Reliability Task Assignments 
 
 
 
 

Allied Reliability Training Series 
 
 
                 Task                  Reliability Engineer            Maintenance Engineer                Planner
                                                                        Responsible for 
                                                                                                   Ensures correct parts and 
                                       Ensures failure modes            technical accuracy of 
                                                                                                   consumables are called out 
                                       addressed are                    the job steps  
                                                                                                   in the procedure  
Preventive Maintenance                 appropriate                      Resource for the 
                                                                                                   Responsible for consistency 
Procedures                             Performs cost/benefit            Planner to establish 
                                                                                                   of format and management 
                                       analysis to set correct          specific equipment 
                                                                                                   of the PM program on daily 
                                       frequency of task(s)             tolerances and 
                                                                                                   basis 
                                                                        specifications 
                                                                                                   Ensures correct parts and 
                                                                        Responsible for 
                                                                                                   consumables are called out 
                                                                        technical accuracy of 
                                                                                                   in the procedure 
                                   •                                    the job steps  
                                       Ensures that all failure 
                                                                                                   Responsible for consistency 
                                                                   •
                                       modes have a job plan            Resource for the 
Job Plans and Job Plan Library                                                                     of format and management 
                                       on file (both proactive          Planner to establish 
                                                                                                   of the Job Plan Library on 
                                       and reactive)                    specific equipment 
                                                                                                   daily basis 
                                                                        tolerances and 
                                                                                                   Responsible for verification 
                                                                        specifications  
                                                                                                   of parts kits 
                                   •   Supports the 
                                       Maintenance Engineer 
                                                                                                   Alerts Maintenance 
                                       with availability                Responsible for 
                                                                                                   Engineer when 
                                       simulation to verify             accuracy of 
                                                                                                   discrepancies are identified.  
                                       stores adjustments               information 
                                                                                                   Works with Maintenance 
                                   •
Bill of Materials                                                       Responsible for 
                                       Alerts stores function 
                                                                                                   Engineer to determine 
                                                                        updating BOM after 
                                       when stocking 
                                                                                                   appropriate stores levels for 
                                                                        equipment 
                                       modifications are 
                                                                                                   parts by tracking parts 
                                                                        modifications 
                                       warranted based on 
                                                                                                   usage. 
                                       usage and failure 
                                       analysis 
                                       Responsible for changes 
                                       to the Equipment                                            Manages the CMMS output 
                                                                        Resource for the 
                                       Maintenance Plan based                                      of inspection schedules for 
                                                                        Reliability Engineer 
                                       on analysis of asset                                        the PM and PdM routes.   
                                                                        with assistance in 
Engineered Maintenance Strategy        failure data                                                Prepares and analyzes 
                                                                        collection and analysis 
                                       Alerts Stores to changes                                    reports on inspection route 
                                                                        of machinery failure 
                                       in stocking levels to                                       compliance and satisfaction 
                                                                        data 
                                       match changes in task                                       of noted action items 
                                       frequency 




                                                                                                              Allied Reliability, Inc.
                                                          Page 1 of 8 
                                                                                                             4360 Corporate Road 
                                                                                                                          Suite 110 
                                                     www.alliedreliability.com 
                                                                                                             Charleston, SC 29405 
                                                                                                             Office (843) 414‐5760 
                                                                   
                                                                                                               Fax (843) 414‐5779 
 
Reliability Task Assignments 
 
 
 
 

Allied Reliability Training Series 
 
 
               Task                Reliability Engineer         Maintenance Engineer               Planner
                                                                                           Completes job plans with 
                                                                                           manpower scheduling and 
                                                                 Optimizes the Mean‐       parts verifications per 
                               •                                 Time‐To‐Repair (MTTR)     standard 
                                   Ensures Condition 
                                                                 Responsible for           Responsible to develop the 
                                   Monitoring information 
Outage/Turn Around Planning 
                                                                 technical accuracy of     master plan for outages and 
                                   is included in turn‐
                                                                 the job steps             turn‐arounds   
                                   around master plan 
                                                                                           Prepares outage schedules 
                                                                                           and manpower requirement 
                                                                                           estimates 
                                                                 Develops equipment 
                                   Assists Maintenance           modification plans 
                                   Engineer with reliability     based on failure data, 
                                   analysis of proposed          crafts feedback and 
                                   equipment modifications       OEM design 
                                                                                           Completes job plans with 
                                   Makes specific                modifications  
                                                                                           manpower scheduling and 
Equipment Modifications            recommendations to            Makes specific 
                                                                                           parts verifications per 
                                   improve machinery             equipment 
                                                                                           standard 
                                   performance and               recommendations to 
                                   reliability based on          improve machinery 
                                   analysis of process and       performance, 
                                   failure data                  maintainability and 
                                                                 reliability 
                                                                 Creates plans to 
                                                                 standardize parts 
                                                                 across like machines 
                                                                 taking into account 
                                   Assists Maintenance           specific component 
                                   Engineer with reliability     performance and           Updates Job Plans to reflect 
Parts Standardizations 
                                   analysis of proposed          maintainability           changes in parts 
                                   changes                       Updates BOM to 
                                                                 reflect changes 
                                                                 Works with stores to 
                                                                 delete unnecessary 
                                                                 spares 




                                                                                                      Allied Reliability, Inc.
                                                     Page 2 of 8 
                                                                                                     4360 Corporate Road 
                                                                                                                  Suite 110 
                                                www.alliedreliability.com 
                                                                                                     Charleston, SC 29405 
                                                                                                     Office (843) 414‐5760 
                                                              
                                                                                                       Fax (843) 414‐5779 
 
Reliability Task Assignments 
 
 
 
 

Allied Reliability Training Series 
 
 
               Task                  Reliability Engineer       Maintenance Engineer                Planner
                                   Responsible for analysis 
                                   of spares usage and 
                                   failure data to determine 
                                   proper stocking levels 
MRO Adjustments                    based on failure data,      
                                   usage and simulation 
                                   modeling of the 
                                   Engineered Maintenance 
                                   Strategy 
                                                                 Responsible to 
                                                                 maintain current and 
                                                                 correct OEM 
                                                                                            Keeps current copy of all 
                                                                 specifications, manuals 
                                                                                            OEM specifications, manuals 
OEM Specification Materials                                      and procedures for 
                                                                                            and procedures as job 
                                                                 plant assets in support 
                                                                                            planning reference 
                                                                 of planning functions 
                                                                 and in support of daily 
                                                                 maintenance function 
                                                                 Resource for the  
                                   Develops and manages 
                                                                 Reliability Engineer       Plans the work and places it 
                                   the PdM/NDT function 
                                                                 with specific machine      on the schedule in a timely 
                                   for the purpose of the 
PdM/NDT                                                          performance                manner such that machinery 
                                   early identification and 
                                                                 information and            breakdown are mitigated or 
                                   elimination of asset 
                                                                 detailed component         eliminated 
                                   defects 
                                                                 and parts data 
                                                                                            Manages the conversion of 
                                                                                            Work Requests to Work 
                                                                                            Orders   
Work Order System                                              
                                                                                            Completes Job Plans   
                                                                                            Follows‐up on job plans 
                                                                                            completion 
                                   Responsible to performs                                  Responsible for ensuring 
                                   statistical analysis on        Resource for the          that all work orders are 
                                   machinery failure data         Reliability Engineer      closed with correct closing 
                                   and work order closing         with specific machine     codes 
CMMS Failure Data (FRACAS)         codes to determine             performance               Ensures the “As Found”, “As 
                                   whether adjustments to         information and           Left” fields on the Job Plan 
                                   the Engineered                 detailed component        Procedures are completed 
                                   Maintenance Strategy           and parts data            by the craft and entered 
                                   are warranted                                            into the CMMS 




                                                                                                       Allied Reliability, Inc.
                                                    Page 3 of 8 
                                                                                                      4360 Corporate Road 
                                                                                                                   Suite 110 
                                               www.alliedreliability.com 
                                                                                                      Charleston, SC 29405 
                                                                                                      Office (843) 414‐5760 
                                                             
                                                                                                        Fax (843) 414‐5779 
 
Reliability Task Assignments 
 
 
 
 

Allied Reliability Training Series 
 
 
                Task                    Reliability Engineer           Maintenance Engineer                 Planner
                                                                        Develops new and 
                                                                        innovative methods for 
                                                                        timely repair of assets 
                                                                        Prepares specific job 
                                                                        plans steps with            Completes job plan to 
Asset Repair Techniques              
                                                                        detailed procedures         specified standard 
                                                                        for completion of 
                                                                        repair in the most 
                                                                        effective and efficient 
                                                                        manner 
                                        Develops specific 
                                        procedures for                                              Converts and maintains 
Asset Test Procedures (Return to 
                                        verification of an assets                                   procedures in standardized 
Service) 
                                        fitness for return to                                       format 
                                        service 
                                                                        Leads the Root Cause 
                                        Leads the Root Cause 
                                                                        Failure Analysis effort 
                                        Failure Analysis effort for 
                                                                        for chronic equipment 
                                        sporadic equipment 
                                                                        failures (typically uses 
                                        failures (typically uses                                    Responsible for ensuring 
                                                                        Cause Mapping 
                                        Logic Tree incident                                         that all work orders are 
                                                                        incident analysis) 
                                        analysis)                                                   closed with correct closing 
                                                                        Catalogues and 
                                        Develops specific                                           codes 
                                                                        databases the 
                                        operational procedure                                       Ensures the “As Found”, “As 
                                                                        RCA/RCFA results and 
                                        changes to help mitigate                                    Left” fields on the Job Plan 
Failure Investigation                                                   subsequent action 
                                        future failures                                             Procedures are completed 
RCA & RCFA                                                              items 
                                        Catalogues and                                              by the craft and entered 
                                                                        Develops specific 
                                        databases the RCA/RCFA                                      into the CMMS 
                                                                        maintenance 
                                        results and subsequent                                      Facilitates a 5‐Why 
                                                                        procedure 
                                        action items                                                discussion with crafts and 
                                                                        modifications to help 
                                        Analyzes plant wide                                         supervision for all failure 
                                                                        mitigate future failures 
                                        failure data and                                            maintenance activities 
                                                                        Develops specific 
                                        downtime scenarios to 
                                                                        machinery 
                                        calculate relevant  
                                                                        modifications to help 
                                        trigger points for RCFA 
                                                                        mitigate future failures 




                                                                                                               Allied Reliability, Inc.
                                                           Page 4 of 8 
                                                                                                              4360 Corporate Road 
                                                                                                                           Suite 110 
                                                      www.alliedreliability.com 
                                                                                                              Charleston, SC 29405 
                                                                                                              Office (843) 414‐5760 
                                                                    
                                                                                                                Fax (843) 414‐5779 
 
Reliability Task Assignments 
 
 
 
 

Allied Reliability Training Series 
 
 
                 Task            Reliability Engineer         Maintenance Engineer                     Planner
                                                               Provides technical           
                                 Provides technical 
                                                               assistance to 
                                 assistance to 
                                                               maintenance 
                                 maintenance 
                                                               supervisors, planners 
                                 supervisors, planners 
Technical Support of Daily                                     and crafts personnel in 
                                 and crafts personnel in 
Maintenance Effort                                             the form of specific, 
                                 the form of specific, 
                                                               technical data on 
                                 technical data on system 
                                                               machinery 
                                 configuration and 
                                                               configuration and 
                                 performance 
                                                               performance 
                                                               Responsible to               
                                 Responsible for the 
Asset Hierarchy and Technical                                  maintain a current and 
                                 upkeep of the plant 
Specifications                                                 correct technical 
                                 asset hierarchy 
                                                               specifications library 
                                 Responsible for the                                           Supports the Reliability 
                                 upkeep of the asset                                           Engineer with specific, 
Criticality Analysis             criticality database and                                      detailed failure data and 
                                 the failure modes                                             component configuration 
                                 criticality database                                          information 
                                                                Utilizes metrics for           Prepares and analyzes 
                                 Utilizes specific metrics 
                                                                system, asset and              reports on system, asset and 
Metrics                          for system, asset and 
                                                                component                      components metrics 
                                 component reliability 
                                                                maintainability 
                                                                Develops specific           
                                 Develops the 
                                                                maintenance activities 
                                 maintenance strategy for 
                                                                to ensure spare fitness 
                                 spare parts inventory 
                                                                for duty 
                                 Develops a testing 
                                                                Develops specific 
Materials Management             strategy incoming new 
                                                                equipment 
                                 and rebuilt spares 
                                                                preservation 
                                 Develops a testing 
                                                                techniques for pre‐
                                 strategy for OEM testing 
                                                                commissioning storage 
                                 compliance 
                                                                of equipment  




                                                                                                          Allied Reliability, Inc.
                                                    Page 5 of 8 
                                                                                                         4360 Corporate Road 
                                                                                                                      Suite 110 
                                               www.alliedreliability.com 
                                                                                                         Charleston, SC 29405 
                                                                                                         Office (843) 414‐5760 
                                                             
                                                                                                           Fax (843) 414‐5779 
 
Reliability Task Assignments 
 
 
 
 

Allied Reliability Training Series 
 
 

                Task            Reliability Engineer      Maintenance Engineer           Planner
                                                                                      
                               Applies reliability 
                               analysis methods to new 
                               designs to determine 
                               system, asset and 
                               component reliability 
                               Determines single‐point 
                               failures 
                               Develops commissioning 
                               procedures for new 
                               system, asset and 
                               component design 
                               Develops strategies for 
                                                            Creates new 
                               OEM warranty issues 
                                                            equipment purchase 
                               and claims 
Reliability Centered Design 
                                                            specifications around 
                               Develop machinery 
                                                            improved 
                               modification plans to 
                                                            maintainability 
                               deal with single‐point 
                               failure scenarios 
                               Develops specific 
                               maintenance and 
                               operational start‐up 
                               procedures for new 
                               installations 
                               Responsible to develop 
                               new equipment 
                               purchase specifications 
                               for reliability and 
                               maintainability 




                                                                                           Allied Reliability, Inc.
                                                Page 6 of 8 
                                                                                          4360 Corporate Road 
                                                                                                       Suite 110 
                                           www.alliedreliability.com 
                                                                                          Charleston, SC 29405 
                                                                                          Office (843) 414‐5760 
                                                         
                                                                                            Fax (843) 414‐5779 
 
Reliability Task Assignments 
 
 
 
 

Allied Reliability Training Series 
 
 

                Task            Reliability Engineer         Maintenance Engineer          Planner
                                                                                        
                               Uses reliability analysis 
                               tools to determine 
                               operational reliability of 
                               systems, assets and 
                               components 
                               Helps determine the 
                               QA/QC test points and 
                               procedures to maximize 
                               operational reliability 
Operational Reliability                                        
                               Aides in the 
                               development of alarms 
                               designed to determine 
                               and verify acceptable 
                               operations 
                               Develop assessment 
                               activities centered 
                               around operability and 
                               performance 
                               optimization 
                                                                                        
                               Responsible for 
                               performing quantitative        Supports the 
                               analysis on new projects       Maintenance Engineer 
Reliability Economics 
                               and determining project        with supporting data 
                               viability based on             specific to equipment 
                               corporate values and           maintainability 
                               standards 
 




                                                                                             Allied Reliability, Inc.
                                                  Page 7 of 8 
                                                                                            4360 Corporate Road 
                                                                                                         Suite 110 
                                             www.alliedreliability.com 
                                                                                            Charleston, SC 29405 
                                                                                            Office (843) 414‐5760 
                                                           
                                                                                              Fax (843) 414‐5779 
 
Reliability Task Assignments 
 
 
 
 

Allied Reliability Training Series 
 
 
                Reliability Engineering                Reliability     Maintenance 
                                                                                        Planner 
               Tools and/or Techniques                  Engineer        Engineer 
Statistical Analysis (Basic)                           Evaluation       Synthesis    Comprehension  
Statistical Analysis (Advanced)                        Synthesis         Analysis      Awareness  
Root Cause Analysis                                    Evaluation       Synthesis       Analysis 
Reliability Centered Maintenance                       Synthesis         Analysis    Comprehension  
Condition Monitoring                                   Synthesis         Analysis    Comprehension  
Reliability Centered Design                            Synthesis         Analysis    Comprehension 
Availability Simulation                                Synthesis         Analysis    Comprehension 
Life Cycle Cost Analysis                               Synthesis      Comprehension Comprehension 
Criticality Analysis                                   Evaluation        Analysis   Comprehension 
 
Reference:  Bloom’s Taxonomy of Learning Objectives 
 
          Knowledge 
          Comprehension 
          Application 
          Analysis 
          Synthesis 
          Evaluation 
 




                                                                                                        Allied Reliability, Inc.
                                                        Page 8 of 8 
                                                                                                       4360 Corporate Road 
                                                                                                                    Suite 110 
                                                   www.alliedreliability.com 
                                                                                                       Charleston, SC 29405 
                                                                                                       Office (843) 414‐5760 
                                                                 
                                                                                                         Fax (843) 414‐5779 
 

More Related Content

Similar to Reliability Task Assignments

Agile Is From Mars Usability is From Venus
Agile Is From Mars Usability is From VenusAgile Is From Mars Usability is From Venus
Agile Is From Mars Usability is From VenusTeale Shapcott
 
Tools Processes And Training
Tools Processes And TrainingTools Processes And Training
Tools Processes And Trainingdgholden
 
Allied Reliability Phase II EMP Development Overview (March 2009)
Allied Reliability Phase II EMP Development Overview (March 2009)Allied Reliability Phase II EMP Development Overview (March 2009)
Allied Reliability Phase II EMP Development Overview (March 2009)Chris Colson
 
The role of mro in enhancing operational capability and mission readiness
The role of mro in enhancing operational capability and mission readinessThe role of mro in enhancing operational capability and mission readiness
The role of mro in enhancing operational capability and mission readinessMichael Parsons
 
Insight SaaS Overview - Cloud Computing
Insight SaaS Overview - Cloud ComputingInsight SaaS Overview - Cloud Computing
Insight SaaS Overview - Cloud Computingjgasior
 
Geneo software overview
Geneo software overviewGeneo software overview
Geneo software overviewGeneo
 
DejaVOO: A Regression Testing Tool for Java Software
DejaVOO: A Regression Testing Tool for Java SoftwareDejaVOO: A Regression Testing Tool for Java Software
DejaVOO: A Regression Testing Tool for Java SoftwareManas Tungare
 
Reverse Logistics Management Systems State Of The Art
Reverse Logistics Management Systems  State Of The ArtReverse Logistics Management Systems  State Of The Art
Reverse Logistics Management Systems State Of The ArtMichael Blumberg
 
Forchu Teck Technology Collaboration Profile
Forchu Teck Technology Collaboration ProfileForchu Teck Technology Collaboration Profile
Forchu Teck Technology Collaboration ProfileCharles Forchu
 
Session #1: Development Practices And The Microsoft Approach
Session #1: Development Practices And The Microsoft ApproachSession #1: Development Practices And The Microsoft Approach
Session #1: Development Practices And The Microsoft ApproachSteve Lange
 
OCCMS Brochure
OCCMS BrochureOCCMS Brochure
OCCMS BrochureBenHolden
 
MOF 4 Overviewv - ITSM Academy Webinar
MOF 4 Overviewv - ITSM Academy WebinarMOF 4 Overviewv - ITSM Academy Webinar
MOF 4 Overviewv - ITSM Academy WebinarITSM Academy, Inc.
 
Information-2-Intelligence
Information-2-IntelligenceInformation-2-Intelligence
Information-2-Intelligencehdbishopjr
 
BIS 08a - Application Development - II Version 2
BIS 08a - Application Development - II Version 2BIS 08a - Application Development - II Version 2
BIS 08a - Application Development - II Version 2Prithwis Mukerjee
 
IFS Company Overview
IFS Company OverviewIFS Company Overview
IFS Company Overviewdaeager
 
IFS Marget Segment Overview
IFS Marget Segment OverviewIFS Marget Segment Overview
IFS Marget Segment Overviewdaeager
 
Proces Simulatie
Proces SimulatieProces Simulatie
Proces SimulatieHaDeGo
 
Xperdyte Manufacturing for Sage Evolution
Xperdyte Manufacturing for Sage EvolutionXperdyte Manufacturing for Sage Evolution
Xperdyte Manufacturing for Sage Evolutionxperdyte
 

Similar to Reliability Task Assignments (20)

Agile Is From Mars Usability is From Venus
Agile Is From Mars Usability is From VenusAgile Is From Mars Usability is From Venus
Agile Is From Mars Usability is From Venus
 
Tools Processes And Training
Tools Processes And TrainingTools Processes And Training
Tools Processes And Training
 
Dallas Mpug
Dallas MpugDallas Mpug
Dallas Mpug
 
Allied Reliability Phase II EMP Development Overview (March 2009)
Allied Reliability Phase II EMP Development Overview (March 2009)Allied Reliability Phase II EMP Development Overview (March 2009)
Allied Reliability Phase II EMP Development Overview (March 2009)
 
The role of mro in enhancing operational capability and mission readiness
The role of mro in enhancing operational capability and mission readinessThe role of mro in enhancing operational capability and mission readiness
The role of mro in enhancing operational capability and mission readiness
 
Insight SaaS Overview - Cloud Computing
Insight SaaS Overview - Cloud ComputingInsight SaaS Overview - Cloud Computing
Insight SaaS Overview - Cloud Computing
 
Geneo software overview
Geneo software overviewGeneo software overview
Geneo software overview
 
DejaVOO: A Regression Testing Tool for Java Software
DejaVOO: A Regression Testing Tool for Java SoftwareDejaVOO: A Regression Testing Tool for Java Software
DejaVOO: A Regression Testing Tool for Java Software
 
Reverse Logistics Management Systems State Of The Art
Reverse Logistics Management Systems  State Of The ArtReverse Logistics Management Systems  State Of The Art
Reverse Logistics Management Systems State Of The Art
 
Forchu Teck Technology Collaboration Profile
Forchu Teck Technology Collaboration ProfileForchu Teck Technology Collaboration Profile
Forchu Teck Technology Collaboration Profile
 
Session #1: Development Practices And The Microsoft Approach
Session #1: Development Practices And The Microsoft ApproachSession #1: Development Practices And The Microsoft Approach
Session #1: Development Practices And The Microsoft Approach
 
OCCMS Brochure
OCCMS BrochureOCCMS Brochure
OCCMS Brochure
 
MOF 4 Overviewv - ITSM Academy Webinar
MOF 4 Overviewv - ITSM Academy WebinarMOF 4 Overviewv - ITSM Academy Webinar
MOF 4 Overviewv - ITSM Academy Webinar
 
Information-2-Intelligence
Information-2-IntelligenceInformation-2-Intelligence
Information-2-Intelligence
 
BIS 08a - Application Development - II Version 2
BIS 08a - Application Development - II Version 2BIS 08a - Application Development - II Version 2
BIS 08a - Application Development - II Version 2
 
2 effra roadmap-decubber
2 effra roadmap-decubber2 effra roadmap-decubber
2 effra roadmap-decubber
 
IFS Company Overview
IFS Company OverviewIFS Company Overview
IFS Company Overview
 
IFS Marget Segment Overview
IFS Marget Segment OverviewIFS Marget Segment Overview
IFS Marget Segment Overview
 
Proces Simulatie
Proces SimulatieProces Simulatie
Proces Simulatie
 
Xperdyte Manufacturing for Sage Evolution
Xperdyte Manufacturing for Sage EvolutionXperdyte Manufacturing for Sage Evolution
Xperdyte Manufacturing for Sage Evolution
 

More from Ricky Smith CMRP, CMRT

Skills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianSkills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianRicky Smith CMRP, CMRT
 
Day in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerDay in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerRicky Smith CMRP, CMRT
 
Day in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerDay in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerRicky Smith CMRP, CMRT
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorRicky Smith CMRP, CMRT
 
How to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveHow to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveRicky Smith CMRP, CMRT
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorRicky Smith CMRP, CMRT
 
Day in the Life of a Proactive Maintenance Technician Article
Day in the Life of a Proactive Maintenance Technician  ArticleDay in the Life of a Proactive Maintenance Technician  Article
Day in the Life of a Proactive Maintenance Technician ArticleRicky Smith CMRP, CMRT
 
Best Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleBest Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleRicky Smith CMRP, CMRT
 
Tool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutTool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutRicky Smith CMRP, CMRT
 
Tool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsTool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsRicky Smith CMRP, CMRT
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingRicky Smith CMRP, CMRT
 
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyTop 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyRicky Smith CMRP, CMRT
 
Tool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyTool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyRicky Smith CMRP, CMRT
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenancePM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenanceRicky Smith CMRP, CMRT
 
How to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training ProgramHow to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training ProgramRicky Smith CMRP, CMRT
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 -  Fundamentals of Preventive MaintenancePM Tool Box Talk 101 -  Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenanceRicky Smith CMRP, CMRT
 
Day in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianDay in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianRicky Smith CMRP, CMRT
 

More from Ricky Smith CMRP, CMRT (20)

Skills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianSkills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance Technician
 
Day in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerDay in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance Manager
 
Day in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerDay in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance Planner
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance Supervisor
 
How to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveHow to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effective
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance Supervisor
 
Day in the Life of a Proactive Maintenance Technician Article
Day in the Life of a Proactive Maintenance Technician  ArticleDay in the Life of a Proactive Maintenance Technician  Article
Day in the Life of a Proactive Maintenance Technician Article
 
Best Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleBest Maintenance Repair Practices Article
Best Maintenance Repair Practices Article
 
Tool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutTool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts Checkout
 
Tool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsTool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of Bearings
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and Scheduling
 
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyTop 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
 
Tool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyTool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and Why
 
Maintenance of Hydraulic Systems
Maintenance of Hydraulic SystemsMaintenance of Hydraulic Systems
Maintenance of Hydraulic Systems
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenancePM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
 
How to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training ProgramHow to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training Program
 
What is Lean Maintenance
What is Lean MaintenanceWhat is Lean Maintenance
What is Lean Maintenance
 
Best Maintenance Repair Practices
Best Maintenance Repair PracticesBest Maintenance Repair Practices
Best Maintenance Repair Practices
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 -  Fundamentals of Preventive MaintenancePM Tool Box Talk 101 -  Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
 
Day in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianDay in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance Technician
 

Recently uploaded

Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 

Recently uploaded (20)

Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort ServiceHot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 

Reliability Task Assignments

  • 1. Reliability Task Assignments          Allied Reliability Training Series      Task  Reliability Engineer Maintenance Engineer Planner Responsible for  Ensures correct parts and  Ensures failure modes  technical accuracy of  consumables are called out  addressed are  the job steps   in the procedure   Preventive Maintenance  appropriate   Resource for the  Responsible for consistency  Procedures  Performs cost/benefit  Planner to establish  of format and management  analysis to set correct  specific equipment  of the PM program on daily  frequency of task(s)  tolerances and  basis  specifications  Ensures correct parts and  Responsible for  consumables are called out  technical accuracy of  in the procedure  • the job steps   Ensures that all failure  Responsible for consistency  • modes have a job plan  Resource for the  Job Plans and Job Plan Library  of format and management  on file (both proactive  Planner to establish  of the Job Plan Library on  and reactive)  specific equipment  daily basis  tolerances and  Responsible for verification  specifications   of parts kits  • Supports the  Maintenance Engineer  Alerts Maintenance  with availability  Responsible for  Engineer when  simulation to verify  accuracy of  discrepancies are identified.   stores adjustments  information  Works with Maintenance  • Bill of Materials  Responsible for  Alerts stores function  Engineer to determine  updating BOM after  when stocking  appropriate stores levels for  equipment  modifications are  parts by tracking parts  modifications  warranted based on  usage.  usage and failure  analysis  Responsible for changes  to the Equipment  Manages the CMMS output  Resource for the  Maintenance Plan based  of inspection schedules for  Reliability Engineer  on analysis of asset  the PM and PdM routes.    with assistance in  Engineered Maintenance Strategy  failure data   Prepares and analyzes  collection and analysis  Alerts Stores to changes  reports on inspection route  of machinery failure  in stocking levels to  compliance and satisfaction  data  match changes in task  of noted action items  frequency  Allied Reliability, Inc. Page 1 of 8  4360 Corporate Road    Suite 110  www.alliedreliability.com    Charleston, SC 29405  Office (843) 414‐5760     Fax (843) 414‐5779   
  • 2. Reliability Task Assignments          Allied Reliability Training Series      Task  Reliability Engineer Maintenance Engineer Planner Completes job plans with  manpower scheduling and  Optimizes the Mean‐ parts verifications per  • Time‐To‐Repair (MTTR)  standard  Ensures Condition  Responsible for  Responsible to develop the  Monitoring information  Outage/Turn Around Planning  technical accuracy of  master plan for outages and  is included in turn‐ the job steps   turn‐arounds    around master plan    Prepares outage schedules  and manpower requirement  estimates  Develops equipment  Assists Maintenance  modification plans  Engineer with reliability  based on failure data,  analysis of proposed  crafts feedback and  equipment modifications  OEM design  Completes job plans with  Makes specific  modifications   manpower scheduling and  Equipment Modifications  recommendations to  Makes specific  parts verifications per  improve machinery  equipment  standard  performance and  recommendations to  reliability based on  improve machinery  analysis of process and  performance,  failure data  maintainability and  reliability  Creates plans to  standardize parts  across like machines  taking into account  Assists Maintenance  specific component  Engineer with reliability  performance and  Updates Job Plans to reflect  Parts Standardizations  analysis of proposed  maintainability  changes in parts  changes  Updates BOM to  reflect changes  Works with stores to  delete unnecessary  spares  Allied Reliability, Inc. Page 2 of 8  4360 Corporate Road    Suite 110  www.alliedreliability.com    Charleston, SC 29405  Office (843) 414‐5760     Fax (843) 414‐5779   
  • 3. Reliability Task Assignments          Allied Reliability Training Series      Task  Reliability Engineer Maintenance Engineer Planner Responsible for analysis  of spares usage and  failure data to determine  proper stocking levels  MRO Adjustments  based on failure data,    usage and simulation  modeling of the  Engineered Maintenance  Strategy  Responsible to  maintain current and  correct OEM  Keeps current copy of all  specifications, manuals  OEM specifications, manuals  OEM Specification Materials    and procedures for  and procedures as job  plant assets in support  planning reference  of planning functions  and in support of daily  maintenance function  Resource for the   Develops and manages  Reliability Engineer  Plans the work and places it  the PdM/NDT function  with specific machine  on the schedule in a timely  for the purpose of the  PdM/NDT  performance  manner such that machinery  early identification and  information and  breakdown are mitigated or  elimination of asset  detailed component  eliminated  defects  and parts data  Manages the conversion of  Work Requests to Work  Orders    Work Order System      Completes Job Plans    Follows‐up on job plans  completion  Responsible to performs  Responsible for ensuring  statistical analysis on  Resource for the   that all work orders are  machinery failure data  Reliability Engineer  closed with correct closing  and work order closing  with specific machine  codes  CMMS Failure Data (FRACAS)  codes to determine  performance  Ensures the “As Found”, “As  whether adjustments to  information and  Left” fields on the Job Plan  the Engineered  detailed component  Procedures are completed  Maintenance Strategy  and parts data  by the craft and entered  are warranted  into the CMMS  Allied Reliability, Inc. Page 3 of 8  4360 Corporate Road    Suite 110  www.alliedreliability.com    Charleston, SC 29405  Office (843) 414‐5760     Fax (843) 414‐5779   
  • 4. Reliability Task Assignments          Allied Reliability Training Series      Task  Reliability Engineer Maintenance Engineer Planner Develops new and  innovative methods for  timely repair of assets  Prepares specific job  plans steps with  Completes job plan to  Asset Repair Techniques    detailed procedures  specified standard  for completion of  repair in the most  effective and efficient  manner  Develops specific  procedures for  Converts and maintains  Asset Test Procedures (Return to  verification of an assets    procedures in standardized  Service)  fitness for return to  format  service  Leads the Root Cause  Leads the Root Cause  Failure Analysis effort  Failure Analysis effort for  for chronic equipment  sporadic equipment  failures (typically uses  failures (typically uses  Responsible for ensuring  Cause Mapping  Logic Tree incident  that all work orders are  incident analysis)  analysis)  closed with correct closing  Catalogues and  Develops specific  codes  databases the  operational procedure  Ensures the “As Found”, “As  RCA/RCFA results and  changes to help mitigate  Left” fields on the Job Plan  Failure Investigation  subsequent action  future failures  Procedures are completed  RCA & RCFA  items  Catalogues and  by the craft and entered  Develops specific  databases the RCA/RCFA  into the CMMS  maintenance  results and subsequent  Facilitates a 5‐Why  procedure  action items  discussion with crafts and  modifications to help  Analyzes plant wide  supervision for all failure  mitigate future failures  failure data and  maintenance activities  Develops specific  downtime scenarios to  machinery  calculate relevant   modifications to help  trigger points for RCFA  mitigate future failures  Allied Reliability, Inc. Page 4 of 8  4360 Corporate Road    Suite 110  www.alliedreliability.com    Charleston, SC 29405  Office (843) 414‐5760     Fax (843) 414‐5779   
  • 5. Reliability Task Assignments          Allied Reliability Training Series      Task  Reliability Engineer Maintenance Engineer Planner Provides technical    Provides technical  assistance to  assistance to  maintenance  maintenance  supervisors, planners  supervisors, planners  Technical Support of Daily  and crafts personnel in  and crafts personnel in  Maintenance Effort  the form of specific,  the form of specific,  technical data on  technical data on system  machinery  configuration and  configuration and  performance  performance  Responsible to    Responsible for the  Asset Hierarchy and Technical  maintain a current and  upkeep of the plant  Specifications  correct technical  asset hierarchy  specifications library  Responsible for the  Supports the Reliability  upkeep of the asset  Engineer with specific,  Criticality Analysis  criticality database and    detailed failure data and  the failure modes  component configuration  criticality database  information  Utilizes metrics for  Prepares and analyzes  Utilizes specific metrics  system, asset and  reports on system, asset and  Metrics  for system, asset and  component  components metrics  component reliability  maintainability  Develops specific    Develops the  maintenance activities  maintenance strategy for  to ensure spare fitness  spare parts inventory  for duty  Develops a testing  Develops specific  Materials Management  strategy incoming new  equipment  and rebuilt spares  preservation  Develops a testing  techniques for pre‐ strategy for OEM testing  commissioning storage  compliance  of equipment   Allied Reliability, Inc. Page 5 of 8  4360 Corporate Road    Suite 110  www.alliedreliability.com    Charleston, SC 29405  Office (843) 414‐5760     Fax (843) 414‐5779   
  • 6. Reliability Task Assignments          Allied Reliability Training Series      Task  Reliability Engineer Maintenance Engineer Planner   Applies reliability  analysis methods to new  designs to determine  system, asset and  component reliability  Determines single‐point  failures  Develops commissioning  procedures for new  system, asset and  component design  Develops strategies for  Creates new  OEM warranty issues  equipment purchase  and claims  Reliability Centered Design  specifications around  Develop machinery  improved  modification plans to  maintainability  deal with single‐point  failure scenarios  Develops specific  maintenance and  operational start‐up  procedures for new  installations  Responsible to develop  new equipment  purchase specifications  for reliability and  maintainability  Allied Reliability, Inc. Page 6 of 8  4360 Corporate Road    Suite 110  www.alliedreliability.com    Charleston, SC 29405  Office (843) 414‐5760     Fax (843) 414‐5779   
  • 7. Reliability Task Assignments          Allied Reliability Training Series      Task  Reliability Engineer Maintenance Engineer Planner   Uses reliability analysis  tools to determine  operational reliability of  systems, assets and  components  Helps determine the  QA/QC test points and  procedures to maximize  operational reliability  Operational Reliability    Aides in the  development of alarms  designed to determine  and verify acceptable  operations  Develop assessment  activities centered  around operability and  performance  optimization    Responsible for  performing quantitative  Supports the  analysis on new projects  Maintenance Engineer  Reliability Economics  and determining project  with supporting data  viability based on  specific to equipment  corporate values and  maintainability  standards    Allied Reliability, Inc. Page 7 of 8  4360 Corporate Road    Suite 110  www.alliedreliability.com    Charleston, SC 29405  Office (843) 414‐5760     Fax (843) 414‐5779   
  • 8. Reliability Task Assignments          Allied Reliability Training Series      Reliability Engineering   Reliability  Maintenance  Planner  Tools and/or Techniques  Engineer  Engineer  Statistical Analysis (Basic)  Evaluation  Synthesis  Comprehension   Statistical Analysis (Advanced)  Synthesis  Analysis  Awareness   Root Cause Analysis  Evaluation  Synthesis  Analysis  Reliability Centered Maintenance  Synthesis   Analysis  Comprehension   Condition Monitoring  Synthesis  Analysis  Comprehension   Reliability Centered Design  Synthesis  Analysis  Comprehension  Availability Simulation  Synthesis  Analysis  Comprehension  Life Cycle Cost Analysis  Synthesis  Comprehension Comprehension  Criticality Analysis  Evaluation  Analysis  Comprehension    Reference:  Bloom’s Taxonomy of Learning Objectives    Knowledge  Comprehension  Application  Analysis  Synthesis  Evaluation    Allied Reliability, Inc. Page 8 of 8  4360 Corporate Road    Suite 110  www.alliedreliability.com    Charleston, SC 29405  Office (843) 414‐5760     Fax (843) 414‐5779