The document outlines plans to reconstruct the Belle Harbor area of Queens, New York from Beach 127th Street to Beach 149th Street. It details the existing concrete header that will be replaced and proposes new beach access details at various street locations between Beach 130th and 149th streets. Martello bollards that are 23 inches high and 24 inches in diameter will be installed. Construction is projected to start in May 2015 and last 12 months, working Monday through Friday from 7am to 6pm and weekends from 8am to 6pm using multiple crews simultaneously at different locations. The presentation concludes by asking for any questions.
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Reconstruction of Belle Harbor 3-24-15 presentation
1. 03/24/15 Slide 1
Reconstruction of Belle Harbor
Project ID: SANDHW24
RECONSTRUCTION OF
BELLE HARBOR
Project ID: SANDHW24
Borough of Queens
Community Board No. 14
March 24, 2015
2. 03/24/15 Slide 2
Reconstruction of Belle Harbor
Project ID: SANDHW24
AGENDA
• PROJECT LOCATION AND LIMITS
• EXISTING PLANS
• PROPOSED PLANS
• MARTELLO BOLLARDS
• CONSTRUCTION SCHEDULE
• QUESTIONS
4. 03/24/15 Slide 4
Reconstruction of Belle Harbor
Project ID: SANDHW24
EXISTING CONTRACT DETAILS:
CONCRETE HEADER
Locations: Beach 127th Street to Beach 149th Street
7. 03/24/15 Slide 7
Reconstruction of Belle Harbor
Project ID: SANDHW24
PROPOSED BEACH ACCESS DETAILS
Location: Beach 147th Street
8. 03/24/15 Slide 8
Reconstruction of Belle Harbor
Project ID: SANDHW24
PROPOSED BEACH ACCESS DETAILS
Locations: Beach 142th Street & Beach 147th Street DRAFT SKETCH
9. 03/24/15 Slide 9
Reconstruction of Belle Harbor
Project ID: SANDHW24
MARTELLO BOLLARDS
Specifications:
• Height: 23”
• Body Diameter: 24”
• Base Diameter: 28.5”
Available Colors:
Source: www.reliance-foundry.com
10. 03/24/15 Slide 10
Reconstruction of Belle Harbor
Project ID: SANDHW24
CONSTRUCTION SCHEDULE
Projected start date May 2015
12 month estimated construction duration
Working hours
Monday – Friday: 7am – 6pm
Saturday – Sunday: 8am – 6pm
Simultaneous work by multiple crews (3 min.) at multiple locations
Starting location of construction to be determined