Several Lean Six Sigma projects were carried out to improve efficiency and reduce costs at an oil and gas company. A project reduced well downtime by over half, saving on production volumes. Testing well fluid for oil content, another project found a 35% reduction in oil was feasible without affecting process efficiency. A third project increased accurate well tests per year and the probability of success year over year. Overall the Lean Six Sigma projects led to substantial savings and business impacts through inventory reduction, shorter rig movement times, reduced debtors collection periods, and less rig breakdowns.