Technology and Skills
in the Construction
Industry
Introduction
The UK Commission is working to transform the UK’s approach to investing in the
skills of its people as an intrinsic part of securing jobs and growth. Key to our
ambition is the need to encourage greater employer ownership of skills, working
to secure long term sustainable partnerships.
This slide pack and accompanying evidence report present the case for more
employers to invest in developing higher level skills in the Construction
Industry. It explores the skills required to meet the demands created by existing
and emerging technologies in construction. The main focus is on innovative
modern methods of construction, particularly offsite construction.
Slide packs and reports are also available for a number of other sectors from:
www.ukces.org.uk Each of the sectors are important to the economy in terms of
driving up higher level skills through technological advancements.
For information about this slide pack and accompanying report please contact:
Helen Beck (Helen.Beck@ukces.org.uk)
Source information can be found in the notes section of each slide. 2
Storyboard
What is the impact of
technology on
higher level skills
needs in the
construction
industry?
The UK construction
industry today
Technology in the
construction
industry
Offsite construction
and drivers
influencing take up
Skills and job roles
in offsite
construction
Future skills and job
roles in offsite
construction
Opportunities and
challenges
Implications for the
government and
construction
industry
3
The UK construction industry today
• The construction industry is a key sector
for the UK economy, contributing nearly
£90 billion with around 3 million jobs based
in construction.
• The sector is dominated by high levels of
self employment, with small and micro
businesses accounting for around 95% of
the sector, although large companies
conduct a disproportionate proportion of
the work by value.
• The global construction market is forecast
to grow by over 70% by 2025, with positive
signs of growth for the industry in the UK.
• A key challenge for the sector is to
maintain its supply of skills, especially
during periods of weak demand.
4
Technology in the construction industry
• Technological change and the drive towards sustainable and low-
carbon construction impacts on skills needs within the industry. High
level skills will be needed to drive the development and use of
innovative methods of building and the uptake of new technologies
and materials.
• Modern methods of construction (MMC) have the potential to introduce
greater efficiencies into the construction process, chiefly through
innovations in building design and management – for example in
adoption of Building Information Modelling (BIM) – and in offsite
construction processes.
• This presents a major opportunity to build quicker, to a higher quality,
more sustainably, foster innovation and compete on the global market.
• MMC and the implementation of low carbon systems will require
new skills and the adaption and upgrading of the skills of people
currently working in the sector.
5
The demand for skills and jobs
Aims to understand the requirements for high level (and supporting)
technical skills, focussing on the supply chain from innovation to
development through to use of technologies:
6
Innovation
Scientific
research and
development
and birth of new
technology and
methods
Development
Integration of
technology into
new products or
processes
Use
Application of
new technology
and processes
The study explores the skills required to meet the demands
created by the use of offsite construction and the associated
impact on job roles.
Definition of offsite construction
12% of construction takes place offsite. The most recent estimates
(2006) suggest the value of offsite construction – specifically the part of
the industry using techniques not as yet routinely used in mainstream
construction – is around £1.5 billion.
Four main categories of production are recognised as ‘offsite’ and
these link closely with the manufacturing sector.
7
Offsite
Component
sub-
assembly
Non-
volumetric
pre-
assembly
Volumetric
pre-
assembly
Complete
buildings
Offsite is most
commonly associated
with pre-fabricated
post war building but is
increasingly
technology driven
Offsite includes
modules, pods, ‘kit’
homes, panelised
systems and small
scale items assembled
offsite, such as
windows and doors
Offsite construction: Context and drivers
• The current recession has supressed the adoption of new technologies but
there is a growing acceptance that offsite will increase in importance
and is key in realising new opportunities for the construction industry.
Drivers influencing the uptake of offsite include:
• Offsite is an opportunity to more tightly control costs, respond to Government
targets for BIM and energy efficiency, increase efficiency in the build process
and improve quality (including site health and safety).
• Future potential will lie in new technologies with the most commercial
application: not necessarily the most ‘innovative’ or technologically advanced
concepts.
8
UK
Government
commitment
Energy
efficiency and
sustainability
Housing
shortage
Fiscal
uncertainty
Emerging
technologies
Ageing
workforce
Current geographical take up of offsite
At present the distribution of offsite construction activity is fairly
irregular in terms of its geographical coverage. Some regional
differences have been reported in the adoption of offsite:
• Largely concentrated in the South of England (mainly infrastructure
projects such as schools, prisons and hospitals);
• Scotland has a large volume of timber frame production (as does
Wales to an extent);
• Some evidence to suggest production sites are commonly located in
areas with a history of manufacturing;
• Limited use of offsite method in Northern Ireland.
The training offer for offsite is equally as fragmented.
9
Hubs of activity
Skills for offsite
10
Core skills, knowledge and behaviours
• Greater focus in future on a knowledge economy and
increased interaction between design, construction,
manufacturing and engineering disciplines
Knowledge, mutual
understanding and
collaboration
• Increasing importance of ‘selling’ the concept of offsite,
requiring skills in negotiation and influencing, and
technical understanding of the technology
Marketing and business
case development
• Management of the interface between offsite and onsite,
requiring skills in timing, sequencing and scheduling
Project management
• BIM requires well developed IT skills
• Knowledge of CAD and automated tools
Information technology
• Requiring skills in phasing of the building process:
development, production, utilisation and disposal
Planning and design
• Design to consider repair and maintenance requirements
(such as air tightness), particularly critical to maintain
energy efficiency
A whole life approach
Skills and job roles in offsite
A key function for the future will be subsequent onsite ‘assembly’ of
offsite manufactured components: rather than ‘construction’ in the
traditional sense.
11
Key differences between onsite and offsite
Integral link with manufacturing sector
Offsite construction is closely associated with
manufacturing: relating the build process to
manufacturing processes. The management of this process and the
interface between the offsite and onsite environment is critical.
“There is a need for multi-skilled people
that are able to understand the interaction
between different materials, for example if
you put timber and insulation products
together, that will require knowledge of
factors such as condensation risk. It is
less about the individual materials but
more about how they interact”
(Technology developer)
Offsite manufacturing:
Specialists skilled
in highly repetitive tasks
Onsite assembly:
Specialists in assembly
with a high degree of
situational awareness
Skills and job roles in offsite
12
Primary, secondary and tertiary job roles required for offsite
construction:
Primary
• Architect
• BIM Modeller
• CAD Specialist
• Consultant
• Designer
• Logistics Manager
• Manufacturer
• Planner
• Project Manager
• Quantity Surveyor
• Site Supervisor
• Structural Engineer
• Supply Chain Manager
• Technician
• Technical Salesperson
Secondary
• Bricklayer
• Carpenter/Joiner
• Electrician
• Factory Worker
• Glazer
• Heating, Ventilation, Air-
Conditioning and
Refrigeration Engineer
• Insulation Installer
• Masonry Worker
• Painter/Decorator
• Plasterer
• Plumber
• Roofer
• Tiler
• Welder
Tertiary
• Banker
• Design Office
Administrator
• General Labourer
• Insurer
• Procurer
• Scheduler
Qualifications and training
13
Concerns with existing education, training and qualification
provision:
Training is largely
conducted in discipline
silos
Much training takes place in-house
Disconnection between
industry and academia
Fragmented provision
Bespoke nature of offsite
creates challenges to
provision of
qualifications and
training
Apprenticeship provision
focussing on ‘traditional’
brick and block
construction methods
Limited understanding
of offsite and some
employer resistance to
change
“There are not enough design engineers –
we have been trying to recruit them for
months. Because the right skills are not
available in the market place the next best
thing is to find people with the right drive
and train them up” (Technology developer)
“Businesses are developing
their own, better solutions
(than are offered by many
training providers) to deliver
training that is bespoke to
their needs” (Technology
innovator)
Example: Timber frame construction
Using a prefabricated timber frame is much
faster than traditional brick and block construction.
At present Scotland maintains the greatest
market share of timber framed building at
around 40% of all new housing.
14
“One of the main benefits in
offsite timber frame construction
is the speed at which erection
can be carried out. We erected
four new classrooms at a school
in just less than 11 weeks, as a
traditional construction project it
would have taken months.
Reducing timescales reduces
disturbance and hazard”
(Timber frame manufacturer)
Skills
required
Dynamic
insulation
Insulation
fitting
Thermal
bridging
detailing
Waste water
heat
recovery
Procurement
Task
management
Cost
management
Mechanical
ventilation
installation
Timber frame construction: job roles
15
Job roles across all levels:
Design
• Architect
• Architectural
Technician
• Design
Consultant
• Technical
Management
• Timber Frame
Designer
Construction
• Contracts
Manager
• Factory
Manager
• Factory
Operatives
• Health and
Safety
Manager
• Site Manager
and Assistant
• Site Trades
• Subcontractor
Commerce
• Buyer
• Commercial
Manager
• Site Surveyor
Sales and
customer care
• Customer
Service
Manager
• Customer
Service
Operative
• Marketing
Executive
• Sales
Administrator
• Sales
Consultant
• Sales
Manager
Example: Straw bale construction
• Straw bale construction uses straw bales either as a loadbearing
structure or as infill to an independent structural system.
• Straw is warm, durable, renewable and has a negative carbon
footprint, absorbing CO2 from the atmosphere.
• Emphasis on drawing and planning, as well as fitting and erection
onsite. Roles within factories manufacturing panels are commonly filled
with those trained in traditional construction methods such as carpentry
and joinery.
• Skills for operational management and business roles include design,
marketing and project management.
• Few universities include modules on prefabrication.
16
Skills required
Future jobs and skills
• Multi-skilling and greater flexibility within
job roles is likely for onsite assembly.
• Offsite could result in multi-skilling becoming
more ‘mainstream’, with smaller teams being required to assemble
components onsite, needing to work more closely together.
• Occupations will be expected to work more collaboratively, rather than
in silos, requiring a clearer knowledge and understanding of other job
roles and how they contribute to the holistic offsite project.
• Roles may become more interlinked particularly at managerial and
professional levels, for example, a technical sales role will require an
overlap between commercial and technical skills.
17
The evolution of job roles
Design
Engineering
Construction/
Manufacturing
“It is not really about new job roles, as it’s merely a transfer of skills from onsite to offsite.
This will require people with a very good understanding of how systems are put together onsite”
(Technology developer)
Future jobs and skills
• Understanding of the design/manufacture/construction
interface;
• Highly developed skills in project management,
scheduling and planning;
• High level skills in marketing, technical
sales, influencing and negotiating;
• Wider adoption of a ‘whole life approach’ to structures.
18
An increased requirement for:
“Designing for manufacture is a
skill that we need to work on.
It’s a mix really of a traditional
design architect and a
consulting engineer role. It’s all
about turning what was a
construction process into a
manufacturing process”
User of technology
“Offsite makes it more important to consider how work is planned, designed and scheduled. If
managers have qualified with high level current qualifications but their expertise is traditionally onsite
then it could be very difficult to move to offsite. It’s not necessarily the technical skills that are different
but more the softer skills including planning, sequencing and link between design and build”
User of technology
Future higher level job roles
• Architect
• BIM Modellers
• Designer
• Planner
• Site supervisor/manager or project manager
• Structural engineer
• Design office staff, including BIM modellers
and CAD specialists
• Engineers
• Project managers
• Quantity surveyors
• Schedulers 19
Greatest impact of offsite is expected for:
Future demand expected for
Opportunities
• Potential to encourage a greater diversity of people,
including more young people, into the sector due to
weatherproof working conditions and reduction in the
use of manual labour;
• Contribute to environmental and sustainability targets;
• Respond to housing demand;
• Realise cost savings through reduced build time;
• Improve sector productivity and build quality;
• Improve health and safety;
• Increase efficiency in the construction process;
• Greater integration of roles and collaborative working;
• Expand construction export market to compete.
globally 20
The increasing uptake and use of offsite construction can
realise the following opportunities for the construction industry
“Offsite construction
carried out in factories can
employ many thousands
of people who would
otherwise be out of work.
It opens up a new labour
market”
Technology developer
Challenges
The future potential of offsite is heavily influenced by a number of
competing factors affecting the level of market demand
• Construction industry can be conservative, leading to reluctance of some
builders to adopt MMC/offsite;
• Need to achieve critical mass in production to realise cost-savings and avoid
high capital costs;
• Risk averse financiers, investors and insurers;
• Time lag in new technologies reaching the market due to time required to
gain certification and the recognition of new technologies;
• Strong and established international competition;
• Negative public associations with ‘pre-fabricated’ structures;
• Patchy’ geographical distribution of offsite industry and expertise;
• Lack of collaboration or direct connection between academia and industry;
• Fragmented training provision offer;
• Difficulties in forecasting growth and uptake of offsite technologies.
21
Conclusions: Implications for government
and the industry
Closer collaborative relationships
• Greater collaboration between industry and academia to influence
the design of training programmes and qualifications.
• Consideration could be given to the creation of an Offsite Skills
Network to bring together academia, research institutes and
industry to share knowledge and establish an interface between
innovation and commercial application.
Stimulating demand
• Trade Federations and Professional Bodies may wish to work
collaboratively on programmes to educate investors, industry
stakeholders and home-owners.
22
Conclusions: Implications (continued)
Training and qualifications
• A culture of ‘multi-skilling’ could be embedded at training stage. For
instance, training could seek to equip students with a broader skills and
knowledge base about offsite.
• Training and education providers could consider approaches to offsite
training provision in Austria and Germany and identify good practice which
can be transferred to the UK.
Careers information
• Advice and guidance to those seeking opportunities in the construction
sector that includes consideration of offsite construction job roles could
help offer clear pathways to higher level occupations and promote offsite to
a greater diversity of people.
Continuing Professional Development
• The construction industry is more likely to be able to take advantage of
CPD that can be delivered flexibly (for example via webinars outside of
core working hours), and that is not cost prohibitive.
23
24
01709 774800
info@ukces.org.uk
#hightechskills

More Related Content

Similar to Technology_and_skills_in_the_construction_industry_slide_pack.pptx

034 INNOVATION DELAY AND DISRUPTION, WASTE ON SITE
034 INNOVATION DELAY AND DISRUPTION, WASTE ON SITE 034 INNOVATION DELAY AND DISRUPTION, WASTE ON SITE
034 INNOVATION DELAY AND DISRUPTION, WASTE ON SITE Dr Fereidoun Dejahang
 
034 innovation & productivity
034 innovation & productivity034 innovation & productivity
034 innovation & productivitydrdej19
 
BIM Gathering 2015 - JHunt.
BIM Gathering 2015 - JHunt.BIM Gathering 2015 - JHunt.
BIM Gathering 2015 - JHunt.John Hunt
 
Emerging Technology in Practice in the field of architectural practice
Emerging Technology in Practice in the field of architectural practiceEmerging Technology in Practice in the field of architectural practice
Emerging Technology in Practice in the field of architectural practicekubahadurrr
 
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 20165 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016Aconex
 
Transforming Infrastructure Performance #COMIT2018
Transforming Infrastructure Performance #COMIT2018Transforming Infrastructure Performance #COMIT2018
Transforming Infrastructure Performance #COMIT2018Comit Projects Ltd
 
IRJET- Study of Procurement Models in the Construction Industry
IRJET- 	  Study of Procurement Models in the Construction IndustryIRJET- 	  Study of Procurement Models in the Construction Industry
IRJET- Study of Procurement Models in the Construction IndustryIRJET Journal
 
Lcc asia pacific engineering and construction technology ConTech
Lcc asia pacific engineering and construction technology ConTechLcc asia pacific engineering and construction technology ConTech
Lcc asia pacific engineering and construction technology ConTechLCC Asia Pacific Corporate Finance
 
Reimagine project delivery with Oracle Industries Innovation Lab UK
Reimagine project delivery with Oracle Industries Innovation Lab UKReimagine project delivery with Oracle Industries Innovation Lab UK
Reimagine project delivery with Oracle Industries Innovation Lab UKAssociation for Project Management
 
Enabled by Design-athon: Robin Wilson
Enabled by Design-athon: Robin WilsonEnabled by Design-athon: Robin Wilson
Enabled by Design-athon: Robin Wilsonenabledbydesign
 
Digital Academy for Sustainable Built Environment
Digital Academy for Sustainable Built EnvironmentDigital Academy for Sustainable Built Environment
Digital Academy for Sustainable Built EnvironmentSeamus Hoyne
 
Could Modular Construction Influence Housing Affordability?
Could Modular Construction Influence Housing Affordability?Could Modular Construction Influence Housing Affordability?
Could Modular Construction Influence Housing Affordability?Scott Robinson
 
Could modular construction influence housing affordability 7.27.16
Could modular construction influence housing affordability 7.27.16Could modular construction influence housing affordability 7.27.16
Could modular construction influence housing affordability 7.27.16Denham Apperley
 
Analogue to Digital
Analogue to DigitalAnalogue to Digital
Analogue to DigitalThe NBS
 

Similar to Technology_and_skills_in_the_construction_industry_slide_pack.pptx (20)

Innovation technique in construction
Innovation technique in constructionInnovation technique in construction
Innovation technique in construction
 
Allan matthews bp icam
Allan matthews   bp icamAllan matthews   bp icam
Allan matthews bp icam
 
034 INNOVATION DELAY AND DISRUPTION, WASTE ON SITE
034 INNOVATION DELAY AND DISRUPTION, WASTE ON SITE 034 INNOVATION DELAY AND DISRUPTION, WASTE ON SITE
034 INNOVATION DELAY AND DISRUPTION, WASTE ON SITE
 
034 innovation & productivity
034 innovation & productivity034 innovation & productivity
034 innovation & productivity
 
BIM Gathering 2015 - JHunt.
BIM Gathering 2015 - JHunt.BIM Gathering 2015 - JHunt.
BIM Gathering 2015 - JHunt.
 
022 a construction productivity (2)
022 a construction productivity (2)022 a construction productivity (2)
022 a construction productivity (2)
 
Emerging Technology in Practice in the field of architectural practice
Emerging Technology in Practice in the field of architectural practiceEmerging Technology in Practice in the field of architectural practice
Emerging Technology in Practice in the field of architectural practice
 
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 20165 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
 
Dawn Thompson
Dawn ThompsonDawn Thompson
Dawn Thompson
 
Transforming Infrastructure Performance #COMIT2018
Transforming Infrastructure Performance #COMIT2018Transforming Infrastructure Performance #COMIT2018
Transforming Infrastructure Performance #COMIT2018
 
IRJET- Study of Procurement Models in the Construction Industry
IRJET- 	  Study of Procurement Models in the Construction IndustryIRJET- 	  Study of Procurement Models in the Construction Industry
IRJET- Study of Procurement Models in the Construction Industry
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
Lcc asia pacific engineering and construction technology ConTech
Lcc asia pacific engineering and construction technology ConTechLcc asia pacific engineering and construction technology ConTech
Lcc asia pacific engineering and construction technology ConTech
 
Prefabricated structure
Prefabricated structurePrefabricated structure
Prefabricated structure
 
Reimagine project delivery with Oracle Industries Innovation Lab UK
Reimagine project delivery with Oracle Industries Innovation Lab UKReimagine project delivery with Oracle Industries Innovation Lab UK
Reimagine project delivery with Oracle Industries Innovation Lab UK
 
Enabled by Design-athon: Robin Wilson
Enabled by Design-athon: Robin WilsonEnabled by Design-athon: Robin Wilson
Enabled by Design-athon: Robin Wilson
 
Digital Academy for Sustainable Built Environment
Digital Academy for Sustainable Built EnvironmentDigital Academy for Sustainable Built Environment
Digital Academy for Sustainable Built Environment
 
Could Modular Construction Influence Housing Affordability?
Could Modular Construction Influence Housing Affordability?Could Modular Construction Influence Housing Affordability?
Could Modular Construction Influence Housing Affordability?
 
Could modular construction influence housing affordability 7.27.16
Could modular construction influence housing affordability 7.27.16Could modular construction influence housing affordability 7.27.16
Could modular construction influence housing affordability 7.27.16
 
Analogue to Digital
Analogue to DigitalAnalogue to Digital
Analogue to Digital
 

Recently uploaded

办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一F La
 
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...narwatsonia7
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiSuhani Kapoor
 
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一A SSS
 
NATA 2024 SYLLABUS, full syllabus explained in detail
NATA 2024 SYLLABUS, full syllabus explained in detailNATA 2024 SYLLABUS, full syllabus explained in detail
NATA 2024 SYLLABUS, full syllabus explained in detailDesigntroIntroducing
 
306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social MediaD SSS
 
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Servicejennyeacort
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130Suhani Kapoor
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一Fi L
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVAAnastasiya Kudinova
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一Fi sss
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxmapanig881
 
Kindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpKindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpmainac1
 
Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girlsssuser7cb4ff
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一z xss
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证nhjeo1gg
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一lvtagr7
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 

Recently uploaded (20)

办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
 
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
 
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
 
NATA 2024 SYLLABUS, full syllabus explained in detail
NATA 2024 SYLLABUS, full syllabus explained in detailNATA 2024 SYLLABUS, full syllabus explained in detail
NATA 2024 SYLLABUS, full syllabus explained in detail
 
306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media
 
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 night
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 nightCheap Rate Call girls Kalkaji 9205541914 shot 1500 night
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 night
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptx
 
Kindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpKindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUp
 
Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girls
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 

Technology_and_skills_in_the_construction_industry_slide_pack.pptx

  • 1. Technology and Skills in the Construction Industry
  • 2. Introduction The UK Commission is working to transform the UK’s approach to investing in the skills of its people as an intrinsic part of securing jobs and growth. Key to our ambition is the need to encourage greater employer ownership of skills, working to secure long term sustainable partnerships. This slide pack and accompanying evidence report present the case for more employers to invest in developing higher level skills in the Construction Industry. It explores the skills required to meet the demands created by existing and emerging technologies in construction. The main focus is on innovative modern methods of construction, particularly offsite construction. Slide packs and reports are also available for a number of other sectors from: www.ukces.org.uk Each of the sectors are important to the economy in terms of driving up higher level skills through technological advancements. For information about this slide pack and accompanying report please contact: Helen Beck (Helen.Beck@ukces.org.uk) Source information can be found in the notes section of each slide. 2
  • 3. Storyboard What is the impact of technology on higher level skills needs in the construction industry? The UK construction industry today Technology in the construction industry Offsite construction and drivers influencing take up Skills and job roles in offsite construction Future skills and job roles in offsite construction Opportunities and challenges Implications for the government and construction industry 3
  • 4. The UK construction industry today • The construction industry is a key sector for the UK economy, contributing nearly £90 billion with around 3 million jobs based in construction. • The sector is dominated by high levels of self employment, with small and micro businesses accounting for around 95% of the sector, although large companies conduct a disproportionate proportion of the work by value. • The global construction market is forecast to grow by over 70% by 2025, with positive signs of growth for the industry in the UK. • A key challenge for the sector is to maintain its supply of skills, especially during periods of weak demand. 4
  • 5. Technology in the construction industry • Technological change and the drive towards sustainable and low- carbon construction impacts on skills needs within the industry. High level skills will be needed to drive the development and use of innovative methods of building and the uptake of new technologies and materials. • Modern methods of construction (MMC) have the potential to introduce greater efficiencies into the construction process, chiefly through innovations in building design and management – for example in adoption of Building Information Modelling (BIM) – and in offsite construction processes. • This presents a major opportunity to build quicker, to a higher quality, more sustainably, foster innovation and compete on the global market. • MMC and the implementation of low carbon systems will require new skills and the adaption and upgrading of the skills of people currently working in the sector. 5
  • 6. The demand for skills and jobs Aims to understand the requirements for high level (and supporting) technical skills, focussing on the supply chain from innovation to development through to use of technologies: 6 Innovation Scientific research and development and birth of new technology and methods Development Integration of technology into new products or processes Use Application of new technology and processes The study explores the skills required to meet the demands created by the use of offsite construction and the associated impact on job roles.
  • 7. Definition of offsite construction 12% of construction takes place offsite. The most recent estimates (2006) suggest the value of offsite construction – specifically the part of the industry using techniques not as yet routinely used in mainstream construction – is around £1.5 billion. Four main categories of production are recognised as ‘offsite’ and these link closely with the manufacturing sector. 7 Offsite Component sub- assembly Non- volumetric pre- assembly Volumetric pre- assembly Complete buildings Offsite is most commonly associated with pre-fabricated post war building but is increasingly technology driven Offsite includes modules, pods, ‘kit’ homes, panelised systems and small scale items assembled offsite, such as windows and doors
  • 8. Offsite construction: Context and drivers • The current recession has supressed the adoption of new technologies but there is a growing acceptance that offsite will increase in importance and is key in realising new opportunities for the construction industry. Drivers influencing the uptake of offsite include: • Offsite is an opportunity to more tightly control costs, respond to Government targets for BIM and energy efficiency, increase efficiency in the build process and improve quality (including site health and safety). • Future potential will lie in new technologies with the most commercial application: not necessarily the most ‘innovative’ or technologically advanced concepts. 8 UK Government commitment Energy efficiency and sustainability Housing shortage Fiscal uncertainty Emerging technologies Ageing workforce
  • 9. Current geographical take up of offsite At present the distribution of offsite construction activity is fairly irregular in terms of its geographical coverage. Some regional differences have been reported in the adoption of offsite: • Largely concentrated in the South of England (mainly infrastructure projects such as schools, prisons and hospitals); • Scotland has a large volume of timber frame production (as does Wales to an extent); • Some evidence to suggest production sites are commonly located in areas with a history of manufacturing; • Limited use of offsite method in Northern Ireland. The training offer for offsite is equally as fragmented. 9 Hubs of activity
  • 10. Skills for offsite 10 Core skills, knowledge and behaviours • Greater focus in future on a knowledge economy and increased interaction between design, construction, manufacturing and engineering disciplines Knowledge, mutual understanding and collaboration • Increasing importance of ‘selling’ the concept of offsite, requiring skills in negotiation and influencing, and technical understanding of the technology Marketing and business case development • Management of the interface between offsite and onsite, requiring skills in timing, sequencing and scheduling Project management • BIM requires well developed IT skills • Knowledge of CAD and automated tools Information technology • Requiring skills in phasing of the building process: development, production, utilisation and disposal Planning and design • Design to consider repair and maintenance requirements (such as air tightness), particularly critical to maintain energy efficiency A whole life approach
  • 11. Skills and job roles in offsite A key function for the future will be subsequent onsite ‘assembly’ of offsite manufactured components: rather than ‘construction’ in the traditional sense. 11 Key differences between onsite and offsite Integral link with manufacturing sector Offsite construction is closely associated with manufacturing: relating the build process to manufacturing processes. The management of this process and the interface between the offsite and onsite environment is critical. “There is a need for multi-skilled people that are able to understand the interaction between different materials, for example if you put timber and insulation products together, that will require knowledge of factors such as condensation risk. It is less about the individual materials but more about how they interact” (Technology developer) Offsite manufacturing: Specialists skilled in highly repetitive tasks Onsite assembly: Specialists in assembly with a high degree of situational awareness
  • 12. Skills and job roles in offsite 12 Primary, secondary and tertiary job roles required for offsite construction: Primary • Architect • BIM Modeller • CAD Specialist • Consultant • Designer • Logistics Manager • Manufacturer • Planner • Project Manager • Quantity Surveyor • Site Supervisor • Structural Engineer • Supply Chain Manager • Technician • Technical Salesperson Secondary • Bricklayer • Carpenter/Joiner • Electrician • Factory Worker • Glazer • Heating, Ventilation, Air- Conditioning and Refrigeration Engineer • Insulation Installer • Masonry Worker • Painter/Decorator • Plasterer • Plumber • Roofer • Tiler • Welder Tertiary • Banker • Design Office Administrator • General Labourer • Insurer • Procurer • Scheduler
  • 13. Qualifications and training 13 Concerns with existing education, training and qualification provision: Training is largely conducted in discipline silos Much training takes place in-house Disconnection between industry and academia Fragmented provision Bespoke nature of offsite creates challenges to provision of qualifications and training Apprenticeship provision focussing on ‘traditional’ brick and block construction methods Limited understanding of offsite and some employer resistance to change “There are not enough design engineers – we have been trying to recruit them for months. Because the right skills are not available in the market place the next best thing is to find people with the right drive and train them up” (Technology developer) “Businesses are developing their own, better solutions (than are offered by many training providers) to deliver training that is bespoke to their needs” (Technology innovator)
  • 14. Example: Timber frame construction Using a prefabricated timber frame is much faster than traditional brick and block construction. At present Scotland maintains the greatest market share of timber framed building at around 40% of all new housing. 14 “One of the main benefits in offsite timber frame construction is the speed at which erection can be carried out. We erected four new classrooms at a school in just less than 11 weeks, as a traditional construction project it would have taken months. Reducing timescales reduces disturbance and hazard” (Timber frame manufacturer) Skills required Dynamic insulation Insulation fitting Thermal bridging detailing Waste water heat recovery Procurement Task management Cost management Mechanical ventilation installation
  • 15. Timber frame construction: job roles 15 Job roles across all levels: Design • Architect • Architectural Technician • Design Consultant • Technical Management • Timber Frame Designer Construction • Contracts Manager • Factory Manager • Factory Operatives • Health and Safety Manager • Site Manager and Assistant • Site Trades • Subcontractor Commerce • Buyer • Commercial Manager • Site Surveyor Sales and customer care • Customer Service Manager • Customer Service Operative • Marketing Executive • Sales Administrator • Sales Consultant • Sales Manager
  • 16. Example: Straw bale construction • Straw bale construction uses straw bales either as a loadbearing structure or as infill to an independent structural system. • Straw is warm, durable, renewable and has a negative carbon footprint, absorbing CO2 from the atmosphere. • Emphasis on drawing and planning, as well as fitting and erection onsite. Roles within factories manufacturing panels are commonly filled with those trained in traditional construction methods such as carpentry and joinery. • Skills for operational management and business roles include design, marketing and project management. • Few universities include modules on prefabrication. 16 Skills required
  • 17. Future jobs and skills • Multi-skilling and greater flexibility within job roles is likely for onsite assembly. • Offsite could result in multi-skilling becoming more ‘mainstream’, with smaller teams being required to assemble components onsite, needing to work more closely together. • Occupations will be expected to work more collaboratively, rather than in silos, requiring a clearer knowledge and understanding of other job roles and how they contribute to the holistic offsite project. • Roles may become more interlinked particularly at managerial and professional levels, for example, a technical sales role will require an overlap between commercial and technical skills. 17 The evolution of job roles Design Engineering Construction/ Manufacturing “It is not really about new job roles, as it’s merely a transfer of skills from onsite to offsite. This will require people with a very good understanding of how systems are put together onsite” (Technology developer)
  • 18. Future jobs and skills • Understanding of the design/manufacture/construction interface; • Highly developed skills in project management, scheduling and planning; • High level skills in marketing, technical sales, influencing and negotiating; • Wider adoption of a ‘whole life approach’ to structures. 18 An increased requirement for: “Designing for manufacture is a skill that we need to work on. It’s a mix really of a traditional design architect and a consulting engineer role. It’s all about turning what was a construction process into a manufacturing process” User of technology “Offsite makes it more important to consider how work is planned, designed and scheduled. If managers have qualified with high level current qualifications but their expertise is traditionally onsite then it could be very difficult to move to offsite. It’s not necessarily the technical skills that are different but more the softer skills including planning, sequencing and link between design and build” User of technology
  • 19. Future higher level job roles • Architect • BIM Modellers • Designer • Planner • Site supervisor/manager or project manager • Structural engineer • Design office staff, including BIM modellers and CAD specialists • Engineers • Project managers • Quantity surveyors • Schedulers 19 Greatest impact of offsite is expected for: Future demand expected for
  • 20. Opportunities • Potential to encourage a greater diversity of people, including more young people, into the sector due to weatherproof working conditions and reduction in the use of manual labour; • Contribute to environmental and sustainability targets; • Respond to housing demand; • Realise cost savings through reduced build time; • Improve sector productivity and build quality; • Improve health and safety; • Increase efficiency in the construction process; • Greater integration of roles and collaborative working; • Expand construction export market to compete. globally 20 The increasing uptake and use of offsite construction can realise the following opportunities for the construction industry “Offsite construction carried out in factories can employ many thousands of people who would otherwise be out of work. It opens up a new labour market” Technology developer
  • 21. Challenges The future potential of offsite is heavily influenced by a number of competing factors affecting the level of market demand • Construction industry can be conservative, leading to reluctance of some builders to adopt MMC/offsite; • Need to achieve critical mass in production to realise cost-savings and avoid high capital costs; • Risk averse financiers, investors and insurers; • Time lag in new technologies reaching the market due to time required to gain certification and the recognition of new technologies; • Strong and established international competition; • Negative public associations with ‘pre-fabricated’ structures; • Patchy’ geographical distribution of offsite industry and expertise; • Lack of collaboration or direct connection between academia and industry; • Fragmented training provision offer; • Difficulties in forecasting growth and uptake of offsite technologies. 21
  • 22. Conclusions: Implications for government and the industry Closer collaborative relationships • Greater collaboration between industry and academia to influence the design of training programmes and qualifications. • Consideration could be given to the creation of an Offsite Skills Network to bring together academia, research institutes and industry to share knowledge and establish an interface between innovation and commercial application. Stimulating demand • Trade Federations and Professional Bodies may wish to work collaboratively on programmes to educate investors, industry stakeholders and home-owners. 22
  • 23. Conclusions: Implications (continued) Training and qualifications • A culture of ‘multi-skilling’ could be embedded at training stage. For instance, training could seek to equip students with a broader skills and knowledge base about offsite. • Training and education providers could consider approaches to offsite training provision in Austria and Germany and identify good practice which can be transferred to the UK. Careers information • Advice and guidance to those seeking opportunities in the construction sector that includes consideration of offsite construction job roles could help offer clear pathways to higher level occupations and promote offsite to a greater diversity of people. Continuing Professional Development • The construction industry is more likely to be able to take advantage of CPD that can be delivered flexibly (for example via webinars outside of core working hours), and that is not cost prohibitive. 23

Editor's Notes

  1. These slides summarise the findings of a UKCES study into the role of technology in driving high level skills needs in the construction industry, with a specific focus on offsite construction. The study uses a broad definition of high level skills needs, based on national qualification levels: level 4 and above of the Qualifications and Credit Framework in England and level 8 and above of the Scottish Qualifications and Credit Framework. This covers such qualifications and programmes as Higher Apprenticeships, Foundation Degrees, Higher National Diplomas (HNDs), Degrees and Postgraduate Qualifications for example. The definition of high level skills was not based exclusively on qualification attainment however; experiential learning and Continuing Professional Development (CPD) are also valid forms of skills development at a higher level and were recognised as such throughout the research.
  2. Sources Bullet one: www.gov.uk/government/uploads/system/uploads/attachment_data/file/229339/construction-sector-infographic.pdf Bullet two: Gambin, L. et al. (2012) Sector Skills Insights: Construction. Evidence Report 50. UKCES, London. Breuer, Z (2012) Sector Skills Assessment: Construction, Building Services, Engineering and Planning. Evidence Report 65. UKCES, London. Bullet three: HM Government (2013) Construction 2025 Industrial Strategy: government and industry in partnership. H M Government, London.
  3. BIM Modelling is in its essence a coordinated set of processes that are supported by technology. Underpinned by ever evolving technology, BIM adds value to the entire life cycle of the construction process by creating, managing and sharing all of the critical elements that make up the design and construction progression from beginning to end. BIM incorporates data that is physical, commercial, environmental, and operational on every element of a development.
  4. The study followed the supply chain of innovative methods of construction as it filters to different tiers, starting with the ‘innovators’ of new technologies (such as universities and academics), the ‘developers’ of those technologies (such as manufacturers and large employers) and the ‘users’ (such as, designers, architects, construction firms and sub-contactors). A mixed method approach of depth interviews, a literature review and roundtable discussion events was used.
  5. Sources: Gambin, L et al., (2012) Sector Skills Insights: Construction. Evidence Report 50. UKCES, London. Taylor, M. (2010) “A definition and valuation of the UK offsite construction sector” Construction Management and Economics, 28(8): 885-896. The actual value of offsite construction varies by the methods and definitions used to measure the industry. Offsite construction has close links with the manufacturing sector due to offsite/prefabricated components and materials being manufactured in factories.
  6. One of the big advantages of offsite construction is the greater efficiency of the build process. The fit out of buildings can be done in the factory setting. Modular steel frame or timber frame systems can be adjusted for performance and cladded off site. Working together, architects and designers are able to create buildings that can be up and dry within a few weeks.
  7. Onsite skills requirements are very different from conventional construction.
  8. Modern Methods of Construction, including offsite construction, dictate a need for ‘core’ or primary job roles in addition to others at secondary and tertiary levels. Primary job roles are essential for both design and delivery of offsite projects, whilst secondary job roles are required to contribute to delivery, for example by assembly offsite or onsite. Tertiary roles carry out a supporting or indirect function, for example through scheduling of component delivery in a logistics role, procuring the right types of materials or by supplying finance for the project.
  9. Interview and roundtable research participants perceived existing education, training and qualification provision as limited and experiencing the challenges above. Most training relating to offsite took place in-house.
  10. Source: Sustainable Homes, Timber Frame Housing online briefing: www.sustainablehomes.co.uk/Portals/63188/docs/Timber%20Frame%20Housing.pdf For more information see full case study in the appendix of the full report.
  11. For more information see the case study in the appendix of full report and www.modcell.com/news/technology-strategy-board-video/
  12. Technologies need to be ‘mainstreamed’ first in order to develop consistent training packages