the current pool of talent         our own proven methods.
can we imagine Ajit Agarkar in the list of probable players?       If followed scrupulously,
Clearly he has been allowed to play a year or two extra on the     these methods can ensure
basis of sheer favoritism stalling the entry of other promising    that we rule the roost in
bowlers. This should stop. It may sound clichéd but, “only the     international cricket for
top talents should be picked”.                                     the next decade. n
home
                     improvement
                     BODIE and FOU Cognac Glasses
                     These Cognac glasses designed by Normann Copenhagen and Rikke Hagen
                     tend to foster a new intimacy between you and the fine spirit you are
                     sipping. Made out of clear glass, and distinctively designed to enhance
                     bouquet, temperature and volume of the Cognac, these glasses will add a
                     touch of class to any party that you are throwing for family and friends.

                     Price - Rs. 2,500




                                                                                                 BODIE and FOU Norm 69 Pendant Light
                                                                                                 It is so much easier to dazzle your guests when you have the Norm 69 Pendant Light
                                                                                                 brightening up the environs of your room. Designed in 1969, by Simon Karkov, the pendant light
                                                                                                 carries in its shape the hallmark of classic Danish artistry. Available in cream or white, this is
                                                                                                 the perfect addition to any modern home.

                                                                                                 Price - Starting at Rs. 5,000



                     Crepax Kadhorna Cabinet                                                                                           Panasonic Massage Chair
                     When your bedroom suffers from boring furniture then                                                              When you are feeling dead tired, there is nothing like getting
                     you truly can’t do without a Crepax Kadhorna cabinet.                                                             massaged by the soft hands of a beautiful woman. Sometimes
                     This immaculately carved piece features the artwork of                                                            that option is not available and that’s when the Panasonic
                     celebrated graphic artist Guido Crepax who is often credited                                                      Massage Chair becomes a necessity. Endorsed by the American
                     with the development of European comic art in the later                                                           Chiropractic Association, this chair is meant to provide deep-
                     half of the 20th century. The erotic, psychedelic and almost                                                      tissue relief and alleviate stiffness in the lower back, hips
                     ephemeral story lines that are portrayed in the drawings is                                                       and thighs. So how does this marvelous device work? The air
                     enough to brighten even the dullest of rooms.                                                                     system in the ottoman squeezes the legs while it lowers and
                                                                                                                                       raises in 20° increments. The back of the chair uses a similar
                     Price - Rs. 3 lakhs                                                                                               mechanism to cover a total of 135 square inches of your body
                                                                                                                                       - including neck, shoulder and back - with eight different
                                                                                                                                       massage modes. Fashionably designed with high-quality leather
                                                                                                                                       upholstery, the chair offers relief to your sore body, and a touch
                                                                                                                                       of style.

                                                                                                                                       Price - Rs. 1 lakh
ROyAL
24 JUnE / JULy ’08
Taking off from the Ramphos is about as easy as
taking a kite into the air. You do it by racing on the
water to speeds of 30-40 knots and at the same time
working the control bar forward and back to break
free from the surface of the water.




amPhiBious
skyBoat


             I
                  f you can have cars that
                  act like boats then why
                  not boats that act like
                  planes. Enter the Ramphos
             Amphibious Sky Boat which has
             the ability to drive, sail, and even
             fly.
                When you’re on water it’s easy to take off
             into the air and reach a maximum height of 7,500
             feet at cruising speeds of 45-50 mph. Truly a unique     free from the surface of the water. Voila! About 8
                                            way to enjoy the          seconds is all it takes to take you up. Once you are
once you are airborne, you                  best of both worlds.      airborne, you can cruise at speeds up to 50 mph and
can cruise at speeds up to 50               Affordability      and    enjoy a birds-eye view of the landscape below. But
mph and enjoy a birds-eye                   mobility are the two      when you do decide to come down, you will find that
view of the landscape below.                main advantages with      the process of descending is about as simple as the
                                            the Ramphos. It folds     process of ascending. And if you are landing on the
                                            for easy storage when     water then the process is even simpler and you can
                                            not in use, and can       even execute some deft maneuvers to impress the
             be easily towed. Since you don’t need an airstrip to     folks who might be watching you from the sidelines.
                                                                                                                                ROyAL JUnE / JULy ’08




             take off and land, you can save on exorbitant runway       The Ramphos is a two-seater so go ahead and
             costs. Such practical, multi-purpose vehicles offer      invite the hottie you’ve been seeing. You’ll easily win
             a very exhilarating way to explore local lakes and       points in the adventurous department. n
             coastlines with a minimum amount of fuss.
                Taking off from the Ramphos is about as easy as       Price - On Request
             taking a kite into the air. You do it by racing on the
             water to speeds of 30-40 knots and at the same time      www.opulentitems.com
             working the control bar forward and back to break
                                                                                                                                25
James Bond was
                                           about 30 years ahead
                                           of his time when he
                                           drove his sleek vehicle
                     T
                                                                                                  by melody brooke
                           he
                           from
                                   sQuba,
                                       the underwater in the cult
                           ensemble of     classic, the spy Who
                     Rinspeed, has now
                     won the distinction
                                           Loved Me.
                     of being the world’s
                     first car that can perform as well on ground,
                     as it can on the surface of water and even
                     underwater. The avant-garde vehicle is the
                     stuff that dreams are made of. Rinspeed’s
                     Founder & CEO Frank M. Rinderknecht is a
                     self-confessed James Bond enthusiast and
                     for many years had been planning to build a
                     car that would capture the hearts of car and
                     technology zealots everywhere.
                        There have been military class vehicles in
                     the past that can go underwater
                     and can be driven slowly over
                                                         But now you don’t even need to
                     the ground, but what sets
                                                         be a superstar spy in order to go
                     sQuba apart is that it can glide
                     like a fish. It is watertight and
                                                         underwater...
                     pressure resistant enough to be
                     maneuverable underwater. The sQuba does
                     not carry a conventional combustion engine;
                     instead several electric motors power it.



                                       Three motors are located in the rear, one of which
                                       provides propulsion when the vehicle is being used
                                       on land, while the other two drive the screws for
                                       underwater motoring. The front of the car features
ROyAL




                                       two Seabob jet drives, which are made out of high-
                                       tech nano materials, and are extremely light and
                                       twist resistant.
26 JUnE / JULy ’08




                                          Once you drive into any beach in an sQuba, there
                                       is no doubt that many beach babe beauties will be
                                       attracted to it like bees to honey. Ask one of them
                                       to hop in, make her wear the scuba mask and then
                                       just drive into the water; the vehicle will float on the
enjoy the underwater scenery,
as the car glides with a swarm
of fish, and floats over a vista of
underwater plants. Top speed is
75mph on land, 4mph on water
and 2mph below the surface.
                      surface, and to get it underwater you have to
                      open the door slightly so that water can get in.
                      The breathing air comes from a compressed
                      air tank connected to the scuba mask that
                      occupants wear. Enjoy the underwater
                      scenery, as the car glides with a swarm of
                      fish, and floats over a vista of underwater
                      plants. Top speed is 75mph on land, 4mph
                      on water and 2mph below the surface. That
                      should be about enough to help you achieve
                      the adrenaline high you are seeking.
                             Best thing about the sQuba is that it
                      is powered by lithium-ion batteries which
                      makes it emission free thus allowing the
                      precious environment to be unharmed. For
                      safety reasons the car is designed without
                      a roof, so that in case of an emergency the
                      occupants can make a quick exit. n

                      www.rinspeed.com

Best thing about the sQuba is that it is powered
by lithium-ion batteries which makes it
emission free thus allowing the precious
environment to be unharmed.

                                                                     ROyAL JUnE / JULy ’08
                                                                     27
interview
                     with
                     giselle
                     uyuni


                          In a bikini and high-heeled
                            shoes, Giselle Uyuni is
                           fetchingly beautiful. Sexy
                         Giselle has been using her
                       light eyes and and sculpted
                       features, not to mention her
                         fabulous 32-24-32 curves,
                        to woo fans worldwide. The
                      camera is always eager to get
                      passionately intimate with her.
                     Bolivia had been her residence
ROyAL




                       for 13 years, but these days
                           she calls San Francisco,
28 JUnE / JULy ’08




                          California home. Working
                         constantly with the world’s
                     leading fashion photographers,
                       Giselle is turning out to be a
                           quintessential pinup girl.
ROyAL JUnE / JULy ’08   29
I would
                           absolutely love to
                     share a sex scene
                                     with
                        Angelina
                              Jolie,
                     Brad Pitt
                        or
                          Christian
                                   Bale.
ROyAL
30 JUnE / JULy ’08
What made you decide to pursue
modeling?
At first it was just for fun but then I realized
that it was something I truly love doing.
Being in front of the camera is exciting and
it is also a good way for me to express my
individuality. I love immersing myself in the
character and concept. I find the creative
process inspiring. There is also a sense
of accomplishment that’s very valuable to
me.



Tell us about the projects you are
currently working on.
I am currently involved in several coffee
book projects. One of them is an outdoor
glamour photography coffee book that
will be sold worldwide. As summer
approaches I will be busy traveling and
shooting in various parts of the country.

How do you maintain your flawless
figure? Any fitness tips for our
readers.
I get lots of exercise, fresh air and I follow a
healthy diet. Eating out is a whole lot of fun
and a favorite pastime with me, but when I
eat out I am always mindful of what I order
and how much I eat. I usually try to order
seafood.

Do Hollywood dreams come on your
radar screen?
Of course, who wouldn’t want to be part of
a cool project in Hollywood?

Favorite Hollywood star you want to
share a steamy love scene with?
Oh my...I would absolutely love to share a
sex scene with Angelina Jolie, Brad Pitt or
Christian Bale. They are gorgeous in every
possible way.

Best body in Hollywood? Worst?
 In my opinion I always thought Pamela
Anderson has one of the hottest figures in
Hollywood. As for the worst - that honor
falls upon Jabba the Hut from Star Wars.
If you were an animal what would
                                                you want to be?
                                                I would love to be a dolphin because of
                                                their wonderful and playful nature.

                                                Many models say they feel very
                                                sexy, even turned on, while posing
                                                for the camera. Do you feel that way
                                                while posing?
                                                For me the whole process is exciting.
                                                Getting my hair and make up done,
                                                choosing a fun wardrobe and then working
                                                with the photographer to produce sexy
                                                and creative images. All this can have an
                                                intoxicating effect. And it does.

                                                What kind of man turns you on the
                                                most?
                                                Even though looks play a role, I find a
                                                man’s personality to be most important.
                                                Any kind-hearted man who knows how to
                                                be sexy without trying too hard will turn me
                                                on. He must know how to handle himself
                                                with elegance and style; he should have a
                                                good sense of humor and self-confidence.
                                                Cheer up guys, there is not much that I am
                                                demanding from you.




                     The worst
                                 pick-up line
                       I’ve ever heard is,
                     “Did it hurt when you
                      fell from heaven?”
ROyAL
32 JUnE / JULy ’08
Describe your ideal date?
Going out to a nice restaurant and having
delicious food and wine.

Worst pick up line ever used on
you?
I personally feel that any pick up line is in
bad taste. The worst one I’ve heard is - Did
it hurt when you fell from heaven?

What is the best piece of advise that
you would give to a man who wants
to approach you?
You only have one chance to make a first
impression. So try to act like a perfect
gentleman and demonstrate proper
etiquette.

They say phenomenal sex for a
regular person is just average sex
for a model. Care to give us your
opinion.
I would say, there is probably some truth
to it. Yes physical attraction definitely
plays a major role but I also believe that
mental and emotional connections are
imperative. Everyone has the ability to
have phenomenal sex. What helps the
most though is having the knowledge of
how to sexually please a partner. To me
that is most essential. n




                                                ROyAL JUnE / JULy ’08
                                                33
Everyone
has the ability to have
    phenomenal
           sex.
QA             &
                                              Dr. Pyar, I have recently learned that
                                                                                       with
                                                                                        Dr.Pyar
                                                                                             some practice, but once you get the gist of
                                              my best friend has betrayed me with my         it you’ll easily be able to last twice as long.
                                              girlfriend. I suspected something wasn’t
                                              right, and when I pretended to my girlfriend
                                              that he’d told me that they were seeing        Dr. Pyar, I have a crush on a female
                                              each other behind my back, she broke down      colleague. As both of us work in the same
                                              and confessed. Now I feel awful and I hate     department, it is virtually impossible for
                                              both of them from the core of my heart. I      us to avoid each other. On my part, I have
                                              don’t think they should get away with their    always treated her like a colleague, but I
                                              moral transgression. The question is – how     have never failed to do some special things
                                              am I going to punish them? Any ideas?          for her. Two weeks ago she surprised me
                                                                   -Ramesh Agarwal, Indore   by dropping the information that she had
                                                                                             separated from her boyfriend and asking me
                                              Dear Betrayed,                                 if I had a girlfriend. I told her that I didn’t,
                                              There is no doubt that you must be very        but I could not muster the courage to ask
                                              hurt and you can only think of revenge.        her for a date. Do you think that I should
Doctor, I have had a steady relationship      But violence and vendetta is not the           wait for a few more signals or should I
with my girlfriend for the past two years.    answer. What will you gain by beating          make a move now?
Before we met, she had been involved with     him up, apart from the momentary                                              -Shahid S., Delhi
another guy, who left for Spain after he      satisfaction? Matter of fact things can
broke up with her. But now this guy has       only go from bad to worse. They might          Dear Slowpoke,
suddenly turned up in town and he seems       report you to the cops if you try to do        What kind of a signal are you waiting for?
eager to revive the relationship with his     anything. Getting your life on the right       Do you expect her to carry a sign that
old girlfriend. Last week when I went to      track should be your priority. Success is      says, “I love you!” That is not the way it
her house, I found him sitting in her room.   the ultimate revenge and them seeing you       works. She has already given you a hint
Both of them seemed somewhat shocked          happy, partying, and wealthy, will make        of what she wants. Now it is up to you to
to see me, but I was even more shocked        them realize their mistake one day.            make a move and sweep her off her feet. If
to see him there. I don’t want to lose my                                                    you keep lingering, then someone else will.
girlfriend at any cost, and this guy from                                                    Nice girls never remain out of relationships
her past is making me feel insecure. What     Dear Doc, I only last about 5-10 minutes       long; they tend to get picked up very
should I do?                                  during sex. Now my wife has started            quickly because they are hard to find in
                         -S N Sinha, Mumbai   commenting on my short stamina. On one         the first place.
                                              occasion she said what’s the point it’ll be
Dear Insecure,                                over in 5 minutes. My ego was immensely
You have a right to be a little worried. He   hurt by her words. What can I do to last       Dr. Pyar, My girlfriend wants me to
is capable of enticing your girlfriend by     longer?                                        perform oral sex on her. But I am not sure
evoking feelings of nostalgia for the good                           -Bhushan P., Bombay     how to do it, or even if I want to do it.
times that they experienced when you were                                                                            -Mahesh S., Mysore
not around. Since your girlfriend allowed     Dear Fast and Furious,
him to come to her house, it is likely that   Most married men don’t use a condom. I         The art of pleasuring your girlfriend by
she still harbors a degree of affection       assume you’re in this category. It is time     oral means is not that difficult to master.
for him. The only way you can hold on         you started using one. Condoms create a        Once you pinpoint her pleasure spots,
to this girl is by being extra creative. Do   loss of sensation and that’s exactly what      focus on that area. Having said that, if
everything you can to make her believe        you need to last longer. You want to have      you don’t want to go oral, you can simply
that you are much better and more reliable    enough sensation to stay hard, but not so      say no to her. But won’t your refusal to
partner than her ex-boyfriend who had         much sensation that you come quickly.          play out her fantasies make her lukewarm
left her once and may do so again in the      Second, only engage in positions where         to fantasies you have? It might be in your
future.                                       you control the rhythm and flow. That way      best interest to go for it. After all, you
                                              if you feel like you’re going to come soon     don’t know whether you like something or
                                              then you can slow down, and take deep          not, until you have tried it.
                                              breaths during the activity. This will take
designerprofile   Kenneth
                      Cole




                    Ü
                                  ber chic and ultramodern,
                                  Kenneth Cole is known for
                                  its impeccable collections of
                                  functional fashion, accessories
                                  and shoes. It should come as
                                  no surprise that outfits carrying
                    the label of this fashion house are a favorite
                    amongst young, urban consumers who
                    aren’t afraid to shake up the status quo. At
                    the boardroom or at a party, a man attired in
                    Kenneth Cole’s immaculate creations easily
                    gets noticed.
                    In 1982, when Kenneth Cole started his
                    company, he was only in the business of
                    dressing up people’s feet. Within two and half
                    days of the company’s launch, he managed
                    to sell an impressive 40,000 pair of shoes.
                    From such an exciting debut, this fashion
                    house has gone on to make a name for itself
                    in not just men’s and women’s footwear, but
                    also in clothing, and a whole assortment of
                    accessories.
                                                                      ROyAL JUnE / JULy ’08
                                                                      37
The key to this
                     company’s
                     success has
                     been its ability
                     to foresee new
                     trends
                     and come up with creations that subsume a sense of being subtly
                     provocative while still evoking the classy and tasteful feeling.
                     Blacks, grays, browns and other neutrals dominate shirts, pants
                     and suits. But Kenneth Cole does not shy from using color for
                     outerwear, splashing in red, blue and green to create a feeling of
                     euphoric and vibrant zeitgeist. The immaculate range of shoes and
                     accessories come as icing on the cake.
                     In a recent development, Kenneth Cole has put its name to an
                     exclusive range being marketed at Britain’s prestigious House of
ROyAL




                     Fraser. House of Fraser is a brand by itself, a place where fashion
                     lovers can revel in an eclectic mix of both classic and contemporary
                     designer names. n
38 JUnE / JULy ’08




                     http://www.houseoffraser.co.uk
                     http://www.kennethcole.com
designerprofile   Kenneth
                      Cole




                         ROyAL JUnE / JULy ’08
                         39
designerprofile   Kenneth
                                           Cole
ROyAL
40 JUnE / JULy ’08
ROyAL JUnE / JULy ’08   41
gLOBE    wORkStAtION
                     Most Indian offices lack any aesthetic
                     value whatsoever. It’s time to
                     change all that with the Globe
                     Workstation being marketed by
                     www.opulentitems.com. When it
                     is closed, it is a simple globe, but
                     when it opens into two separate
                     halves, it transmogrifies into a
                     sitting arrangement on one half
                     and a working table on the other.
                     The system is founded on a cast
                     aluminum base, which contains
                     invisible wheels that will automatically
                     lock themselves when it has been
                     opened. Your comfort is guaranteed,        StRAdA    PORtABLE
                     as the sitting arrangement is adorned      MOBILE NAvIgAtION
                     with the finest Elmo leather and is
                     ergonomically designed.
                                                                SYStEM
                                                                Here comes a device that will make it
                     PRICE - RS. 2 LAkHS                        just about impossible for you to get lost,
                                                                but only if you use it in North America.
                                                                Petite enough for you to carry with ease,
                                                                the Strada Mobile Navigation System is
                                                                embellished with a 5” LCD screen and
                                                                GPS Assist technology, which can help
                                                                you plan your route from the comfort of
                                                                your home or hotel room without even receiving
                                                                GPS signals. Until this navigation system arrives in India,
                                                                we’ll have to rely on the good old-fashioned way of asking fifty people for
                                                                directions.

                                                                PRICE - tBA


                                                                                                                LOgItECH     Z CINEMA
                                                                                                                Who hasn’t griped about the mediocre
                                                                                                                PC audio when playing DVDs or listening
                                                                                                                to music? That could be a thing of the
                                                                                                                past if you opt for the Z Cinema advanced
                                                                                                                surround sound system from Logitech.
ROyAL




                                                                                                                Movies, games, music, and TV all turn out
                                                                                                                to be a much more enjoyable experience
                                                                                                                on your PC. The option heavy remote is an
42 JUnE / JULy ’08




                                                                                                                added plus, especially for users who have
                                                                                                                extensive media collections.

                                                                                                                RS. 12,000
SONY vAIO     gRAPHIC SPLASH
Tired of your dull black notebook? Opt for
the artistically unique Sony VAIO Graphic
Splash. This notebook uses the process of
dye-sublimation to infuse stunning colors
and eye-catching patterns on the exterior.
With a plethora of designs and colors to
choose from, you will have no difficulty in
finding a pattern that best suits your tastes
and personality. You can even decide which
font you want to have on your keyboard.
But the scope for customization does not
end only with the notebook’sexterior;
the VAIO also allows you the freedom to
decide the internal configuration as well.
Personalize the hard drive, processor,
memory, and more to fit your budget and
needs.

PRICE - StARtINg At RS. 50,000
                                                                        gAtEwAY FX SERIES
                                                                        dESktOP
                                                                        Is it possible to get seduced by a desktop?
                                                                        With Gateway FX series anything is possible.
                                                                        Marketed mostly for gamers, the FX series will
                                                                        enable you to dominate the latest games and
                                                                        blaze through multi-threaded programs with
                                                                        supreme speed. Its AMD quad-core power and
                                                                        DirectX® 10 graphics, makes it a breeze to
                                                                        handle just about any graphic-intensive task.
                                                                        You don’t have to wait for rich demanding
                                                                        content to load on your screen, everything
                                                                        happens instantly, in the blink of an eye. An
                                                                        added plus is that the FX series comes with a
                                                                        TV tuner and a media center remote control.
                                                                        A rich 8-channel high-definition audio is
                                                                        there to deliver premium sound for viewing
                                                                        TV, DVDs, and for gaming. A sure recipe to
                                                                        exorcise your days of any boredom.

                                                                        PRICE - StARtINg At RS. 44,000




dIAMONd     tELEvISION
If diamonds are a girl’s best friend, and a flat screen tv is a man’s
best friend, then whose best friend does a diamond television
belong to? But hey if you can afford a diamond television then you
may not even need friends. Go to www.opulentitems.com and
check out their range of 32”, 40” and 46” models of HD flat panels.
By the way, if you harbor a fetish for rubies, then it is possible to
go for a ruby-encrusted model as well. Truly extravagant!

PRICE ON REQUESt
gadgets
                             LOgItECH
                             ZEBRA MOUSE
                             If you’re an animal lover then throw away your
                             dull mouse and plug in the Zebra Mouse by
                             Logitech. Designed for smaller hands this mouse
                             is perfect for kids or your shrinking parents. As
                             it incorporates an optical engine, it can be used
                             with or without a mouse pad. No prior set up is
                             required; just plug in and start clicking away.

                             PRICE - RS.800




                                                                                                                                                Lg
                                                                                                                                       PRAdA
                                                                                                                 When avant-garde fashion mates
                                                                                                              with cutting edge technology, a
                                                                                                 LG Prada phone is born. The end result of a
                                                                                                 collaboration between Prada and LG, this new
                                                                                                 phone is embellished with an advanced touch
                                                                                                 interface, and is all geared to strike a new level of
                                                                                                 sophistication to your overall attire. An extra wide
                                                                                                 LCD screen, 2 megapixel camera, video player, and
                                                                                                 a document viewer, are just a few of the benefits to
                      SONY                                                                       this elegant phone. Its white on black display verges

                      HdR-tg1                                                                    on the minimalist and makes a perfect fashion
                                                                                                 statement, but that is something to be expected in
                                                                                                 anything being marketed under the Prada brand.
                      Imagine a
                      camcorder so
                      small that you can
                                                                                                 PRICE - tBA
                      comfortably carry
                      it in your trouser
                      pocket. Next time
                      you are off on a
                      vacation, be sure

                                                                                      LU20
                      to pack the Sony
                      HDr-TG1, which                                             Lg
                      is delightfully small
                      and lightweight,                                           This ultra-portable Tablet PC from LG is perfect for people on the
                      and yet it still                                           move. The unique built-in swivel LCD screen allows you to easily
                      manages to do                                              share with companions nearby. It comes with an Intel Pentium M
                      everything that a                                          processor, 256 MB rAM, a 30GB hard drive and Windows XP Home
                      regular camcorder                                          operating system. Incorporation of TFT Active Matrix Display and
                      is supposed to do.                                         Intel Extreme Graphics 2 is sure to take care of all your gaming and
                      It can record 1920 x                                       movie viewing needs.
                      1080 HD video and 4-megapixel digital photos
                      directly to a Sony memory stick or PrO Duo                 PRICE - tBA
 ROyAL




                      media cards. A 2.7” touch panel LCD display
                      provides excellent viewing, and the Carl Zeiss
                      Vario-Tessar 10x optical zoom lens is there to
 44 JUnE / JULy ’08




                      impart professional quality to every video that
                      you capture.

                      PRICE - RS. 36,000
Keeping your job                    “Okay,” he said, “One, two,       where he stops at a saloon          He saddled up and started to
                     Banta Singh woke up with a          three, four, five, six, seven -   for a drink. Unfortunately, the     ride out of town.
                     massive headache and utterly        then there’s you - nine, ten,     locals have the nasty habit of      The bartender wandered out
                     unable to recall the events         11, 12, 13...”                    picking on strangers, which         of the bar and asked, “Say
                     of the previous evening.                                              he was. When he finished his        partner, before you go...what
                     Somehow he managed to               Bollywood blondes                 drink, he found his horse had       happened in Alabama?”
                     leave the bed and walk into the     A blood red Ferrari is moving     been stolen.                        Vinod turned back and said, “I
                     drawing room where his wife         on the road at breakneck          He went back into the bar,          had to walk home.”
                     was lounging on the sofa.           speed. A cop on a motorcycle      handily flipped his gun into
                     “My dear wife,” he whined,          gives chase and finally           the air, caught it above his        Q. What did one saggy tit say
                     “Tell me what happened last         succeeds in forcing the Ferrari   head without even looking and       to the other saggy tit?
                     night. Is it as bad as I think?”    to stop.                          fired a shot into the ceiling.      a. If we don’t get some
                     “It was even worse,” his wife                                                                             support soon, people will
                     shot back. “You got drunk                                                                                 think we’re nuts!
                     like a fish and you made a
                     complete ass of yourself.                                                                                 The wedding of the
                     You heaped insults on the                                                                                 century
                     entire Board of Directors and                                                                             All of Las Vegas was abuzz
                     you slapped the Managing                                                                                  about the wedding of the
                     Director on his face.”                                                                                    century, where the groom
                     “The Managing Director is an                                                                              was a 95 year old billionaire
                     idiot,” Banta shouted. “Piss                                                                              and the bride was 23 year old
                     on him.”                                                                                                  stripper. The groom looked
                     “That is what you did. And he                                                                             pretty feeble and the feeling
                     fired you.”                                                                                               was that the wedding night
                     “Well, then screw him.”                                                                                   might kill him, because his
                     “I did,” his wife smiled. “And                                                                            bride was a healthy, vivacious
                     so he agreed to give you back                                                                             young woman.
                     your job. Go back to work on           Why don’t blind men skydive?                                       But lo and behold, the next
                     Monday.”                               Because it scares the shit out of the dog                          morning, the bride came down
                                                                                                                               the main staircase slowly,
                     Marriage blues                                                                                            step by step, hanging onto the
                     After one year of their marriage    Surprise!     Surprise!     The   “Which one of you crooks            banister for dear life.
                     Santa Singh’s wife started to       Ferrari driver turns out to be    stole my horse?” he yelled          The hotel clerk looked up,
                     question him about his lurid        none other than Bollywood’s       with surprising forcefulness.       really concerned, “Whatever
                     past. “Come on tell me,” she        most popular heroine.             No one answered. “Alright, I’m      happened to you, honey? You
                     asked for the hundredth time,       When the cop asks her for her     gonna have another beer, and        look like you’ve been wrestling
                     “how many women have you            license, she replies in a huff,   if my horse ain’t back outside      a 2,000 pound gorilla!”
                     slept with?”                        “I wish you guys could get your   by the time I finish, I’m gonna     The bride groaned, hung on
ROyAL




                     “If I tell you the truth you will   act together. Just yesterday      do what I dun in Alabama! And       to the counter and managed
                     be furious with me. You might       you take away my license and      I don’t like to have to do what I   to speak, “My God! He told
                     even try to strangle me to          today you expect me to show       dun in Alabama!”                    me he’d been saving up for 75
46 JUnE / JULy ’08




                     death,” Santa pleaded.              it to you.”                       Some of the locals shifted          years and I thought he meant
                     But his wife promised that                                            restlessly. The man, true to        his money!”
                     she would forgive all his           Cowboy Vinod                      his word, had another beer,
                     transgressions if he told her       While on a tour of Texas,         walked outside, and his horse
                     the truth.                          Vinod ends up in a small town     has been returned to the post.
The                                                        M
                                                                             irror, mirror on the wall, who is the
                                                                             richest of them all. The combined net
                                                                             worth of India’s 40 richest capitalists
                                                                             stands at more than $300 billion dollars.
                                                                             If you are part of this elite group then it is




World’s
                                                                             time to uncork the bubbly. If not, then the
                                                     only recourse open for you is to sit tight and try to garner some
                                                     vicarious joy as the rich find new ways to flaunt their wealth.
                                                     The erstwhile maharajahs of India were famous for buying Rolls




Richest
                                                     Royce by the dozen and Cartier jewellery by the quintal. About
                                                     as profligate are the new maharajahs of the business world who
                                                     don’t tend to think twice before buying luxury yachts, million
                                                     dollar cars, a string of palatial homes and a plethora of gems
                                                     and art.




Indians
                                                          A scion of one of the most prestigious business dynasties
                                                     in the country, Ratan Tata is credited with transforming his
                                                     business group from a sprawling, conservative conglomerate
                                                     into a corporate powerhouse hungry for growth. Last year, he
                                                     engineered India’s biggest takeover - Tata Steel’s $13 billion
                                                                                 purchase of UK’s prestigious Corus
          The erstwhile maharajahs of India were famous for buying steel. But despite ranking amongst
          Rolls Royce by the dozen and Cartier jewellery by the                  the richest people in the world, he

          quintal. About as profligate are the new maharajahs of the drives Marina wagon. office in a Tata
                                                                                 Indigo
                                                                                        himself to his
                                                                                                          While Tata may
          business world who don’t tend to think twice before buying not splurge on fancy cars, flying is a
          luxury yachts, million dollar cars, a string of palatial               completely different ballgame. He is
          homes and a plethora of gems and art.                                  an avid aviator, who likes to pilot his
                                                                                 own Falcon 2000 business jet around
                                                     India. In February 2007, he created a sensation by co-piloting
                                                     a Lockheed F-16 and Boeing F-18 fighter jets at a nationally
By   asit amrevy                                     televised air-show. He continues to hold the distinction of being
                                                     the nation’s most eligible bachelor and his weekends are spent
                                                     in solitude with his two dogs at a beachfront home he designed
                                                     himself.
                                                        On October 30, 2007, the day when Indian stock markets had
                                                     hit their all time high, Mukesh Ambani had became the richest
                                                     person in the world, surpassing American software czar Bill
                                                     Gates, Mexican business tycoon Carlos Slim Helu and famous




                                                                                                                              royal	 	June	/	July	’08	
                                                                                                                              47
investment guru Warren Buffett.          when it comes to making money, he      not just for his fabulous wealth,
                                At that time, his wealth of about        is blessed with a midas touch. This    but also for his mercurial
                                Rs 2,49,000 crore ($62.3 billion)        year he’s placed at the 5th richest    temperament. His net valuation
                                included about Rs 2,10,000 crore         in the world with an estimated         is estimated to hover around $42
                                from RIL (50.98 per cent stake),         worth of $43 billion. So how does      billion. Other than business, he
                                                                         India’s richest man demonstrate        indulges in running marathons and
                                                                         his wealth? Well, on his wife’s        attending page three type parties.
                                                                         birthday, Mukesh Ambani gifted         Recently he raised $3 billion
                             On his wife’s birthday,                     her a specially customized 242         from the highly anticipated initial

                       Mukesh Ambani gifted her                          crore rupee Airbus 319 Corporate
                                                                         Jet. The plane is said to have a
                                                                                                                offering of his Reliance Power,
                                                                                                                the biggest in India’s history. Had
                       a specially customized 242                        state of the art business office and   the shares of Reliance Power
                                                                         cabin management system for            performed well after listing on
                            crore rupee Airbus 319                       games, music, satellite television     the stock exchanges, Anil would
                          Corporate Jet. The plane                       and wireless communication.            have whizzed past elder brother
                                                                         It also has all the luxuries of        Mukesh, but that didn’t happen.
                           is said to have a state of                    a home in it, namely a master          Despite the hype, the stock
                        the art business office and                      bedroom, a master lavatory with
                                                                         a range of showers, galleys and
                                                                                                                tumbled 17% immediately after its
                                                                                                                February listing.
                       cabin management system                           a sky bar in the forward lounge            The richest Indian turns out

                         for games, music, satellite                     complete with mood lighting. He
                                                                         is currently engaged in building
                                                                                                                to be the guy who is named after
                                                                                                                the goddess of wealth, Lakshmi.
                             television and wireless                     a 600 crore skyscraper for his         Lakshmi Mittal is the steel king

                                    communication.                       family that could as well turn
                                                                         out to be the world’s costliest
                                                                                                                of the world and when he opens
                                                                                                                his wallet, watch out! Few years
                                                                         residence. When the 27-storey          ago Mittal was in the news for
                                                                         home is completed, it will have 3      buying a plush house in London
                                Rs 37,500 crore from RPL (37.5           helipads, 6 floors of car parks, a     for $150 million. For that much
royal




                                per cent) and Rs 2,100 crore from        state of the art communications        money you could easily buy 2,000
                                RIIL (46.23 per cent). It is true that   system, a security system that is      luxury flats in Bangalore and still
                                Mukesh Ambani’s place at the             at par with the best in the world, a   have money left to bag a luxurious
48	 June	/	July	’08	




                                top was exceedingly ephemeral,           50 seat theatre, a luxurious gym,      villa in Delhi’s best locality. On
                                because the Indian markets started       three air-conditioned swimming         his daughter’s marriage Lakshmi
                                falling almost immediately after         pools and much else.                   Mittal lavished a cool $100 million.
                                making a high. But by reaching the           Mukesh’s little brother, Anil      The guest list at the marriage
                                top even once he has proved that         Ambani, happens to be famous           party included 1200 members, all
TOP
                                                                            10
                                                                                         Richest
                                                                                         People in
                                                                                         The World

                                                                         Name                               Worth (in USD)
                                                                         1. Warren Buffett                  $62 billion
                                                                         2. Carlos Slim Helú                $60 billion
                                                                         3. Bill Gates                      $58 billion
                                                                         4. Lakshmi Mittal                  $45 billion
                                                                         5. Mukesh Ambani                   $43 billion
                                                                         6. Anil Ambani                     $42 billion
                                                                         7. Ingvar Kamprad & family         $31 billion
                                                                         8. Kushal Pal Singh                $30 billion
                                                                         9. Oleg Deripaska                  $28 billion
                                                                         10. Karl Albrecht                  $27 billion

            of them cream of UK and Indian society. The party
            itself was held at the magnificent Palace of Versailles,
            where the French ‘Sun King’ Louis XIV held court in
            the 17th century. Some say that Lakshmi Mittal made        demonstration of his love for his daughter.
            history by throwing the most lavish wedding ever.             The year 2007 saw the wealth of Kushal Pal
            Some may call him exceedingly profligate. But for          Singh, the head honcho of India’s largest real estate
            the steel tycoon the event was nothing more than a         company, DLF, increase by 51% to $30 billion. His
                                                                       wealth comes mainly from the deep pockets of India’s
                                                                       rising middle class who suddenly find themselves
   The richest Indian turns out to be the                              capable of buying fancy flats that DLF is so proficient
     guy who is named after the goddess                                in building. He is credited for putting Gurgaon on the
                                                                       map as a destination for global companies. Ramesh
    of wealth, Lakshmi. Lakshmi Mittal is                              Chandra, the founder of Unitech, happens to be the

   the steel king of the world. Few years                              second real estate tycoon who has made it really big.
                                                                       With a net worth of $11.6 billion he is also India’s
 ago Mittal was in the news for buying a                               eighth richest man. He is exceedingly media shy. Only

plush house in London for $150 million.                                on rare occasions you might get to see him on TV.
                                                                          Kumar Mangalam Birla wins the distinction of
                                                                                    being the talented scion of the Birla
                                                                                    clan. His net worth stands at around $11
                                                                                    billion. Kumar Manglam does not fit the
                                                                                    bill as a typical colorful tycoon. When he
                                                                                    is not busy attending to the concerns of
                                                                                    his global business empire, he prefers
                                                                                    to stay at home and spend time with his
                                                                                    extended family. In other words, Kumar
                                                                                    Mangalam is an epitome of what a Birla
                                                                                    is supposed to be – he is a workaholic and
                                                                                                                                  royal	 	June	/	July	’08	




                                                                                    a family man. Recently he was in news
                                                                                    when his flagship company Hindalco
                                                                                    purchased America’s largest aluminum
                                                                                    company for a few billion dollars.
                                                                                        Another super-rich guy is Azim
                                                                                    Premji, the founder of Wipro. He is worth
                                                                                    $12.7 billion and yet he continues to drive
                                                                                    around in his old Ford Escort. But that is
                                                                                                                                  49
prestigious labels like Napoleon, Polo
                                                                                                                   and Lanvin. He ranks number 42 on
                                                                                                                   India’s richest with an estimated worth
                                                                                                                   of $1.6 billion, but that may be because
                                                                                                                   he really knows how to spend money on
                                                                                                                   the finer things in life.
                                                                                                                       Then there is the India’s media
                                                                                                                   tycoon, the promoter of Zee network,
                                                                                                                   Subhash Chandra. He is reputed for
                                                                                                                   having lavish mansions all over the world
                                                                                                                   and he won’t be seen in any car that is
                                                                                                                   less than a Mercedes S class. Yet, he
                                                                                                                   prefers to smoke Bidi No 502. Clearly
                                                                                                                   cigarette is passé for this leader who has
                                                                                                                   made it his lifelong mission to turn the
                                                                                                                   humble bidi into a fashionable brand. But
                                                                                                                   there is nothing remotely humble about
                                                                                                                   Chandra’s preferred brand of suits,
                                                                                                                   which turn out to be the immaculately
                                                                                                                   tailored Armani.
                                                                                                                       The guy who is credited with bringing
                                                                                                                   telecom revolution in the country, Sunil
                                                                                                                   Mittal, has earned a well-deserved place
                                                                                                                   in India’s rich list. These days his wealth
                                                                          When it comes to the steel and           hovers around $12.5 billion. That is
                                                                     telecom sector, the Ruias are a name to       quite an achievement for a man who is
                            When you think                           reckon with. In 2007 brothers Shash and       said to have started his business with a
                            of India’s poster                        Ravi Ruia made it to the Forbes list of the
                                                                     10 richest Indians with their combined
                                                                                                                   borrowed capital of just Rupees 20,000.
                                                                                                                   Golf is his passion; this is a sport in
                         boy of conspicuous                          wealth of $12 billion. There are famous       which he is reputed to have an excellent

                          consumption and                            for their dapper suits, their majestic
                                                                     bungalow in Bombay’s plush Malabar
                                                                                                                   handicap. Today he lives in what can be
                                                                                                                   termed as New Delhi’s most lavish home.
                         consumerism, then                           Hill area and their penchant to keep away     Even in Lutyens’ Delhi, there is no more

                            the face of Vijay                        from media and from all controversies.
                                                                     Their flagship company, The Essar Group,
                                                                                                                   exclusive address than Amrita Shergill
                                                                                                                   Marg. And among the mansions that line
                        Mallya automatically                         has been in business since the 1800s.         this leafy road, Sunil Mittal’s grand house
                                                                     Essar Chairman Shashi Ruia recently           easily stands apart from the rest.
                        comes to your mind,                          remarked about the entrepreneurial                The fact is that the year 2007 has been
                          the quintessential                         spirit that runs in the family: “I am not     very good for billionaires everywhere
                                                                     just an MBA, but also an MBB (Marwari         in the world. This is the year that has
                             profligate icon.                        by birth).”                                   witnessed a phenomenal rise in the
                                                                        When you think of India’s poster           number of billionaires. Their number
                                                                     boy of conspicuous consumption and            has shot up by 19 per cent to 946,
                       only because he feels that it is his lucky    consumerism, then the face of Vijay           previous year the number stood at 793.
                       car. If he so desired he could easily build   Mallya automatically comes to your mind.      And the combined net worth of these
                       a 100 car garage and park the best of         This is the quintessential profligate icon    lucky individuals has climbed up by $900
                       best vehicles inside. Self-deprecation,       who leads a charmed life surrounded           billion to $3.5 trillion. Steve Forbes, the
                       humility and modesty runs in the blood        by fast cars, beautiful women, designer       chief executive of Forbes magazine,
royal




                       of India’s IT czars. The Infosys boss, N.     houses, horses, jewellery and art. The        says, “This is the richest year ever in
                       R. Narayana Murthy, is famous for not         king of good times truly lives up to his      the human history. Never in history has
                       employing servants in his house. He and       reputation. Recently Mallya was in news       there been such a notable advance.” It’ll
50	 June	/	July	’08	




                       his wife prefer to do their housework         for spending a couple of million dollars      be interesting to see how 2008 shapes
                       themselves. In an interview he is known       for Tipu Sultan’s sword, which was            up. Will you make the list of India’s rich
                       to have said that his bathroom was the        being auctioned by Sotheby’s in London.       elite? Just keep your fingers crossed. n
                       cleanest in the country, because he           His suits come from Emporio Giorgio
                       himself cleaned it every morning.             Armani, but he is also a patron of other
By anoop verma




  The Art of
Sculpting Beauty
The Ins and OuTs Of PlasTIc surgery

            W
                        hen most men think of plastic surgery, chances are
                        that they end up hyperventilating about skimpily clad
                        Pamela Anderson bouncing her bubbly breasts on
            the hit show Baywatch. It is a well known fact that Pamela’s
            seemingly perfect boobs had benefited from the art of
            plastic surgery. But that may be true of many babes from the
            entertainment world who boast of curvaceous figures, which
                                                                                royal	 	June	/	July	’08	




            in many cases turn out to be a surgeon’s work of art. Are you
            still wondering why your favorite heroine’s curves keep getting
            sharper after every new film? Full lips, glowing skin, ample
            bosom, shapely butt! The art of extreme makeovers is there to
            help anyone achieve the body that they always dreamed about.
                                                                                51
In India, plastic surgery has been practiced much
                         before the Pamela Andersons’ of the world started
                         flaunting their enhanced assets. In fact, plastic
                         surgery originated in India at around 3500 BC.
                         The art is well documented in ancient treatises like
                         the Sushruta Samhita, which describes over 120
                         surgical instruments, 300 surgical procedures and
                         classifies human surgery into 8 categories. Known
                         as the “Father of Surgery,” Sushruta is thought to
                         have lived in the 6th century BC on the banks of
                         river Ganga, where he practiced his techniques.
                         Many of the cosmetic surgery procedures that
                         are being provided in the best clinics around the
                         world today were first practiced in the ashram of
                         this renowned sage.

                         the Desire of youth
                           People, everywhere in the world, are motivated
                            by a similar desire for eternal youth. They don’t
                               want to grow old gracefully; they want to
                                manage how they age. It is estimated that
                                around 12 million Americans go in for plastic
It is estimated that            surgery procedures every year, and believe
  around 12 million             it or not, many of them flock to Indian shores
                                to get their procedures done. They come to
    Americans go in             India because the costs here are much less
for plastic surgery             than their Western counterparts. Times

         procedures             have certainly changed from the days when
                                the only surgery hot spots in the world were
     every year, and            in cities like Los Angeles, New York, Miami
    believe it or not,          and Dallas.
                                   These days almost every major Indian city      absurdly simple. Surgery to create 6-pack abs
       many of them             and town is dotted with plastic surgery clinics   (Pectoral implants), bulging pectorals and buttock
      flock to Indian           that offer world-class beauty enhancement         enhancements are becoming more and more
                                procedures. According to one estimate             popular.
shores to get their             over 10,000 Britons travel to India every            The desire to have a body with perfect figure
  procedures done.              year for tummy tucks, liposuction, breast         seems to rank fairly high in the priority list of
                                manipulation, nose shaping, eyelid surgery,       many people of the young generation. To reduce
                                face-lifts, and more. A tummy tuck can cost       fat in their abdomen, hip and upper thighs, people
                                up to 6,500 pounds in Britain, but only           go in for liposuction, which involves a procedure
                               1,500 pounds in India. It is also easier to get    wherein the body fat is converted to liquid and
                         appointments with qualified Indian surgeons. The         is sucked out. The procedure is fairly simple as
                         waiting list for a procedure in Britain can range        compared to other forms of plastic surgery. You
                         from 6 months to a year, but in India the same           get admitted in the hospital in the morning and
                         procedure can be done in less than a month.              get discharged in the evening looking much
                           Desi denizens are not far behind in the beauty         thinner and sexier. With modern times the social
                         game. With the economy growing at a scorching            ethos have changed and these days there is lot of
                         pace, a lot of money is flowing into the pockets of      societal acceptance to the idea of plastic surgery,
  royal




                         new breed of nouveau riche. These are the people         and that makes it easier for people to opt for such
                         who are always trying to find new ways to splurge.       procedures.
                         Plastic surgery is just one of them. There are
  52	 June	/	July	’08	




                         women who yearn for pouting lips like Rekha and          plastic surgery on private parts
                         there are men who desire dimples like Shahrukh              It is James Bond, who is credited with the
                         Khan. No problem! If you can afford the services         line, “Diamonds are forever,” but so are breast
                         of a proficient plastic surgeon, then enhancing          implants and they are about as coveted. More
                         your image by adding a pout or a dimple becomes          and more women are going under the knife to
surgically attain that perfect eye catching   enhancement! You won’t believe how many people
          size. According to one report, doctors        in India and in rest of the world are looking for a
          in US performed about 329,000 breast          way to increase the size of their tool. Clearly, when
          augmentations in 2006. Similar statistics     it comes to sex, size does matter!
          do not exist for India, but the number of        As with other forms of plastic surgery, penile
          operations are growing at a feverish pace     enhancement too can be conducted at a much
          and there might come a time when this         cheaper rate in India. But the surgery is not as
          country might become the plastic surgery      trivial as it might seem. The procedure involves
          capital of the world.                         the cutting up of the suspensory ligament in
            It is not as if only older females are      the penis and it requires extensive after-care,
          going in for such procedures. Age is          which includes a regimen of hanging weights off
          clearly no bar. About three years ago,        your tool. But there are many who feel that any
          the news made headlines when a 15-            procedure that promises to make them hung like a
          year-old British girl decided to get breast   porn-star is worth all that trouble and effort. Some
          implants for her sixteenth birthday.          men also go in for fat injections to increase the
          Cosmetic surgery, once the exclusive          girth of their penis. Testicle implants and scrotum
          domain of wealthy older women, is now         reductions are also not unheard of.
          becoming the trendy new option for any
          teenager with an adolescent hang-up. The      Where Curves matter most
          enormous popularity of reality TV shows          If you want to ogle at a really prefect body,
          such as Extreme Makeover, The Swan and        you have to be in Brazil at the time of Samba
          MTV’s I Want a Famous Face, has played        carnival. It is an unforgettable sight - high-
          an important role in fueling the desire       energy samba dancers gliding down the               The most common
          of adolescent girls to alter their bodies     avenue in five-inch high heels, their bare
          permanently.                                  stomach topped by an ample bosom, the like          procedures that
            Plastic surgery is also being used          of which you might have never seen before.          men go in for
          to improve sexual performance in the
          bedroom. Many medical practitioners
                                                        It is quite common for samba dancers to go
                                                        under the knife to perfect their body. The
                                                                                                            are - liposuction,
          are finding themselves swamped by             famous dancer, Angela Bismarchi, has had            nose reshaping,
          requests from women who want to go in         42 different plastic surgeries done. In fact,       eyelid surgery,
          for procedures that call for nipping of the   she is already the Brazilian record holder for
          inner labia, plumping of the outer labia,     the most cosmetic surgeries. Of course, she         facelift and
tightening of the vagina and even restoration of        had a breast implant, how else could she get        Botox injections.
the hymen, the little membrane that breaks during
first intercourse. In certain parts of the world, the
                                                        a bosom of that unbelievable size.
                                                           But the place where almost everyone
                                                                                                            But there will
hymen is still considered to be the ultimate proof      has had a plastic surgery procedure done            always be those
of virginity. There will always be those who want
to keep reclaiming their virginal status, hence the
                                                        is certainly Hollywood. Demi Moore is 43
                                                        years old, and yet she looks a decade or
                                                                                                            who want to try
popularity of hymen surgery. The procedure of           two younger, all thanks to the extensive            something that is
“vaginal tightening,” which entails firming up of       procedures that have been done on her               truly unique.
the outer ring that leads up to the vagina, is also     magnificent body. Tara Reid had a horrible
quite popular.                                          experience with breast enhancement. She
                                                        went to the clinic to get B sized breasts,
men Jump on the Beauty                                  but the surgeon accidentally stuck Cs in her.
Bandwagon                                               Unfortunately, the media went crazy and stated
  While women still enjoy the distinction of having     that Tara only did that for publicity. Cindy
the most procedures done in India and abroad,           Crawford has already admitted to taking recourse
men also are getting on the beauty bandwagon in         to plastic surgery and so has Lindsay Lohan.
a big way. Well, why should it come as a surprise          When Bollywood starlet, Rakhi Sawant was
                                                                                                                           royal	 	June	/	July	’08	




that men want to be attractive and youthful             quizzed by the inimitable Karan Johar, on his
too? If anything, both sexes are motivated by a         show Koffee with Karan about reports of her
similar desire to look young and attractive. The        getting breast implants, she flirtingly replied, “Jo
most common procedures that men go in for               Bhagwan nahin deta, woh doctor deta hai”
are - liposuction, nose reshaping, eyelid surgery,      (What God doesn’t give, doctor gives it). It takes
facelift and Botox injections. But there will always    guts to come clean in Bollywood, but Rakhi has
be those who want to try something that is truly        what it takes. The rumor mills have it that Shilpa
unique. Welcome to the brave new world of penile        Shetty had a nose job done, and so has Koena
                                                                                                                           53
Mitra. With the rise in popularity of Botox and
                       silicone implants, it is getting hard to tell a real
                       beauty from a fake one in Bollywood.
                          In Rakhi Sawant’s case, she has not only admitted
                       to having a boob job done, she also revealed that
                       she would remove her implants to participate in
                       Nach Baliye 3 contest because implants obstruct
                       her dance movements. But it is not just Bollywood
                       women who are resorting to such tactics for
                       enhancing their appeal. There is a spate of rumors
                       about Salman Khan having resorted to hair
                       implants to take care of his thinning crown. Many
                       aging superstars are great aficionados of face-lift
                       and Botox injections. How else can they have shiny,
                       wrinkle-free cheeks at the age of 70?

                       Benefits and Risks
                          Like all things in life, plastic surgery too has
                       its share of pitfalls as well as benefits. The most
                       common procedure is clearly breast implants.
                       Breast implants have helped scores of women
                       around the world to develop self-confidence by
                       augmenting the size of their breasts. But women
                       who go in for such procedures need to understand
                       the risks that the implants can pose and the
                       long-term maintenance that they require. Breast
                       implantation is not necessarily a one-time surgery.
                       In fact, statistics show that roughly one third of
                       women who go in for implant surgery for cosmetic
                       reasons or for reconstruction after breast cancer
                       have a second operation within four to five years.
                          There is no dearth of people who go in for a
                       nose job, and when they venture into the society with a brand       stretched too tight. In Hollywood it is possible to find old film
                       new nose, they find people saying, “Hey, you don’t look like        stars who walk around with a look of constant amazement on
                       yourself.” Not all criticism is subtle, especially from those who   their face. That is because their face-lift has been overdone.
                       believe surgery has robbed someone                                                          Sometimes it seems that the surgeon has
                       of an endearing feature or rendered
                                                                       As far as positive                          pulled the skin so tight that they cannot
                       him or her almost unrecognizable. It is                                                     even close their eyes. Extra care needs
                       always a good idea to do a full research     impacts from plastic                           to be taken in case of teenage girls and
                       before going in for an operation,           surgery are concerned,                          boys, who tend to be both obsessed and
                       because once the procedure gets done,                                                       dissatisfied with their looks, and are too
                       it is lot more complicated to undo it. So,
                                                                    it is highly beneficial                        young and shortsighted to understand
                       if you’re considering cosmetic surgery        for people who are                            the implications of surgery.
                       you need to ask yourself what you
                       hope to achieve, because it’s not going
                                                                    consistently tied to a                           As far as positive impacts from
                                                                                                                   plastic surgery are concerned, it is
                       to be the one magic solution that makes       negative focus on a                           highly beneficial for people who are
                       everything better. It can even change       particular facial feature                       consistently tied to a negative focus on
                       you for the worse, like what happened                                                       a particular facial feature or body part.
                       to John Mullins who was inspired by                or body part.                            An operation may turn out to be the
royal




                       extreme makeover TV shows to go in                                                          best way to fix low self-esteem, but you
                       for surgery. He was not even aspiring to look like Brad Pitt,       need to have realistic expectations. You should not be going in
                       all he wanted was a face-lift, a small nose job and a few nips      for plastic surgery merely because your girlfriend or boyfriend
54	 June	/	July	’08	




                       and tucks. But, eighteen operations later Mullins is horribly       thinks that you would look much better with a nose or chin job.
                       scarred. He has ended up in a hospital in excruciating pain         Going under the knife has to be a deeply personal decision. If
                       from vascular and circulatory problems and a pseudomonas            you really think that surgery will improve your social standing,
                       infection.                                                          your career prospects and self-confidence, then go for it.
                          Even ordinary face-lift operation can go bad if the skin gets    Otherwise learn to accept yourself the way you are. n
grooming                       fashion
  Pangea Facial Cleanser
  Rs. 1000




                             Usher Deodorant, Shower Gel
                             & After Shave Soother
                             Starting at Rs. 1000




                                          Redken Mint
                                       Clean Shampoo
                                               Rs. 700



                           Lucky Tiger Essential
                           Grooming Kit
                           Rs. 2900                                  royal	 	June	/	July	’08	




Pangea Shower Gel
Rs. 550
                                                                     55
fashion                                bags


                                                            hugo boss bLack
                                                            coLLection Leather bags
                                                            rs. 12,000




                             dieseL despatch bag
                             rs. 7,800




                                                      Linea canVas bag
                                                      rs. 4,000




                                                   beLkin Leather sLeeVe for Macbook air
                                                                                rs. 2,000




  ted baker Vintage Leather bag
  rs. 10,000
AZ
By shaheen raaJ


  It is impossible to miss
                             to


  Kareena Kapoor these
  days and why would
  anyone want
                                           with
  to. Movies,
  billboards,
  commercials,
                           Kareena Kapoor
  and
  magazines, Kareena is
  everywhere. Bollywood
  has lapped her up and
  her fans can’t have
  enough of her. Her career
  is at an all time high.
  With Saif Ali Khan in her
  life, it is safe to assume
  that her love life is
  doing even better. In this
  exclusive interview she
  divulges the A to Z of her
  personal and professional
  life.

                                     		
  Acting
    I	 have	 a	 very	 chequered	 career	
    and	 a	 jolly	 good	 roller-coaster	
    ride	 from	 J.P.	 Dutta’s	 Refugee	
    to	Imtyiaz	ali’s	Jab We Met	&	of	
    course	 yash	 raj	 films	 Tashan.	 I	
    think	I	have	proved	my	worth	and	
                                                                                                  royal	 	June	/	July	’08	




    carved	a	niche	for	myself.	Today,	
    I	can	safely	say	that	I	am	a	good	and	reliable	actress.	They	call	me	STar,	but	to	very	
    modest	I	think	I	am	yet	to	attain	that	status.	But,	I	will	one	day.	Wish	me	luck!	
    		
  Bebo
    My	pet	name	since	childhood.	on	this	score	I	would	describe	my	personal	traits.	I	am	
    lively,	bubbly,	headstrong,	impulsive,	sensitive	and	vulnerable.	I	get	hurt	easily.	I	hate	
    being	rubbed	the	wrong	way,	you	know	what	I	mean.		
                                                                                                  57
high.	With	love	I	can	do	anything,	without	it,	I	get	depressed.	
                                      I hate being emotionally                                        I	hate	being	taken	for	a	ride	when	I	am	deeply	in	love	with	
                                 blackmailed into any kind of                                         someone.	 I	was	in	love	 once	and	 now	I	 am	in	love	again.	
                                                                                                      Hope	I	can	be	in	love	forever.
                               relationship, be it in my family                                       		
                                   life or my own private and                                         Joy
                                                 personal life.                                       The	 joy	 and	 happiness	 that	 I	 share	 with	 my	 family,	 my	
                                                                                                      friends,	 my	 relatives,	 my	 three	 best	 film	 industry	 friends	
                                                                                                      amrita	arora,	esha	Deol	and	Konkana	Sen	Sharma.	It	also	
                       		                                                                             happens	on	my	shoots	when	I	spend		my	precious	moments	
                       Comedy                                                                         with	my	directors,	costars,	unit	people	like	the	technicians,	
                       The	word	itself	tickles	a	funny	bone	in	me.	I	think	I	do	have	a	               the	make	up	dada,	the	junior	artists	and	dancers	and	above	
                       streak	for	comedy	in	me.	I	also	have	a	good	sense	of	humor.	                   all	the	spot	boys.	
                       after	working	with	Priyadarshan	sir	in	Hulchul	and	Chup Chup                   		
                       Ke	and	with	Imtiyaz	ali	in	Jab We Met	I	think	I	can	call	myself	a	             Khandaan
                       Comedy	Queen.	I	am	proud	of	the	comic	flair	inherent	in	me.		                  obviously	the	Kapoor	Khandaan,	the	first	such	a	big	family	of	
                       		                                                                             Bollywood.	I	am	proud	to	be	the	scion	of	such	an	illustrious	
                       Don                                                                            and	talented	Kapoor	family.	The	Kapoor	heritage	right	from	
                       not	as	in	the	film,	but	I	was	elated	doing	Helen	auntie’s	song	                my	great	grandfather	the	late	Shri.	Prithiviraj	Kapoor	to	the	
                       Yeh Mera Dil Pyar Ka Deewana	in	Farhan	akhtar’s	Don	and	also	                  latest	 entrant	 my	 cousin	 ranbir	 Kapoor	 has	 indeed	 been	
                       for	sharing	the	stage	with	her	for	the	same	song	in	one	of	the	                very	remarkable,	a	noteworthy	milestone	in	the	annals	of	
                       awards	ceremony.	I	was	on	cloud	nine	when	she	appreciated	                     the	golden	history	of	Indian	Cinema.	
                       my	dancing	skills	and	blessed	me	on	stage.	                                    		
                       		                                                                             Lolo
                       Emotions                                                                       My	sister	Karishma.	My	guide,	my	mentor,	my	philosopher,	
                       I	am	an	emotional	fool.	I	get	emotional	very	fast.	But,	I	hate	being	          my	soul,	my	love,	my	inspiration,	my	source,	my	force	and	
                       emotionally	blackmailed	into	any	kind	of	relationship,	be	it	in	my	            my	best	buddy.	I	can	go	on	and	on	but	I	am	running	out	of	
                       family	life	or	my	own	private	and	personal	life.		                             words.			
                       		                                                                             		
                       Fans                                                                           Movies
                       I	 love	 to	 keep	 in	 touch	 with	 all	 my	 fans.	 I	 interact	 with	 them	   I	don’t	know	what	I	would	be	if	I	was	not	an	actress.	Perhaps	I	
                       through	 my	 fan	 mails,	 my	 blogs	 and	 smses.	 So	 what	 if	 I	 have	       was	destined	to	be	one	because	the	profession	of	acting	runs	
                       had	 some	 unpleasant	 experiences	 in	 India	 and	 abroad.	 But	
                       there	have	been	some	pleasant	memories	too.	I	am	what	I	am	
                       today	because	of	them	sounds	clichéd	to	me,	but	it	is	true.	God	
                       promise!	
                       		
                       Girlfriends
                       Seriously	 no	 jokes!	 I	 have	 my	 own	 set	 of	 girlfriends	 since	 my	
                       childhood,	 school	 and	 college	 days.	 	 We	 still	 meet	 whenever	
                       I	 am	 free,	 go	 out	 on	 dates,	 long	 drives,	 discotheques,	 pubs,	
                       candlelight	 dinners.	 I	 just	 love	 to	 freak	 out	 with	 them,	 have	 a	
                       blast	and	paint	the	town	red	whenever	I	can.		
                       		
                       Home
                       ahhhh!	 Home	 sweet	 home.	 I	 just	 love	
                       to	be	at	home	with	my	mom.	now	that	
                       lolo	is	away	in	her	own	sasural,	I	am	the	
                       only	 person	 who	 gives	 company	 and	
                                                                                                                    I don’t know what I would
royal




                       comfort	 to	 my	 mom.	 I	 wish	 I	 could	 do	
                       that	often	enough.	So	when	I	am	unable	                                                      be if I was not an actress.
                       to	do	that	I	just	force	her	to	accompany	                                                       Perhaps I was destined
58	 June	/	July	’08	




                       me	to	my	overseas	shoots.		
                       		                                                                                               to be one because the
                       In love                                                                                       profession of acting runs
                       	 I	 relish	 the	 idea	 of	 being	 in	 love	 every	
                       second	of	my	life.	It	gives	me	the	greatest	
                                                                                                                         in my family’s genes.
be	daring	enough	to	face	all	the	pitfalls,	the	highs	and	lows,	the	
                                                   ups	and	downs.		
                                                   		
                                                   Roles
in	 my	 family’s	 genes.	 So	 here	 I	 would	      	yeah!	I	have	done	all	kinds	of	roles	till	date.	yet	I	am	still	waiting	
like	to	list	my	favorite	and	forthcoming	          to	get	a	chance	to	enact	my	dream	role.	no	I	can’t	tell	you	now.	
movies.	out	of	the	twenty	six	films	that	          I	want	it	to	be	a	surprise	for	one	and	all.	
have	been	released	till	this	date	I	would	         		
like	to	make	a	mention	of	ten	of	them	as	          Someone Special
follows	in	reverse	order	-	Jab We Met,             There	was	someone	special	in	my	life	then	and	there	is	someone	
Omkara, Bewafaa, Hulchul, Aitraaz, Fida,           special	in	my	life	now.	yes!	Saifu	has	come	in	my	life	at	a	very	
Khushi, Chameli, Asoka	 and	 my	 debut	            special	 juncture.	 He	 has	 made	 me	 come	 out	 of	 my	 pits	 of	
movie		Refugee.	While	my	forthcoming	              depression.		He	has	done	so	many	special	things	to	proclaim	his	
movies	in	ascending	order	are	Tashan,              love	for	me.	He	has	even	accepted	our	relationship	openly	on	a	
Kambakht Ishq	 and	 Golmaal Returns.	              television	channel	during	a	fashion	show.		
But	I	don’t	know	what’s	happening	on	              		
the	front	of	my	other	under	production	            Trophies
movies	like	Lajjo, Milenge Milenge	and	I	          5	Filmfare	trophies	for	Refugee, Chameli, Dev,	and	Omkara	and	
think		Kismet Talkies	too.		                       the	 last	 one	 also	 got	 me	 the	 critic’s	 award	 too.	 But	 my	 most	
		                                                 memorable	 award	 is	 the	 ‘Queen	 of	 Hearts’	 trophy	 I	 received	
Number                                             from	Kareena	Kapoor	Fan’s	association.		
I	 hate	 being	 labeled	 with	 a	 number.	 I	      		
am	 not	 in	 the	 race	 to	 be	 the	 number	       Uncle
one	heroine.	I	have	been	appreciated	as	           I	still	remember	and	cherish	the	fond	memories	of	my	uncle	the	
a	good	and	successful	actress.	I	would	            late	Sri	raj	Kapoor	Sahab.	He	loved	me	too	much.	I	was	very	
love	 to	 be	 appreciated	 as	 a	 good	 and	       close	to	his	heart.	Whenever	we	met	we	used	to	be	so	happy	
successful	 STar.	 I	 hate	 being	 rated	 as	      with	each	other.		
an	actress	too.	I	am	not	an	underrated	            		
actress.	I	am	not	an	overrated	actress.	I	         Voice over
am	just	a	talented	actress.	That’s	it.		           I	have	done	playback	singing	for	films	like	Dev	and	Kabhie Khushi
		                                                 Kabhie Gham	but	for	the	first	time	I	will	be	doing	a	voice	over	
Performance                                        for	an	animation	film	called	Roadside Romeo.	Just	wait	and	watch	
	 I	 was	 on	 cloud	 nine	 when	 I	 got	 a	 lot	   I	can’t	tell	you	more.				
of	 critical	 acclaim	 for	 my	 performance	       		
as	Dolly	 in	Omkara	and	as	Geet	in	 Jab            Wedding Bells
We Met.	 I	 am	 so	 glad	 that	 both	 these	       yes!	 He	 has	 proposed	 to	 me	 in	 his	 own	 unique	 style.	 yes!	 I	
performances	 were	 considered	 as	                have	accepted	it.	We	will	make	an	official	announcement	of	our	
outstanding	 by	 my	 fans	 and	 even	              wedding	date	soon.		
hardcore	critics.	I	consider	these	as	the	         		
best	compliments	of	my	life.			                    Xmas
		                                                 We	 will	 celebrate	 Xmas	 and	 new	 year’s	 eve	 together	
Question mark                                      and………the	rest	is	all	a	secret.	
	What	can	I	say?	life	is	always	a	question	        		
mark	at	every	crossroad.	So	we	should	             Year
                                                   2007	was	good	but	in	the	end…I	was	heartbroken.	2007	also	
                                                   helped	me	to	find	my	true	love.	2008	will	bring	in	a	lot	of	joy	and	
                                                   happiness	in	its	wake	both	on	the	professional	and	the	personal	
                                                   front.	I	am	sure	it	will	be	a	rocking	year	for	both	of	us.	
                                                   		
                                                   Zeitgeist
                                                                                                                               royal	 	June	/	July	’08	




                                                   I	forgot	to	make	a	mention	of	Zoya	akhtar’s	untitled	film	and	the	
                                                   special	appearances	item	numbers	that	I	have	done	in	movies	
                                                   like	Don	and	Kya Love Story Hai.	I	mean	ours!	Hai	na?	 n
                                                   	
                                                                                                                               59
Fernanda
Ferrari

      T
       he exotic, curvaceous and long-limbed beauty,
       Fernanda Ferrari, is barely 21, and yet she
       has managed to make a name for herself as
       Brazil’s freshest gift to the world of modeling.
       When she is executing spunky poses in lingerie
       that reveals much more than it shields, she
       seems to be at her enchanting best. Guys find it
       impossible to resist her charms, but getting an
       eyeful is not a problem as she has a penchant
       for showing off her luscious body.
FernandaFerrari
You carry Brazilian as well as Italian                 yet to come! Someday I would like to appear in a
genes inside you. How did that happen?                 Bollywood film where I get to wear a traditional
My father is Italian and my mother is Brazilian.       Indian dress. That is something I am extremely
Brazil is a big melting pot of people from different   keen on. Don’t you think I will look really good
cultural backgrounds; we have every kind of mix.       with all that jewelry and mehndi henna body art?
From Afro-Brazilian like the football legend Pelé
to blonde German like Gisele Bündchen and to           We’re getting goosebumps just thinking
someone like me.                                       about it. So, what’s the inspiration that
                                                       drives your career?
Do you harbor a desire to move from                    I can’t help but be inspired by older Brazilian
modeling to acting? Are you familiar                   models like Gisele Bündchen and Adriana Lima
with the Bollywood industry?                           or people who changed the world like Nelson
When I was hosting the ZEE Cine Awards someone         Mandela and Mahatma Gandhi, but I think the
did ask me if I was interested in acting. If the       person who inspires me more than anyone else is
right kind of offer came along I would be game         my mother. She is the one who got me to enter the
for it. I am a lot more familiar with Bollywood        beauty contest in my hometown. She has always
after doing the awards ceremony, which was quite       supported me. Everything I am today, I owe it
a spectacle. I think Aishwarya Rai Bachchan is         to her. So guys if you like my pictures thank my
simply gorgeous.                                       mom!

What do you consider your greatest
achievement till date?                                                    vitals
I did win a certain bikini contest, probably the
biggest in the world, but I don’t want to rest on                          Bust           34
my laurels. I think my greatest achievement is                             Waist          26
                                                                           Hips           36
                                                                           Birthplace     Sao Paulo,
                                                                                          Brazil
                                                                           Birth date     14/01/1987
                                                                           Height         6 ft.
                                                                           Weight         65 kg.
                                                                           Website
                                                                           www.fernandaferrari.com




                                   I did        win
                                   a certain bikini contest,
                         but I don’t want to rest
                                           on my laurels.
You have a lot of runway                   Have you ever been stalked by
                       experiences. What’s the most               a fan? How do you tackle such
                       embarrassing thing to happen               obsessive types?
                       to you on stage?                           I have never had to deal with an actual
                       I was participating in New York Fashion    stalker. But as far as real fans are
                       Week when one of my boobs popped           concerned, I am very appreciative of
                       out as I was turning and I didn’t even     them. Obsessive is a relative term. If
                       notice. It was definitely embarrassing,    my fans like me a lot, I would prefer to
                       but I can take solace from the fact that   take that as a compliment. My page on
                       such incidents have happened with          MySpace is full of lavish compliments
                       other models as well.                      from scores of fans. Check it out.

                       What’s your sexiest feature?
                       I think that depends on whether you
                       are a breast man, a legs man or an
                       ass man. I have all three. As far as my
                       own opinion is concerned, my sexiest
                       feature could be my overall figure and
                       more specifically my butt, which is
                       quite shapely.

                       You mention that people love
                       your body, have you always had
                       such a great body?
                       When I was younger, I used to be very
                       tall and skinny, so boys used to taunt
                       me with names like “Olívia Palito”
                       which is Portuguese for Olive Oyl, the
                       wife of Popeye in the famous cartoon.
                       But when my figure filled up, the same
                       boys became extra courteous and they
                       started begging me for a date. After
                       I had won my city’s beauty pageant I
                       became quite popular. People started
                       calling me “The Miss.” At my home in
                       Brazil I still am “Miss” to those who
                       know me.
royal
62	 June	/	July	’08
FernandaFerrari




My sexiest
feature
could be my
overall figure and
more specifically
my butt,
which is quite
shapely.
FernandaFerrari                                  What’s the weirdest email or message
                                                 you ever received from a fan?
                                                 I can’t think of anything in particular. If a message
                                                 or email is too weird for me then I’ll just delete it.
                                                 Also it’s not humanly possible for me to read every
                                                 message because I get so many of them.

                                                 Describe your ideal man?
                                                 I like guys who are rugged and strong. Someone
                                                 like Akshay Kumar, who I think is simply delicious.

                                                 Which Hollywood star would you love to
                                                 share a steamy scene with?
                                                 I would go for George Clooney. I am a sucker for
                                                 older guys, though I am still quite young, and so
                                                 most guys are older than me!

                                                 Tell us about the most seductive line
                                                 any man has ever said to you?
                                                 I get quizzed about my marriage plans all too
                                                 often. But such proposals don’t work with me!
                                                 In my opinion what a man doesn’t say is possibly
                                                 more seductive. To be really effective a man
                                                 should be able to communicate through subtle
                                                 gestures. Guys who talk too much turn out to be
                                                 just that - all talk and no substance.

                                                 At 6 feet tall you’re taller than the
                                                 average Indian. Would you ever date a
                                                 guy shorter than you?
                                                 I think if you asked any fashion model they would
                                                 probably say that they are used to dating guys who
                                                 are shorter than them. It is quite normal to date
                                                 shorter guys. In fact, all my boyfriends have been
                                                 shorter, especially when I wear high heels, then
                                                 I am really tall, but I tend to wear those only on
                                                 special occasions.




                                       I think
                                     Akshay Kumar
                                      is an ideal man.
 Photo courtesy of James Shubinski
Do you consider yourself to be a party
animal?
I don’t go to that many parties, unless it’s work
related. I don’t drink alcohol, so all I do at parties
is dance.

You’ve traveled a lot. What’s your
favorite place to get romantic and
relax?
When I think of romance and relaxation, the
flamboyant beaches of Brazil always come to
my mind. The pace of life is very relaxed at the
Brazilian beaches - just the kind of place to make
romance blossom.

Have you been to India?
In Asia, I have been to Singapore, Hong Kong,
Mongolia, Taiwan and I will be going to Dubai soon,
but somehow I have not been able to visit India
yet. Once I was offered a job to shoot for a film
that would have had me traveling through India’s
most scenic spots, but I missed out on that offer
as I was already booked.

If you were to create a headline about
your sexual behavior what would it say?
Hot Italian Passion meets Latin Fire - I may be
quite demure on the outside, but underneath I am
as passionate and as hot as my heritage would
suggest. n
FernandaFerrari
I may be quite demure on
the outside, but
underneath I am as
passionate and as hot
as my heritage would
suggest.
Gallardo LP560-4
                        The vehicle is extremely wide and bonded to the road
                       surface, so it does not matter how fast you drive, the
                              Gallardo will always keep its balance.


                               B
                                    urning with a desire to feast your eyes on the most stunning piece of luxury on wheels, then check out the
                                    Lamborghini Gallardo LP560-4. The car is so unbelievably beautiful that it might inspire you to go down on
                                    your knees and plead for a date. But beauty is not the only thing that the Gallardo scores in. Its sexy shape
                                    packs a state of the art 5.2 litre V10 engine that can ejaculate an output of unbelievable 560 PS (412 kW)
                                    at 8000 rpm. As a result you have the ability to break 100km/h in 3.7 heavy back-pressing seconds. At top
                                                                          speed the car is capable of going at 325km/h.
                                                                          The vehicle is extremely wide and bonded to the road surface, so it
                                                                          does not matter how fast you drive, the Gallardo will always keep
                                                                          its balance. The large cooling intakes in front of the car and the low
                                                                          positioned front spoiler between them, impart the car with a kind
                                                                          of menacing appeal. It comes with a permanent four-wheel-drive
                                                                          transmission and a vastly improved suspension design. The optimized
                                                                          aerodynamics and a weight reduction of about 44 lbs make the car
                                                                          about as agile on the road, as a panther in the savanna. An added plus
                                                                          comes from the carbon-ceramic-disc braking system and a futuristic
                                                                          looking Bi-Xenon-LED symbiosis headlights system.
                                                                          The interior fulfills the promise of luxury and comfort. The sports
                                                                          seats are positioned very low, as is the norm in all sports cars, and
                                                                          are draped in the finest quality leather. The control panel, handbrake
                                                                          and the gear-stick surrounds are built from carbon fibre. Gallardo
royal
68	 June	/	July	’08
allows you enough room to individualize the interior
by opting for different colors and designs. There
is a wide middle console that accommodates the
versatile Lamborghini multimedia system as well
as the air conditioning, which can be regulated from
both the driver and passenger sides. The cockpit,
embellished with seven rounds of instruments, can
provide all sorts of data that can be useful while
driving. Start saving your rupees today because this
baby will cost more than the average home. n




                                                       royal	 	June	/	July	’08	
                                                       69
Suzuki
   ConCept
                                              Kizashi                                    3
W
                       hen you reflect on a dynamic athlete in motion, your mind gets filled with
                       the imagery of a strong honed physique capable performing marvelous feats
                       of endurance. Now try to translate that imagery into the field of cars. That
                       would be exactly the kind of impression that Suzuki’s Concept Kizashi 3, with
                       its perfect shape and superb performance, will make. Kizashi in Japanese
means prelude. How accurate the name is! The moment you set your eyes on this great looking
car, you realize that the Kizashi 3 is a prelude to a futuristic way of traveling. It is so far ahead of
competition.
    The vehicle’s immaculately engineered body evokes a feeling of capability, refinement, as
well as raw power that flows from a 3.6-liter DOHC V6 engine with plated cylinders. There is
absolutely no attempt to hide the vehicle’s power; the hood and the body are designed with a kind
of menacing appeal that is quintessentially macho. Measuring in at 183.1 inches in length, 74.8
inches in width, 57.1 inches in height and with a wheelbase length of 110.2 inches, Kizashi falls in
the category of a large vehicle.
    The body, finished in monochrome and sparkling with metallic paint, Kizashi Silver, imparts the
vehicle a sense of composure and depth of character; if anything, this is the kind of sex appeal that
makes both men and women stare in awe. Furnished with plush leather, top-notch accessories
and a state of the art audio system, this concept car turns out to be as perfect in its interior as its
exterior. In India, Suzuki is famous for its Maruti brand of cars, but the future will always belong
to cars such as Kizashi 3.

            The body is
             finished in
       monochrome and
              sparkling
          Kizashi Silver
         metallic paint.
                                                                                                           Price - TBA
Capable of scorching the tarmac at 150 mph (240 km/h)
                                       and extreme cornering.




                                                  Yamaha
T
            he 599cc Thundercat stands and rides
            with an aggressive posture that clearly
            makes it fall in the category of an alpha
            macho sports bike. It is comfortable
            to ride and it looks and sounds great.
            In other words, this is the kind of bike
that you need to take care of all your transportation
needs. Powered by an inline 4 cylinder engine and
90 bhp (67 kW) the bike is best suited not just for
long rides across windy highways, but also for inner
city travel. Even though it weighs a hefty 417 lb
(189 kg), it is still capable of scorching the tarmac
at 150 mph (240 km/h) and of extreme cornering.
The large one piece seat is ergonomically shaped
to let you ride for longer periods without being
plagued by pain in your back or neck. The frame,
made out of steel, makes the bike rather sturdy.
Suspension is fully adjustable and for braking
there is the state-of-the-art Sumitomo One that
is extremely effective, whether on racetracks or
on ordinary roads. If you really want to go in for a
proverbial ‘All-Rounder’ then this Yamaha YZF-R6
Thundercat is very much it. Comfy, fast, reliable,
economical and really nice looking, we’re getting
goose bumps just thinking about it.
                                                                royal	 	June	/	July	’08	




                              Price - Rs. 4 lakhs
                                                                71
The artificial intelligence in TNA Impact
                                                                                                              is advanced enough to allow you to choose
                                                                                                              your wrestling style, customize your moves
                                                                                                              and decide what kind of clothing you prefer
                                                                                                              the ultimate champion to wear. But the
                                                                                                              best aspect of the game lies in the fact
                                                                                                              that it features some of the topmost TNA
                                                                                                              superstars. If you have ever had the fantasy
                                                                                                              to get into the ring with superstars like Kurt
                                                                                                              Angle, Jeff Jarrett, Rhino, Samoa Joe, AJ
                                                                                                              Styles, Sting, Christian Cage and Abyss then
                                                                                                              this game is a dream come true.


                                                                                                                           Price - Rs. 2,400



                       A   frenetic style, a quick pace and a series of high-flying moves make it
                           seem as if you are actually in the ring wrestling for your life against
                       a fearsome foe. Of course, this is only a video game, but the bedlam
                       is so excitingly real. Wrestlers can jump up and try to crush their
                       opponents, they can fly and hit from the side with a resounding impact.
                       There is just so much of heated action going around that you hardly
                       have time to breathe. All you can do is keep playing your best game as
                       it             skyrockets towards an adrenalin pumping high.




                                                                                                                         choose which Nintendo characters
                                                                                                                         they wish to race as. Best thing is
                                                                                                                         that you can even play as yourself.
                                                                                                                         Imagine the delight of racing in
                                                                                                                         an unpredictable cartoon world
                                                                                                                         as Mario, Luigi, Peach, Yoshi,
                                                                                                                         Donkey Kong, Wario, Bowser,
                                                                                                                                Toad, and a host of other

                                   W   hen you have an
                                       obsession with speed
                        then you have no alternative except to
                                                                      viciously random cruel
                                                                      streak. But beneath
                                                                      the veil of bedlam there
                                                                                                                                 new faces including your
                                                                                                                                 own! Pick up an avatar
                                                                                                                                 and let the battle to win
royal




                        keep searching for every inch of space        lies a deep, precise, and                                  Mushroom        Kingdom’s
                        on the track so that you can go faster        technically      rewarding                               most prestigious racing
                        and faster. That is the kind of thrill that   racing game that you can
72	 June	/	July	’08	




                                                                                                                          cup begin in earnest. Plenty of
                        Mario Kart packs amidst its classic           afford to play for hours without              power-ups and oodles of objects for
                        confusion and slapstick chaos. Intense,       even a whiff of ennui ever touching        players to slow down other drivers only
                        addictive and powerfully exhilarating,        you.                                       add to the excitement.
                        this game has all but perfected the art          Like in most Mario games, in Mario
                        of blending cartoon foolishness with a        Kart players too enjoy the freedom to              Price - Rs. 2,000
D    eveloped in collaboration with
                         master film director Steven
                    Spielberg, Boom Blox, is all geared
                                                                     most entertaining. The best thing about
                                                                     the game is that it allows players to
                                                                     remix any level in Create mode using
                    to bring you a unique fun-filled family          props, blocks, or characters that have
                    game. The game basically consists of a           been unlocked during the game. It is
                    series of puzzles that allow the players         also possible for you to build anything
                    to throw objects at towers made of               that is straight out of the realms of
                    blocks. The ultimate goal is to send             your imagination. The really visceral
                    these towers crumbling. It may sound             game play turns out to be perfectly
                    easy, but once you start playing, you            suited for the Wii’s interactive motion-
                    find that the game is quite complex              sensitive controls.
                    and there are over three hundred
                    levels that you can conquer. An
                    easy to use game editor is just the
                    right recipe to inspire your creative
                    juices to flow in torrents.
                       There are brain-twisting
                                     challenges galore.
                                     You interact
                                     with amusing
                                     characters such
                                     as the block-laying
                                     chickens or baseball-
                                     throwing monkeys
                                     prancing across four
                                     themed environments.
                                     In fact, there are more
Price - Rs. 2,000                    than 30 characters
                    amongst which Tiki, Medieval, Frontier,
                    and Haunted could rank amongst the




                    MAss EffEct
                                          A         stellar presentation and fantastic special effects make Mass Effect
                                                    one of the best galactic adventures in the market today. Definitely
                                          the kind of game that will have players pining for more. It does not even
                                          matter if you are a less experienced player or a longtime gamer, Mass Effect
                                          deftly combines accessibility and challenge, all wrapped up in a package
                                          that’s both deep and addictive. You play as Captain Shepard and your job is
                                          to indulge in all kinds of nail biting adventures till you manage to save the
                                          galaxy from imminent destruction.
                                              The universe is full of a variety of colorful species; some of them are
                                          good while others are highly malevolent. As the compelling storyline rushes
                                          towards a rocking climax, Captain Shepard has to tackle the treacherous
                                          enemies on whom he must unleash savage vengeance. But there are heroic
                                          allies to help him accomplish his mission. The artificial intelligence in the
                                          game is fairly advanced and all the decisions you make while playing as
                                          Captain Shepard has strong bearing on the outcome of the game itself. If
                                          you are playing as a female, then some characters will deliver a different
                                          dialogue.
                                                                                                                          royal	 	June	/	July	’08	




                                              Audio is also excellent, thanks largely to the top-notch soundtrack
                                          that incorporates voices from Hollywood actors such as Seth Green, Marina
                                          Sirtis, Lance Henriksen and Keith David. If you are familiar with the seminal
                                          game, BioWare’s Star Wars, then the action packed progression of Mass
                                          Effect will probably seem quite familiar to you.

                                               Price - Rs. 2,400
                                                                                                                          73
B    ased on the legendary MMOs EverQuest® (EQ) and
                            EverQuest® II (EQII), the Legends of Norrath has always
                       enjoyed an immense fan following, and the advent of graphic rich
                       Inquisitor is only going to add to its popularity. The game packs
                       avant-garde excitement with stunning new card art, fresh loot and
                       fierce new enemy encounters. It is easy for players to get wooed
                       by fascinating characters like Monks, Enchanters, Inquisitors and
                       Bards. You can build your best deck and test your skills in monthly
                       Championship Qualifier Tournaments that dole out prizes ranging
                       up to $1,500.
                       With the new version you will still be able to experience all the
                       previous features of Legend of Norrath. The 4 primary Archetypes
                       of cards: Priest, Mage, Fighter, and Scout are there and each
                       Archetype continues to have the ability to create a deck along a
                       Light, Shadow or Neutral path. Where the Inquisitor scores is by
                       adding 250 astonishingly beautiful cards and more than 20 new
                       loot items each for EQ and EQII. The result is that the new version
                       of Legends of Norrath has now become wholly reinforced as a
                       complete online card gaming experience, where it can feature
                       numerous casual and tournament game lobbies with three exciting
                       tournament formats.
                                                                                                Price - TBA



                                                                                A    n adventure on high seas means an encounter with a ship full
                                                                                     of swashbuckling pirates. Canon fire spewing from the portals
                                                                                of mighty ships, swords and cutlasses flying through the air as
                                                                                people fight for their lives, and to top it all there is the search for
                                                                                hidden treasure! Pirates of the Revolution is a game that promises
                                                                                adrenalin pumping excitement and stands out by introducing new
                                                                                and powerful Spanish, English, French and pirate ships along with
                                                                                colorful heroes and villains.
                                                                                In fact, there are as many as 65 different ships in the fray, each
                                                                                ship populated with its own cast of crews. There are 14 different
                                                                                treasures that you can find and five different forts that you have to
                                                                                capture. The weapons are explosive and it is possible for you to set
                                                                                fire to rival ships. You can even use mythical weapons such as the
                                                                                Neptune’s trident to send your opponents into a bottomless abyss.
                                                                                                 Destruction is not the only thing you can do, you can
                                                                                                       also get creative by building your own ships.
                                                                                                          But the best aspect of the game lies in
                                                                                                            surprising your unsuspecting opponents
royal




                                                                                                             with powerful new tools such as Divers,
                                                                                                             Foul Winds and the ever-popular
                                                                                                             Mermaids. Characters from history
74	 June	/	July	’08	




                                                                                                             mingle with the most abject villains ever
                                                                                                            to sail the seas, including the famous
                                                                                                          American John Paul Jones. Developed by
                                                                                                       Sony Online Entertainment.
                                                 Price - TBA
SimCity Societies Destinations
                                                                                                        visitors enjoy. There is an enhanced
                                                                                                        map generator, through which players
                                                                                                        can identify each city’s opportunity for
                                                                                                        diversion and the city can capitalize on

M     ost video games are about destroying
      rather than creating. They are
replete with marauding monsters, blazing
                                               and nightclubs, there is so much you can
                                               develop in this game.
                                               SimCity Societies Destinations is packed
                                                                                                        that draw.
                                                                                                      There is enough room for psychological
                                                                                                      power play in this game as well. You can
guns, martial art fights and all kinds of      with tools that you may need to get
                                                                                                      get your Sims to challenge authority and
mayhem. Simcity Societies Destinations         your lust for creation into overdrive.
                                                                                                      experiment with what happens when
stands out by offering a different kind of     The thrill and excitement is all yours as
                                                                                                      citizens flagrantly disobey power. Sounds
entertainment, one that appeals to your        skyscrapers start rising up from empty
                                                                                                      like India!. After all, who doesn’t want to
creative instincts. In this game you can       land. Roads and superhighways get
                                                                                                      disobey pesky orders from the powerful
create an entire city, instead of blowing      built and traffic starts flowing smoothly
                                                                                                      elite?
up one. From sprawling theme parks and         on them. Factories come up and so do
tropical beach resorts to lavish casinos       myriad attractions and amenities that                                Price - Rs.1,200




                                             G  etting into the nitty-gritty of evolution can
                                                be more exciting than you might have ever
                                             imagined, especially if you are able to build
                                             an entire civilization in a matter of hours. And
                                             what about building an entire galaxy or the
                                             universe itself? If you have ever caught yourself       the ocean and evolve into land-based creatures.
                                             yearning for the almighty powers of God, then           Are they going to be carnivore or herbivore!
                                             Spore presents an entertaining opportunity              Will they be social or independent! You get to
                                             to experience the thrilling zeitgeist of being          decide that. Then many of the creatures develop
                                             omnipotent.                                             intelligence to form mutually dependent societies.
                                             Your odyssey begins at the dawn of life, when           You provide them with tools with which they can
                                                      the Earth is replete with sub-microbial        be creative. You watch with joy as your creatures
                                                       creatures that are struggling to survive.     develop the intelligence and the tact to build entire
                                                       You help these creatures evolve into          cities and nations.
                                                                                                                                                              royal	 	June	/	July	’08	




                                                       more advanced beings, but that leads          But with the planet broken up into different nations
                                                       to an exciting struggle for survival with     can war be far behind? Of course not. Your goal is
                                                       other advanced creatures that other           to annihilate the rebellious nations and unite the
                                                       players may create. There is survival         planet under a singe government of your choice.
                                                       of the fittest at the most microscopic        Filled with excellent graphics and an artificial
                                                       level, with the players wielding the          intelligence that is far ahead of its time, Spore is a
                                                       power to tilt the verdict in favor of their   game of such massive scope that you will want to
                                                       preferred creatures.                          keep playing it.
                                                                                                                                                              75




                                                       Inevitably the creatures emerge from
T    his game rocks, quite literally. If you have ever harbored a secret desire to be a
     mesmerizing guitarist and a pop idol, here is your chance to have your fantasy
fulfilled within the realms of a video game. Guitar Hero III enables you to strum your
way through all kinds of venues - from hole-in-the-wall bars to sold-out stadiums.
And if you opt to play in the new multi-player action inspired battle mode, then you get
transported into a world of exciting rock venues, where you can even compete for the
title of the world’s most legendary rock star.
The best part of the game comes from the incorporation of new song tracks. It is now
possible for you to download content from multiple platforms. Some of the featured
hits include all time favorites like- Rock And Roll All Night (as made famous by Kiss)
School’s Out (by Alice Cooper) Cult of Personality (by Living Colour) Barracuda (by
Heart). All you need now is to find some groupies! Just don’t wake the parents.
NEW                                                                                                 enTerTaInMenT



RELEASES
                                                              Cast: Arshad Warsi, Diya Mirza, Irfan Khan, Rajpal Yadav, Suresh
                                                              Menon, Rajat Kapoor, Zakir Hussain, Juhi Chawla
                                                              Director: Jaideep Sen
                                                              Producer: Rakesh Roshan
                                                              Music: Rajesh Roshan
                                                              Lyrics: Javed Akhtar



                                                              O
                                                                        ne thing is for sure, after seeing this movie, you are going
                                                                        to emerge from the theatre with a big smile on your face.
                                                                        The movie is a laugh out loud comedy. The film is about four
                                                              crazy guys who are being treated by an extra-sensitive doctor by the
                                                              name of Sonali (Juhi Chawla). The four crazy guys happen to be Irrfan
                                                              Khan, Arshad Warsi, Suresh Menon, and our personal favorite Rajpal
                                                              Yadav, who manages to make us laugh in every movie he acts in.
                                                              There is no end to the ways by which a man can prove that he is
                                                              crazy. So you can expect the protagonists of Krazzy 4 to display
                                                              unique idiosyncrasies. There is Raja (Arshad Warsi) who is very short
                                                              tempered. Dabboo (Suresh Menon) can hear and understand but
                                                              doesn’t talk even though he can. Gangadhar (Rajpal Yadav) believes he




krazzy4
                                                              is a freedom fighter from Gandhi’s time. Then there is the inimitable
                                                              Dr. Mukharjee (Irfan Khan) who is always losing himself one way or
                                                              the other.
                                                              Additional entertainment value comes from stylish item numbers by
                                                              Hrithik Roshan, Shahrukh Khan and Rakhi Sawant.




DVDs of the Month
over her dead body                                                                 Flight oF the living
Starring: Eva Longoria Parker, Paul Rudd, Lake Bell,                                   DeaD, outbreak
Lindsay Sloane, Stephen Root
Director: Jeff Lowell                                                                      on a Plane
T     his movie has all the ingredients for a romantic comedy
      (read chick flick) so it’s best viewed with a girlfriend or
wife. Paul Rudd plays the role of the inimitable Henry who is a
                                                                                                           Starring: David Chisum,
                                                                                                           Kristen Kerr
                                                                                                           Director: Scott Thomas
bumbling veterinarian and deeply in love with his bossy fiancée
Kate (Eva Longoria). The movie takes off when they get married
and are preparing for a gala reception to which all their friends
and relatives are invited. Kate is busy delivering orders to a team
                                                                                                           D     ead can be more interesting
                                                                                                                 than the living, especially if it is
                                                                                                           a Hollywood film. The corpses are
of caterers, when the angel ice sculpture arrives without wings.                                           back and they are ravenous for a
But Kate won’t tolerate such a transgression, she picks up a huge                                          mouthful of meat. Flight of the Living
fight with the sculptor and in the ensuing commotion the heavy                                             Dead: Outbreak on a Plane turns out
ice maiden falls on her sending her on a non-stop journey to                                               to be yet another rendition of the
heaven.                                                                                                    famous living dead genre that enjoys
Henry is devastated by her death, but the best thing is that even                                          cult following around the world. This
in his devastation he manages to conjure enough lighthearted                                               time the corpses come to life inside
                           moments that will keep you laughing all    a plane during mid-flight which gives no one the option to run. The
                           the way. He refuses to see any other       passengers have to fight or die.
                           woman, as he can’t bear the thought        A routine flight between Los Angles and Paris turns into a nightmare
                           of betraying Kate’s memory. An year        due to the doings of a renegade group of scientists who smuggle
                           passes by, before his concerned sister     abroad a corpse infected with a genetically engineered virus capable
                                                                                                                                                        royal	 	June	/	July	’08	




                           arranges for a psychic called Ashley to    of reanimating the dead. In mid-flight the aircraft encounters massive
                           tell him that Kate would have wanted       turbulence and in the ensuing commotion the dead body gets released
                           him to date other women and move           from the cargo hold. The living corpse that gets released attacks others
                           forward. One thing leads to next and       in the plane creating many more zombies.
                           it ends with the psychic (Lake Bell)       The uninfected passengers and crew must fight for their survival aboard
                           falling in love with Henry. But Kate is    the plane. To make matters worse the zombies have superhuman
                           watching from heaven and she is not        abilities. They can sprint and leap over long distances and are very
                           prepared to let Henry be seduced. Her      durable; in fact, in one thrilling sequence a zombie manages to survive
                           ghost arrives to wreck havoc on Ashley     despite being thrown into the plane’s engine. Talk about a flight from
                                                                                                                                                        77




                           and that’s when the real fun begins.       hell! Better fly Kingfisher next time.
St. James’s Club
                        N
                                               estled amidst pristine landscape of a 100-acre
                                               peninsula, which is gently lashed by waves
                                               of a deep cerulean sea, the St. James’s Club is
                                               Antigua’s prime holiday destination. If you are
                                               looking forward to spend time in a place that is
                                               truly sophisticated and majestic, this is where you
                                               have to be. The property boasts of many superbly
                        landscaped tropical gardens, and it has two beautiful white-sand
                        beaches and four spectacular pools. But all that is in addition to the
                        whole array of lovely accommodations, opportunities for fine dining, a
                        proficient staff to look after your every need, and last but not the least,
                        a casino that ranks amongst the best in the Caribbean.
                           In keeping with its general theme of ultra sophistication, the casino
                        at St. James’s Club is designed for a more intimate kind of gaming.
                        The garrulous and flamboyant kind of casino experience, which is
                        the hallmark of Las Vegas, is simply not what this place is all about.
                        Conveniently located at the south of the island of Antigua, the casino
                        out here is classically European in design and is quiet, rather than noisy.
                        Despite the general ambiance of regal grandeur, the mood is absolutely
                        lighthearted and playful. American roulette, blackjack, Caribbean poker
                        and slot machines of different types are some of the games that can be
                        played.
                           If you happen to be a celebrity buff, it would make sense for you to
                        try your luck at the St. James’s Casino. In case you were to get lucky you
                        might win a bagful of cash and as an added benefit catch a glimpse of a
                        celebrity or two. Best of all, you might even be able to play with them.
                        Some of the hottest names in sports, entertainment, politics, media and
                        royalty happen to be regular patrons of this place. Another exceptional
                        feature is that the casino out here comes with a range of health club
                        benefits. Even as you get entertained at the roulette, blackjack or poker
                        games, you can pay attention to your health as well.
royal
78	 June	/	July	’08
Antigua’s prime holiday
    destination, the property
    boasts of many superbly
landscaped tropical gardens,
     and it has two beautiful
white-sand beaches and four
          spectacular pools.




                                royal	 	June	/	July	’08	
                                79
Accommodation                   Restaurants and Bars
                                               A sociable club like         St. James’s Club hosts a whole range of
                                            ambiance           prevails   restaurants that you can choose from. But before
                                             wherever you go in St.       you decide to visit any restaurant, it is always
                                             James’s Club. If you         better to inquire about the dress code that they
                                             choose to stay in the Club   follow. Most of them follow a simple dress code
                                              Rooms then you will find    that requests their guests to wear their shoes and
                                              yourself in a spacious      have their bathing suits covered. But it is possible
                                               living     environment     to have different code for different occasions and
                                               furnished           with   for different times of the day. Post 6.30 PM guests
                                       excellent beds, combination        are requested to wear slacks (no shorts or jeans)
                bathrooms (tub/shower), commodious vanities,              and collared shirts in short or long sleeves (no t-
                dual basins, and sliding-glass doors that open onto       shirts or tank tops). Female guests are advised to
                private balconies or patios. Then there are the           wear dresses, skirts, slacks, culottes, or tailored
                                    premium rooms that are even           Bermuda-length shorts (no “short shorts”, cutoffs,
                                    more spacious and their private       or jeans).
 To really savor the joy            balcony offers an unforgettable         The most popular restaurant at the club happens

   of staying here, you             view of the sea. Those who
                                    happen to fall in the category of
                                                                          to be the Rainbow Garden. Set amidst the resort’s
                                                                          tropical gardens, its spacious dining room opens
  have to book yourself             beach hounds will love staying
    in the pricey private           in beachfront rooms. These
   villas, each of which            spacious guestrooms feature
is developed to exude               an airy floor plan and are all
 the charms of an ultra             equipped with a private balcony

    luxurious residence             or terrace only steps away from
                                    the famous Coco Beach.
that is quintessentially               But to really savor the joy of
                 palatial.          staying here, you have to book
                                    yourself in the pricey private
                                    villas, each of which is developed
                to exude the charms of an ultra luxurious residence
                that is quintessentially palatial. Each villa has two
                regally appointed bedrooms, plush living area,
                                             lavish bathrooms and a
                                             porch that is geared to
                                             let your eyes bask in the
                                             most pristine view of the
                                             surrounding landscape.
                                             It is possible for you to
                                             see the yachts that keep
                                             coming and going from
                                             the nearby harbor and
                                             that only adds to the
                                             glamour. These villas
                                             are a particular hit with    out onto a terrace that overlooks a delightfully
                                             honeymooning couples,        appointed pool. Every Monday this restaurant
                                             primarily because of the     hosts live calypso music. Another restaurant that
                                             definitive privacy that      offers excellent alfresco settings, right on the
                                             they offer. So, if you’re    edge of tranquil Mamora Bay happens to go by
                                             looking     to   vacation    the name of The Docksider. Traditionally it opens
                                             with someone special         only after dark and offers grilled favorites such as
                                             this is the place to park    fish kebabs and sirloin steaks. Specialty dishes like
                                             yourself.                    freshly caught lobster and prime beef tenderloin
                                                                          are also hot favorites with diners.
                                                                             Then there is the inimitable Piccolo Mondo
the coastline beckon you to indulge in all kinds
                                                    of water sports. Snorkeling, windsurfing and
                                                    kayaking, are just some of the
                                                    non-motorized ways by which
                                                    you can imbibe your dose of               Snorkeling,
                                                    adrenalin pumping thrill. Or you
                                                    may decide to go in for activities
                                                                                              windsurfing and
                                                    like yachting, deep-sea fishing and       kayaking, are just
                                                    motorboat racing. In fact, fishing        some of the non-
                                                    expeditions organized by the St.          motorized ways
                                                    James’s Club are known to have            by which you
                                                    yielded anything from mahi mahi
                                                                                              can imbibe your
                                                    to an occasional marlin.
                                                       For land buffs there are six
                                                                                              dose of adrenalin
                                                    tennis courts on which to sweat           pumping thrill.
                                                    it out. The body shop gym proves
                                                    to be a good place to make you
                                                    lose some extra flab. If you are an avid golfer
                                                    then you are going to love playing at the Jolly
                                                    Harboured Golf Club and the Cedar Valley Golf
                                                    Club, both of which are about a 35-minutes
that is famous for the fine dining experience       drive away and are 18 hole courses. But the
that it offers. Its sequestered hillside setting    best thing about this place could be the nifty
is definitely a part of its charm and so is the     wedding chapel that is famous for being the
creative Caribbean cuisine that it serves. Out      venue for many celebrity couplings. Clearly this
here you can hope to regale your palate with        is the place to get married in style. All you have
some deep-fried calamari, fresh lobster and         to do is decide on the date and be present with
grilled beef tenderloin. For more informal dining   your sweetheart. Just leave it to the club to take
the Coco restaurant that overlooks palm fringed     care of all the arrangements.
Atlantic shoreline comes as a good choice. The         It is quite fitting that St. James’s Club is called
Garden Patio restaurant is primarily for those      Antigua’s most glamorized address. This is the
who are seeking to savor their coffee or tea.       kind of style that is seldom overbearing and is
   When it comes to bars, St. James offers          most quintessentially regal in its sophisticated
an array of choices. There is the Reef Deck         settings and its immaculate entertainment. This
Bar located by the main pool. There is also         clearly is the place where you can relish the
Jacaranda Lounge. If you are looking forward        joys of living like a king! n
to get adventurous then you must give the
Sundowners at Mamora Beach Bar a try. The           St. James’s Club & Villas
Coco Bay Bar is built in more racy settings and     www.StJamesClubAntigua.com
it serves a delectable variety of food and
drinks. An added advantage of these bars
is that they are the kind of venues where
you can expect to meet the top echelon
of celebrities. You never know, but it is
possible that on a particular night the
guest at table next to you might turn out
to be your favorite movie star. Such an
                                                                                                                   royal	 	June	/	July	’08	




encounter is just one of the many things
that can make your trip unforgettable.

Activities and recreations
  There is just so much enjoyment that
you can have in this 100-acre spread
of St. James’s Club. The aquamarine
waters of the peaceful seas that skirt
                                                                                                                   81
Poker
                       TournamenTs
                                         What is a                         l You don’t win any money          there is only one left.
                                         tournament?                       unless you “place” in the top
                                         A tournament is just like any     prize positions. Each tournament   l Tournaments have a buy-in
                                         normal poker game with some       will list out what positions get   and an entry fee. In a normal
                                         distinct differences.             paid. This varies depending on     poker game, there are usually
                       TournamenTs
                                                                           the type of tournament and the     a minimum and maximum buy
                       have a buy-in
                                         l First, the goal is to win       number of players.                 in amount. The buy-in is the
                       and an enTry
                                         everyone’s chips and the                                             tournament prize pool, and
                             fee. in a   tournament does not stop until    l Everyone starts with the same    the entry fee is the “casino” or
                       normal poker      someone does so.                  amount of chips. This is usually   “host” fee. For example, if you
                         game, There                                       $1,000 to $1,500 in chips.         see a tournament with a $5.00
                       are usually a     l You can win a LOT of money                                         + $.50 buy in, $5.00 will go
royal




                        minimum and      for a small initial buy-in. How   l The blinds in a tournament       to the tournament prize pool
                        maximum buy      much you ask? Well that           change. When playing at a          and $.50 will go to the “casino”
                          in amounT.     depends on the tournament. It     normal poker game, the blinds      or online host organizing the
82	 June	/	July	’08	




                                         can be in the tens of thousands   are constant. No matter how        tournament. The average fee the
                                         though. Once all players are      long you play, the blinds stay     host takes is usually 10% of the
                                         registered, the pay off amounts   the same. In tournaments, the      prize pool fee.
                                         are usually listed somewhere      blinds increase to force action
                                         within the games.                 which eliminates players until     l A tournament can be played
on a single table or multiple tables at one      hours.
time. You will only play on one table at a       6. Freerolls aren’t the best place to test
time, but if there are more than 10 players      your skills as much as they test your luck.
in the tournament they will be playing at the    When people play in a FREE tournament,
same time on other tables. You may even be       they tend to play recklessly, but it’s free, so
moved at random to another table as more         go out there and have some fun!
players lose all their chips.                    7. Some freerolls pay out entries to bigger
                                                 tournaments! More on that later.
l The great thing about tournaments? For a
small buy-in, you can win a LOT of money,        GUaranteeD
but you can only lose your initial buy-in. Try   tournaments
doing that in a normal poker game! Also, if      These tournaments are usually multi table
you lose a big hand, you still have a chance     tournaments with a GUARANTEED prize
to win your chips back. In a real poker          pool.
game, when you lose chips, you lose real         1. Prize pool is guaranteed to be a set           The greaT Thing abouT
money immediately.                               MINIMUM amount. Ex. $500 Guaranteed               TournamenTs? for a
                                                 Tourney means the prize pool will be a            small buy-in, you can
                                                 minimum of $500.
                                                                                                   win a loT of money, buT
types of tournaments                             2. These tournaments vary in their buy-in
                                                                                                   you can only lose your
Okay, now that we have a good idea of what       structure, but can be as low as $1.00 +
                                                                                                   iniTial buy-in. Try doing
tournaments are, lets look at the various type   $.10
of tournaments and what might be the best        3. They usually have a minimum of 50              ThaT in a normal poker
for you to play in. We’ll start with the least   players in order for the tournament to start      game! also, if you lose a
complicated type and work our way up.            and a maximum of 1000 players                     big hand, you sTill have
                                                 4. The number of players depends on the           a chance To win your
sit-n-Go tournaments                             number of entries                                 chips back.
A sit-n-go tournament is the type of             5. These tournaments vary in amount of
tournament where you sit down at the table       time due to the random number of entries
with a small number of players and play          6. Re-buys are usually not allowed                the lower buy-in amounts. Ex. a $500
until one person has all the chips.              7. These are usually the best tournaments         guaranteed tournament pays $150 for first
1. These are ONE table tournaments.              to buy into. Why? Well the prize pool             place which is a great pay-off for a $2.00 +
2. Usually the top 2 positions pay for           is guaranteed for one. If 50 people buy           $.20 entry fee.
6 player tournaments and top 3 for 10            into a $2.00 + $.20 $500 guaranteed
player.                                          tournament, the prize pool entries will only      FreeZeoUt tournaments
3. These are usually quick games lasting         add up to $100. The host will be responsible      These are tournaments which do not allow
no longer than 30-45 minutes.                    for the other $400 in the prize pool.             re-buys or add-ons. Basically, you can only
4. They are a great way to test your skills      8. With fewer players in the game, your           play with the chips you started with and are
and win decent money for as little as $1.00      chances are much better to win a bigger           out of the tournament when you lose them
+ $.10 buy in.                                   pay-off! Great for players of all levels for      all.

FreeroLL tournaments
These are a bit more complicated, but
they’re free, so it’s worth trying them out
and learning the different nuances about
them.
1. Freerolls are almost always multi table
tournaments.
2. Freerolls that do not require a coupon
to play usually have between 500-2000
players.
3. Of course they are free to enter, if you
are lucky enough to register in time.
4. Some freerolls require a coupon to play.
Usually if the freeroll prize pool is about
$500 or more. You win coupons by playing
“raked” hands.
5. These can be long games lasting 2-4
re-BUy / aDD-on
                     tournaments
                     A re-buy is an opportunity to
                     buy additional chips. You are
                     only allowed to buy the initial
                     amount of chips you started
                     the tournament with, which is
                     around $1,000 - $1,500. This
                     is only allowed when you’ve
                     lost all your chips. Instead of
     an add-on is    being out of the tournament
    The same as a    permanently, you can “re-buy”
  re-buy, buT can    and start again with your initial
                     amount of chips.
 occur while you
                     An Add-on is the same as a re-
 sTill have chips.
                     buy, but can occur while you still
     add-ons will    have chips. Add-ons will only
only bring you up    bring you up to the maximum
  To The maximum     chip amount you started with.
 chip amounT you     For example, if you started with
    sTarTed wiTh.    $1,000 in chips, and were
                     down to $200, and add-ons
                     were allowed, you could pay
                     the tournament entry fee again
                     and be brought up to $1,000 in
                     chips, but nothing more.
                     1. The cost of the re-buy is the     been running. Usually re-buys      this option which adds more to
                     same amount you paid to start        are not allowed after an hour.     the prize pool.
                     the tournament.                      4. Expect to see players playing
                     2. Some tournaments allow            recklessly though since they       sateLLite
                     you a single re-buy or multiple      know they can buy additional       tournaments
                     re-buys.                             chips later.                       These types of tournaments don’t
                     3. The ability to re-buy during      5. Re-buy tournaments can          pay any actual money. When you
                     a tournament is usually limited      have big pay offs as many          play in a satellite tournament,
                     by how long the tournament has       players will take advantage of     you are playing for an entry into
                                                                                             a larger tournament.
                                                                                             1. Satellites can be single or
                                                                                             multi table tournaments.
                                                                                             2. Entry fees can be free, as
                                                                                             small as $1.00 + $.10 or in
                                                                                             the hundreds of dollars.
                                                                                             3. The top positions that win
                                                                                             are given entries into a larger
                                                                                             more expensive tournament.
                                                                                             4. Satellites are a great way to
                                                                                             spend a small amount of money
                                                                                             to enter a tournament with a
                                                                                             much larger prize pool and entry
                                                                                             fee. n

                                                                                             Courtesy of Poker.com
Calculating
Pot Odds
T
                he concept of pot odds is easy   This is a risk/reward ratio - if you risk
                to learn and in my opinion is    losing the bet, you need to have a big
                one of the most important        enough reward to make it affordable.
                concepts of playing winning         Pot odds can be used during different
                poker, especially no limit       situations, including calling bets or
Texas Hold’em.                                   drawing to a straight or flush. For
  It’s simply, the relationship, expressed as    example, if you need to call $5 with
a ratio, between the size of the bet you are     a 25% chance to win a hand, there
making or calling, and the number of bets in     needs to be 4 or more times the size of
the pot. For example, if there is $12 in the     your bet in the pot, or $20.
pot and you need to call a $3 bet, you are
getting 4:1 pot odds, expressed as 4:1.          beFore The FLoP:
  To have good enough pot odds, generally           Especially when you are playing
you need to have better pot odds than your       weaker hands trying to hit a flop, ex.
chance of winning the hand. So if you think      suited connectors and small pairs, be
you only have a 20% chance to win the            aware if the pot is big enough for you
hand, you should only play that hand if          to take a flop and try to hit your hand.
there is 5 times your bet or more in the pot.    To have good enough odds, generally
                                                  you need to have better pot odds than your       bLUFFING:
                                                  chance of winning the hand. So if you think         Pot odds must also be considered when
        Drawing odds from a deck of               you only have a 20% chance to win the            bluffing. Over and over again I have seen
             47 unseen cards                      hand, you should only play that hand if          people bluff all-in to attempt to steal the
  Outs 2 Cards to Come 1 Card to come             there is 5 times your bet or more in the         smaller blinds: an incredibly high risk for
  20	      	   67.5%	        	   43.5%            pot.                                             a very small reward. The mathematical
  19	      	   65.0%	        	   41.3%                                                             rule for bluffing is that THE POT ODDS
  18	      	   62.4%	        	   39.1%           aFTer The FLoP:                                   MUST BE GREATER THAN THE ODDS
  17	      	   59.8%	        	   37.0%              This will mainly be applied when you           OF SUCCESSFULLY PULLING OFF THE
  16	      	   57.0%	        	   34.8%           are drawing to a hand, but the same rule          BLUFF.
  15	      	   54.1%	        	   32.6%           applies, you must have better pot odds               For example, if you estimate the odds of
  14	      	   51.2%	        	   30.4%           then your chance of winning, so it will be        bluffing and winning is 1 in 5, then there
  14	      	   51.2%	        	   30.4%           profitable in the long run if you hit. To apply   must be more than 5 bets in the pot when
  14	      	   51.2%	        	   30.4%           this, you need to know how many outs you          you attempt the bluff. This means that you
  13	      	   48.1%	        	   28.3%           have, and what percentage this gives you          can bluff 1/10th the size of the pot and lose
  12	      	   45.0%	        	   26.1%           to win the hand. Below is a chart drawing         9 times, and you win in the long run if you
  11	      	   41.7%	        	   23.9%           odds from a deck of 47 unseen cards.              win the 10th time. HOWEVER, be careful
  10	      	   38.4%	        	   21.7%              Good players will also use these when          when playing against bad players, who are
  9	       	   35.0%	        	   19.6%           defending the best hand. When you are             often “un-bluffable”. Make sure you consider
  8	       	   31.5%	        	   17.4%           playing with the best hand, especially            that your chance of bluffing bad players is
                                                                                                                                                   royal	 	June	/	July	’08	




                                                 against loose players, you can put in a bet       very small, and use this move scarcely.
  7	       	   27.8%	        	   15.2%
                                                 that gives the player bad odds to call if you        As you can see, pot odds can make
  6	       	   24.1%	        	   13.0%
                                                 think he will play anyway, or if you want to      you a winning player in many aspects of
  5	       	   20.4%		       	   10.9%
                                                 just win the pot right away you can put an        the game, and it is essential to always be
  4	       	   16.5%	        	   8.7%
                                                 over-sized bet so it clearly becomes not an       thinking about pot odds in the risk/reward
  3	       	   12.5%	        	   6.5%
                                                 affordable price to draw. This is just one of     game that is poker. n
  2	       	   8.4%	         	   4.3%
                                                 the ways that you can tilt pot odds in your
  1	       	   4.3%	         	   2.2%
                                                 favor.                                              Courtesy of Poker.com
                                                                                                                                                   85
the
                         Menace
                             of
                       Straydogs
                                                                    By a n Jha




                                    rchaeologists aver that the                simply amazing. They can be the eyes for the
                                    friendship between man and dog             blind, give warning to the deaf that something
                                    is over 15,000 years old. The reason       needs their attention, and as police dogs they
                                    why dogs have remained a man’s             can sniff for drugs or even explosives.
                                    best friend for all these years is quite      But what about the dogs that are no one’s
royal




                                    obvious - loyalty, unconditional           pets and are forced to loiter on the streets as
                                    love, and companionship. Your              strays? The main problem with the stray dog
                                    pet dog can make your life better          population is that it is way too high. Every
86	 June	/	July	’08	




                                    and healthier by convincing you            Indian city or town has its share of stray dogs
                       to be more active. No matter how lazy you feel,         that roam the streets barking and bullying the
                       you can’t afford to refuse when your loving pet         hapless citizens. A spate of attacks in cities
                       walks up to you and starts begging to go for a          like Bangalore has only increased their vicious
                       walk. The kind of service that dogs provide is          reputation. When chilling pictures of small
The stray dogs
defecate on the
roads and on the
sidewalks spoiling
the ambiance of the
area and because
of their tendency
to scrounge around
garbage dumps
they contribute to
littering.


children mauled by stray dogs start
making headlines in the press, then even
the most avid dog lover is bound to cringe.
Something needs to be done. But what?
Moreover, whose fault is it that there are                                               DISTURBING
so many strays in every Indian city and                                                  FACTS
town?                                           running after passing vehicles. Two-        l Approximately 40,000 to
                                                wheeler drivers being chased by a              70,000 people die from rabies
Problem of Strays                               pack of dogs can prove particularly            every year according to the
                                                                                               World Health Organization.
                                                dangerous, as the driver tends to
   The stray dogs are fairly territorial and    accelerate in order to avoid being          l Nearly 30,000 of these deaths
they are always ready to fight to protect       bitten on his legs and he faces the            occur in India.
their turf from other strays. When a newer      risk of losing balance or crashing          l 96% of rabies cases in India
                                                                                               are caused by stray dogs.
dog steps into a street that other dogs         into something.
                                                                                            l Nearly 2.2 million people in
have their claim on, there ensues a very           The     danger     gets     vastly
                                                                                               India are bitten by animals
noisy altercation, which mostly entails         exemplified when it is an airport’s
                                                                                               every year.
of lots of barking. At times such noisy         runway that is infested with strays.
incidents happen during the nights and          Such an unthinkable event has
disturb the residents. Many old people          happened a number of times in
and kids find it difficult to sleep, but they   India. On 28th March 2008, the takeoff of a Kingfisher flight had to be
are forced to put up with the discomfort.       aborted when it collided against a stray dog that was loitering on the
The stray dogs defecate on the roads and        runway. Fortunately the crew and 25 passengers were not hurt and
on the sidewalks spoiling the ambiance          were immediately evacuated, but there was minor damage to the plane.
of the area and because of their tendency       Later the company issued a statement saying, “The aircraft hit a dog
to scrounge around garbage dumps they           on the runway during its take-off roll, causing the nose landing gear to
contribute to littering.                        collapse.” Even the airport in the nation’s capital is not safe from strays.
   Children who are too small to defend         Few months ago a rabid dog entered Delhi international airport and bit
themselves get frequently targeted by           four people before it was captured after a three-hour chase.
packs of stray dogs. Sometimes such
attacks result in tragic deaths. Recently       Who is responsible?
                                                                                                                               royal	 	June	/	July	’08	




there was a case in Bangalore where a
stray dog bit 20 people, 6 of whom were           Almost everyone enjoys taking care of his pet dog, but feeding a stray
school children. In another such incident,      may not make much sense. Many residents, on the pretext of being
at Hyderabad, last year, a stray dog            compassionate to animals, start feeding stray dogs. But when it comes
managed to enter the campus of a Woman’s        to taking responsibility for the behavior of their roadside pets, no one
College and bite 8 students. Even when          comes forward. It hardly makes any sense to feed a creature whose
stray dogs are not biting people, they can      behavior you can’t control. Then there are the plethora of illegal meat
                                                                                                                               87




create a nuisance by simply barking and         and chicken shops, which tend to dump their waste meat in the garbage
up, they perform a vanishing trick and
                       Sterilizing the stray                                                    reappear only when the municipal van has
                       dog population is a                                                      left. Sterilizing the stray dog population is
                                                                                                a partial answer, but it is a daunting, if not
                       partial answer, but it                                                   impossible task to sterilize our huge dog
                       is a daunting, if not                                                    population. According to one estimate,
                       impossible task to                                                       in South Bangalore alone, there are more
                                                                                                than 60 dogs for every square kilometer.
                       sterilize our huge dog                                                   Our municipal corporations simply don’t
                       population. According to                                                 have enough vaccines to sterilize that
                       one estimate, in South                                                   many dogs.
                                                                                                   In Greece, hundreds of stray dogs were
                       Bangalore alone, there                                                   killed before Athens Olympics, because
                       are more than 60 dogs for                                                authorities there feared that a sight of
                       every square kilometer.                                                  packs of dogs roaming the streets would
                                                                                                damage their efforts to use the Games
                                                                                                to show the world that their country
                                                                                                is modern and civilized. In UK local
                                                                                                authorities killed nearly 10,000 stray dogs
                                                                                                in 2003. According to Dogs Trust, UK’s
                                                                                                largest dog charity, an average of one dog
                                                                                                per hour gets put to sleep simply because
                                                                                                their owners cannot be traced or new
                                                                                                homes found for them. Ireland puts more
                                                                                                than 17,000 unwanted pets put to death
                                                                                                every year. Scotland kills only 800.
                                                                                                   Maybe, it is time that we started
                                                                                                emulating the drastic measures that the
                                                                                                European nations are using to control
                                                                                                their stray population. In fact, a former
                                                                                                Mumbai Municipal Commissioner created
                                                                                                quite a stir when he said, “Stray dogs
                                                                                                must be killed as that is the world-wide
                                                                                                practice. That is how advanced countries
                                                                                                manage to control their stray population.”
                                                                                                But animal activists in India oppose that
                                                                                                type of a solution. Many animal activists
                       dumps or in vacant neighborhood plots that end up          want housing societies in various cities to start taking
                       serving as a magnet for stray dogs.                        care of the strays. But taking care of a dog is a big
                         The meat shops can be prosecuted for throwing            responsibility and it is also costly. Housing societies
                       their waste in public places, but there is no law to       don’t have the motivation or the financial muscle to
                       stop compassionate residents from feeding the dogs.        adopt the stray dog population.
                       In any case, the responsibility of dealing with stray        In the end, there seems to be no alternative except
                       dog population lies with the municipal corporations.       to put a sizable number of stray dogs to sleep. At
                       Till a few years back, stray dogs being put to death       the same time we can also try putting money into
                       in large numbers were not unheard of in this country.      sterilization and anti-rabies programs so that at least
                       But during the last few years there has been rise in       few of the dogs can be saved. Many of the strays could
                       awareness about animal rights in India. Moreover,          vanish from the streets if pet lovers came forward to
royal




                       in its 1994 judgment, the SC has clarified that killing    adopt them. But these days most people prefer to go
                       stray dogs is not a solution to the problem.               in for thoroughbred dogs only, so there is hardly any
                                                                                  home that the strays can call their own. The moot
88	 June	/	July	’08	




                       Are there any solutions?                                   point is that we are a poor country, where countless
                                                                                  homeless children are forced to eke out a living by
                         So how do we deal with the problem? Put them in an       begging on the streets. When we are not able to do
                       animal shelter? But it is not that easy to catch a stray   enough for our children then how can we come to the
                       dog. When the corporation van arrives to pick them         aid of our canine friends. n
90	 June	/	July	’08	   royal
MAG (2) GR / PRB /132 / 06-07
KARENG / 03468 / 10 /1 / 07-TG

008 Royal June July 2008

  • 1.
    A to Zwith KAreenA KApoor royal Live Like a King JUNE / JULY 2008 | rs.50 Live Like a King Steamy Pictorial with supermodel giselle the art of uyuni sculpting beauty Fernanda the menace Ferrari of stray JUNE / JULY ‘08 rs.50 dogs on Fire PLUS GaminG the world’s GroominG richest GadGets indians www.royalmag.in
  • 2.
    SERENADE Dual Time Zones Automatic, Patented GV- AOASE Movement 18K White Gold. Louisiana Crocodile. Limited Edition: 50 Pieces www.gevril.com
  • 4.
    royal Live Like a King Letter from editor-in-Chief JUNE /JULY 2008 | rs.50 Dear Readers, Editor-in-Chief It is time for us to celebrate the fabulous women in the Hindi ronak V. Vyas film industry and what better way of doing that than by carrying a mesmerizing pictorial and interview of Bollywood’s reigning queen Media Partner diva, Kareena Kapoor. To her fans she has come to epitomize the Prashanth r oomph factor. In the year 2000 she made a sizzling debut with the film Refugee and since then Editor she has never looked back. In her latest film Tashan she turns on the heat with her flirtatious lime Anoop Verma green bikini and tiny boy shorts. Her interview gives fascinating insights into the career and life of one of India’s most famous personalities. Advertising & Events Pictures of beautiful women do inspire feelings of intense desire. Our cover model is Brazilian Atul Prabhu / Italian bombshell, Fernanda Ferrari, who has perfected the art of executing spunky poses in Business Manager revealing lingerie. She has a thing for adrenalin pumping rides in fast cars, but a girl with Ferrari Manjunath Amashi in her name is expected to live her life in the fast lane. Then there is the statuesque beauty Arsha Tahir, whose performances on the catwalk have started creating ripples in the modeling Design & Layout world. Curvaceous and long-limbed, Giselle Uyuni’s spellbinding appeal makes her omnipresent ranjit Joseph in everyone’s fantasies. Advertising Indeed, it is intrinsic to human nature to pursue good looks, whether it is in our clothes, cars, Ankur Vyas homes, environment, or within ourselves. In an article titled, The Art of Sculpting Beauty, we take you on a ride through the world of plastic surgery. While plastic surgery primarily remains the Consultant domain of women, the number of men going under the scalpel is steadily on the rise. There are so Jayesh Pandya many obvious benefits, but what about the pitfalls! We bring you both sides of the story. Cartoonist From beautiful bodies to beautiful destinations! When you find yourself yearning for a truly Dan Thompson majestic holiday, then it is time to pack your bags, grab your girlfriend and go for an extended trip to the St. James’s Club! Antigua’s prime holiday destination is a hot spot for celebrities, socialites, Contributors party goers, and anyone else with a high standard of living. Another great destination for this Chand Kishore Patro, summer is China’s legendary hot-spot Macau. Billed as the Las Vegas of the Orient, Macau offers Debjani Choudhuri, Vijay Sai, Ashwin myriad opportunities for high-octane gambling. We take you on a whirlwind tour of Macau’s most Satyanarayana, Steve Badger, luxurious hotel & casino, the fabled Mandarin Oriental. Mikhail Chuklai The World’s Richest Indians article throws light on how it is “raining wealth” on the biggest Web Design Indian tycoons. What an average person makes within a year these honchos make in a minute. MAC Technology With rising bank balances comes expectations of better living, but there are a host of societal problems such as the stray dog population. It is disconcerting that as pets, the dogs can bring us To Subscribe so much happiness, but as strays they end up being a menace to society. We explore this emotive subscribe@royalmag.net issue in our article titled, The Menace of Stray Dogs. On a lighter note, the power of invention Advertising never ceases to amaze us. Check out our feature on a car that can drive on water and then advertising@royalmag.net submerse itself and move around like a submarine. If that is not impressive enough how about a boat that can fly and then touch down either on water or land! Website Plus there are the usual articles on gadgets, games, movies, cars and motorcycles! www.royalmag.in Do email me with your opinions and suggestions at rvyas@royalmag.net Printed at Tholasi Prints India Pvt Ltd. Ronak Vyas #4, Platform road, Sheshadripuram, Editor-in-Chief Bangalore - 560 020 PhoTo CrEDiTS Cover page - Fernanda Ferrari | Cartoons by Dan Thompson | Arsha Tahir - Photos courtesy of Porter Photography and O.S. Photography | Mandarin Oriental Macau - Photos courtesy of Mandarin Oriental | Ibn Battuta Mall - Photos copyright by Nakheel Media Center | Rinspeed sQuba - Photos copyright by Rinspeed | Giselle Uyuni - Photos courtesy of Juan Zambrano | Kenneth Cole - Photos copyright by House of Fraser Press | Usher Fragrance - Copyright by Clifford/Bratskeir Public Relations | Fernanda Ferrari - Photos courtesy of Fernanda Ferrari | Lamborghini - Photos copyright by Lamborghini Press | Suzuki - Photos copyright by Suzuki Press | Yamaha - Photos copyright by Yamaha Press | Over Her Dead Body - Copyright by New Line Cinema Movie Publicity | Flight of the Living Dead - Copyright by New Line Cinema Movie Publicity | Krazzy 4 - Copyright by Eros Entertainment | St. James’s Club - Photos copyright by Elite Island Resorts Buying guiDE Panasonic Massage Chair - www.panasonic.com | Crepax Kadhorna Cabinet - www.mossonline.com | BODIE and FOU Cognac Glasses - www.bodieandfou.com | Norm 69 Pendant Light - www.bodieandfou.com | Sky Boats - www.opulentitems.com | Globe Workstation - www.opulentitems.com | Logitech Z Cinema - www.logitech.com | Strada Navigation System - www.panasonic.com | Sony Vaio - www.sony.com | Diamond TV - www.opulentitems.com | Gateway FX Series - www.gateway.com | Logitech Zebra Mouse - www.logitech.com | LG Prada - www.lge.com | Sony Camcorder - www.sony.com | LG LU20 - www.lge. com | Hugo Boss Bag - www.hugoboss.com | Belkin Bag - www.belkin.com | Diesel Bag - www.houseoffraser.co.uk | Linea Bag - www.houseoffraser.co.uk | Ted Baker Bag - www.houseoffraser.co.uk | Pangea - www.pangeaorganics.com | Lucky Tiger - www.getluckytiger.com | Redken - www.redken.com | TNA Impact - www.tnagame.com | Nintendo Kart Wii - www.nintendo.com/wii | Mass Effect - http://masseffect.bioware.com | Spore - www.spore.com | Boom Blox - www. ea.com/boomblox | Pirates of the Revolution - http://piratesonline.station.sony.com | Legend of Norrath - http://legendsofnorrath.station.sony.com | Sim City Societies - http://simcitysocieties.ea.com | Guitar Hero III - www.guitarherogame.com
  • 5.
    COnTEnTS JUNE /JULY 2008 26 Rinspeed sQuba With the Rinspeed sQuba emulating James Bond becomes a notch easier. Drive it on land as a normal vehicle and when you reach a water body don’t be afraid to just drive in. The sQuba is capable of achieving a top speed of 75mph on land, 4mph on water and 2mph below the surface. Just the right speed to make for a great escape. 13 Mandarin Oriental Macau 16 The Essence of Being Cool 18 Ibn Battuta Mall 22 Indian Cricket Team: 28 Uyuni Staying at the Top 24 Home Improvement Giselle Originally from Bolivia and now based in San Francisco, Giselle is determined to set the world afire with her high-octane sexuality. In a striking pictorial you’ll see why her curvaceous body and mesmerizing eyes make men go weak in the knees. 47 36 Q & A with Dr.Pyar 37 Featured Designer: Kenneth Cole 42 Gadgets The World’s Richest Indians They could make the legendary Midas feel jealous. The combined worth of the top 10 richest Indians is worth more than the GDP of entire nations. They are the uber-rich Indian entrepreneurs, hungry for new ways to demonstrate their wealth. Their eclectic shopping list is peppered with items like billion dollar global companies, fancy cars, corporate jets, plush mansions and everything else that money can buy.
  • 6.
    COnTEnTS 46 Jokes 51 The Art of Sculpting Beauty 55 Fashion: Grooming, Bags 68 Cars 71 Bikes 72 Gaming 77 Movies 57 60 A to Z with Kareena Kapoor Kareena Kapoor has perfected the art of making the silver screen sizzle through an enticing blend of sexuality and histrionics. Her fans consider her to be the sexiest heroine in Bollywood. Coupled with her bold statements, and clever answers, the actress is definitely at the top of her game. 82 All about Poker Tournaments 85 Calculating Pot Odds Fernanda Ferrari Fernanda Ferrari is a ravishing mix of Italian and 86 The Menace of Stray Dogs Brazilian. A supermodel who loves the thrill of speed, is every man’s fantasy woman. But what kind of man does Fernanda like? Without hesitation she responds stating she likes the quiet, rugged type like Akshay Kumar. St. James’s Club 78 Located in Antigua’s lush tropical playground, St. James’s Club spans across a 100-acre estate boasting of breathtaking ocean views, two white sand beaches, a regally appointed casino, excellent set of bars, restaurants and accommodations fit for a king.
  • 8.
    Facts & statsnOWing!!! OW OFF K THAT YOU CAN sH >>>1 The great Roman Emperor Julius Caeser suffered from epilepsy. >>>2 Bangalore has the highest number of pubs in India. >>>3 every hour the Universe expands by a billion miles in all directions. >>>4 the call of the humpback whale is louder than a Concorde and can be heard from 500 miles away. e it sHaK !! Y! BaB >>>5 Humans and dolphins are the only species that have sex for pleasure. >>>8 india has never invaded any country in her last 100,000 years of history. >>>6 >>>9 despite its omnipresence in movies The four religions born in India - Hinduism, and in popular culture the modern Buddhism, Jainism, and Sikhism, are followed bikini is only about 62 years old. by 25% of the world’s population. ROyAL >>>7 >>>10 there are men in Guam whose job is the Vishnu temple in the city of tirupathi built in 08 JUnE / JULy ’08 to travel the countryside and deflower the 10th century, is the world’s largest religious young virgins, who pay them for the pilgrimage destination. Larger than either Vatican privilege of having sex for the first City or Mecca, an average of 30,000 visitors donate time. $6 million (US) to the temple everyday.
  • 9.
    ROyAL JUnE /JULy ’08 09 of the month babe TAHIR ARSHA
  • 10.
    A rsha Tahir is hot; hotter than most models that you will come across. She has what it takes to make men turn their heads and do a double take - flawless skin, chiseled features, flowing dark locks, an hourglass figure. Her personality seems to subsume the best attributes of two divergent worlds. While her beauty is evocative of the sun-kissed Fijian landscape, where she was born, her style is wholly western, with Canada being the country where she was raised. She has always been passionate about modeling, because she loves the challenges that are intrinsic to this profession. And what could those challenges be! What else, but the exciting routine of traveling around the world on photo shoots and meeting interesting people. But it is also a fact that she takes immense joy in executing sultry poses for the camera. Even though she is only 23 years old, she is already on her way to becoming Canada’s most in demand model. Now it is only a question of time before Hollywood beckons. But if she has her way, then it is quite likely that Bollywood will be her first move to acting. She confesses that she harbors an incredible crush on Dino Morea and Shahid Kapoor. If she were called upon to do a steamy love scene in any movie, then she would prefer it to be with either of these two guys.
  • 11.
    babe of the month I just love Dino Morea and Shahid Kapoor. ROyAL JUnE / JULy ’08 11
  • 12.
    babe of the month Aside from the Bollywood hunks, who else is capable of turning her on? This is how she describes the Casanova who might win her heart, “He has to be the confident type, but he cannot afford to be cocky. He has to be open-minded, adventurous, versed in the art of cracking funny jokes and he should be game enough for being challenged by a girl.” So now you know what sort of avatar to pick up if you are planning to make inroads into Arsha’s heart and mind. But there is another ethereal side to her personality, one that makes her appreciate the beauty and vibrancy of nature’s every creature. She is clearly in love with the natural environment. She talks about missing the pet horse that her grandfather kept back in Fiji. She says that if God had decided to make her an animal then she would like to be a horse. Is it possible that her energetic lifestyle gets inspired from her favorite creature. I like a guy who isn’t afraid ROyAL to be challenged. 12 JUnE / JULy ’08
  • 13.
    Mandarin Oriental Macau by v deepti A ttached to the bottom of Mainland China, on the banks of the picturesque Pearl River, there lies a famous peninsula called Macau. Billed as a paradise seeped in history, culture and en- tertainment, this place presents the unique facet of being traditional and yet so modern. For many centuries Macau had been the prized jewel in the crown of Portuguese empire and to this day its landscape continues to be dotted with buildings and churches built in inimitable Portuguese style of architecture. Of these, the seventeenth-century Jesuit Church of Madre de Deus, better known as Sao Paolo, is probably the finest Christian monument in the Far East. It was only in 1999 that Mainland China regained control of Macau under previous treaty agreements with ROyAL JUnE / JULy ’08 the Portuguese establishment. Under Chinese tutelage there came growth at a scorching pace. In a matter of few years, Macau transmogrified itself into orient’s answer to the fabled Las Vegas. Its casinos and resorts attract thrill seekers in droves. The nights turn out to be brighter than the day, as animated billboards and marquees advertising myriad gambling hotspots light up the streets. Limousines carry the rich for their tryst with casinos of their choice. Beautiful women who can balance themselves precariously on their high-heels offer tantalizing prospects for romance and seduction. 13
  • 14.
    There are 388rooms and 28 suites waiting for you to take your pick from and have the time of your life. Whether you choose to stay in a room or a suite, you are bound to discover that luxury comes standard at mandarin Oriental. with its carved teak staircase and an ecclesiastical window looking down upon it, creates an impression of a Portuguese Palacio. Wherever you look, your eyes are greeted by incredible opulence - the sitting arrangements, the elevators, the bars, restaurants, landscaped swimming pools and the casino. Chandeliers, tapestries, and artwork embellish every inch of the lobby. Even the guest rooms are decorated in Portuguese fabrics and natural teak. Whether you choose to stay in a room or a suite, you are bound to discover that luxury comes standard at Mandarin A Gambling Paradise types of slot machines. Roulette and Oriental. If you yearn to indulge in some Amongst all the casinos of Macau, it is blackjack are hot favorites, and so are sightseeing without going through the the Mandarin Oriental that turns out to games of local origin going by fanciful rigmarole of stepping out of your plush be the most prestigious. If anything, the names like Mahjong Baccarat, Mahjong room, then you can go in for the Superior hotel is built with a casino in mind and Paikao and Taiwan Paikao. As the casino City View Rooms and Deluxe City View that is just one of the reasons why it can is part of a sprawling hotel, that makes it Rooms that offer magnificent views of boast of such a fine playing environment a perfect place where you can fuel your South China Sea or the historic Guia within its premises. Out here Baccarat gambling fire, while still enjoying quality Fortress. Even greater delight lies in the enjoys the distinction of being the most time with your loved ones. In fact, the Club Floor City View Rooms that offer popular table game. Even on the most Mandarin Oriental Casino & Hotel is views of the city and the famous Macau tranquil day it will be easy for you to included in Forbes’ list of the best casinos Grand Prix Race Track. find baccarat tables surrounded with in the world. There are 388 rooms and 28 suites gamblers cheering for a win. Everyone is waiting for you to take your pick from trying to get a touch of the sacred green The Aesthetics of and have the time of your life. The felt and strike it rich. It is a popular Mandarin truth is that the vibrant environment of saying in Macau that gamblers come to The magnificent structure of the hotel Mandarin Hotel is especially conducive Las Vegas solely to be entertained, but exudes an aura that is a unique blend for romantic interludes. After all, where over here, gamblers, especially those of Portuguese heritage, the traditional else can love blossom if not in a setting ROyAL of Chinese origin, step into casinos to cultures of the Orient and the futuristic such as this. Just imagine the feeling challenge their destiny. The casino is spirit of Las Vegas. Once you walk into of you and your girlfriend enjoying a open 24 hours a day, thus enabling its its air-conditioned portal, you can’t champagne breakfast in your room even 14 JUnE / JULy ’08 patrons to challenge their destiny round escape the feeling of being in a mythical as the city around you is still awakening the clock. land, so luxurious and artistic that it from the mists of the night. Other than Baccarat, the sumptuous seems far removed from anything that spread of Mandarin Oriental’s casino you have ever seen or experienced. Restaurants and Bars offers 11 types of table games and 59 The immaculately proportioned lobby, From the broad range of fashionable
  • 15.
    restaurants located within you can get them from the Tennis the Mandarin, it is easy to Pro Shop. If you need to polish choose one that suits your your playing style, an instructor needs and your tastes. The is also available. A squash court is most romantic restaurant is available on the third floor of the Mezzaluna, located on the 2nd hotel for those who really want to floor; this elegant restaurant sweat it out. You don’t even have offers Italian cuisine in stylish to go out looking for a mountain surroundings. Inspired by a in order to indulge in rock renovated Tuscan villa, the climbing. The Mandarin has a 10- restaurant features a wine metre high, 360-degree modular room with a global collection rock tower, which is capable of vintage wine. The open of offering a truly adventurous kitchen with wood-burning holiday experience. oven only adds to the charm. For shopping addicts the For aficionados of Mandarin Oriental Shopping Cantonese cuisine, there is Arcade represents a vista of no alternative to Tunk Yee Heen which choice of cakes and pastries, all baked unparalleled opportunities. Situated on offers Cantonese a-la-carte menus, as freshly on the premises. the lobby floor, the shopping arcade is well as stylish Chinese banquets. Then The memory and the spirit of the home to almost every major brand in there is the Naam Thai restaurant, legendary Portuguese maritime explorer the world - Cartier, Emporio Armani, famous for its top class Thai menu in Vasco Da Gama lives on in the restaurant Burberry, Ermenegildo Zegna, Louis Macau. Strategically located at a spot called Vasco. Out here irresistible local Vuitton, Hugo Boss, Salvatore Ferragamo, where it overlooks a vibrant swimming tapa-style treats, exquisite high tea and Dunhill, Hermes, Omega and Dior. One pool and luxuriant tropical gardens, this a vast repertoire of creative cocktails thing is for sure, if you are staying at intimate 60-seat restaurant is bright, await you. But the main attraction of Mandarin, you won’t have to travel far casual and contemporary. Out here you the Vasco lies in the live band that is in order to buy an appropriate gift for can try some of the most delicious Thai often billed as Macau’s best nightly your girlfriend or wife. But the world dishes cooked from the freshest produce entertainment. Looking for a more laid of Mandarin is as enchanting outside and the finest herbs and spices. back type restaurant? Try The Veranda, the building as it is inside it. Stepping Then there is the Café Bela Vista that a poolside spot to enjoy al fresco dining, out of the hotel and taking peek at the carries all the splendor and charm of the where you can savor grilled seafood and local culture can be an unforgettable historic Hotel Bela Vista and remains exotic cocktails. experience by itself. open 24 hours a day. Breakfast, lunch You only need to take a five-minute and dinner buffets - you can depend on Leisure Facilities walk to reach the famous Macau this charming restaurant to keep you Other than the sprawling casino, the Fisherman’s Wharf that covers an area of supplied with the tastiest morsels at Mandarin Hotel boasts of a host of other over 93,000 square metres and is home all times of the day. If cakes are your facilities to let you have the time of your to all kinds of entertainment and retail weakness then The Cake Shop is the life. If it is peace and relaxation you are facilities. The Nam Van Lake Cybernautic place to hang out. Located on the 2nd seeking, then check out the in-house spa. Fountain is a man-made lake that gushes floor, this shop is famous for its extensive Designed like a tropical garden, the spa with 86 waterspouts, some of which boasts of an outdoor swimming pool are up to 80 meters high. At night the and a picturesque waterfall. Teams of waterspouts are a sight to behold when For aficionados highly trained professional therapists 288 colorful spotlights illuminate them. pamper and rejuvenate every inch of The Taipa Houses and the Macau Tower of Cantonese your body through their massages, body are important landmarks that showcase cuisine, there is no treatments, facials, manicures, pedicures the best aspects of local culture. Then alternative to tunk and much else. An added plus are the new therapies for relaxation like the there is the Wine Museum where wine aficionados can discover over 1,115 Yee Heen which offers ROyAL JUnE / JULy ’08 Comfort Zone treatments, which use the labels. Cantonese a-la- marriage of science and nature to leave Mandarin Oriental Macau is a your body and spirit in a state of bliss. microcosm of an unique paradise on carte menus, as well Mandarin Hotel makes it easy for you earth that every human being needs to as stylish Chinese to have a knockabout on a round of experience at least once. n energetic sports. There are three tennis banquets. courts available for guests. No problem if www.mandarinoriental.com/macau/ you don’t have your own racket and balls, 15
  • 16.
    The Essence of Being Cool T here once was a man named Adam. up — in general, he became a much more attractive He was a nice enough fellow — he man. He became the forbidden fruit. Only it’s much didn’t really know any better — and more complex than that. Most of the women didn’t he had a woman, food, plenty of sex know he was dating someone else. Part of it was and nudity, more pets than a zoo, and because he was happy and confident, but he’d been lived an idyllic life. Only one thing — he couldn’t eat happy and confident alone before, without this one particular fruit. Other than that, he could do change coming. What was going on? whatever he wanted. So what did he do? Obviously, The forbidden fruit is the obvious and easy little he ate the fruit. Thus began a long tradition in all trick we can watch humanity fall for. But there is an humanity; we want what we can’t have. opposite corollary; we don’t want what we can have. Psychologists have a name for this, given to us Theories for this abound. Some people think it’s by that early Adam. It’s the forbidden fruit complex, because our unconscious mind is triggered to think ROyAL and almost everyone has it to one degree or another. ourselves better than those who are desperate to be Women have a name for this too. It is called playing with us. Some people just find it boring — where’s hard-to-get. Now, some significant time later, there the thrill? The chase? The get-to-know-you game? 16 JUnE / JULy ’08 was another Adam. The poor guy didn’t really know Maybe it smacks of self-consciousness and a lack of what he was doing with women, and he rarely had confidence — why do you need me so much? What’s successful dates. Finally, through blind luck, he wrong with you? Maybe it’s the insult of skin-deep found himself in a relationship. Overnight the world lust. Hey, some women enjoy one-night-stands as changed — ladies smiled at him, some chatted him much as the next guy, but outside of the porn industry,
  • 17.
    You don’t needto tell her few women want to be viewed as how much you want her. you try and pet her, just a body. And if you want it so And more importantly, don’t you’ll never catch up to bad in such a short amount of time, well, you don’t truly know her so we show her. Really, this is the her. But act chill around cats — even ignore know what you really want. Maybe definition of cool. You may them — and you’ll have it makes no logical sense at all, and think you’re playing it cool them crawling all over it’s useless to analyze. you. What we can do, though, is and not telegraphing your This is the way of life. recognize it for the pattern it is, intentions, but guess what It is one of the most and learn from it. Just as you were important concepts turned off by that nerdy girl in high — if the intentions are there, you’ll ever learn when it school who had the crush on you, you probably are. comes to attraction and attractive women are turned off dating. Act with ulterior by drooling dorks. But now we’ve motives and she’ll got a problem. If women don’t like know, guaranteed, and men who obviously like them, and we too close, you fidget with buttons, you’ve lost all hope with her. only want to be with women we like, you laugh about things that aren’t Act with no expectations and it’s a then this easily turns into a nightmare funny, you awkwardly get in position fair bet she’ll see a bit of the forbidden scenario of hopelessness. for a handhold. And about 2000 more. fruit in you. This is what people mean This paradox is probably the cause If you were a yogini you might be when they say to just be yourself. If of something like 95% of the world’s able to approach a woman with her you can simply enjoy being you and loneliness. It’s a pity our emotional attractiveness front and center in your living your life around women without brain — the part of the mind that is brain and control all the little tics that chasing them, it works. It says you are responsible for attraction — is such a give you away as a bundle of nervous an interesting, confident guy who might mess. But that’s the way it is. sexual energy. Of course, if you were enjoy being with a particular woman, I guess we should all get used to it a yogini, you probably wouldn’t be but you don’t need that woman. Unlike and prepare for a life of marriage to interested in this, but that’s another modifying your behavior around someone we settle for, not someone story. No, there is a much easier way to her, which smacks of insecurity and we want. Right? Understand this is the deal with this, to eliminate all the signs weakness. So what do you need to do to way it usually happens. It’s not the way that say ‘I want you’. The simple answer eliminate yearning in your interactions it has to happen. We’ve said before that is - relax. The longer answer is don’t with attractive women? attractive women assume as a matter of try. Pretend she’s your sister. Pretend Convince yourself you’re too busy for course that all men want them. It might she’s a character in a video game. her anyway. Or, better yet, too good for not always be true — maybe not every Pretend she’s a practice conversation her. Or only talk to women within areas bum sitting outside the library with an for some imaginary future. that have easy access to cold showers. upside down hat in front of them wants Whatever you do, don’t think about Whatever you need to do to get your quarter — but it’s true enough that going back to your place with her. yourself in the right frame of mind, do it’s a useful rule in her daily life. She Really, you don’t need to pretend, you it. Remember, she’s just practice. This knows how to deal with men when she can simply make the conversation is a simple concept, really, but hard to knows what they want. So what do you practice. With every woman. From put into, ahem, practice. You’ll probably need to do? now till forever. You just can’t show a hold your head well for a bit before a girl your cards early on. It’s death to situation turns promising and you think Nothing. attraction. It transmits all the wrong you’re in, and the magic ends. You lose things. Sure, you might get away with it — just for a second — and you may You don’t need to tell her how much it now and again, but not usually, and never recover. you want her. And more importantly, never with extremely attractive women Of course, just standing around not ROyAL JUnE / JULy ’08 don’t show her. Really, this is the in high demand. And until you realize wanting women isn’t enough. You need definition of cool. You may think you’re that, you should treat all women as to know how to go up to them, talk to playing it cool and not telegraphing practice with that bit of knowledge. them, trigger attraction in them, and your intentions, but guess what — if Because it’s never going anywhere eventually seal the deal. Happy dating! the intentions are there, you probably otherwise. Once you do realize it, you’ll n are. There are literally thousands of see that you just need to do what you’ve physical clues that set off a woman’s been doing, treating a lady as a practice For more great articles on this topic radar. You lean in too far or approach conversation with no aim. Like a cat, if check out www.pualife.net 17
  • 18.
    by pinki ShrivaStava T raveling to far-off lands like any concept of a shopping mall. intrepid globetrotter is what many of us It is possible for you to retrace Ibn Battuta’s famous constantly fantasize about, but only few journey without undergoing the hardships that the amongst us possess the determination legendary traveler faced during his lifetime. You or the resources to give full vent to our navigate in the cool and plush environs of a shopping fanciful flights of wanderlust. Ibn Battuta, was one such mall and still manage to catch a glimpse of myriad ROyAL intrepid traveler, who set off on his legendary journey cultures from all over the world. The place where you more than 700 years ago, when the fastest means of can experience such a sense of adventure happens to transportation were the human feet, and only those be the eponymous Ibn Battuta Mall, located in Dubai, 18 JUnE / JULy ’08 that were blessed by fortune could hope for the luxury where the possibilities tend to get limitless. Billed as of traveling on a camel, horse or a ship. The account of world’s largest themed mall, this place is embellished his journey across many continents continues to be the by six elaborately designed courts that throw fanciful inspiration for many books, movies, TV serials and now visions of places that Ibn Battuta visited and wrote about for the first time it is being glorified in the design and - Tunisia, China, Egypt, India, Persia and Andalusia.
  • 20.
    guess its importancefrom the fact that this place boasts of the only IMAX theatre in the United Arab Emirates and it also offers a 21- screen Cinema Megaplex, which is located in the China Court area of the mall. So the next time you are here don’t be surprised to find your favorite Bollywood movie running on any one of the screens at the Megaplex. In fact, Bollywood movies are a huge draw at the mall and so are flicks from Hollywood. Spread across an area of 5.4 million square feet, the place is larger than most malls in the world. It includes 10 car parks that can jointly accommodate the ibn Battuta more than 5000 cars. The retail area alone mall is like a bridge is spread across an between the present astonishing 67,500 and the past, a place square meters and it has 275 retail where the most outlets, while modern appliances, the well-planned artifacts and Food Courts span across 3,800 square entertainments get meters. Some of juxtaposed with an the best brands environment that is in the world are represented here decidedly from the - Betsey Johnson, 14th century world. H&M, TopShop, Forever 21, Ginger & Lace, Lacoste, Next, Pierrie Cardin, Gucci, Omega, Versace, Banana Republic and many others. Then there is the children’s play zone packed with all sorts of amusements and thrills. It is quite natural that walking up and down this mega mall is going to stimulate your appetite. But there is ample scope out here to take care of that need. On both ends of the mall two large food courts are located and that is in addition to the several coffee shops, an enchanted world scattered throughout its entire length. If you are an aficionado Don’t be amazed if a visit to the Ibn Battuta mall evokes the for cuisine from all over the world then you are not going to be surreal feeling that you have been transported to the enchanted disappointed. Along with the best concoctions from the world world of 14th century. You will be wooed by the splendor of the of western food, here you will also find enough opportunities Arabic wind towers, and swept off your feet by the magnificence to titillate your palate with relishing dishes of Chinese origin, ROyAL of Indian domes. The lavish architecture of medieval China sumptuous Indian fare, Tunisian food, and lip smacking treats will awe you and the picturesque beauty of Tunisia will from Egypt. have a soothing effect. The Ibn Battuta mall is like a bridge 20 JUnE / JULy ’08 between the present and the past, a place where most modern the Place for edutainment appliances, artifacts and entertainments get juxtaposed with The most outstanding appeal of the mall lies in its an environment that is decidedly from the 14th century world. edutainment features, which combine features of education Located on Dubai’s Sheikh Zayed Road, the mall was and entertainment. There are numerous storytelling tours that developed by Nakheel Properties Group in early 2005. You can provide an exciting opportunity for visitors to better understand
  • 21.
    the historical perspectivesthat can be gleaned from the life of Ibn Battuta. Then there are the numerous exhibits of ancient technological inventions, especially from the Middle East. The modern full-size working reproduction of an elephant clock is particularly interesting. It is basically an invention of Islamic origin that consists of a water-powered clock developed in the form of an elephant. Another piece of everlasting appeal is the re- creation of a 25-metre Chinese sea faring junk that happens to be a replica of an ancient boat on which Ibn Battuta is said to have sailed through the Indian Ocean. The mirror maze located in the Chinese court is great fun and many visitors Landmarks of Dubai can’t have enough of it. Another interesting item Year-round sunshine and a culture that is eminently lavish is the virtual aquarium that enables visitors to pose enough reasons to make Dubai an enormously popular observe many different types of marine life, including great holiday and shopping destination. white sharks. There is also a sand sculpture, created by world- renowned artist Jenny Rossen, based on different mosques of Burj Al Arab the Middle East. If there is any structure that succinctly epitomizes the For book lovers a tryst with the famous Magrudy’s bookstore bustling, bright and cosmopolitan character of the city is a must. Located right next to it is a toy store. Even Géant, which of Dubai, it is the Burj Al Arab. The name translates holds the distinction of being the largest French supermarket into english as “Tower of Arabs”. Since it’s opening chain, has a store here. When you tire of sightseeing and date in 1999, the Burj Al Arab quickly gained the shopping, then it is time for rest & relaxation. What can be a status of being Dubai’s iconic symbol. It is the better place for that than a luxurious spa or a state of the art world’s most luxurious seven-star hotel, and its gym! Try it and chances are that you will be able to recharge opulence is unparalleled anywhere else on the you batteries for another round of adventures at this mall. planet. If anything, the Ibn Battuta mall is certainly worth a visit, not Even those who are not staying here, flock just for the shopping and entertainment experience, but also to this hotel because a trip to Dubai is never for the fantastic design and concept. But before you venture complete unless your eyes have basked the beauty of Burj Al inside this place make sure you have a full wallet and a pair of Arab’s sail like shape soaring into the sky. At 321 meters, comfortable walking shoes on. It is really big, so big that you this hotel is one of the tallest in the world. It even has its own have to become an explorer to fully appreciate its grandeur. n helipad. It is furnished throughout in opulent Arabic style, and an astounding 8,600 pieces of 22-carat gold have been used in its construction. Sheikh Zayed Road The Sheikh Zayed Road is a landmark by itself. This road happens to be the home to some of the tallest buildings in the world, including the magnificent 355m-high Emirates Towers, which is the tallest building in all of Middle East and Europe. Many tourists board the glass elevators that take you to a viewing deck on the top which offers unforgettable views of Jumeria coast. Creekside Park Even though Dubai enjoys the reputation of being the city of high-rises and beaches, it does have a fair number of parks where you can chill out. the One such oasis is the Creekside Park that lies in Umm Hurair area of Dubai. The park contains over 280 botanical species, as well as a mass of green areas, leafy paths for roller-skating and jogging, three jetties for fishing, a mini-golf course and a 30m high cable car.
  • 22.
    by chand kiShorepatro Staying What the Indian Cricket Team at the top W Should Do hen the young guns of the Indian team roistered after the historic win in the first Twenty20 World Cup, the writing was clear on the wall – a youthful Team India is emerging as a new force to reckon with. The amalgamation of valuable experience and spirited youth is proving to be a sure recipe for success. Now it is only a question of time before we make it to the top in other versions of the game– ODI, and test cricket. There is a glut of talent knocking the doors of the selection committee. Promising bowlers like Balaji sit out because of injury and we don’t even miss him, as an Ishant Sharma or a Praveen Kumar are there to chip in with memorable performances. These are great days for Indian cricket, when we can keep a player of Virendra Sehwag’s or V V S Laxman’s caliber out of the team for not being in form and yet win matches in trot. The saying of a famous tennis champion comes to mind – it’s easier reaching the top than remaining there. So now that India has reached a pivotal position what should it do to remain there? Here are a few tips that can be employed: Right Attitude: There is no doubt that an aggressive attitude from team members is a precondition for winning games. But the dosage of aggression has been increasing dangerously during the last few months. In South Africa and Australia players like Bhajji and Sreesanth demonstrated in no uncertain terms that they will not take any nonsense from anybody. That’s a beautiful attitude, despite a penalty here and a reprimand there by cricketing governing bodies. But it becomes a problem if these players
  • 23.
    lose self-control. Therecent slapgate incident, where Bhajji slapped Sreesanth, tarnished the images of both the players. Additionally, it has now put pressure on the whole team to prove that it’s aggression is well within reasonable sportive limits. Players need to be counseled so that they don’t break into fits of anger. Two Teams and Two Captains: The talented youngster, Dhoni, has ample cricketing acumen. He is capable of leading the test team, as well as a one-day or a T20 team. But he shouldn’t be overburdened with test Calendar Allowing for Rest Cricket, despite being a captaincy. With the amount of cricket he is playing he will be lucky if he can last for 5 years. Being a wicket keeper- and Relaxation: glorious game captain, he has to be busy, mentally and physically all through Its time for us the game. Adding the burden of test captaincy will be a sure to admit – India is recipe for shortening Dhoni’s career. So let’s stick to the two teams, two captains policy. It’s working fine. witnessing a virtual deluge of cricket. of uncertainty Guard against the Ganguly Syndrome: Players have been follows certain patterns. complaining of stress Ganguly came in as the captain when Sachin buckled resulting from packed under the pressure of leading the team. Ganguly exuded schedules. Now with rare confidence and mental toughness. He led the Indian the T20 version of team to many memorable victories and there was a time the game having made its debut, there is bound to be extra when everybody was singing paeans on his name. But with pressure on highly rated players who are expected to take part Jagmohan Dalmiya at the helm of the affairs he took his in all the versions of the game: Dhoni, Yuvraj Singh, Virendra position for granted and developed a group of sycophants Sehwag etc. The calendar should be designed so that it allows around him. In future, no player or captain should be allowed enough time for rest and rejuvenation of players. to become bigger than the team. Cricket, despite being a glorious game of uncertainty follows certain patterns. Maintain a Healthy Balance: And great teams like Bowlers like Ishant Sharma, Sreesanth, Praveen Kumar, Australia that stayed at and Balaji have off-set the imbalance in the Indian team the acme of international composition that comprised of mostly batsmen. In addition to cricket for considerable Zaheer Khan, Irfan Pathan, and R P Singh, these bowlers form period have established a robust group that offers selectors a plethora of choice. The the unwritten formula ratio of bowlers to batsmen availability is healthy now and this of retaining the prime balance should be retained. position. Luckily we have the privilege of imbibing Kick Favoritism Out of the Window: some of their methods This means players like Ajit Agarkar shouldn’t be in the and mix them with some of contracted player’s list. Given the current pool of talent our own proven methods. can we imagine Ajit Agarkar in the list of probable players? If followed scrupulously, Clearly he has been allowed to play a year or two extra on the these methods can ensure basis of sheer favoritism stalling the entry of other promising that we rule the roost in bowlers. This should stop. It may sound clichéd but, “only the international cricket for top talents should be picked”. the next decade. n
  • 24.
    home improvement BODIE and FOU Cognac Glasses These Cognac glasses designed by Normann Copenhagen and Rikke Hagen tend to foster a new intimacy between you and the fine spirit you are sipping. Made out of clear glass, and distinctively designed to enhance bouquet, temperature and volume of the Cognac, these glasses will add a touch of class to any party that you are throwing for family and friends. Price - Rs. 2,500 BODIE and FOU Norm 69 Pendant Light It is so much easier to dazzle your guests when you have the Norm 69 Pendant Light brightening up the environs of your room. Designed in 1969, by Simon Karkov, the pendant light carries in its shape the hallmark of classic Danish artistry. Available in cream or white, this is the perfect addition to any modern home. Price - Starting at Rs. 5,000 Crepax Kadhorna Cabinet Panasonic Massage Chair When your bedroom suffers from boring furniture then When you are feeling dead tired, there is nothing like getting you truly can’t do without a Crepax Kadhorna cabinet. massaged by the soft hands of a beautiful woman. Sometimes This immaculately carved piece features the artwork of that option is not available and that’s when the Panasonic celebrated graphic artist Guido Crepax who is often credited Massage Chair becomes a necessity. Endorsed by the American with the development of European comic art in the later Chiropractic Association, this chair is meant to provide deep- half of the 20th century. The erotic, psychedelic and almost tissue relief and alleviate stiffness in the lower back, hips ephemeral story lines that are portrayed in the drawings is and thighs. So how does this marvelous device work? The air enough to brighten even the dullest of rooms. system in the ottoman squeezes the legs while it lowers and raises in 20° increments. The back of the chair uses a similar Price - Rs. 3 lakhs mechanism to cover a total of 135 square inches of your body - including neck, shoulder and back - with eight different massage modes. Fashionably designed with high-quality leather upholstery, the chair offers relief to your sore body, and a touch of style. Price - Rs. 1 lakh ROyAL 24 JUnE / JULy ’08
  • 25.
    Taking off fromthe Ramphos is about as easy as taking a kite into the air. You do it by racing on the water to speeds of 30-40 knots and at the same time working the control bar forward and back to break free from the surface of the water. amPhiBious skyBoat I f you can have cars that act like boats then why not boats that act like planes. Enter the Ramphos Amphibious Sky Boat which has the ability to drive, sail, and even fly. When you’re on water it’s easy to take off into the air and reach a maximum height of 7,500 feet at cruising speeds of 45-50 mph. Truly a unique free from the surface of the water. Voila! About 8 way to enjoy the seconds is all it takes to take you up. Once you are once you are airborne, you best of both worlds. airborne, you can cruise at speeds up to 50 mph and can cruise at speeds up to 50 Affordability and enjoy a birds-eye view of the landscape below. But mph and enjoy a birds-eye mobility are the two when you do decide to come down, you will find that view of the landscape below. main advantages with the process of descending is about as simple as the the Ramphos. It folds process of ascending. And if you are landing on the for easy storage when water then the process is even simpler and you can not in use, and can even execute some deft maneuvers to impress the be easily towed. Since you don’t need an airstrip to folks who might be watching you from the sidelines. ROyAL JUnE / JULy ’08 take off and land, you can save on exorbitant runway The Ramphos is a two-seater so go ahead and costs. Such practical, multi-purpose vehicles offer invite the hottie you’ve been seeing. You’ll easily win a very exhilarating way to explore local lakes and points in the adventurous department. n coastlines with a minimum amount of fuss. Taking off from the Ramphos is about as easy as Price - On Request taking a kite into the air. You do it by racing on the water to speeds of 30-40 knots and at the same time www.opulentitems.com working the control bar forward and back to break 25
  • 26.
    James Bond was about 30 years ahead of his time when he drove his sleek vehicle T by melody brooke he from sQuba, the underwater in the cult ensemble of classic, the spy Who Rinspeed, has now won the distinction Loved Me. of being the world’s first car that can perform as well on ground, as it can on the surface of water and even underwater. The avant-garde vehicle is the stuff that dreams are made of. Rinspeed’s Founder & CEO Frank M. Rinderknecht is a self-confessed James Bond enthusiast and for many years had been planning to build a car that would capture the hearts of car and technology zealots everywhere. There have been military class vehicles in the past that can go underwater and can be driven slowly over But now you don’t even need to the ground, but what sets be a superstar spy in order to go sQuba apart is that it can glide like a fish. It is watertight and underwater... pressure resistant enough to be maneuverable underwater. The sQuba does not carry a conventional combustion engine; instead several electric motors power it. Three motors are located in the rear, one of which provides propulsion when the vehicle is being used on land, while the other two drive the screws for underwater motoring. The front of the car features ROyAL two Seabob jet drives, which are made out of high- tech nano materials, and are extremely light and twist resistant. 26 JUnE / JULy ’08 Once you drive into any beach in an sQuba, there is no doubt that many beach babe beauties will be attracted to it like bees to honey. Ask one of them to hop in, make her wear the scuba mask and then just drive into the water; the vehicle will float on the
  • 27.
    enjoy the underwaterscenery, as the car glides with a swarm of fish, and floats over a vista of underwater plants. Top speed is 75mph on land, 4mph on water and 2mph below the surface. surface, and to get it underwater you have to open the door slightly so that water can get in. The breathing air comes from a compressed air tank connected to the scuba mask that occupants wear. Enjoy the underwater scenery, as the car glides with a swarm of fish, and floats over a vista of underwater plants. Top speed is 75mph on land, 4mph on water and 2mph below the surface. That should be about enough to help you achieve the adrenaline high you are seeking. Best thing about the sQuba is that it is powered by lithium-ion batteries which makes it emission free thus allowing the precious environment to be unharmed. For safety reasons the car is designed without a roof, so that in case of an emergency the occupants can make a quick exit. n www.rinspeed.com Best thing about the sQuba is that it is powered by lithium-ion batteries which makes it emission free thus allowing the precious environment to be unharmed. ROyAL JUnE / JULy ’08 27
  • 28.
    interview with giselle uyuni In a bikini and high-heeled shoes, Giselle Uyuni is fetchingly beautiful. Sexy Giselle has been using her light eyes and and sculpted features, not to mention her fabulous 32-24-32 curves, to woo fans worldwide. The camera is always eager to get passionately intimate with her. Bolivia had been her residence ROyAL for 13 years, but these days she calls San Francisco, 28 JUnE / JULy ’08 California home. Working constantly with the world’s leading fashion photographers, Giselle is turning out to be a quintessential pinup girl.
  • 29.
    ROyAL JUnE /JULy ’08 29
  • 30.
    I would absolutely love to share a sex scene with Angelina Jolie, Brad Pitt or Christian Bale. ROyAL 30 JUnE / JULy ’08
  • 31.
    What made youdecide to pursue modeling? At first it was just for fun but then I realized that it was something I truly love doing. Being in front of the camera is exciting and it is also a good way for me to express my individuality. I love immersing myself in the character and concept. I find the creative process inspiring. There is also a sense of accomplishment that’s very valuable to me. Tell us about the projects you are currently working on. I am currently involved in several coffee book projects. One of them is an outdoor glamour photography coffee book that will be sold worldwide. As summer approaches I will be busy traveling and shooting in various parts of the country. How do you maintain your flawless figure? Any fitness tips for our readers. I get lots of exercise, fresh air and I follow a healthy diet. Eating out is a whole lot of fun and a favorite pastime with me, but when I eat out I am always mindful of what I order and how much I eat. I usually try to order seafood. Do Hollywood dreams come on your radar screen? Of course, who wouldn’t want to be part of a cool project in Hollywood? Favorite Hollywood star you want to share a steamy love scene with? Oh my...I would absolutely love to share a sex scene with Angelina Jolie, Brad Pitt or Christian Bale. They are gorgeous in every possible way. Best body in Hollywood? Worst? In my opinion I always thought Pamela Anderson has one of the hottest figures in Hollywood. As for the worst - that honor falls upon Jabba the Hut from Star Wars.
  • 32.
    If you werean animal what would you want to be? I would love to be a dolphin because of their wonderful and playful nature. Many models say they feel very sexy, even turned on, while posing for the camera. Do you feel that way while posing? For me the whole process is exciting. Getting my hair and make up done, choosing a fun wardrobe and then working with the photographer to produce sexy and creative images. All this can have an intoxicating effect. And it does. What kind of man turns you on the most? Even though looks play a role, I find a man’s personality to be most important. Any kind-hearted man who knows how to be sexy without trying too hard will turn me on. He must know how to handle himself with elegance and style; he should have a good sense of humor and self-confidence. Cheer up guys, there is not much that I am demanding from you. The worst pick-up line I’ve ever heard is, “Did it hurt when you fell from heaven?” ROyAL 32 JUnE / JULy ’08
  • 33.
    Describe your idealdate? Going out to a nice restaurant and having delicious food and wine. Worst pick up line ever used on you? I personally feel that any pick up line is in bad taste. The worst one I’ve heard is - Did it hurt when you fell from heaven? What is the best piece of advise that you would give to a man who wants to approach you? You only have one chance to make a first impression. So try to act like a perfect gentleman and demonstrate proper etiquette. They say phenomenal sex for a regular person is just average sex for a model. Care to give us your opinion. I would say, there is probably some truth to it. Yes physical attraction definitely plays a major role but I also believe that mental and emotional connections are imperative. Everyone has the ability to have phenomenal sex. What helps the most though is having the knowledge of how to sexually please a partner. To me that is most essential. n ROyAL JUnE / JULy ’08 33
  • 34.
    Everyone has the abilityto have phenomenal sex.
  • 36.
    QA & Dr. Pyar, I have recently learned that with Dr.Pyar some practice, but once you get the gist of my best friend has betrayed me with my it you’ll easily be able to last twice as long. girlfriend. I suspected something wasn’t right, and when I pretended to my girlfriend that he’d told me that they were seeing Dr. Pyar, I have a crush on a female each other behind my back, she broke down colleague. As both of us work in the same and confessed. Now I feel awful and I hate department, it is virtually impossible for both of them from the core of my heart. I us to avoid each other. On my part, I have don’t think they should get away with their always treated her like a colleague, but I moral transgression. The question is – how have never failed to do some special things am I going to punish them? Any ideas? for her. Two weeks ago she surprised me -Ramesh Agarwal, Indore by dropping the information that she had separated from her boyfriend and asking me Dear Betrayed, if I had a girlfriend. I told her that I didn’t, There is no doubt that you must be very but I could not muster the courage to ask hurt and you can only think of revenge. her for a date. Do you think that I should Doctor, I have had a steady relationship But violence and vendetta is not the wait for a few more signals or should I with my girlfriend for the past two years. answer. What will you gain by beating make a move now? Before we met, she had been involved with him up, apart from the momentary -Shahid S., Delhi another guy, who left for Spain after he satisfaction? Matter of fact things can broke up with her. But now this guy has only go from bad to worse. They might Dear Slowpoke, suddenly turned up in town and he seems report you to the cops if you try to do What kind of a signal are you waiting for? eager to revive the relationship with his anything. Getting your life on the right Do you expect her to carry a sign that old girlfriend. Last week when I went to track should be your priority. Success is says, “I love you!” That is not the way it her house, I found him sitting in her room. the ultimate revenge and them seeing you works. She has already given you a hint Both of them seemed somewhat shocked happy, partying, and wealthy, will make of what she wants. Now it is up to you to to see me, but I was even more shocked them realize their mistake one day. make a move and sweep her off her feet. If to see him there. I don’t want to lose my you keep lingering, then someone else will. girlfriend at any cost, and this guy from Nice girls never remain out of relationships her past is making me feel insecure. What Dear Doc, I only last about 5-10 minutes long; they tend to get picked up very should I do? during sex. Now my wife has started quickly because they are hard to find in -S N Sinha, Mumbai commenting on my short stamina. On one the first place. occasion she said what’s the point it’ll be Dear Insecure, over in 5 minutes. My ego was immensely You have a right to be a little worried. He hurt by her words. What can I do to last Dr. Pyar, My girlfriend wants me to is capable of enticing your girlfriend by longer? perform oral sex on her. But I am not sure evoking feelings of nostalgia for the good -Bhushan P., Bombay how to do it, or even if I want to do it. times that they experienced when you were -Mahesh S., Mysore not around. Since your girlfriend allowed Dear Fast and Furious, him to come to her house, it is likely that Most married men don’t use a condom. I The art of pleasuring your girlfriend by she still harbors a degree of affection assume you’re in this category. It is time oral means is not that difficult to master. for him. The only way you can hold on you started using one. Condoms create a Once you pinpoint her pleasure spots, to this girl is by being extra creative. Do loss of sensation and that’s exactly what focus on that area. Having said that, if everything you can to make her believe you need to last longer. You want to have you don’t want to go oral, you can simply that you are much better and more reliable enough sensation to stay hard, but not so say no to her. But won’t your refusal to partner than her ex-boyfriend who had much sensation that you come quickly. play out her fantasies make her lukewarm left her once and may do so again in the Second, only engage in positions where to fantasies you have? It might be in your future. you control the rhythm and flow. That way best interest to go for it. After all, you if you feel like you’re going to come soon don’t know whether you like something or then you can slow down, and take deep not, until you have tried it. breaths during the activity. This will take
  • 37.
    designerprofile Kenneth Cole Ü ber chic and ultramodern, Kenneth Cole is known for its impeccable collections of functional fashion, accessories and shoes. It should come as no surprise that outfits carrying the label of this fashion house are a favorite amongst young, urban consumers who aren’t afraid to shake up the status quo. At the boardroom or at a party, a man attired in Kenneth Cole’s immaculate creations easily gets noticed. In 1982, when Kenneth Cole started his company, he was only in the business of dressing up people’s feet. Within two and half days of the company’s launch, he managed to sell an impressive 40,000 pair of shoes. From such an exciting debut, this fashion house has gone on to make a name for itself in not just men’s and women’s footwear, but also in clothing, and a whole assortment of accessories. ROyAL JUnE / JULy ’08 37
  • 38.
    The key tothis company’s success has been its ability to foresee new trends and come up with creations that subsume a sense of being subtly provocative while still evoking the classy and tasteful feeling. Blacks, grays, browns and other neutrals dominate shirts, pants and suits. But Kenneth Cole does not shy from using color for outerwear, splashing in red, blue and green to create a feeling of euphoric and vibrant zeitgeist. The immaculate range of shoes and accessories come as icing on the cake. In a recent development, Kenneth Cole has put its name to an exclusive range being marketed at Britain’s prestigious House of ROyAL Fraser. House of Fraser is a brand by itself, a place where fashion lovers can revel in an eclectic mix of both classic and contemporary designer names. n 38 JUnE / JULy ’08 http://www.houseoffraser.co.uk http://www.kennethcole.com
  • 39.
    designerprofile Kenneth Cole ROyAL JUnE / JULy ’08 39
  • 40.
    designerprofile Kenneth Cole ROyAL 40 JUnE / JULy ’08
  • 41.
    ROyAL JUnE /JULy ’08 41
  • 42.
    gLOBE wORkStAtION Most Indian offices lack any aesthetic value whatsoever. It’s time to change all that with the Globe Workstation being marketed by www.opulentitems.com. When it is closed, it is a simple globe, but when it opens into two separate halves, it transmogrifies into a sitting arrangement on one half and a working table on the other. The system is founded on a cast aluminum base, which contains invisible wheels that will automatically lock themselves when it has been opened. Your comfort is guaranteed, StRAdA PORtABLE as the sitting arrangement is adorned MOBILE NAvIgAtION with the finest Elmo leather and is ergonomically designed. SYStEM Here comes a device that will make it PRICE - RS. 2 LAkHS just about impossible for you to get lost, but only if you use it in North America. Petite enough for you to carry with ease, the Strada Mobile Navigation System is embellished with a 5” LCD screen and GPS Assist technology, which can help you plan your route from the comfort of your home or hotel room without even receiving GPS signals. Until this navigation system arrives in India, we’ll have to rely on the good old-fashioned way of asking fifty people for directions. PRICE - tBA LOgItECH Z CINEMA Who hasn’t griped about the mediocre PC audio when playing DVDs or listening to music? That could be a thing of the past if you opt for the Z Cinema advanced surround sound system from Logitech. ROyAL Movies, games, music, and TV all turn out to be a much more enjoyable experience on your PC. The option heavy remote is an 42 JUnE / JULy ’08 added plus, especially for users who have extensive media collections. RS. 12,000
  • 43.
    SONY vAIO gRAPHIC SPLASH Tired of your dull black notebook? Opt for the artistically unique Sony VAIO Graphic Splash. This notebook uses the process of dye-sublimation to infuse stunning colors and eye-catching patterns on the exterior. With a plethora of designs and colors to choose from, you will have no difficulty in finding a pattern that best suits your tastes and personality. You can even decide which font you want to have on your keyboard. But the scope for customization does not end only with the notebook’sexterior; the VAIO also allows you the freedom to decide the internal configuration as well. Personalize the hard drive, processor, memory, and more to fit your budget and needs. PRICE - StARtINg At RS. 50,000 gAtEwAY FX SERIES dESktOP Is it possible to get seduced by a desktop? With Gateway FX series anything is possible. Marketed mostly for gamers, the FX series will enable you to dominate the latest games and blaze through multi-threaded programs with supreme speed. Its AMD quad-core power and DirectX® 10 graphics, makes it a breeze to handle just about any graphic-intensive task. You don’t have to wait for rich demanding content to load on your screen, everything happens instantly, in the blink of an eye. An added plus is that the FX series comes with a TV tuner and a media center remote control. A rich 8-channel high-definition audio is there to deliver premium sound for viewing TV, DVDs, and for gaming. A sure recipe to exorcise your days of any boredom. PRICE - StARtINg At RS. 44,000 dIAMONd tELEvISION If diamonds are a girl’s best friend, and a flat screen tv is a man’s best friend, then whose best friend does a diamond television belong to? But hey if you can afford a diamond television then you may not even need friends. Go to www.opulentitems.com and check out their range of 32”, 40” and 46” models of HD flat panels. By the way, if you harbor a fetish for rubies, then it is possible to go for a ruby-encrusted model as well. Truly extravagant! PRICE ON REQUESt
  • 44.
    gadgets LOgItECH ZEBRA MOUSE If you’re an animal lover then throw away your dull mouse and plug in the Zebra Mouse by Logitech. Designed for smaller hands this mouse is perfect for kids or your shrinking parents. As it incorporates an optical engine, it can be used with or without a mouse pad. No prior set up is required; just plug in and start clicking away. PRICE - RS.800 Lg PRAdA When avant-garde fashion mates with cutting edge technology, a LG Prada phone is born. The end result of a collaboration between Prada and LG, this new phone is embellished with an advanced touch interface, and is all geared to strike a new level of sophistication to your overall attire. An extra wide LCD screen, 2 megapixel camera, video player, and a document viewer, are just a few of the benefits to SONY this elegant phone. Its white on black display verges HdR-tg1 on the minimalist and makes a perfect fashion statement, but that is something to be expected in anything being marketed under the Prada brand. Imagine a camcorder so small that you can PRICE - tBA comfortably carry it in your trouser pocket. Next time you are off on a vacation, be sure LU20 to pack the Sony HDr-TG1, which Lg is delightfully small and lightweight, This ultra-portable Tablet PC from LG is perfect for people on the and yet it still move. The unique built-in swivel LCD screen allows you to easily manages to do share with companions nearby. It comes with an Intel Pentium M everything that a processor, 256 MB rAM, a 30GB hard drive and Windows XP Home regular camcorder operating system. Incorporation of TFT Active Matrix Display and is supposed to do. Intel Extreme Graphics 2 is sure to take care of all your gaming and It can record 1920 x movie viewing needs. 1080 HD video and 4-megapixel digital photos directly to a Sony memory stick or PrO Duo PRICE - tBA ROyAL media cards. A 2.7” touch panel LCD display provides excellent viewing, and the Carl Zeiss Vario-Tessar 10x optical zoom lens is there to 44 JUnE / JULy ’08 impart professional quality to every video that you capture. PRICE - RS. 36,000
  • 46.
    Keeping your job “Okay,” he said, “One, two, where he stops at a saloon He saddled up and started to Banta Singh woke up with a three, four, five, six, seven - for a drink. Unfortunately, the ride out of town. massive headache and utterly then there’s you - nine, ten, locals have the nasty habit of The bartender wandered out unable to recall the events 11, 12, 13...” picking on strangers, which of the bar and asked, “Say of the previous evening. he was. When he finished his partner, before you go...what Somehow he managed to Bollywood blondes drink, he found his horse had happened in Alabama?” leave the bed and walk into the A blood red Ferrari is moving been stolen. Vinod turned back and said, “I drawing room where his wife on the road at breakneck He went back into the bar, had to walk home.” was lounging on the sofa. speed. A cop on a motorcycle handily flipped his gun into “My dear wife,” he whined, gives chase and finally the air, caught it above his Q. What did one saggy tit say “Tell me what happened last succeeds in forcing the Ferrari head without even looking and to the other saggy tit? night. Is it as bad as I think?” to stop. fired a shot into the ceiling. a. If we don’t get some “It was even worse,” his wife support soon, people will shot back. “You got drunk think we’re nuts! like a fish and you made a complete ass of yourself. The wedding of the You heaped insults on the century entire Board of Directors and All of Las Vegas was abuzz you slapped the Managing about the wedding of the Director on his face.” century, where the groom “The Managing Director is an was a 95 year old billionaire idiot,” Banta shouted. “Piss and the bride was 23 year old on him.” stripper. The groom looked “That is what you did. And he pretty feeble and the feeling fired you.” was that the wedding night “Well, then screw him.” might kill him, because his “I did,” his wife smiled. “And bride was a healthy, vivacious so he agreed to give you back young woman. your job. Go back to work on Why don’t blind men skydive? But lo and behold, the next Monday.” Because it scares the shit out of the dog morning, the bride came down the main staircase slowly, Marriage blues step by step, hanging onto the After one year of their marriage Surprise! Surprise! The “Which one of you crooks banister for dear life. Santa Singh’s wife started to Ferrari driver turns out to be stole my horse?” he yelled The hotel clerk looked up, question him about his lurid none other than Bollywood’s with surprising forcefulness. really concerned, “Whatever past. “Come on tell me,” she most popular heroine. No one answered. “Alright, I’m happened to you, honey? You asked for the hundredth time, When the cop asks her for her gonna have another beer, and look like you’ve been wrestling “how many women have you license, she replies in a huff, if my horse ain’t back outside a 2,000 pound gorilla!” slept with?” “I wish you guys could get your by the time I finish, I’m gonna The bride groaned, hung on ROyAL “If I tell you the truth you will act together. Just yesterday do what I dun in Alabama! And to the counter and managed be furious with me. You might you take away my license and I don’t like to have to do what I to speak, “My God! He told even try to strangle me to today you expect me to show dun in Alabama!” me he’d been saving up for 75 46 JUnE / JULy ’08 death,” Santa pleaded. it to you.” Some of the locals shifted years and I thought he meant But his wife promised that restlessly. The man, true to his money!” she would forgive all his Cowboy Vinod his word, had another beer, transgressions if he told her While on a tour of Texas, walked outside, and his horse the truth. Vinod ends up in a small town has been returned to the post.
  • 47.
    The M irror, mirror on the wall, who is the richest of them all. The combined net worth of India’s 40 richest capitalists stands at more than $300 billion dollars. If you are part of this elite group then it is World’s time to uncork the bubbly. If not, then the only recourse open for you is to sit tight and try to garner some vicarious joy as the rich find new ways to flaunt their wealth. The erstwhile maharajahs of India were famous for buying Rolls Richest Royce by the dozen and Cartier jewellery by the quintal. About as profligate are the new maharajahs of the business world who don’t tend to think twice before buying luxury yachts, million dollar cars, a string of palatial homes and a plethora of gems and art. Indians A scion of one of the most prestigious business dynasties in the country, Ratan Tata is credited with transforming his business group from a sprawling, conservative conglomerate into a corporate powerhouse hungry for growth. Last year, he engineered India’s biggest takeover - Tata Steel’s $13 billion purchase of UK’s prestigious Corus The erstwhile maharajahs of India were famous for buying steel. But despite ranking amongst Rolls Royce by the dozen and Cartier jewellery by the the richest people in the world, he quintal. About as profligate are the new maharajahs of the drives Marina wagon. office in a Tata Indigo himself to his While Tata may business world who don’t tend to think twice before buying not splurge on fancy cars, flying is a luxury yachts, million dollar cars, a string of palatial completely different ballgame. He is homes and a plethora of gems and art. an avid aviator, who likes to pilot his own Falcon 2000 business jet around India. In February 2007, he created a sensation by co-piloting a Lockheed F-16 and Boeing F-18 fighter jets at a nationally By asit amrevy televised air-show. He continues to hold the distinction of being the nation’s most eligible bachelor and his weekends are spent in solitude with his two dogs at a beachfront home he designed himself. On October 30, 2007, the day when Indian stock markets had hit their all time high, Mukesh Ambani had became the richest person in the world, surpassing American software czar Bill Gates, Mexican business tycoon Carlos Slim Helu and famous royal June / July ’08 47
  • 48.
    investment guru WarrenBuffett. when it comes to making money, he not just for his fabulous wealth, At that time, his wealth of about is blessed with a midas touch. This but also for his mercurial Rs 2,49,000 crore ($62.3 billion) year he’s placed at the 5th richest temperament. His net valuation included about Rs 2,10,000 crore in the world with an estimated is estimated to hover around $42 from RIL (50.98 per cent stake), worth of $43 billion. So how does billion. Other than business, he India’s richest man demonstrate indulges in running marathons and his wealth? Well, on his wife’s attending page three type parties. birthday, Mukesh Ambani gifted Recently he raised $3 billion On his wife’s birthday, her a specially customized 242 from the highly anticipated initial Mukesh Ambani gifted her crore rupee Airbus 319 Corporate Jet. The plane is said to have a offering of his Reliance Power, the biggest in India’s history. Had a specially customized 242 state of the art business office and the shares of Reliance Power cabin management system for performed well after listing on crore rupee Airbus 319 games, music, satellite television the stock exchanges, Anil would Corporate Jet. The plane and wireless communication. have whizzed past elder brother It also has all the luxuries of Mukesh, but that didn’t happen. is said to have a state of a home in it, namely a master Despite the hype, the stock the art business office and bedroom, a master lavatory with a range of showers, galleys and tumbled 17% immediately after its February listing. cabin management system a sky bar in the forward lounge The richest Indian turns out for games, music, satellite complete with mood lighting. He is currently engaged in building to be the guy who is named after the goddess of wealth, Lakshmi. television and wireless a 600 crore skyscraper for his Lakshmi Mittal is the steel king communication. family that could as well turn out to be the world’s costliest of the world and when he opens his wallet, watch out! Few years residence. When the 27-storey ago Mittal was in the news for home is completed, it will have 3 buying a plush house in London Rs 37,500 crore from RPL (37.5 helipads, 6 floors of car parks, a for $150 million. For that much royal per cent) and Rs 2,100 crore from state of the art communications money you could easily buy 2,000 RIIL (46.23 per cent). It is true that system, a security system that is luxury flats in Bangalore and still Mukesh Ambani’s place at the at par with the best in the world, a have money left to bag a luxurious 48 June / July ’08 top was exceedingly ephemeral, 50 seat theatre, a luxurious gym, villa in Delhi’s best locality. On because the Indian markets started three air-conditioned swimming his daughter’s marriage Lakshmi falling almost immediately after pools and much else. Mittal lavished a cool $100 million. making a high. But by reaching the Mukesh’s little brother, Anil The guest list at the marriage top even once he has proved that Ambani, happens to be famous party included 1200 members, all
  • 49.
    TOP 10 Richest People in The World Name Worth (in USD) 1. Warren Buffett $62 billion 2. Carlos Slim Helú $60 billion 3. Bill Gates $58 billion 4. Lakshmi Mittal $45 billion 5. Mukesh Ambani $43 billion 6. Anil Ambani $42 billion 7. Ingvar Kamprad & family $31 billion 8. Kushal Pal Singh $30 billion 9. Oleg Deripaska $28 billion 10. Karl Albrecht $27 billion of them cream of UK and Indian society. The party itself was held at the magnificent Palace of Versailles, where the French ‘Sun King’ Louis XIV held court in the 17th century. Some say that Lakshmi Mittal made demonstration of his love for his daughter. history by throwing the most lavish wedding ever. The year 2007 saw the wealth of Kushal Pal Some may call him exceedingly profligate. But for Singh, the head honcho of India’s largest real estate the steel tycoon the event was nothing more than a company, DLF, increase by 51% to $30 billion. His wealth comes mainly from the deep pockets of India’s rising middle class who suddenly find themselves The richest Indian turns out to be the capable of buying fancy flats that DLF is so proficient guy who is named after the goddess in building. He is credited for putting Gurgaon on the map as a destination for global companies. Ramesh of wealth, Lakshmi. Lakshmi Mittal is Chandra, the founder of Unitech, happens to be the the steel king of the world. Few years second real estate tycoon who has made it really big. With a net worth of $11.6 billion he is also India’s ago Mittal was in the news for buying a eighth richest man. He is exceedingly media shy. Only plush house in London for $150 million. on rare occasions you might get to see him on TV. Kumar Mangalam Birla wins the distinction of being the talented scion of the Birla clan. His net worth stands at around $11 billion. Kumar Manglam does not fit the bill as a typical colorful tycoon. When he is not busy attending to the concerns of his global business empire, he prefers to stay at home and spend time with his extended family. In other words, Kumar Mangalam is an epitome of what a Birla is supposed to be – he is a workaholic and royal June / July ’08 a family man. Recently he was in news when his flagship company Hindalco purchased America’s largest aluminum company for a few billion dollars. Another super-rich guy is Azim Premji, the founder of Wipro. He is worth $12.7 billion and yet he continues to drive around in his old Ford Escort. But that is 49
  • 50.
    prestigious labels likeNapoleon, Polo and Lanvin. He ranks number 42 on India’s richest with an estimated worth of $1.6 billion, but that may be because he really knows how to spend money on the finer things in life. Then there is the India’s media tycoon, the promoter of Zee network, Subhash Chandra. He is reputed for having lavish mansions all over the world and he won’t be seen in any car that is less than a Mercedes S class. Yet, he prefers to smoke Bidi No 502. Clearly cigarette is passé for this leader who has made it his lifelong mission to turn the humble bidi into a fashionable brand. But there is nothing remotely humble about Chandra’s preferred brand of suits, which turn out to be the immaculately tailored Armani. The guy who is credited with bringing telecom revolution in the country, Sunil Mittal, has earned a well-deserved place in India’s rich list. These days his wealth When it comes to the steel and hovers around $12.5 billion. That is telecom sector, the Ruias are a name to quite an achievement for a man who is When you think reckon with. In 2007 brothers Shash and said to have started his business with a of India’s poster Ravi Ruia made it to the Forbes list of the 10 richest Indians with their combined borrowed capital of just Rupees 20,000. Golf is his passion; this is a sport in boy of conspicuous wealth of $12 billion. There are famous which he is reputed to have an excellent consumption and for their dapper suits, their majestic bungalow in Bombay’s plush Malabar handicap. Today he lives in what can be termed as New Delhi’s most lavish home. consumerism, then Hill area and their penchant to keep away Even in Lutyens’ Delhi, there is no more the face of Vijay from media and from all controversies. Their flagship company, The Essar Group, exclusive address than Amrita Shergill Marg. And among the mansions that line Mallya automatically has been in business since the 1800s. this leafy road, Sunil Mittal’s grand house Essar Chairman Shashi Ruia recently easily stands apart from the rest. comes to your mind, remarked about the entrepreneurial The fact is that the year 2007 has been the quintessential spirit that runs in the family: “I am not very good for billionaires everywhere just an MBA, but also an MBB (Marwari in the world. This is the year that has profligate icon. by birth).” witnessed a phenomenal rise in the When you think of India’s poster number of billionaires. Their number boy of conspicuous consumption and has shot up by 19 per cent to 946, only because he feels that it is his lucky consumerism, then the face of Vijay previous year the number stood at 793. car. If he so desired he could easily build Mallya automatically comes to your mind. And the combined net worth of these a 100 car garage and park the best of This is the quintessential profligate icon lucky individuals has climbed up by $900 best vehicles inside. Self-deprecation, who leads a charmed life surrounded billion to $3.5 trillion. Steve Forbes, the humility and modesty runs in the blood by fast cars, beautiful women, designer chief executive of Forbes magazine, royal of India’s IT czars. The Infosys boss, N. houses, horses, jewellery and art. The says, “This is the richest year ever in R. Narayana Murthy, is famous for not king of good times truly lives up to his the human history. Never in history has employing servants in his house. He and reputation. Recently Mallya was in news there been such a notable advance.” It’ll 50 June / July ’08 his wife prefer to do their housework for spending a couple of million dollars be interesting to see how 2008 shapes themselves. In an interview he is known for Tipu Sultan’s sword, which was up. Will you make the list of India’s rich to have said that his bathroom was the being auctioned by Sotheby’s in London. elite? Just keep your fingers crossed. n cleanest in the country, because he His suits come from Emporio Giorgio himself cleaned it every morning. Armani, but he is also a patron of other
  • 51.
    By anoop verma The Art of Sculpting Beauty The Ins and OuTs Of PlasTIc surgery W hen most men think of plastic surgery, chances are that they end up hyperventilating about skimpily clad Pamela Anderson bouncing her bubbly breasts on the hit show Baywatch. It is a well known fact that Pamela’s seemingly perfect boobs had benefited from the art of plastic surgery. But that may be true of many babes from the entertainment world who boast of curvaceous figures, which royal June / July ’08 in many cases turn out to be a surgeon’s work of art. Are you still wondering why your favorite heroine’s curves keep getting sharper after every new film? Full lips, glowing skin, ample bosom, shapely butt! The art of extreme makeovers is there to help anyone achieve the body that they always dreamed about. 51
  • 52.
    In India, plasticsurgery has been practiced much before the Pamela Andersons’ of the world started flaunting their enhanced assets. In fact, plastic surgery originated in India at around 3500 BC. The art is well documented in ancient treatises like the Sushruta Samhita, which describes over 120 surgical instruments, 300 surgical procedures and classifies human surgery into 8 categories. Known as the “Father of Surgery,” Sushruta is thought to have lived in the 6th century BC on the banks of river Ganga, where he practiced his techniques. Many of the cosmetic surgery procedures that are being provided in the best clinics around the world today were first practiced in the ashram of this renowned sage. the Desire of youth People, everywhere in the world, are motivated by a similar desire for eternal youth. They don’t want to grow old gracefully; they want to manage how they age. It is estimated that around 12 million Americans go in for plastic It is estimated that surgery procedures every year, and believe around 12 million it or not, many of them flock to Indian shores to get their procedures done. They come to Americans go in India because the costs here are much less for plastic surgery than their Western counterparts. Times procedures have certainly changed from the days when the only surgery hot spots in the world were every year, and in cities like Los Angeles, New York, Miami believe it or not, and Dallas. These days almost every major Indian city absurdly simple. Surgery to create 6-pack abs many of them and town is dotted with plastic surgery clinics (Pectoral implants), bulging pectorals and buttock flock to Indian that offer world-class beauty enhancement enhancements are becoming more and more procedures. According to one estimate popular. shores to get their over 10,000 Britons travel to India every The desire to have a body with perfect figure procedures done. year for tummy tucks, liposuction, breast seems to rank fairly high in the priority list of manipulation, nose shaping, eyelid surgery, many people of the young generation. To reduce face-lifts, and more. A tummy tuck can cost fat in their abdomen, hip and upper thighs, people up to 6,500 pounds in Britain, but only go in for liposuction, which involves a procedure 1,500 pounds in India. It is also easier to get wherein the body fat is converted to liquid and appointments with qualified Indian surgeons. The is sucked out. The procedure is fairly simple as waiting list for a procedure in Britain can range compared to other forms of plastic surgery. You from 6 months to a year, but in India the same get admitted in the hospital in the morning and procedure can be done in less than a month. get discharged in the evening looking much Desi denizens are not far behind in the beauty thinner and sexier. With modern times the social game. With the economy growing at a scorching ethos have changed and these days there is lot of pace, a lot of money is flowing into the pockets of societal acceptance to the idea of plastic surgery, royal new breed of nouveau riche. These are the people and that makes it easier for people to opt for such who are always trying to find new ways to splurge. procedures. Plastic surgery is just one of them. There are 52 June / July ’08 women who yearn for pouting lips like Rekha and plastic surgery on private parts there are men who desire dimples like Shahrukh It is James Bond, who is credited with the Khan. No problem! If you can afford the services line, “Diamonds are forever,” but so are breast of a proficient plastic surgeon, then enhancing implants and they are about as coveted. More your image by adding a pout or a dimple becomes and more women are going under the knife to
  • 53.
    surgically attain thatperfect eye catching enhancement! You won’t believe how many people size. According to one report, doctors in India and in rest of the world are looking for a in US performed about 329,000 breast way to increase the size of their tool. Clearly, when augmentations in 2006. Similar statistics it comes to sex, size does matter! do not exist for India, but the number of As with other forms of plastic surgery, penile operations are growing at a feverish pace enhancement too can be conducted at a much and there might come a time when this cheaper rate in India. But the surgery is not as country might become the plastic surgery trivial as it might seem. The procedure involves capital of the world. the cutting up of the suspensory ligament in It is not as if only older females are the penis and it requires extensive after-care, going in for such procedures. Age is which includes a regimen of hanging weights off clearly no bar. About three years ago, your tool. But there are many who feel that any the news made headlines when a 15- procedure that promises to make them hung like a year-old British girl decided to get breast porn-star is worth all that trouble and effort. Some implants for her sixteenth birthday. men also go in for fat injections to increase the Cosmetic surgery, once the exclusive girth of their penis. Testicle implants and scrotum domain of wealthy older women, is now reductions are also not unheard of. becoming the trendy new option for any teenager with an adolescent hang-up. The Where Curves matter most enormous popularity of reality TV shows If you want to ogle at a really prefect body, such as Extreme Makeover, The Swan and you have to be in Brazil at the time of Samba MTV’s I Want a Famous Face, has played carnival. It is an unforgettable sight - high- an important role in fueling the desire energy samba dancers gliding down the The most common of adolescent girls to alter their bodies avenue in five-inch high heels, their bare permanently. stomach topped by an ample bosom, the like procedures that Plastic surgery is also being used of which you might have never seen before. men go in for to improve sexual performance in the bedroom. Many medical practitioners It is quite common for samba dancers to go under the knife to perfect their body. The are - liposuction, are finding themselves swamped by famous dancer, Angela Bismarchi, has had nose reshaping, requests from women who want to go in 42 different plastic surgeries done. In fact, eyelid surgery, for procedures that call for nipping of the she is already the Brazilian record holder for inner labia, plumping of the outer labia, the most cosmetic surgeries. Of course, she facelift and tightening of the vagina and even restoration of had a breast implant, how else could she get Botox injections. the hymen, the little membrane that breaks during first intercourse. In certain parts of the world, the a bosom of that unbelievable size. But the place where almost everyone But there will hymen is still considered to be the ultimate proof has had a plastic surgery procedure done always be those of virginity. There will always be those who want to keep reclaiming their virginal status, hence the is certainly Hollywood. Demi Moore is 43 years old, and yet she looks a decade or who want to try popularity of hymen surgery. The procedure of two younger, all thanks to the extensive something that is “vaginal tightening,” which entails firming up of procedures that have been done on her truly unique. the outer ring that leads up to the vagina, is also magnificent body. Tara Reid had a horrible quite popular. experience with breast enhancement. She went to the clinic to get B sized breasts, men Jump on the Beauty but the surgeon accidentally stuck Cs in her. Bandwagon Unfortunately, the media went crazy and stated While women still enjoy the distinction of having that Tara only did that for publicity. Cindy the most procedures done in India and abroad, Crawford has already admitted to taking recourse men also are getting on the beauty bandwagon in to plastic surgery and so has Lindsay Lohan. a big way. Well, why should it come as a surprise When Bollywood starlet, Rakhi Sawant was royal June / July ’08 that men want to be attractive and youthful quizzed by the inimitable Karan Johar, on his too? If anything, both sexes are motivated by a show Koffee with Karan about reports of her similar desire to look young and attractive. The getting breast implants, she flirtingly replied, “Jo most common procedures that men go in for Bhagwan nahin deta, woh doctor deta hai” are - liposuction, nose reshaping, eyelid surgery, (What God doesn’t give, doctor gives it). It takes facelift and Botox injections. But there will always guts to come clean in Bollywood, but Rakhi has be those who want to try something that is truly what it takes. The rumor mills have it that Shilpa unique. Welcome to the brave new world of penile Shetty had a nose job done, and so has Koena 53
  • 54.
    Mitra. With therise in popularity of Botox and silicone implants, it is getting hard to tell a real beauty from a fake one in Bollywood. In Rakhi Sawant’s case, she has not only admitted to having a boob job done, she also revealed that she would remove her implants to participate in Nach Baliye 3 contest because implants obstruct her dance movements. But it is not just Bollywood women who are resorting to such tactics for enhancing their appeal. There is a spate of rumors about Salman Khan having resorted to hair implants to take care of his thinning crown. Many aging superstars are great aficionados of face-lift and Botox injections. How else can they have shiny, wrinkle-free cheeks at the age of 70? Benefits and Risks Like all things in life, plastic surgery too has its share of pitfalls as well as benefits. The most common procedure is clearly breast implants. Breast implants have helped scores of women around the world to develop self-confidence by augmenting the size of their breasts. But women who go in for such procedures need to understand the risks that the implants can pose and the long-term maintenance that they require. Breast implantation is not necessarily a one-time surgery. In fact, statistics show that roughly one third of women who go in for implant surgery for cosmetic reasons or for reconstruction after breast cancer have a second operation within four to five years. There is no dearth of people who go in for a nose job, and when they venture into the society with a brand stretched too tight. In Hollywood it is possible to find old film new nose, they find people saying, “Hey, you don’t look like stars who walk around with a look of constant amazement on yourself.” Not all criticism is subtle, especially from those who their face. That is because their face-lift has been overdone. believe surgery has robbed someone Sometimes it seems that the surgeon has of an endearing feature or rendered As far as positive pulled the skin so tight that they cannot him or her almost unrecognizable. It is even close their eyes. Extra care needs always a good idea to do a full research impacts from plastic to be taken in case of teenage girls and before going in for an operation, surgery are concerned, boys, who tend to be both obsessed and because once the procedure gets done, dissatisfied with their looks, and are too it is lot more complicated to undo it. So, it is highly beneficial young and shortsighted to understand if you’re considering cosmetic surgery for people who are the implications of surgery. you need to ask yourself what you hope to achieve, because it’s not going consistently tied to a As far as positive impacts from plastic surgery are concerned, it is to be the one magic solution that makes negative focus on a highly beneficial for people who are everything better. It can even change particular facial feature consistently tied to a negative focus on you for the worse, like what happened a particular facial feature or body part. to John Mullins who was inspired by or body part. An operation may turn out to be the royal extreme makeover TV shows to go in best way to fix low self-esteem, but you for surgery. He was not even aspiring to look like Brad Pitt, need to have realistic expectations. You should not be going in all he wanted was a face-lift, a small nose job and a few nips for plastic surgery merely because your girlfriend or boyfriend 54 June / July ’08 and tucks. But, eighteen operations later Mullins is horribly thinks that you would look much better with a nose or chin job. scarred. He has ended up in a hospital in excruciating pain Going under the knife has to be a deeply personal decision. If from vascular and circulatory problems and a pseudomonas you really think that surgery will improve your social standing, infection. your career prospects and self-confidence, then go for it. Even ordinary face-lift operation can go bad if the skin gets Otherwise learn to accept yourself the way you are. n
  • 55.
    grooming fashion Pangea Facial Cleanser Rs. 1000 Usher Deodorant, Shower Gel & After Shave Soother Starting at Rs. 1000 Redken Mint Clean Shampoo Rs. 700 Lucky Tiger Essential Grooming Kit Rs. 2900 royal June / July ’08 Pangea Shower Gel Rs. 550 55
  • 56.
    fashion bags hugo boss bLack coLLection Leather bags rs. 12,000 dieseL despatch bag rs. 7,800 Linea canVas bag rs. 4,000 beLkin Leather sLeeVe for Macbook air rs. 2,000 ted baker Vintage Leather bag rs. 10,000
  • 57.
    AZ By shaheen raaJ It is impossible to miss to Kareena Kapoor these days and why would anyone want with to. Movies, billboards, commercials, Kareena Kapoor and magazines, Kareena is everywhere. Bollywood has lapped her up and her fans can’t have enough of her. Her career is at an all time high. With Saif Ali Khan in her life, it is safe to assume that her love life is doing even better. In this exclusive interview she divulges the A to Z of her personal and professional life. Acting I have a very chequered career and a jolly good roller-coaster ride from J.P. Dutta’s Refugee to Imtyiaz ali’s Jab We Met & of course yash raj films Tashan. I think I have proved my worth and royal June / July ’08 carved a niche for myself. Today, I can safely say that I am a good and reliable actress. They call me STar, but to very modest I think I am yet to attain that status. But, I will one day. Wish me luck! Bebo My pet name since childhood. on this score I would describe my personal traits. I am lively, bubbly, headstrong, impulsive, sensitive and vulnerable. I get hurt easily. I hate being rubbed the wrong way, you know what I mean. 57
  • 58.
    high. With love I can do anything, without it, I get depressed. I hate being emotionally I hate being taken for a ride when I am deeply in love with blackmailed into any kind of someone. I was in love once and now I am in love again. Hope I can be in love forever. relationship, be it in my family life or my own private and Joy personal life. The joy and happiness that I share with my family, my friends, my relatives, my three best film industry friends amrita arora, esha Deol and Konkana Sen Sharma. It also happens on my shoots when I spend my precious moments Comedy with my directors, costars, unit people like the technicians, The word itself tickles a funny bone in me. I think I do have a the make up dada, the junior artists and dancers and above streak for comedy in me. I also have a good sense of humor. all the spot boys. after working with Priyadarshan sir in Hulchul and Chup Chup Ke and with Imtiyaz ali in Jab We Met I think I can call myself a Khandaan Comedy Queen. I am proud of the comic flair inherent in me. obviously the Kapoor Khandaan, the first such a big family of Bollywood. I am proud to be the scion of such an illustrious Don and talented Kapoor family. The Kapoor heritage right from not as in the film, but I was elated doing Helen auntie’s song my great grandfather the late Shri. Prithiviraj Kapoor to the Yeh Mera Dil Pyar Ka Deewana in Farhan akhtar’s Don and also latest entrant my cousin ranbir Kapoor has indeed been for sharing the stage with her for the same song in one of the very remarkable, a noteworthy milestone in the annals of awards ceremony. I was on cloud nine when she appreciated the golden history of Indian Cinema. my dancing skills and blessed me on stage. Lolo Emotions My sister Karishma. My guide, my mentor, my philosopher, I am an emotional fool. I get emotional very fast. But, I hate being my soul, my love, my inspiration, my source, my force and emotionally blackmailed into any kind of relationship, be it in my my best buddy. I can go on and on but I am running out of family life or my own private and personal life. words. Fans Movies I love to keep in touch with all my fans. I interact with them I don’t know what I would be if I was not an actress. Perhaps I through my fan mails, my blogs and smses. So what if I have was destined to be one because the profession of acting runs had some unpleasant experiences in India and abroad. But there have been some pleasant memories too. I am what I am today because of them sounds clichéd to me, but it is true. God promise! Girlfriends Seriously no jokes! I have my own set of girlfriends since my childhood, school and college days. We still meet whenever I am free, go out on dates, long drives, discotheques, pubs, candlelight dinners. I just love to freak out with them, have a blast and paint the town red whenever I can. Home ahhhh! Home sweet home. I just love to be at home with my mom. now that lolo is away in her own sasural, I am the only person who gives company and I don’t know what I would royal comfort to my mom. I wish I could do that often enough. So when I am unable be if I was not an actress. to do that I just force her to accompany Perhaps I was destined 58 June / July ’08 me to my overseas shoots. to be one because the In love profession of acting runs I relish the idea of being in love every second of my life. It gives me the greatest in my family’s genes.
  • 59.
    be daring enough to face all the pitfalls, the highs and lows, the ups and downs. Roles in my family’s genes. So here I would yeah! I have done all kinds of roles till date. yet I am still waiting like to list my favorite and forthcoming to get a chance to enact my dream role. no I can’t tell you now. movies. out of the twenty six films that I want it to be a surprise for one and all. have been released till this date I would like to make a mention of ten of them as Someone Special follows in reverse order - Jab We Met, There was someone special in my life then and there is someone Omkara, Bewafaa, Hulchul, Aitraaz, Fida, special in my life now. yes! Saifu has come in my life at a very Khushi, Chameli, Asoka and my debut special juncture. He has made me come out of my pits of movie Refugee. While my forthcoming depression. He has done so many special things to proclaim his movies in ascending order are Tashan, love for me. He has even accepted our relationship openly on a Kambakht Ishq and Golmaal Returns. television channel during a fashion show. But I don’t know what’s happening on the front of my other under production Trophies movies like Lajjo, Milenge Milenge and I 5 Filmfare trophies for Refugee, Chameli, Dev, and Omkara and think Kismet Talkies too. the last one also got me the critic’s award too. But my most memorable award is the ‘Queen of Hearts’ trophy I received Number from Kareena Kapoor Fan’s association. I hate being labeled with a number. I am not in the race to be the number Uncle one heroine. I have been appreciated as I still remember and cherish the fond memories of my uncle the a good and successful actress. I would late Sri raj Kapoor Sahab. He loved me too much. I was very love to be appreciated as a good and close to his heart. Whenever we met we used to be so happy successful STar. I hate being rated as with each other. an actress too. I am not an underrated actress. I am not an overrated actress. I Voice over am just a talented actress. That’s it. I have done playback singing for films like Dev and Kabhie Khushi Kabhie Gham but for the first time I will be doing a voice over Performance for an animation film called Roadside Romeo. Just wait and watch I was on cloud nine when I got a lot I can’t tell you more. of critical acclaim for my performance as Dolly in Omkara and as Geet in Jab Wedding Bells We Met. I am so glad that both these yes! He has proposed to me in his own unique style. yes! I performances were considered as have accepted it. We will make an official announcement of our outstanding by my fans and even wedding date soon. hardcore critics. I consider these as the best compliments of my life. Xmas We will celebrate Xmas and new year’s eve together Question mark and………the rest is all a secret. What can I say? life is always a question mark at every crossroad. So we should Year 2007 was good but in the end…I was heartbroken. 2007 also helped me to find my true love. 2008 will bring in a lot of joy and happiness in its wake both on the professional and the personal front. I am sure it will be a rocking year for both of us. Zeitgeist royal June / July ’08 I forgot to make a mention of Zoya akhtar’s untitled film and the special appearances item numbers that I have done in movies like Don and Kya Love Story Hai. I mean ours! Hai na? n 59
  • 60.
    Fernanda Ferrari T he exotic, curvaceous and long-limbed beauty, Fernanda Ferrari, is barely 21, and yet she has managed to make a name for herself as Brazil’s freshest gift to the world of modeling. When she is executing spunky poses in lingerie that reveals much more than it shields, she seems to be at her enchanting best. Guys find it impossible to resist her charms, but getting an eyeful is not a problem as she has a penchant for showing off her luscious body.
  • 61.
    FernandaFerrari You carry Brazilianas well as Italian yet to come! Someday I would like to appear in a genes inside you. How did that happen? Bollywood film where I get to wear a traditional My father is Italian and my mother is Brazilian. Indian dress. That is something I am extremely Brazil is a big melting pot of people from different keen on. Don’t you think I will look really good cultural backgrounds; we have every kind of mix. with all that jewelry and mehndi henna body art? From Afro-Brazilian like the football legend Pelé to blonde German like Gisele Bündchen and to We’re getting goosebumps just thinking someone like me. about it. So, what’s the inspiration that drives your career? Do you harbor a desire to move from I can’t help but be inspired by older Brazilian modeling to acting? Are you familiar models like Gisele Bündchen and Adriana Lima with the Bollywood industry? or people who changed the world like Nelson When I was hosting the ZEE Cine Awards someone Mandela and Mahatma Gandhi, but I think the did ask me if I was interested in acting. If the person who inspires me more than anyone else is right kind of offer came along I would be game my mother. She is the one who got me to enter the for it. I am a lot more familiar with Bollywood beauty contest in my hometown. She has always after doing the awards ceremony, which was quite supported me. Everything I am today, I owe it a spectacle. I think Aishwarya Rai Bachchan is to her. So guys if you like my pictures thank my simply gorgeous. mom! What do you consider your greatest achievement till date? vitals I did win a certain bikini contest, probably the biggest in the world, but I don’t want to rest on Bust 34 my laurels. I think my greatest achievement is Waist 26 Hips 36 Birthplace Sao Paulo, Brazil Birth date 14/01/1987 Height 6 ft. Weight 65 kg. Website www.fernandaferrari.com I did win a certain bikini contest, but I don’t want to rest on my laurels.
  • 62.
    You have alot of runway Have you ever been stalked by experiences. What’s the most a fan? How do you tackle such embarrassing thing to happen obsessive types? to you on stage? I have never had to deal with an actual I was participating in New York Fashion stalker. But as far as real fans are Week when one of my boobs popped concerned, I am very appreciative of out as I was turning and I didn’t even them. Obsessive is a relative term. If notice. It was definitely embarrassing, my fans like me a lot, I would prefer to but I can take solace from the fact that take that as a compliment. My page on such incidents have happened with MySpace is full of lavish compliments other models as well. from scores of fans. Check it out. What’s your sexiest feature? I think that depends on whether you are a breast man, a legs man or an ass man. I have all three. As far as my own opinion is concerned, my sexiest feature could be my overall figure and more specifically my butt, which is quite shapely. You mention that people love your body, have you always had such a great body? When I was younger, I used to be very tall and skinny, so boys used to taunt me with names like “Olívia Palito” which is Portuguese for Olive Oyl, the wife of Popeye in the famous cartoon. But when my figure filled up, the same boys became extra courteous and they started begging me for a date. After I had won my city’s beauty pageant I became quite popular. People started calling me “The Miss.” At my home in Brazil I still am “Miss” to those who know me. royal 62 June / July ’08
  • 63.
    FernandaFerrari My sexiest feature could bemy overall figure and more specifically my butt, which is quite shapely.
  • 64.
    FernandaFerrari What’s the weirdest email or message you ever received from a fan? I can’t think of anything in particular. If a message or email is too weird for me then I’ll just delete it. Also it’s not humanly possible for me to read every message because I get so many of them. Describe your ideal man? I like guys who are rugged and strong. Someone like Akshay Kumar, who I think is simply delicious. Which Hollywood star would you love to share a steamy scene with? I would go for George Clooney. I am a sucker for older guys, though I am still quite young, and so most guys are older than me! Tell us about the most seductive line any man has ever said to you? I get quizzed about my marriage plans all too often. But such proposals don’t work with me! In my opinion what a man doesn’t say is possibly more seductive. To be really effective a man should be able to communicate through subtle gestures. Guys who talk too much turn out to be just that - all talk and no substance. At 6 feet tall you’re taller than the average Indian. Would you ever date a guy shorter than you? I think if you asked any fashion model they would probably say that they are used to dating guys who are shorter than them. It is quite normal to date shorter guys. In fact, all my boyfriends have been shorter, especially when I wear high heels, then I am really tall, but I tend to wear those only on special occasions. I think Akshay Kumar is an ideal man. Photo courtesy of James Shubinski
  • 65.
    Do you consideryourself to be a party animal? I don’t go to that many parties, unless it’s work related. I don’t drink alcohol, so all I do at parties is dance. You’ve traveled a lot. What’s your favorite place to get romantic and relax? When I think of romance and relaxation, the flamboyant beaches of Brazil always come to my mind. The pace of life is very relaxed at the Brazilian beaches - just the kind of place to make romance blossom. Have you been to India? In Asia, I have been to Singapore, Hong Kong, Mongolia, Taiwan and I will be going to Dubai soon, but somehow I have not been able to visit India yet. Once I was offered a job to shoot for a film that would have had me traveling through India’s most scenic spots, but I missed out on that offer as I was already booked. If you were to create a headline about your sexual behavior what would it say? Hot Italian Passion meets Latin Fire - I may be quite demure on the outside, but underneath I am as passionate and as hot as my heritage would suggest. n
  • 66.
  • 67.
    I may bequite demure on the outside, but underneath I am as passionate and as hot as my heritage would suggest.
  • 68.
    Gallardo LP560-4 The vehicle is extremely wide and bonded to the road surface, so it does not matter how fast you drive, the Gallardo will always keep its balance. B urning with a desire to feast your eyes on the most stunning piece of luxury on wheels, then check out the Lamborghini Gallardo LP560-4. The car is so unbelievably beautiful that it might inspire you to go down on your knees and plead for a date. But beauty is not the only thing that the Gallardo scores in. Its sexy shape packs a state of the art 5.2 litre V10 engine that can ejaculate an output of unbelievable 560 PS (412 kW) at 8000 rpm. As a result you have the ability to break 100km/h in 3.7 heavy back-pressing seconds. At top speed the car is capable of going at 325km/h. The vehicle is extremely wide and bonded to the road surface, so it does not matter how fast you drive, the Gallardo will always keep its balance. The large cooling intakes in front of the car and the low positioned front spoiler between them, impart the car with a kind of menacing appeal. It comes with a permanent four-wheel-drive transmission and a vastly improved suspension design. The optimized aerodynamics and a weight reduction of about 44 lbs make the car about as agile on the road, as a panther in the savanna. An added plus comes from the carbon-ceramic-disc braking system and a futuristic looking Bi-Xenon-LED symbiosis headlights system. The interior fulfills the promise of luxury and comfort. The sports seats are positioned very low, as is the norm in all sports cars, and are draped in the finest quality leather. The control panel, handbrake and the gear-stick surrounds are built from carbon fibre. Gallardo royal 68 June / July ’08
  • 69.
    allows you enoughroom to individualize the interior by opting for different colors and designs. There is a wide middle console that accommodates the versatile Lamborghini multimedia system as well as the air conditioning, which can be regulated from both the driver and passenger sides. The cockpit, embellished with seven rounds of instruments, can provide all sorts of data that can be useful while driving. Start saving your rupees today because this baby will cost more than the average home. n royal June / July ’08 69
  • 70.
    Suzuki ConCept Kizashi 3 W hen you reflect on a dynamic athlete in motion, your mind gets filled with the imagery of a strong honed physique capable performing marvelous feats of endurance. Now try to translate that imagery into the field of cars. That would be exactly the kind of impression that Suzuki’s Concept Kizashi 3, with its perfect shape and superb performance, will make. Kizashi in Japanese means prelude. How accurate the name is! The moment you set your eyes on this great looking car, you realize that the Kizashi 3 is a prelude to a futuristic way of traveling. It is so far ahead of competition. The vehicle’s immaculately engineered body evokes a feeling of capability, refinement, as well as raw power that flows from a 3.6-liter DOHC V6 engine with plated cylinders. There is absolutely no attempt to hide the vehicle’s power; the hood and the body are designed with a kind of menacing appeal that is quintessentially macho. Measuring in at 183.1 inches in length, 74.8 inches in width, 57.1 inches in height and with a wheelbase length of 110.2 inches, Kizashi falls in the category of a large vehicle. The body, finished in monochrome and sparkling with metallic paint, Kizashi Silver, imparts the vehicle a sense of composure and depth of character; if anything, this is the kind of sex appeal that makes both men and women stare in awe. Furnished with plush leather, top-notch accessories and a state of the art audio system, this concept car turns out to be as perfect in its interior as its exterior. In India, Suzuki is famous for its Maruti brand of cars, but the future will always belong to cars such as Kizashi 3. The body is finished in monochrome and sparkling Kizashi Silver metallic paint. Price - TBA
  • 71.
    Capable of scorchingthe tarmac at 150 mph (240 km/h) and extreme cornering. Yamaha T he 599cc Thundercat stands and rides with an aggressive posture that clearly makes it fall in the category of an alpha macho sports bike. It is comfortable to ride and it looks and sounds great. In other words, this is the kind of bike that you need to take care of all your transportation needs. Powered by an inline 4 cylinder engine and 90 bhp (67 kW) the bike is best suited not just for long rides across windy highways, but also for inner city travel. Even though it weighs a hefty 417 lb (189 kg), it is still capable of scorching the tarmac at 150 mph (240 km/h) and of extreme cornering. The large one piece seat is ergonomically shaped to let you ride for longer periods without being plagued by pain in your back or neck. The frame, made out of steel, makes the bike rather sturdy. Suspension is fully adjustable and for braking there is the state-of-the-art Sumitomo One that is extremely effective, whether on racetracks or on ordinary roads. If you really want to go in for a proverbial ‘All-Rounder’ then this Yamaha YZF-R6 Thundercat is very much it. Comfy, fast, reliable, economical and really nice looking, we’re getting goose bumps just thinking about it. royal June / July ’08 Price - Rs. 4 lakhs 71
  • 72.
    The artificial intelligencein TNA Impact is advanced enough to allow you to choose your wrestling style, customize your moves and decide what kind of clothing you prefer the ultimate champion to wear. But the best aspect of the game lies in the fact that it features some of the topmost TNA superstars. If you have ever had the fantasy to get into the ring with superstars like Kurt Angle, Jeff Jarrett, Rhino, Samoa Joe, AJ Styles, Sting, Christian Cage and Abyss then this game is a dream come true. Price - Rs. 2,400 A frenetic style, a quick pace and a series of high-flying moves make it seem as if you are actually in the ring wrestling for your life against a fearsome foe. Of course, this is only a video game, but the bedlam is so excitingly real. Wrestlers can jump up and try to crush their opponents, they can fly and hit from the side with a resounding impact. There is just so much of heated action going around that you hardly have time to breathe. All you can do is keep playing your best game as it skyrockets towards an adrenalin pumping high. choose which Nintendo characters they wish to race as. Best thing is that you can even play as yourself. Imagine the delight of racing in an unpredictable cartoon world as Mario, Luigi, Peach, Yoshi, Donkey Kong, Wario, Bowser, Toad, and a host of other W hen you have an obsession with speed then you have no alternative except to viciously random cruel streak. But beneath the veil of bedlam there new faces including your own! Pick up an avatar and let the battle to win royal keep searching for every inch of space lies a deep, precise, and Mushroom Kingdom’s on the track so that you can go faster technically rewarding most prestigious racing and faster. That is the kind of thrill that racing game that you can 72 June / July ’08 cup begin in earnest. Plenty of Mario Kart packs amidst its classic afford to play for hours without power-ups and oodles of objects for confusion and slapstick chaos. Intense, even a whiff of ennui ever touching players to slow down other drivers only addictive and powerfully exhilarating, you. add to the excitement. this game has all but perfected the art Like in most Mario games, in Mario of blending cartoon foolishness with a Kart players too enjoy the freedom to Price - Rs. 2,000
  • 73.
    D eveloped in collaboration with master film director Steven Spielberg, Boom Blox, is all geared most entertaining. The best thing about the game is that it allows players to remix any level in Create mode using to bring you a unique fun-filled family props, blocks, or characters that have game. The game basically consists of a been unlocked during the game. It is series of puzzles that allow the players also possible for you to build anything to throw objects at towers made of that is straight out of the realms of blocks. The ultimate goal is to send your imagination. The really visceral these towers crumbling. It may sound game play turns out to be perfectly easy, but once you start playing, you suited for the Wii’s interactive motion- find that the game is quite complex sensitive controls. and there are over three hundred levels that you can conquer. An easy to use game editor is just the right recipe to inspire your creative juices to flow in torrents. There are brain-twisting challenges galore. You interact with amusing characters such as the block-laying chickens or baseball- throwing monkeys prancing across four themed environments. In fact, there are more Price - Rs. 2,000 than 30 characters amongst which Tiki, Medieval, Frontier, and Haunted could rank amongst the MAss EffEct A stellar presentation and fantastic special effects make Mass Effect one of the best galactic adventures in the market today. Definitely the kind of game that will have players pining for more. It does not even matter if you are a less experienced player or a longtime gamer, Mass Effect deftly combines accessibility and challenge, all wrapped up in a package that’s both deep and addictive. You play as Captain Shepard and your job is to indulge in all kinds of nail biting adventures till you manage to save the galaxy from imminent destruction. The universe is full of a variety of colorful species; some of them are good while others are highly malevolent. As the compelling storyline rushes towards a rocking climax, Captain Shepard has to tackle the treacherous enemies on whom he must unleash savage vengeance. But there are heroic allies to help him accomplish his mission. The artificial intelligence in the game is fairly advanced and all the decisions you make while playing as Captain Shepard has strong bearing on the outcome of the game itself. If you are playing as a female, then some characters will deliver a different dialogue. royal June / July ’08 Audio is also excellent, thanks largely to the top-notch soundtrack that incorporates voices from Hollywood actors such as Seth Green, Marina Sirtis, Lance Henriksen and Keith David. If you are familiar with the seminal game, BioWare’s Star Wars, then the action packed progression of Mass Effect will probably seem quite familiar to you. Price - Rs. 2,400 73
  • 74.
    B ased on the legendary MMOs EverQuest® (EQ) and EverQuest® II (EQII), the Legends of Norrath has always enjoyed an immense fan following, and the advent of graphic rich Inquisitor is only going to add to its popularity. The game packs avant-garde excitement with stunning new card art, fresh loot and fierce new enemy encounters. It is easy for players to get wooed by fascinating characters like Monks, Enchanters, Inquisitors and Bards. You can build your best deck and test your skills in monthly Championship Qualifier Tournaments that dole out prizes ranging up to $1,500. With the new version you will still be able to experience all the previous features of Legend of Norrath. The 4 primary Archetypes of cards: Priest, Mage, Fighter, and Scout are there and each Archetype continues to have the ability to create a deck along a Light, Shadow or Neutral path. Where the Inquisitor scores is by adding 250 astonishingly beautiful cards and more than 20 new loot items each for EQ and EQII. The result is that the new version of Legends of Norrath has now become wholly reinforced as a complete online card gaming experience, where it can feature numerous casual and tournament game lobbies with three exciting tournament formats. Price - TBA A n adventure on high seas means an encounter with a ship full of swashbuckling pirates. Canon fire spewing from the portals of mighty ships, swords and cutlasses flying through the air as people fight for their lives, and to top it all there is the search for hidden treasure! Pirates of the Revolution is a game that promises adrenalin pumping excitement and stands out by introducing new and powerful Spanish, English, French and pirate ships along with colorful heroes and villains. In fact, there are as many as 65 different ships in the fray, each ship populated with its own cast of crews. There are 14 different treasures that you can find and five different forts that you have to capture. The weapons are explosive and it is possible for you to set fire to rival ships. You can even use mythical weapons such as the Neptune’s trident to send your opponents into a bottomless abyss. Destruction is not the only thing you can do, you can also get creative by building your own ships. But the best aspect of the game lies in surprising your unsuspecting opponents royal with powerful new tools such as Divers, Foul Winds and the ever-popular Mermaids. Characters from history 74 June / July ’08 mingle with the most abject villains ever to sail the seas, including the famous American John Paul Jones. Developed by Sony Online Entertainment. Price - TBA
  • 75.
    SimCity Societies Destinations visitors enjoy. There is an enhanced map generator, through which players can identify each city’s opportunity for diversion and the city can capitalize on M ost video games are about destroying rather than creating. They are replete with marauding monsters, blazing and nightclubs, there is so much you can develop in this game. SimCity Societies Destinations is packed that draw. There is enough room for psychological power play in this game as well. You can guns, martial art fights and all kinds of with tools that you may need to get get your Sims to challenge authority and mayhem. Simcity Societies Destinations your lust for creation into overdrive. experiment with what happens when stands out by offering a different kind of The thrill and excitement is all yours as citizens flagrantly disobey power. Sounds entertainment, one that appeals to your skyscrapers start rising up from empty like India!. After all, who doesn’t want to creative instincts. In this game you can land. Roads and superhighways get disobey pesky orders from the powerful create an entire city, instead of blowing built and traffic starts flowing smoothly elite? up one. From sprawling theme parks and on them. Factories come up and so do tropical beach resorts to lavish casinos myriad attractions and amenities that Price - Rs.1,200 G etting into the nitty-gritty of evolution can be more exciting than you might have ever imagined, especially if you are able to build an entire civilization in a matter of hours. And what about building an entire galaxy or the universe itself? If you have ever caught yourself the ocean and evolve into land-based creatures. yearning for the almighty powers of God, then Are they going to be carnivore or herbivore! Spore presents an entertaining opportunity Will they be social or independent! You get to to experience the thrilling zeitgeist of being decide that. Then many of the creatures develop omnipotent. intelligence to form mutually dependent societies. Your odyssey begins at the dawn of life, when You provide them with tools with which they can the Earth is replete with sub-microbial be creative. You watch with joy as your creatures creatures that are struggling to survive. develop the intelligence and the tact to build entire You help these creatures evolve into cities and nations. royal June / July ’08 more advanced beings, but that leads But with the planet broken up into different nations to an exciting struggle for survival with can war be far behind? Of course not. Your goal is other advanced creatures that other to annihilate the rebellious nations and unite the players may create. There is survival planet under a singe government of your choice. of the fittest at the most microscopic Filled with excellent graphics and an artificial level, with the players wielding the intelligence that is far ahead of its time, Spore is a power to tilt the verdict in favor of their game of such massive scope that you will want to preferred creatures. keep playing it. 75 Inevitably the creatures emerge from
  • 76.
    T his game rocks, quite literally. If you have ever harbored a secret desire to be a mesmerizing guitarist and a pop idol, here is your chance to have your fantasy fulfilled within the realms of a video game. Guitar Hero III enables you to strum your way through all kinds of venues - from hole-in-the-wall bars to sold-out stadiums. And if you opt to play in the new multi-player action inspired battle mode, then you get transported into a world of exciting rock venues, where you can even compete for the title of the world’s most legendary rock star. The best part of the game comes from the incorporation of new song tracks. It is now possible for you to download content from multiple platforms. Some of the featured hits include all time favorites like- Rock And Roll All Night (as made famous by Kiss) School’s Out (by Alice Cooper) Cult of Personality (by Living Colour) Barracuda (by Heart). All you need now is to find some groupies! Just don’t wake the parents.
  • 77.
    NEW enTerTaInMenT RELEASES Cast: Arshad Warsi, Diya Mirza, Irfan Khan, Rajpal Yadav, Suresh Menon, Rajat Kapoor, Zakir Hussain, Juhi Chawla Director: Jaideep Sen Producer: Rakesh Roshan Music: Rajesh Roshan Lyrics: Javed Akhtar O ne thing is for sure, after seeing this movie, you are going to emerge from the theatre with a big smile on your face. The movie is a laugh out loud comedy. The film is about four crazy guys who are being treated by an extra-sensitive doctor by the name of Sonali (Juhi Chawla). The four crazy guys happen to be Irrfan Khan, Arshad Warsi, Suresh Menon, and our personal favorite Rajpal Yadav, who manages to make us laugh in every movie he acts in. There is no end to the ways by which a man can prove that he is crazy. So you can expect the protagonists of Krazzy 4 to display unique idiosyncrasies. There is Raja (Arshad Warsi) who is very short tempered. Dabboo (Suresh Menon) can hear and understand but doesn’t talk even though he can. Gangadhar (Rajpal Yadav) believes he krazzy4 is a freedom fighter from Gandhi’s time. Then there is the inimitable Dr. Mukharjee (Irfan Khan) who is always losing himself one way or the other. Additional entertainment value comes from stylish item numbers by Hrithik Roshan, Shahrukh Khan and Rakhi Sawant. DVDs of the Month over her dead body Flight oF the living Starring: Eva Longoria Parker, Paul Rudd, Lake Bell, DeaD, outbreak Lindsay Sloane, Stephen Root Director: Jeff Lowell on a Plane T his movie has all the ingredients for a romantic comedy (read chick flick) so it’s best viewed with a girlfriend or wife. Paul Rudd plays the role of the inimitable Henry who is a Starring: David Chisum, Kristen Kerr Director: Scott Thomas bumbling veterinarian and deeply in love with his bossy fiancée Kate (Eva Longoria). The movie takes off when they get married and are preparing for a gala reception to which all their friends and relatives are invited. Kate is busy delivering orders to a team D ead can be more interesting than the living, especially if it is a Hollywood film. The corpses are of caterers, when the angel ice sculpture arrives without wings. back and they are ravenous for a But Kate won’t tolerate such a transgression, she picks up a huge mouthful of meat. Flight of the Living fight with the sculptor and in the ensuing commotion the heavy Dead: Outbreak on a Plane turns out ice maiden falls on her sending her on a non-stop journey to to be yet another rendition of the heaven. famous living dead genre that enjoys Henry is devastated by her death, but the best thing is that even cult following around the world. This in his devastation he manages to conjure enough lighthearted time the corpses come to life inside moments that will keep you laughing all a plane during mid-flight which gives no one the option to run. The the way. He refuses to see any other passengers have to fight or die. woman, as he can’t bear the thought A routine flight between Los Angles and Paris turns into a nightmare of betraying Kate’s memory. An year due to the doings of a renegade group of scientists who smuggle passes by, before his concerned sister abroad a corpse infected with a genetically engineered virus capable royal June / July ’08 arranges for a psychic called Ashley to of reanimating the dead. In mid-flight the aircraft encounters massive tell him that Kate would have wanted turbulence and in the ensuing commotion the dead body gets released him to date other women and move from the cargo hold. The living corpse that gets released attacks others forward. One thing leads to next and in the plane creating many more zombies. it ends with the psychic (Lake Bell) The uninfected passengers and crew must fight for their survival aboard falling in love with Henry. But Kate is the plane. To make matters worse the zombies have superhuman watching from heaven and she is not abilities. They can sprint and leap over long distances and are very prepared to let Henry be seduced. Her durable; in fact, in one thrilling sequence a zombie manages to survive ghost arrives to wreck havoc on Ashley despite being thrown into the plane’s engine. Talk about a flight from 77 and that’s when the real fun begins. hell! Better fly Kingfisher next time.
  • 78.
    St. James’s Club N estled amidst pristine landscape of a 100-acre peninsula, which is gently lashed by waves of a deep cerulean sea, the St. James’s Club is Antigua’s prime holiday destination. If you are looking forward to spend time in a place that is truly sophisticated and majestic, this is where you have to be. The property boasts of many superbly landscaped tropical gardens, and it has two beautiful white-sand beaches and four spectacular pools. But all that is in addition to the whole array of lovely accommodations, opportunities for fine dining, a proficient staff to look after your every need, and last but not the least, a casino that ranks amongst the best in the Caribbean. In keeping with its general theme of ultra sophistication, the casino at St. James’s Club is designed for a more intimate kind of gaming. The garrulous and flamboyant kind of casino experience, which is the hallmark of Las Vegas, is simply not what this place is all about. Conveniently located at the south of the island of Antigua, the casino out here is classically European in design and is quiet, rather than noisy. Despite the general ambiance of regal grandeur, the mood is absolutely lighthearted and playful. American roulette, blackjack, Caribbean poker and slot machines of different types are some of the games that can be played. If you happen to be a celebrity buff, it would make sense for you to try your luck at the St. James’s Casino. In case you were to get lucky you might win a bagful of cash and as an added benefit catch a glimpse of a celebrity or two. Best of all, you might even be able to play with them. Some of the hottest names in sports, entertainment, politics, media and royalty happen to be regular patrons of this place. Another exceptional feature is that the casino out here comes with a range of health club benefits. Even as you get entertained at the roulette, blackjack or poker games, you can pay attention to your health as well. royal 78 June / July ’08
  • 79.
    Antigua’s prime holiday destination, the property boasts of many superbly landscaped tropical gardens, and it has two beautiful white-sand beaches and four spectacular pools. royal June / July ’08 79
  • 80.
    Accommodation Restaurants and Bars A sociable club like St. James’s Club hosts a whole range of ambiance prevails restaurants that you can choose from. But before wherever you go in St. you decide to visit any restaurant, it is always James’s Club. If you better to inquire about the dress code that they choose to stay in the Club follow. Most of them follow a simple dress code Rooms then you will find that requests their guests to wear their shoes and yourself in a spacious have their bathing suits covered. But it is possible living environment to have different code for different occasions and furnished with for different times of the day. Post 6.30 PM guests excellent beds, combination are requested to wear slacks (no shorts or jeans) bathrooms (tub/shower), commodious vanities, and collared shirts in short or long sleeves (no t- dual basins, and sliding-glass doors that open onto shirts or tank tops). Female guests are advised to private balconies or patios. Then there are the wear dresses, skirts, slacks, culottes, or tailored premium rooms that are even Bermuda-length shorts (no “short shorts”, cutoffs, more spacious and their private or jeans). To really savor the joy balcony offers an unforgettable The most popular restaurant at the club happens of staying here, you view of the sea. Those who happen to fall in the category of to be the Rainbow Garden. Set amidst the resort’s tropical gardens, its spacious dining room opens have to book yourself beach hounds will love staying in the pricey private in beachfront rooms. These villas, each of which spacious guestrooms feature is developed to exude an airy floor plan and are all the charms of an ultra equipped with a private balcony luxurious residence or terrace only steps away from the famous Coco Beach. that is quintessentially But to really savor the joy of palatial. staying here, you have to book yourself in the pricey private villas, each of which is developed to exude the charms of an ultra luxurious residence that is quintessentially palatial. Each villa has two regally appointed bedrooms, plush living area, lavish bathrooms and a porch that is geared to let your eyes bask in the most pristine view of the surrounding landscape. It is possible for you to see the yachts that keep coming and going from the nearby harbor and that only adds to the glamour. These villas are a particular hit with out onto a terrace that overlooks a delightfully honeymooning couples, appointed pool. Every Monday this restaurant primarily because of the hosts live calypso music. Another restaurant that definitive privacy that offers excellent alfresco settings, right on the they offer. So, if you’re edge of tranquil Mamora Bay happens to go by looking to vacation the name of The Docksider. Traditionally it opens with someone special only after dark and offers grilled favorites such as this is the place to park fish kebabs and sirloin steaks. Specialty dishes like yourself. freshly caught lobster and prime beef tenderloin are also hot favorites with diners. Then there is the inimitable Piccolo Mondo
  • 81.
    the coastline beckonyou to indulge in all kinds of water sports. Snorkeling, windsurfing and kayaking, are just some of the non-motorized ways by which you can imbibe your dose of Snorkeling, adrenalin pumping thrill. Or you may decide to go in for activities windsurfing and like yachting, deep-sea fishing and kayaking, are just motorboat racing. In fact, fishing some of the non- expeditions organized by the St. motorized ways James’s Club are known to have by which you yielded anything from mahi mahi can imbibe your to an occasional marlin. For land buffs there are six dose of adrenalin tennis courts on which to sweat pumping thrill. it out. The body shop gym proves to be a good place to make you lose some extra flab. If you are an avid golfer then you are going to love playing at the Jolly Harboured Golf Club and the Cedar Valley Golf Club, both of which are about a 35-minutes that is famous for the fine dining experience drive away and are 18 hole courses. But the that it offers. Its sequestered hillside setting best thing about this place could be the nifty is definitely a part of its charm and so is the wedding chapel that is famous for being the creative Caribbean cuisine that it serves. Out venue for many celebrity couplings. Clearly this here you can hope to regale your palate with is the place to get married in style. All you have some deep-fried calamari, fresh lobster and to do is decide on the date and be present with grilled beef tenderloin. For more informal dining your sweetheart. Just leave it to the club to take the Coco restaurant that overlooks palm fringed care of all the arrangements. Atlantic shoreline comes as a good choice. The It is quite fitting that St. James’s Club is called Garden Patio restaurant is primarily for those Antigua’s most glamorized address. This is the who are seeking to savor their coffee or tea. kind of style that is seldom overbearing and is When it comes to bars, St. James offers most quintessentially regal in its sophisticated an array of choices. There is the Reef Deck settings and its immaculate entertainment. This Bar located by the main pool. There is also clearly is the place where you can relish the Jacaranda Lounge. If you are looking forward joys of living like a king! n to get adventurous then you must give the Sundowners at Mamora Beach Bar a try. The St. James’s Club & Villas Coco Bay Bar is built in more racy settings and www.StJamesClubAntigua.com it serves a delectable variety of food and drinks. An added advantage of these bars is that they are the kind of venues where you can expect to meet the top echelon of celebrities. You never know, but it is possible that on a particular night the guest at table next to you might turn out to be your favorite movie star. Such an royal June / July ’08 encounter is just one of the many things that can make your trip unforgettable. Activities and recreations There is just so much enjoyment that you can have in this 100-acre spread of St. James’s Club. The aquamarine waters of the peaceful seas that skirt 81
  • 82.
    Poker TournamenTs What is a l You don’t win any money there is only one left. tournament? unless you “place” in the top A tournament is just like any prize positions. Each tournament l Tournaments have a buy-in normal poker game with some will list out what positions get and an entry fee. In a normal distinct differences. paid. This varies depending on poker game, there are usually TournamenTs the type of tournament and the a minimum and maximum buy have a buy-in l First, the goal is to win number of players. in amount. The buy-in is the and an enTry everyone’s chips and the tournament prize pool, and fee. in a tournament does not stop until l Everyone starts with the same the entry fee is the “casino” or normal poker someone does so. amount of chips. This is usually “host” fee. For example, if you game, There $1,000 to $1,500 in chips. see a tournament with a $5.00 are usually a l You can win a LOT of money + $.50 buy in, $5.00 will go royal minimum and for a small initial buy-in. How l The blinds in a tournament to the tournament prize pool maximum buy much you ask? Well that change. When playing at a and $.50 will go to the “casino” in amounT. depends on the tournament. It normal poker game, the blinds or online host organizing the 82 June / July ’08 can be in the tens of thousands are constant. No matter how tournament. The average fee the though. Once all players are long you play, the blinds stay host takes is usually 10% of the registered, the pay off amounts the same. In tournaments, the prize pool fee. are usually listed somewhere blinds increase to force action within the games. which eliminates players until l A tournament can be played
  • 83.
    on a singletable or multiple tables at one hours. time. You will only play on one table at a 6. Freerolls aren’t the best place to test time, but if there are more than 10 players your skills as much as they test your luck. in the tournament they will be playing at the When people play in a FREE tournament, same time on other tables. You may even be they tend to play recklessly, but it’s free, so moved at random to another table as more go out there and have some fun! players lose all their chips. 7. Some freerolls pay out entries to bigger tournaments! More on that later. l The great thing about tournaments? For a small buy-in, you can win a LOT of money, GUaranteeD but you can only lose your initial buy-in. Try tournaments doing that in a normal poker game! Also, if These tournaments are usually multi table you lose a big hand, you still have a chance tournaments with a GUARANTEED prize to win your chips back. In a real poker pool. game, when you lose chips, you lose real 1. Prize pool is guaranteed to be a set The greaT Thing abouT money immediately. MINIMUM amount. Ex. $500 Guaranteed TournamenTs? for a Tourney means the prize pool will be a small buy-in, you can minimum of $500. win a loT of money, buT types of tournaments 2. These tournaments vary in their buy-in you can only lose your Okay, now that we have a good idea of what structure, but can be as low as $1.00 + iniTial buy-in. Try doing tournaments are, lets look at the various type $.10 of tournaments and what might be the best 3. They usually have a minimum of 50 ThaT in a normal poker for you to play in. We’ll start with the least players in order for the tournament to start game! also, if you lose a complicated type and work our way up. and a maximum of 1000 players big hand, you sTill have 4. The number of players depends on the a chance To win your sit-n-Go tournaments number of entries chips back. A sit-n-go tournament is the type of 5. These tournaments vary in amount of tournament where you sit down at the table time due to the random number of entries with a small number of players and play 6. Re-buys are usually not allowed the lower buy-in amounts. Ex. a $500 until one person has all the chips. 7. These are usually the best tournaments guaranteed tournament pays $150 for first 1. These are ONE table tournaments. to buy into. Why? Well the prize pool place which is a great pay-off for a $2.00 + 2. Usually the top 2 positions pay for is guaranteed for one. If 50 people buy $.20 entry fee. 6 player tournaments and top 3 for 10 into a $2.00 + $.20 $500 guaranteed player. tournament, the prize pool entries will only FreeZeoUt tournaments 3. These are usually quick games lasting add up to $100. The host will be responsible These are tournaments which do not allow no longer than 30-45 minutes. for the other $400 in the prize pool. re-buys or add-ons. Basically, you can only 4. They are a great way to test your skills 8. With fewer players in the game, your play with the chips you started with and are and win decent money for as little as $1.00 chances are much better to win a bigger out of the tournament when you lose them + $.10 buy in. pay-off! Great for players of all levels for all. FreeroLL tournaments These are a bit more complicated, but they’re free, so it’s worth trying them out and learning the different nuances about them. 1. Freerolls are almost always multi table tournaments. 2. Freerolls that do not require a coupon to play usually have between 500-2000 players. 3. Of course they are free to enter, if you are lucky enough to register in time. 4. Some freerolls require a coupon to play. Usually if the freeroll prize pool is about $500 or more. You win coupons by playing “raked” hands. 5. These can be long games lasting 2-4
  • 84.
    re-BUy / aDD-on tournaments A re-buy is an opportunity to buy additional chips. You are only allowed to buy the initial amount of chips you started the tournament with, which is around $1,000 - $1,500. This is only allowed when you’ve lost all your chips. Instead of an add-on is being out of the tournament The same as a permanently, you can “re-buy” re-buy, buT can and start again with your initial amount of chips. occur while you An Add-on is the same as a re- sTill have chips. buy, but can occur while you still add-ons will have chips. Add-ons will only only bring you up bring you up to the maximum To The maximum chip amount you started with. chip amounT you For example, if you started with sTarTed wiTh. $1,000 in chips, and were down to $200, and add-ons were allowed, you could pay the tournament entry fee again and be brought up to $1,000 in chips, but nothing more. 1. The cost of the re-buy is the been running. Usually re-buys this option which adds more to same amount you paid to start are not allowed after an hour. the prize pool. the tournament. 4. Expect to see players playing 2. Some tournaments allow recklessly though since they sateLLite you a single re-buy or multiple know they can buy additional tournaments re-buys. chips later. These types of tournaments don’t 3. The ability to re-buy during 5. Re-buy tournaments can pay any actual money. When you a tournament is usually limited have big pay offs as many play in a satellite tournament, by how long the tournament has players will take advantage of you are playing for an entry into a larger tournament. 1. Satellites can be single or multi table tournaments. 2. Entry fees can be free, as small as $1.00 + $.10 or in the hundreds of dollars. 3. The top positions that win are given entries into a larger more expensive tournament. 4. Satellites are a great way to spend a small amount of money to enter a tournament with a much larger prize pool and entry fee. n Courtesy of Poker.com
  • 85.
    Calculating Pot Odds T he concept of pot odds is easy This is a risk/reward ratio - if you risk to learn and in my opinion is losing the bet, you need to have a big one of the most important enough reward to make it affordable. concepts of playing winning Pot odds can be used during different poker, especially no limit situations, including calling bets or Texas Hold’em. drawing to a straight or flush. For It’s simply, the relationship, expressed as example, if you need to call $5 with a ratio, between the size of the bet you are a 25% chance to win a hand, there making or calling, and the number of bets in needs to be 4 or more times the size of the pot. For example, if there is $12 in the your bet in the pot, or $20. pot and you need to call a $3 bet, you are getting 4:1 pot odds, expressed as 4:1. beFore The FLoP: To have good enough pot odds, generally Especially when you are playing you need to have better pot odds than your weaker hands trying to hit a flop, ex. chance of winning the hand. So if you think suited connectors and small pairs, be you only have a 20% chance to win the aware if the pot is big enough for you hand, you should only play that hand if to take a flop and try to hit your hand. there is 5 times your bet or more in the pot. To have good enough odds, generally you need to have better pot odds than your bLUFFING: chance of winning the hand. So if you think Pot odds must also be considered when Drawing odds from a deck of you only have a 20% chance to win the bluffing. Over and over again I have seen 47 unseen cards hand, you should only play that hand if people bluff all-in to attempt to steal the Outs 2 Cards to Come 1 Card to come there is 5 times your bet or more in the smaller blinds: an incredibly high risk for 20 67.5% 43.5% pot. a very small reward. The mathematical 19 65.0% 41.3% rule for bluffing is that THE POT ODDS 18 62.4% 39.1% aFTer The FLoP: MUST BE GREATER THAN THE ODDS 17 59.8% 37.0% This will mainly be applied when you OF SUCCESSFULLY PULLING OFF THE 16 57.0% 34.8% are drawing to a hand, but the same rule BLUFF. 15 54.1% 32.6% applies, you must have better pot odds For example, if you estimate the odds of 14 51.2% 30.4% then your chance of winning, so it will be bluffing and winning is 1 in 5, then there 14 51.2% 30.4% profitable in the long run if you hit. To apply must be more than 5 bets in the pot when 14 51.2% 30.4% this, you need to know how many outs you you attempt the bluff. This means that you 13 48.1% 28.3% have, and what percentage this gives you can bluff 1/10th the size of the pot and lose 12 45.0% 26.1% to win the hand. Below is a chart drawing 9 times, and you win in the long run if you 11 41.7% 23.9% odds from a deck of 47 unseen cards. win the 10th time. HOWEVER, be careful 10 38.4% 21.7% Good players will also use these when when playing against bad players, who are 9 35.0% 19.6% defending the best hand. When you are often “un-bluffable”. Make sure you consider 8 31.5% 17.4% playing with the best hand, especially that your chance of bluffing bad players is royal June / July ’08 against loose players, you can put in a bet very small, and use this move scarcely. 7 27.8% 15.2% that gives the player bad odds to call if you As you can see, pot odds can make 6 24.1% 13.0% think he will play anyway, or if you want to you a winning player in many aspects of 5 20.4% 10.9% just win the pot right away you can put an the game, and it is essential to always be 4 16.5% 8.7% over-sized bet so it clearly becomes not an thinking about pot odds in the risk/reward 3 12.5% 6.5% affordable price to draw. This is just one of game that is poker. n 2 8.4% 4.3% the ways that you can tilt pot odds in your 1 4.3% 2.2% favor. Courtesy of Poker.com 85
  • 86.
    the Menace of Straydogs By a n Jha rchaeologists aver that the simply amazing. They can be the eyes for the friendship between man and dog blind, give warning to the deaf that something is over 15,000 years old. The reason needs their attention, and as police dogs they why dogs have remained a man’s can sniff for drugs or even explosives. best friend for all these years is quite But what about the dogs that are no one’s royal obvious - loyalty, unconditional pets and are forced to loiter on the streets as love, and companionship. Your strays? The main problem with the stray dog pet dog can make your life better population is that it is way too high. Every 86 June / July ’08 and healthier by convincing you Indian city or town has its share of stray dogs to be more active. No matter how lazy you feel, that roam the streets barking and bullying the you can’t afford to refuse when your loving pet hapless citizens. A spate of attacks in cities walks up to you and starts begging to go for a like Bangalore has only increased their vicious walk. The kind of service that dogs provide is reputation. When chilling pictures of small
  • 87.
    The stray dogs defecateon the roads and on the sidewalks spoiling the ambiance of the area and because of their tendency to scrounge around garbage dumps they contribute to littering. children mauled by stray dogs start making headlines in the press, then even the most avid dog lover is bound to cringe. Something needs to be done. But what? Moreover, whose fault is it that there are DISTURBING so many strays in every Indian city and FACTS town? running after passing vehicles. Two- l Approximately 40,000 to wheeler drivers being chased by a 70,000 people die from rabies Problem of Strays pack of dogs can prove particularly every year according to the World Health Organization. dangerous, as the driver tends to The stray dogs are fairly territorial and accelerate in order to avoid being l Nearly 30,000 of these deaths they are always ready to fight to protect bitten on his legs and he faces the occur in India. their turf from other strays. When a newer risk of losing balance or crashing l 96% of rabies cases in India are caused by stray dogs. dog steps into a street that other dogs into something. l Nearly 2.2 million people in have their claim on, there ensues a very The danger gets vastly India are bitten by animals noisy altercation, which mostly entails exemplified when it is an airport’s every year. of lots of barking. At times such noisy runway that is infested with strays. incidents happen during the nights and Such an unthinkable event has disturb the residents. Many old people happened a number of times in and kids find it difficult to sleep, but they India. On 28th March 2008, the takeoff of a Kingfisher flight had to be are forced to put up with the discomfort. aborted when it collided against a stray dog that was loitering on the The stray dogs defecate on the roads and runway. Fortunately the crew and 25 passengers were not hurt and on the sidewalks spoiling the ambiance were immediately evacuated, but there was minor damage to the plane. of the area and because of their tendency Later the company issued a statement saying, “The aircraft hit a dog to scrounge around garbage dumps they on the runway during its take-off roll, causing the nose landing gear to contribute to littering. collapse.” Even the airport in the nation’s capital is not safe from strays. Children who are too small to defend Few months ago a rabid dog entered Delhi international airport and bit themselves get frequently targeted by four people before it was captured after a three-hour chase. packs of stray dogs. Sometimes such attacks result in tragic deaths. Recently Who is responsible? royal June / July ’08 there was a case in Bangalore where a stray dog bit 20 people, 6 of whom were Almost everyone enjoys taking care of his pet dog, but feeding a stray school children. In another such incident, may not make much sense. Many residents, on the pretext of being at Hyderabad, last year, a stray dog compassionate to animals, start feeding stray dogs. But when it comes managed to enter the campus of a Woman’s to taking responsibility for the behavior of their roadside pets, no one College and bite 8 students. Even when comes forward. It hardly makes any sense to feed a creature whose stray dogs are not biting people, they can behavior you can’t control. Then there are the plethora of illegal meat 87 create a nuisance by simply barking and and chicken shops, which tend to dump their waste meat in the garbage
  • 88.
    up, they performa vanishing trick and Sterilizing the stray reappear only when the municipal van has dog population is a left. Sterilizing the stray dog population is a partial answer, but it is a daunting, if not partial answer, but it impossible task to sterilize our huge dog is a daunting, if not population. According to one estimate, impossible task to in South Bangalore alone, there are more than 60 dogs for every square kilometer. sterilize our huge dog Our municipal corporations simply don’t population. According to have enough vaccines to sterilize that one estimate, in South many dogs. In Greece, hundreds of stray dogs were Bangalore alone, there killed before Athens Olympics, because are more than 60 dogs for authorities there feared that a sight of every square kilometer. packs of dogs roaming the streets would damage their efforts to use the Games to show the world that their country is modern and civilized. In UK local authorities killed nearly 10,000 stray dogs in 2003. According to Dogs Trust, UK’s largest dog charity, an average of one dog per hour gets put to sleep simply because their owners cannot be traced or new homes found for them. Ireland puts more than 17,000 unwanted pets put to death every year. Scotland kills only 800. Maybe, it is time that we started emulating the drastic measures that the European nations are using to control their stray population. In fact, a former Mumbai Municipal Commissioner created quite a stir when he said, “Stray dogs must be killed as that is the world-wide practice. That is how advanced countries manage to control their stray population.” But animal activists in India oppose that type of a solution. Many animal activists dumps or in vacant neighborhood plots that end up want housing societies in various cities to start taking serving as a magnet for stray dogs. care of the strays. But taking care of a dog is a big The meat shops can be prosecuted for throwing responsibility and it is also costly. Housing societies their waste in public places, but there is no law to don’t have the motivation or the financial muscle to stop compassionate residents from feeding the dogs. adopt the stray dog population. In any case, the responsibility of dealing with stray In the end, there seems to be no alternative except dog population lies with the municipal corporations. to put a sizable number of stray dogs to sleep. At Till a few years back, stray dogs being put to death the same time we can also try putting money into in large numbers were not unheard of in this country. sterilization and anti-rabies programs so that at least But during the last few years there has been rise in few of the dogs can be saved. Many of the strays could awareness about animal rights in India. Moreover, vanish from the streets if pet lovers came forward to royal in its 1994 judgment, the SC has clarified that killing adopt them. But these days most people prefer to go stray dogs is not a solution to the problem. in for thoroughbred dogs only, so there is hardly any home that the strays can call their own. The moot 88 June / July ’08 Are there any solutions? point is that we are a poor country, where countless homeless children are forced to eke out a living by So how do we deal with the problem? Put them in an begging on the streets. When we are not able to do animal shelter? But it is not that easy to catch a stray enough for our children then how can we come to the dog. When the corporation van arrives to pick them aid of our canine friends. n
  • 90.
  • 92.
    MAG (2) GR/ PRB /132 / 06-07 KARENG / 03468 / 10 /1 / 07-TG