1. 1
I have the pleasure to submit here my C.V hopping
it will meet your requirement.
Personal date:
Name :RAMADAN ABBAS HARAGY.
Address : Alex - sadly basher64 No.20.
Birth date : 17/10/1976
Tel. No. : 01001808307 01229402152
Graduate : Diploma.
Branch :electrical Supervisor.
E.mail : RAMADAN ABBAS97@yahoo.com
The fields of work: ◘
Cable termination (power, control and instrumentation)
◘ Telecommunication work (CCTV sys, ACCESS sys, LAN sys,
VHF &UHF sys and emergency notification sys fire sys .)
Work history and experience:
2. 2
Fram 7/5/2016 up to naw
Working FOR five builders at beni suef power station4800
mw Work as electrical Supervisor
From 1 /12/2015 610o/4/1 ot
Working FOR JV ( ENPPI ) at Ethylene project
inalexandria Work as electrical Supervisor.
From 3/6/2014 to11/12/2014
Working for taiba electrical construction
at LG now factory project_10 th of Ramadan .
electrical Supervisor.
From 5/8/2013 to 21/2/2014
Working for Siemens in Carrefour city light
Work as electrical Supervisor.
From 12/7/2011 to 31/12/2012
Working for Techint CimiMontubi in Nigeria
Project – Escravos Gas To Liquid (EGTL1)
Work as electrical Supervisor.
3. 3
From 1/3/2011 to 1/7/2011
Working for Kharafi National
At Project – al shabab Project ( 1000 MW )
Work as electrical Supervisor.
From 3/2/2009 to 10/8/2010
Working for CARLO GAVAZZI EGYPTatEmethanex
Damietta 1 projec Work as electrical
-1-2008 to 28-7-From 7
Working for CARLO GAVAZZI EGYPT
Project – Elgamil New power generation.
Work as electrical Supervisor.
From 13-3-2007 to 20-6-2008
Working for Hitachi plant
Project – Kure mat power station
Work as Electrical Forman
From 25/12/2006 to 5-3-2007
4. 4
Working for Alstom Alex
Project - Abu Queer. Power Plant
Work as electrical Forman
From 12/11/2005 to 30/7/2006
Working for Morganti in Jordan in water Station
Commissioning and operator electrical Forman
From 10/11/2003 to 10/11/2005:
Working for HPC (Hitachi plant Co.) in Cairo North Power
Plant 750 MW Combined Cycle (2GT+1ST) Electrical {Group
leader}.
From 11/1/2003 to 5/11/2003:
Working for ABB Connection cable
From 7/5/2001 to 8/1/2003:
Working in HPC constructing the EZZ factory for flat steel plastes in
EL-Ain EL-Soukhnah -Suize as an Electric connection cable and
commissioning in the works of:
• Constructing a milting furnace 80 Ton.
• Constructing the factory of continues casting (CCM).
• Building the Oxygen Station.
• Building the water station.
• Building the dust collector unit (FUME).
5. 5
From 18/11/2000 to 5/5/2001:
Working for Carlo Gavazzi Egypt (AMOC). Connection cable and
commissioning
From 2/2/2000 to 15/11/2000:
sisteitalian company to present this certificate (Anrpc-alex). Working
for it is our grateful as C.S.I company on behalf of Connection cable
and commissioning.
From 9/5/1999 to 22/1/2000:
Working in HPC the construction of the direct reduction 3 (DR3) in
the national Iron Co. (ansdk) in fiL-dekhela Alex. As an Electric,
connection cable and commissioning.
From 25/4/1998 to 10/4 1999:
Working in HPC the construction of the iron factory in the national
iron Co. (ansdk) in El-dekhela Alex as an Electrical, connection cable
and commissioning in the new par.milk.plant.
From 13/11/1997 to 18/6/1998:
Working for HPC in EZZ for iron Factory in {Sadat} City as an
Electrician in the Works of:
• Constructing a milting furnace 80 Ton.
6. 6
• Constructing the factory of continues casting (CCM).
• Building the Oxygen Station.
• Building the water station.
• Building the dust collector unit (FUME).
From 1/10/1996 to 29/10/1997:
Working for HPC in the project of constructing the direct reduction
(DR2) in the National iron Co. (ANSDK) at EL-Dekhaila Alex as an
Electrician, connection cable