SlideShare a Scribd company logo
1 of 7
Yogurtland Operations
Optimization
Prepared By: Raylene Rodriquez
Snap Shot Preview
• The Problem: Patio
• Current Process: Nightly Cleaning
• The Solution: Desired Equipment
• Statistics: Current Costs
• The Result: Efficiency
Yogurtland standards are in place to maximize the customer experience.
One aspect that could easily be improved upon is the exterior dining area
Appearance. Through normal usage of our customers it has become a issue
Current Process
The nightly cleaning crew usually takes between 30-45 minutes in cleaning however they
Are not always able to get everything due to a lack in proper cleaning equipment.
The most time consuming part of the process is the amount of trips made to the sink in the
Restaurant in order to get water to scrub the concrete which is usually 4 to 6 buckets
Equipment
• Setup time is minimal
• Simple to operate
• Minimal maintenance
• More efficient with water usage
• Minimal Usage (only as necessary)
Costs
• Power Washer cost is only $229
• No additional cost for cleaning supplies
• Decrease in the use of cleaning supplies
• One time cost
• Employee labor cost decreased
• Cleaning time decreased to 15 min (25 min decrease)
The Results
$0.00
$20.00
$40.00
$60.00
$80.00
$100.00
$120.00
$140.00
$160.00
$180.00
$200.00
Week 1 Week 2 Week 3 Week 4
Labor Costs Incurred
Labor Without Power Washer Labor with power washer

More Related Content

What's hot

The 5 Lean Principles
The 5 Lean PrinciplesThe 5 Lean Principles
The 5 Lean Principlesbengreenman
 
Real lean transition case for a clothing company english daha-iyisini-yapabil...
Real lean transition case for a clothing company english daha-iyisini-yapabil...Real lean transition case for a clothing company english daha-iyisini-yapabil...
Real lean transition case for a clothing company english daha-iyisini-yapabil...Utkan Uluçay, MSc., CDDP
 
Lean awareness handouts
Lean awareness  handoutsLean awareness  handouts
Lean awareness handoutsjdrcables
 
Applications of lean manufacturing tools
Applications of lean manufacturing toolsApplications of lean manufacturing tools
Applications of lean manufacturing toolsIshmam Ahmed
 
IMPROVEMENT OF MANUFACTURING OPERATIONS THROUGH A LEAN MANAGEMENT APPROACH A...
IMPROVEMENT OF MANUFACTURING OPERATIONS  THROUGH A LEAN MANAGEMENT APPROACH A...IMPROVEMENT OF MANUFACTURING OPERATIONS  THROUGH A LEAN MANAGEMENT APPROACH A...
IMPROVEMENT OF MANUFACTURING OPERATIONS THROUGH A LEAN MANAGEMENT APPROACH A...sanobar77
 
Just in time
Just in timeJust in time
Just in timeSartaj
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutionssashi prabhu
 
Seven wastes of lean operations management
Seven wastes of lean operations managementSeven wastes of lean operations management
Seven wastes of lean operations managementHriday Bora
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OMthangv
 
Xperdyte Manufacturing at Sage Evolution Event - 2 July 2013
Xperdyte Manufacturing at Sage Evolution Event - 2 July 2013Xperdyte Manufacturing at Sage Evolution Event - 2 July 2013
Xperdyte Manufacturing at Sage Evolution Event - 2 July 2013xperdyte
 
Production & materials management
Production & materials managementProduction & materials management
Production & materials managementVaibhav Shah
 
Van Davis Resume DOC
Van Davis Resume DOCVan Davis Resume DOC
Van Davis Resume DOCVan L. Davis
 
Mba ii pmom_unit-1.4 process design, analysis & selection a
Mba ii pmom_unit-1.4 process design, analysis & selection aMba ii pmom_unit-1.4 process design, analysis & selection a
Mba ii pmom_unit-1.4 process design, analysis & selection aRai University
 

What's hot (18)

The 5 Lean Principles
The 5 Lean PrinciplesThe 5 Lean Principles
The 5 Lean Principles
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Real lean transition case for a clothing company english daha-iyisini-yapabil...
Real lean transition case for a clothing company english daha-iyisini-yapabil...Real lean transition case for a clothing company english daha-iyisini-yapabil...
Real lean transition case for a clothing company english daha-iyisini-yapabil...
 
Lean awareness handouts
Lean awareness  handoutsLean awareness  handouts
Lean awareness handouts
 
Takt Time, Cycle Time & Line Balancing
Takt Time, Cycle Time & Line BalancingTakt Time, Cycle Time & Line Balancing
Takt Time, Cycle Time & Line Balancing
 
Applications of lean manufacturing tools
Applications of lean manufacturing toolsApplications of lean manufacturing tools
Applications of lean manufacturing tools
 
5 Steps to implementing Lean
5  Steps to implementing Lean5  Steps to implementing Lean
5 Steps to implementing Lean
 
IMPROVEMENT OF MANUFACTURING OPERATIONS THROUGH A LEAN MANAGEMENT APPROACH A...
IMPROVEMENT OF MANUFACTURING OPERATIONS  THROUGH A LEAN MANAGEMENT APPROACH A...IMPROVEMENT OF MANUFACTURING OPERATIONS  THROUGH A LEAN MANAGEMENT APPROACH A...
IMPROVEMENT OF MANUFACTURING OPERATIONS THROUGH A LEAN MANAGEMENT APPROACH A...
 
Just in time
Just in timeJust in time
Just in time
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutions
 
Seven wastes of lean operations management
Seven wastes of lean operations managementSeven wastes of lean operations management
Seven wastes of lean operations management
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OM
 
Planning optimisation
Planning optimisationPlanning optimisation
Planning optimisation
 
Xperdyte Manufacturing at Sage Evolution Event - 2 July 2013
Xperdyte Manufacturing at Sage Evolution Event - 2 July 2013Xperdyte Manufacturing at Sage Evolution Event - 2 July 2013
Xperdyte Manufacturing at Sage Evolution Event - 2 July 2013
 
Production & materials management
Production & materials managementProduction & materials management
Production & materials management
 
Van Davis Resume DOC
Van Davis Resume DOCVan Davis Resume DOC
Van Davis Resume DOC
 
Overall Equipment Efficiency
Overall Equipment EfficiencyOverall Equipment Efficiency
Overall Equipment Efficiency
 
Mba ii pmom_unit-1.4 process design, analysis & selection a
Mba ii pmom_unit-1.4 process design, analysis & selection aMba ii pmom_unit-1.4 process design, analysis & selection a
Mba ii pmom_unit-1.4 process design, analysis & selection a
 

Viewers also liked

Curriculum Vitae _JALIN NILESHBHAI MEHTA_Instrumentation Engineer_1
Curriculum Vitae _JALIN NILESHBHAI MEHTA_Instrumentation Engineer_1Curriculum Vitae _JALIN NILESHBHAI MEHTA_Instrumentation Engineer_1
Curriculum Vitae _JALIN NILESHBHAI MEHTA_Instrumentation Engineer_1Jalin Mehta
 
2014 TransITech conf - How Will Future Passengers Choose to Travel and Consum...
2014 TransITech conf - How Will Future Passengers Choose to Travel and Consum...2014 TransITech conf - How Will Future Passengers Choose to Travel and Consum...
2014 TransITech conf - How Will Future Passengers Choose to Travel and Consum...David Jacobs
 
Yogurtland operations optimization
Yogurtland operations optimizationYogurtland operations optimization
Yogurtland operations optimizationrayantrod8
 
Enter paper intro
Enter paper introEnter paper intro
Enter paper introSeaminLEE
 
Yogurtland Promotional Campaign
Yogurtland Promotional CampaignYogurtland Promotional Campaign
Yogurtland Promotional CampaignNicole Fernandez
 
'Expo U' PPT for SKP insider 2015 by EnterPaper
'Expo U' PPT for SKP insider 2015 by EnterPaper'Expo U' PPT for SKP insider 2015 by EnterPaper
'Expo U' PPT for SKP insider 2015 by EnterPaperSeaminLEE
 

Viewers also liked (14)

Curriculum Vitae _JALIN NILESHBHAI MEHTA_Instrumentation Engineer_1
Curriculum Vitae _JALIN NILESHBHAI MEHTA_Instrumentation Engineer_1Curriculum Vitae _JALIN NILESHBHAI MEHTA_Instrumentation Engineer_1
Curriculum Vitae _JALIN NILESHBHAI MEHTA_Instrumentation Engineer_1
 
2014 TransITech conf - How Will Future Passengers Choose to Travel and Consum...
2014 TransITech conf - How Will Future Passengers Choose to Travel and Consum...2014 TransITech conf - How Will Future Passengers Choose to Travel and Consum...
2014 TransITech conf - How Will Future Passengers Choose to Travel and Consum...
 
Global Project
Global ProjectGlobal Project
Global Project
 
about me
about meabout me
about me
 
YUKAKO YONEZU
YUKAKO YONEZUYUKAKO YONEZU
YUKAKO YONEZU
 
Yogurtland operations optimization
Yogurtland operations optimizationYogurtland operations optimization
Yogurtland operations optimization
 
Poer Point Entrepreneur
Poer Point EntrepreneurPoer Point Entrepreneur
Poer Point Entrepreneur
 
Sludge Digestion demo
Sludge Digestion demoSludge Digestion demo
Sludge Digestion demo
 
roadsealorTRIAL (2)
roadsealorTRIAL (2)roadsealorTRIAL (2)
roadsealorTRIAL (2)
 
Enter paper intro
Enter paper introEnter paper intro
Enter paper intro
 
Yogurtland Promotional Campaign
Yogurtland Promotional CampaignYogurtland Promotional Campaign
Yogurtland Promotional Campaign
 
'Expo U' PPT for SKP insider 2015 by EnterPaper
'Expo U' PPT for SKP insider 2015 by EnterPaper'Expo U' PPT for SKP insider 2015 by EnterPaper
'Expo U' PPT for SKP insider 2015 by EnterPaper
 
Retail Operations
Retail OperationsRetail Operations
Retail Operations
 
Berkeley taxi service
Berkeley taxi serviceBerkeley taxi service
Berkeley taxi service
 

Similar to Yogurtland operations optimization

Six sigma on burning brownie
Six sigma on burning brownieSix sigma on burning brownie
Six sigma on burning brownieYamna Rashid
 
Project six sigma
Project  six sigmaProject  six sigma
Project six sigmaUrooj Iqbal
 
Cut Energy Use by Engaging Building Occupants in Energy Reduction Contests
Cut Energy Use by Engaging Building Occupants in Energy Reduction ContestsCut Energy Use by Engaging Building Occupants in Energy Reduction Contests
Cut Energy Use by Engaging Building Occupants in Energy Reduction ContestsPulse Energy
 
Just in Time and Lean Manufacturing
Just in Time and Lean ManufacturingJust in Time and Lean Manufacturing
Just in Time and Lean Manufacturingshahroze11
 
WEBINAR: 2 Easy Ways to Quantify Project Savings
WEBINAR: 2 Easy Ways to Quantify Project SavingsWEBINAR: 2 Easy Ways to Quantify Project Savings
WEBINAR: 2 Easy Ways to Quantify Project SavingsGoLeanSixSigma.com
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSJulian Kalac P.Eng
 
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh AroraJIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
Reduce Component Costs with Photo Chemical Etching
Reduce Component Costs with Photo Chemical EtchingReduce Component Costs with Photo Chemical Etching
Reduce Component Costs with Photo Chemical EtchingNewcut
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Chris Baichoo
 
Lean Supply Chain Management--by JULIAN KALAC
Lean Supply Chain Management--by JULIAN KALACLean Supply Chain Management--by JULIAN KALAC
Lean Supply Chain Management--by JULIAN KALACJulian Kalac P.Eng
 
Carbonated Softdrinks and ECA technology (CIP)
Carbonated Softdrinks and ECA technology (CIP)Carbonated Softdrinks and ECA technology (CIP)
Carbonated Softdrinks and ECA technology (CIP)Radical Waters
 
Just in time - Operation Management
Just in time - Operation ManagementJust in time - Operation Management
Just in time - Operation ManagementDurgesh S
 
IE-009 Just In Time Systems
IE-009 Just In Time SystemsIE-009 Just In Time Systems
IE-009 Just In Time Systemshandbook
 
SAMPLE PRESENTATION OF FOREGIGN TRADE POLICY .pptx
SAMPLE PRESENTATION OF FOREGIGN TRADE POLICY .pptxSAMPLE PRESENTATION OF FOREGIGN TRADE POLICY .pptx
SAMPLE PRESENTATION OF FOREGIGN TRADE POLICY .pptxaadimhatre1392000
 
SMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineSMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineParth Patel
 
Smed implementation on manufacturing stamping line
Smed implementation on manufacturing stamping lineSmed implementation on manufacturing stamping line
Smed implementation on manufacturing stamping lineDhruvShah202
 
289158090_Classic_Pen_Company_Case__1_.pptx.pdf
289158090_Classic_Pen_Company_Case__1_.pptx.pdf289158090_Classic_Pen_Company_Case__1_.pptx.pdf
289158090_Classic_Pen_Company_Case__1_.pptx.pdfluxasuhi
 

Similar to Yogurtland operations optimization (20)

Six sigma on burning brownie
Six sigma on burning brownieSix sigma on burning brownie
Six sigma on burning brownie
 
Project six sigma
Project  six sigmaProject  six sigma
Project six sigma
 
Cut Energy Use by Engaging Building Occupants in Energy Reduction Contests
Cut Energy Use by Engaging Building Occupants in Energy Reduction ContestsCut Energy Use by Engaging Building Occupants in Energy Reduction Contests
Cut Energy Use by Engaging Building Occupants in Energy Reduction Contests
 
Just in Time and Lean Manufacturing
Just in Time and Lean ManufacturingJust in Time and Lean Manufacturing
Just in Time and Lean Manufacturing
 
Lean with green
Lean with greenLean with green
Lean with green
 
Ch9 Jit
Ch9 JitCh9 Jit
Ch9 Jit
 
WEBINAR: 2 Easy Ways to Quantify Project Savings
WEBINAR: 2 Easy Ways to Quantify Project SavingsWEBINAR: 2 Easy Ways to Quantify Project Savings
WEBINAR: 2 Easy Ways to Quantify Project Savings
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
 
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh AroraJIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
 
Reduce Component Costs with Photo Chemical Etching
Reduce Component Costs with Photo Chemical EtchingReduce Component Costs with Photo Chemical Etching
Reduce Component Costs with Photo Chemical Etching
 
Lean Production
Lean ProductionLean Production
Lean Production
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006
 
Lean Supply Chain Management--by JULIAN KALAC
Lean Supply Chain Management--by JULIAN KALACLean Supply Chain Management--by JULIAN KALAC
Lean Supply Chain Management--by JULIAN KALAC
 
Carbonated Softdrinks and ECA technology (CIP)
Carbonated Softdrinks and ECA technology (CIP)Carbonated Softdrinks and ECA technology (CIP)
Carbonated Softdrinks and ECA technology (CIP)
 
Just in time - Operation Management
Just in time - Operation ManagementJust in time - Operation Management
Just in time - Operation Management
 
IE-009 Just In Time Systems
IE-009 Just In Time SystemsIE-009 Just In Time Systems
IE-009 Just In Time Systems
 
SAMPLE PRESENTATION OF FOREGIGN TRADE POLICY .pptx
SAMPLE PRESENTATION OF FOREGIGN TRADE POLICY .pptxSAMPLE PRESENTATION OF FOREGIGN TRADE POLICY .pptx
SAMPLE PRESENTATION OF FOREGIGN TRADE POLICY .pptx
 
SMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineSMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping Line
 
Smed implementation on manufacturing stamping line
Smed implementation on manufacturing stamping lineSmed implementation on manufacturing stamping line
Smed implementation on manufacturing stamping line
 
289158090_Classic_Pen_Company_Case__1_.pptx.pdf
289158090_Classic_Pen_Company_Case__1_.pptx.pdf289158090_Classic_Pen_Company_Case__1_.pptx.pdf
289158090_Classic_Pen_Company_Case__1_.pptx.pdf
 

Yogurtland operations optimization

  • 2. Snap Shot Preview • The Problem: Patio • Current Process: Nightly Cleaning • The Solution: Desired Equipment • Statistics: Current Costs • The Result: Efficiency
  • 3. Yogurtland standards are in place to maximize the customer experience. One aspect that could easily be improved upon is the exterior dining area Appearance. Through normal usage of our customers it has become a issue
  • 4. Current Process The nightly cleaning crew usually takes between 30-45 minutes in cleaning however they Are not always able to get everything due to a lack in proper cleaning equipment. The most time consuming part of the process is the amount of trips made to the sink in the Restaurant in order to get water to scrub the concrete which is usually 4 to 6 buckets
  • 5. Equipment • Setup time is minimal • Simple to operate • Minimal maintenance • More efficient with water usage • Minimal Usage (only as necessary)
  • 6. Costs • Power Washer cost is only $229 • No additional cost for cleaning supplies • Decrease in the use of cleaning supplies • One time cost • Employee labor cost decreased • Cleaning time decreased to 15 min (25 min decrease)
  • 7. The Results $0.00 $20.00 $40.00 $60.00 $80.00 $100.00 $120.00 $140.00 $160.00 $180.00 $200.00 Week 1 Week 2 Week 3 Week 4 Labor Costs Incurred Labor Without Power Washer Labor with power washer