2010 Li Portfolio

548 views

Published on

On Line Portfolio

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
548
On SlideShare
0
From Embeds
0
Number of Embeds
9
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

2010 Li Portfolio

  1. 1. On Broadway Retail & Theatre Complex Redwood City, CA Field Paoli Architects PROJECT DATA Size: 198,000 SF Cost: $40 M Completion: 7/2006
  2. 2. <ul><li>Project Architect </li></ul><ul><li>DD through CA phases </li></ul><ul><li>Multiple consultant teams </li></ul><ul><li>Complex coordination with a 2 story underground garage, 16 retail tenants, a 20 screen theatre, and new streetscape </li></ul><ul><li>Type 1 construction </li></ul><ul><li>Full city block of downtown revitalization effort </li></ul>
  3. 3. The On Broadway Retail and Theatre Complex anchors a major revitalization effort in downtown Redwood City. Facades are designed to compliment the scale of adjacent Art Deco buildings. Theatre Way Streetscape allows outdoor dining and public street fairs.  
  4. 11. <ul><li>PROJECT DATA </li></ul><ul><li>  Size: 21,000 S.F. </li></ul><ul><li>Cost: $13.8 m </li></ul><ul><li>Completion: 1/2009 </li></ul><ul><li>LEED Certified </li></ul><ul><li>  </li></ul>Mayfair Community Center San Jose, CA Field Paoli Architects
  5. 12. <ul><li>The Mayfair Community Center includes a large banquet room, classroom and meeting spaces, child care area, as well as fitness rooms. </li></ul><ul><li>Site improvements include a new recreational pool, picnic area, spray-ground, tot lot and skate park. </li></ul><ul><li>LEED certified with a host of sustainable design features including shaded exterior circulation, abundant day lighting, natural ventilation, and a highly efficient mechanical system. </li></ul><ul><li>  </li></ul>
  6. 13. <ul><li>Senior Project Detailer </li></ul><ul><li>Developed building and wall sections </li></ul><ul><li>Developed wall, window, and roofing details </li></ul><ul><li>DD through CD phases </li></ul><ul><li>Type V-1 Hr construction, mixed use </li></ul>
  7. 17. Burgess Park Gymnasium/Gymnastics Center Facilities Assessment and Conceptual Design Menlo Park, CA Field Paoli Architects <ul><li>Prepared Existing Facilities Assessment </li></ul><ul><li>Led Public Participation process </li></ul><ul><li>Conducted meetings for Public Works, Parks & Rec, and Steering Committee </li></ul><ul><li>Conceptual Design Planning for 5 schemes </li></ul><ul><li>40,000 SF facility at Civic Center site </li></ul><ul><li>Conceptual Cost Estimate, Specifications and Budget </li></ul>
  8. 20. Presidio Branch Library San Francisco, CA Field Paoli Architects <ul><li>PROJECT DATA </li></ul><ul><li>Size: Presidio 10,000 SF </li></ul><ul><li>Cost: Presidio $2.3 M </li></ul><ul><li>Completion: 8/2010 </li></ul><ul><li>Application for LEED Gold CI </li></ul>
  9. 21. <ul><li>Project Architect for Schematic thru Construction Document phases </li></ul><ul><li>Interior remodel with ADA upgrades </li></ul><ul><li>Presentation meetings for public input </li></ul><ul><li>Led team meetings with SFPL, Friends of the Library and consultants </li></ul><ul><li>Coordinated historic restoration team </li></ul><ul><li>Projected LEED Commercial Interior Gold </li></ul>
  10. 22. Park Branch Library San Francisco, CA Field Paoli Architects <ul><li>PROJECT DATA </li></ul><ul><li>Size: 8,500 SF </li></ul><ul><li>Cost: Park $1.1 M </li></ul><ul><li>Completion: 8/2010 </li></ul><ul><li>Application for LEED Gold CI </li></ul>
  11. 23. <ul><li>Project Architect for Schematic thru CD phases </li></ul><ul><li>Interior remodel with ADA upgrades </li></ul><ul><li>Presentation meetings for public input </li></ul><ul><li>Led team meetings with SFPL, Friends of the Library and consultants </li></ul><ul><li>Projected LEED CI Gold </li></ul>
  12. 24. Pleasanton Public Library Facilities Assessment and Conceptual Design Pleasanton, CA Field Paoli Architects
  13. 25. <ul><li>Prepared Existing Facilities Assessment </li></ul><ul><li>Conducted meetings with the Library Commission and City Staff </li></ul><ul><li>Conceptual Design Planning for 3 building and 6 parking schemes </li></ul><ul><li>72,000 SF facility at Civic Center site </li></ul><ul><li>Conceptual Cost Estimate, Specifications and Budget </li></ul>
  14. 26. <ul><li>Project Architect </li></ul><ul><li>Planning through Construction Phases </li></ul><ul><li>Renovation and seismic upgrade for an existing 300,000 SF building and parking structure </li></ul><ul><li>Type 1 construction </li></ul>Potrero Center San Francisco, CA SGPA Architecture & Planning

×