2. Monday 21st December 2015
• Location- Field
• Actors- Kirsty and Callum
• Shots- All shots that are to be filmed on the field
excluding performing shots
• Arrival/End Time- 1:30pm-5:30pm
• Equipment-Tripod and Camera
• Health and safety-The field could be muddy so we
would have to be careful where we would step and not
to slip over, to do this we will have to tread carefully.
3. Tuesday 22nd December
2015
• Location- Track
• Actors- Kirsty and Callum
• Shots- All shots to be filmed down the track excluding
performing shots
• Arrival/End Time- 1:30-5:30pm
• Equipment-Tripod, Camera, Dolly and Steadicam
• Health and safety-The track can get very muddy and wet
and there is a river that runs beside it therefore we will have
to be careful to not slip over or fall in the river, to do so we
will tread carefully and stay on the other side of the path to
the river
4. Sunday 27th December 2015
• Location- House
• Actors- Kirsty and Callum
• Shots- All shots that are to be filmed in the house
• Arrival/End Time- 1:30pm-5:30pm
• Equipment-Tripod, Camera and Track
• Health and safety- In the house there could be wires to be
careful to trip over and animals that run impulsively in front
of you, to solve this the wires and anything else on the floor
will be picked up and the dog will be put in his cage for the
duration of filming.
5. Tuesday 29th December
2015
• Location- Various Locations
• Actors- Shona
• Shots- All shots with performer
• Arrival/End Time- 1pm-5pm
• Equipment- Tripod and Camera
• Health and safety-The remaining of the shots will be
covered here therefore all of the above risks will be
relevant.