Current Process Flow
Capacity                                                            25~27             1200
(bbl/hr)          `-                `-                 `-           17~24             2000
                                                                     D1. Holding Bins (Wet)
Process       A. Trucks
                                B. Weighing       C. Dumpors
               Arrival
                                                                      D2. Holding Bins (Dry)      E. Destoning
                  `-                `-                 `-           17~24             2000             4500
                                                                    1~16              4000

                     Problems:                                         Options to be evaluated
           Too much waiting time for Trucks                         From Process flow its is evident that DRYING capacity is th
           Managing Overtime                                        1. Addition of 1 Dryer
                                                                    2. Addition of 2 Dryers
                                                                    3. Converting Dry berry holding bins into Wet berry holdin

Assuming that Deliveries during 9/20~ 10/9 represent distribution of entire deliveries in PEAK period
Avg Deliveries            A           16,380
Standard Deviation        d            1939
Capacity of A+ 3d will meet 99.7% of Peak load deliveries          Capacity of A+ 2d will meet 96% of Peak load deliveries

If we build for 3d, we might end up having underutilisation of MOST of the season, and meet PEAK time demand which occure
In such situations invetsing for capacity of additiona 3d will Not be justified.
Since we don’t have entire Frequency distribution of deliveries, we assume that Avg+ 2d will be the optimal capacity to Target

Target Daily deliveries (bbl)            20258              20000
Hourly incoming berries                                      1818   Assumption: Berries received only for 07:00~18:00, trucks
Hourly incoming Wetberries                                   1273
1500              600            1200~1350
                                  G. Drying                             I. Milling
                 F. Dechaffing                         H. Seprator                         J. Shipping

                      3000



 at DRYING capacity is the bottleneck; Hence DRYER must be added.


 ns into Wet berry holding bins




 f Peak load deliveries           Capacity of A+ d will meet 68% of Peak load deliveries

me demand which occures very rarely say 2~3 times.

ptimal capacity to Target.


 for 07:00~18:00, trucks are coming at even rate
Time         Incoming berries     Berries Processed      Inventory Build Up        Trucks in Waiting
                 7:00        1273                   600                    673
                 8:00        1273                   600                   1345
                 9:00        1273                   600                   2018
                10:00        1273                   600                   2691
                11:00        1273                   600                   3364
   AM           12:00        1273                   600                   4036
                13:00        1273                   600                   4709
                14:00        1273                   600                   5382                        9
                15:00        1273                   600                   6055                       18
                16:00        1273                   600                   6727                       27
                17:00        1273                   600                   7400                       36
                18:00        1273                   600                   8073                       45
                19:00          0                    600                   7473
                20:00          0                    600                   6873
                21:00          0                    600                   6273
                22:00          0                    600                   5673
                23:00          0                    600                   5073
   PM            0:00          0                    600                   4473
                 1:00          0                    600                   3873
                 2:00          0                    600                   3273
                 3:00          0                    600                   2673
                 4:00          0                    600                   2073
   AM            5:00          0                    600                   1473
           Total                  15273

  Peak Season Labour Cost calculation
From Inventory Build up, it will be necessary to run the plant till 05:00 am; hence we will need worker to work till in Third Shif
Timing of Shifts                                                                          No. of Workers
                  Shift 1                                    7:00                   15:00                   16
                  Shift 2                                   15:00                   23:00                     1
                 General                                    11:00                   19:00                   36
Total Labour/day                                                                                            53
Peak demand days 1 5Sept~31 Oct                                                               46
Total Labour/Season
Weighted Reg. Labour Wages                                                                   5.3
Weighted OT Labour Wages                                                                     7.9
Labor Cost
Totsl Labour Cost                                                                        212,019.21

Timing of Shifts                                                                            No. of Workers
                 Shift 1                                     7:00                   15:00                         16
                 Shift 2                                    15:00                   23:00                          1
                 Shift 3                                    23:00                    7:00                         12
                General                                     11:00                   19:00                         36
Total Labour/day                                                                                                  65
Peak demand days 1 5Sept~31 Oct                                                                46
Total Labour/Season
Weighted Reg. Labour Wages                                                                     5.3
Weighted OT Labour Wages                                                                       7.9
Labor Cost
Totsl Labour Cost   200,132.55
Inventory Build up will remain in Holding Unit, Dechaffing unit which precedes Drying Block= 3200+ 1500=4700
            Once the capacity of Holding Bins and Dechaffing unit is lost Trucks will be required to wait till HOLDING capacity Frees up.




            Berries will be HOLD in trucks here after as Holding Unit and Dechaffing capacity exhausted. 4700
            These Trucks will need to wait
                 9000
                 8000
                 7000
                 6000
                 5000
                 4000                                                       Inventory Build
                 3000                                                       Up
                 2000
                 1000
                    0
                         7:00

                         9:00




                         0:00
                         1:00

                         3:00
                         8:00

                        10:00
                        11:00
                        12:00
                        13:00
                        14:00
                        15:00
                        16:00
                        17:00
                        18:00
                        19:00
                        20:00
                        21:00
                        22:00
                        23:00



                         2:00

                         4:00
                         5:00
            It indicates that even after operating for 22 hrs plant will not be able to process all berries receieved on particular day
            It will build up additional inventory for next day, and likely damage to portion of WET berries, which is unacceptable.


ker to work till in Third Shift 23:00~07:00
                Reg. Labour Hrs OT Hrs
                       128                  60
                        8                    0
                       288                 240
                       424                 300
                                                   CURRENT
                    19504              13800         PLAN

                   102856          109163.21


               Reg. Labour Hrs     OT Hrs
                     128                     60
                       8                      0
                      96                      0
                     288                    144
                                                   Proposed
                     519                    204
                                                  PLAN- additing
                    23874                9384        3 rd shift
PLAN- additing
                          3 rd shift


125901.57   74230.98
1500=4700
DING capacity Frees up.




d on particular day
h is unacceptable.
Addition of 1 Dryer: Processing rate=
           Time         Incoming berries   Berries Processed      Inventory Build Up         Trucks in Waiting
                 7:00        1273                 800                     473
                 8:00        1273                 800                     945
                 9:00        1273                 800                    1418
                10:00        1273                 800                    1891
                11:00        1273                 800                    2364
   AM           12:00        1273                 800                    2836
                13:00        1273                 800                    3309
                14:00        1273                 800                    3782
                15:00        1273                 800                    4255
                16:00        1273                 800                    4727                        0
                17:00        1273                 800                    5200                        7
                18:00        1273                 800                    5673                       20
                19:00          0                  800                    4873
                20:00          0                  800                    4073
                21:00          0                  800                    3273
                22:00          0                  800                    2473
                23:00          0                  800                    1673
   PM            0:00          0                  800                     873
                 1:00          0                  800                      73
                 2:00          0
                 3:00          0
                 4:00          0
   AM            5:00          0
           Total                  15273                  15200

  Peak Season Labour Cost calculation
From Inventory Build up, it will be necessary to run the plant till 05:00 am; hence we will need worker to work till in Third Shif
Timing of Shifts                                                                          No. of Workers
                 Shift 1                                     7:00                   15:00                   16
                 Shift 2                                    15:00                   23:00                     1
                 General                                    11:00                   19:00                   36
Total Labour/day                                                                                            53
Peak demand days 1 5Sept~31 Oct                                                               46
Total Labour/Season
Weighted Reg. Labour Wages                                                                    5.3
Weighted OT Labour Wages                                                                      7.9
Labor Cost
Total Labour Cost                                                                        194,553.09
Savings in Labour Cost                                                                    17,466.11
Cost of 1 Dryer                                                                             20000
Recovery Period (yrs or Season)                                                              1.15
800

            Inventory Build up will remain in Holding Unit, Dechaffing unit which precedes Drying Block= 3200+ 1500=4700
            Once the capacity of Holding Bins and Dechaffing unit is lost Trucks will be required to wait till HOLDING capacity Frees up.




            Berries will be HOLD in trucks here after as Holding Unit and Dechaffing capacity exhausted. 4700
            These Trucks will need to wait
                    6000
                    5000
                    4000
                    3000
                    2000                                                Inventory Build
                                                                        Up
                    1000
                         0
                              1:00
                              2:00
                              3:00
                              4:00
                              7:00
                              8:00
                              9:00
                             10:00
                             11:00
                             12:00
                             13:00
                             14:00
                             15:00
                             16:00
                             17:00
                             18:00
                             19:00
                             20:00
                             21:00
                             22:00
                             23:00
                              0:00




                              5:00
            It indicates that only after operating for 18 hrs plant will be able to process all berries receieved on particular day



ker to work till in Third Shift 23:00~07:00
                Reg. Labour Hrs OT Hrs
                       128                  60
                        8                    0
                       288                 192
                       424                 252
                                                  CURRENT
                    19504              11592        PLAN

                   102856           91697.09
1500=4700
DING capacity Frees up.




particular day
Addition of 1 Dryer: Processing rate=
           Time         Incoming berries   Berries Processed      Inventory Build Up         Trucks in Waiting
                 7:00        1273                1000                     273
                 8:00        1273                1000                     545
                 9:00        1273                1000                     818
                10:00        1273                1000                    1091
                11:00        1273                1000                    1364
   AM           12:00        1273                1000                    1636
                13:00        1273                1000                    1909
                14:00        1273                1000                    2182
                15:00        1273                1000                    2455
                16:00        1273                1000                    2727
                17:00        1273                1000                    3000
                18:00        1273                1000                    3273
                19:00          0                 1000                    2273
                20:00          0                 1000                    1273
                21:00          0                 1000                     273
                22:00          0                  273                      0
                23:00          0
   PM            0:00          0
                 1:00          0
                 2:00          0
                 3:00          0
                 4:00          0
   AM            5:00          0
           Total                  15273                  15273

  Peak Season Labour Cost calculation
From Inventory Build up, it will be necessary to run the plant till 05:00 am; hence we will need worker to work till in Third Shif
Timing of Shifts                                                                          No. of Workers
                 Shift 1                                     7:00                   15:00                   16
                 Shift 2                                    15:00                   23:00                     1
                 General                                    11:00                   19:00                   36
Total Labour/day                                                                                            53
Peak demand days 1 5Sept~31 Oct                                                               46
Total Labour/Season
Weighted Reg. Labour Wages                                                                    5.3
Weighted OT Labour Wages                                                                      7.9
Labor Cost
Total Labour Cost                                                                        177,086.98
Savings in Labour Cost                                                                    34,932.23
Cost of 1 Dryer                                                                             40000
Recovery Period (yrs or Season)                                                              1.15
1000

            Inventory Build up will remain in Holding Unit, Dechaffing unit which precedes Drying Block= 3200+ 1500=4700
            Once the capacity of Holding Bins and Dechaffing unit is lost Trucks will be required to wait till HOLDING capacity Frees up.
            Berries will be NOT BE HOLD in trucks since Holding Unit and Dechaffing capacity is NEVER exhausted.
                  3500
                  3000
                  2500
                  2000
                  1500
                  1000                                                    Inventory Build
                                                                          Up
                   500
                      0
                   -500
                           8:00




                           0:00
                           1:00
                           2:00
                           3:00
                           4:00
                           7:00

                           9:00
                          10:00
                          11:00
                          12:00
                          13:00
                          14:00
                          15:00
                          16:00
                          17:00
                          18:00
                          19:00
                          20:00
                          21:00
                          22:00
                          23:00




                           5:00
            It indicates that only after operating for 15 hrs plant will be able to process all berries receieved on particular day



ker to work till in Third Shift 23:00~07:00
                Reg. Labour Hrs OT Hrs
                       128                  60
                        8                    0
                       288                 144
                       424                 204
                                                  CURRENT
                    19504                9384       PLAN

                   102856           74230.98
1500=4700
DING capacity Frees up.




particular day
Current Processing Capacity of Dry Berries                               1350 (Seprator)
           Input rate of Dry Berries                                                 545 Hence we can assume that no invento
           Bins to be converted for Wet Berries (4~16)                              3250
           Time         Incoming berries   Berries Processed        Inventory Build Up     Trucks in Waiting
                  7:00        1273                 600                     673
                  8:00        1273                 600                    1345
                  9:00        1273                 600                    2018
                10:00         1273                 600                    2691
                11:00         1273                 600                    3364
   AM           12:00         1273                 600                    4036
                13:00         1273                 600                    4709
                14:00         1273                 600                    5382
                15:00         1273                 600                    6055
                16:00         1273                 600                    6727
                17:00         1273                 600                    7400
                18:00         1273                 600                    8073                     2
                19:00           0                  600                    7473
                20:00           0                  600                    6873
                21:00           0                  600                    6273
                22:00           0                  600                    5673
                23:00           0                  600                    5073
   PM             0:00          0                  600                    4473
                  1:00          0                  600                    3873
                  2:00          0                  600                    3273
                  3:00          0                  600                    2673
                  4:00          0                  600                    2073
   AM             5:00          0                  600                    1473
           Total                    15273

  Peak Season Labour Cost calculation
From Inventory Build up, it will be necessary to run the plant till 05:00 am; hence we will need worker to work till in Third Shif
Timing of Shifts                                                                          No. of Workers
                  Shift 1                                    7:00                   15:00                   16
                  Shift 2                                   15:00                   23:00                     1
                 General                                    11:00                   19:00                   36
Total Labour/day                                                                                            53
Peak demand days 1 5Sept~31 Oct                                                               46
Total Labour/Season
Weighted Reg. Labour Wages                                                                   5.3
Weighted OT Labour Wages                                                                     7.9
Labor Cost
Totsl Labour Cost                                                                        212,019.21

Timing of Shifts                                                                            No. of Workers
                 Shift 1                                     7:00                   15:00                      16
                 Shift 2                                    15:00                   23:00                       1
                 Shift 3                                    23:00                    7:00                      12
                General                                     11:00                   19:00                      36
Total Labour/day                                                                                               65
Peak demand days 1 5Sept~31 Oct                                                                46
Total Labour/Season
Weighted Reg. Labour Wages           5.3
Weighted OT Labour Wages             7.9
Labor Cost
Totsl Labour Cost                 200,132.55
Savings in Labour Cost               0.00
Cost of Bins Conversion             7500
Recovery Period (yrs or Season)       NA
can assume that no inventory Build up in Dry Berries Processing. Additionaly Destoning Capacity can be used as Temporary Holding Capaci


            Inventory Build up will remain in Holding Unit, Dechaffing unit which precedes Drying Block= 3200+ 1500+3250=7950
            Once the capacity of Holding Bins and Dechaffing unit is lost Trucks will be required to wait till HOLDING capacity Frees up.




            Berries will be HOLD in trucks here after as Holding Unit and Dechaffing capacity exhausted. 4700
            These Trucks will need to wait
                 9000
                 8000
                 7000
                 6000
                 5000
                 4000                                                       Inventory Build
                 3000                                                       Up
                 2000
                 1000
                    0
                         7:00

                         9:00
                        10:00
                        11:00
                        12:00
                        13:00
                        14:00
                        15:00
                        16:00
                        17:00
                        18:00
                        19:00
                        20:00
                        21:00
                        22:00
                        23:00
                         0:00
                         1:00

                         3:00
                         8:00




                         2:00

                         4:00
                         5:00
            It indicates that even after operating for 22 hrs plant will not be able to process all berries receieved on particular day
            It will build up additional inventory for next day, and likely damage to portion of WET berries, which is unacceptable.


ker to work till in Third Shift 23:00~07:00
                Reg. Labour Hrs OT Hrs
                       128                  60
                        8                    0
                       288                 240
                       424                 300
                                                   CURRENT
                    19504              13800         PLAN

                   102856          109163.21


               Reg. Labour Hrs     OT Hrs
                     128                     60
                       8                      0
                      96                      0
                     288                    144
                                                   Proposed
                     519                    204
                                                  PLAN- additing
                                                     3 rd shift
Proposed
                       PLAN- additing
 23874         9384       3 rd shift


125901.57   74230.98
Temporary Holding Capacity


 1500+3250=7950
DING capacity Frees up.




d on particular day
h is unacceptable.
Current                         Option 1
                              Labour Cost     Trucks Waiting Labour Cost      Trucks Waiting
                                   212,019.21               45    194,553.09                 20
Savings in Labour Cost                     0.00                          17,466.11
Investment                                 0.00                          20,000.00
Period for Returns                          NA                             1.15
Does it process all Berries                 NO                              YES
Addional Capacity                           NO                              YES

From above performance parametersOption 2 i.e. Adding two dryers should be excercised
We should also note that in Future Seprator (capacity 1350 bbls/hr) can be Bottleneck.
Option 2                        Option 3
Labour Cost      Trucks Waiting Labour Cost      Trucks Waiting
     177,086.98                0     200,132.55                 2
            34,932.23                       11,886.66
            40,000.00                        7,500.00
              1.15                              NA
               YES                              NO
               YES                              NO

More Related Content

What's hot

Som case study - dont bother me i cant cope
Som   case study - dont bother me i cant copeSom   case study - dont bother me i cant cope
Som case study - dont bother me i cant cope
Rajendra Inani
 
American Connector Company
American Connector CompanyAmerican Connector Company
American Connector Company
Subhradeep Mitra
 
Kristin’s Cookie Company Production process and analysis case study
Kristin’s Cookie Company Production process and analysis case studyKristin’s Cookie Company Production process and analysis case study
Kristin’s Cookie Company Production process and analysis case study
Arfan Afzal
 
Som case study - dont bother me i cant cope
Som   case study - dont bother me i cant copeSom   case study - dont bother me i cant cope
Som case study - dont bother me i cant cope
Rajendra Inani
 
Da merton truck company case study
Da   merton truck company case studyDa   merton truck company case study
Da merton truck company case study
Rajendra Inani
 
CEO GE Jeff Immelt Case Study
CEO GE Jeff Immelt Case StudyCEO GE Jeff Immelt Case Study
CEO GE Jeff Immelt Case Study
Mahammad Khadafi
 
Case Study 1_PrafullaKumarShahi_FaryalQasim
Case Study 1_PrafullaKumarShahi_FaryalQasimCase Study 1_PrafullaKumarShahi_FaryalQasim
Case Study 1_PrafullaKumarShahi_FaryalQasim
Prafulla Kumar Shahi
 
Ocean Carriers Case Report
Ocean Carriers Case ReportOcean Carriers Case Report
Ocean Carriers Case Report
Rodney Piiru
 

What's hot (20)

Som case study - dont bother me i cant cope
Som   case study - dont bother me i cant copeSom   case study - dont bother me i cant cope
Som case study - dont bother me i cant cope
 
American Connector Company
American Connector CompanyAmerican Connector Company
American Connector Company
 
Manzana insurance
Manzana insuranceManzana insurance
Manzana insurance
 
Kristin’s Cookie Company Production process and analysis case study
Kristin’s Cookie Company Production process and analysis case studyKristin’s Cookie Company Production process and analysis case study
Kristin’s Cookie Company Production process and analysis case study
 
Dakota product
Dakota productDakota product
Dakota product
 
Benihana of Tokyo, case study
Benihana of Tokyo, case studyBenihana of Tokyo, case study
Benihana of Tokyo, case study
 
Som case study - dont bother me i cant cope
Som   case study - dont bother me i cant copeSom   case study - dont bother me i cant cope
Som case study - dont bother me i cant cope
 
The Case Analysis: Benihana of Tokyo
The Case Analysis: Benihana of TokyoThe Case Analysis: Benihana of Tokyo
The Case Analysis: Benihana of Tokyo
 
Manzana insurance case study analysis.
Manzana insurance case study analysis.Manzana insurance case study analysis.
Manzana insurance case study analysis.
 
Moon chem Case Study
Moon chem Case StudyMoon chem Case Study
Moon chem Case Study
 
Da merton truck company case study
Da   merton truck company case studyDa   merton truck company case study
Da merton truck company case study
 
Barilla
BarillaBarilla
Barilla
 
curled-metal-case study01
curled-metal-case study01curled-metal-case study01
curled-metal-case study01
 
CEO GE Jeff Immelt Case Study
CEO GE Jeff Immelt Case StudyCEO GE Jeff Immelt Case Study
CEO GE Jeff Immelt Case Study
 
Case Study 1_PrafullaKumarShahi_FaryalQasim
Case Study 1_PrafullaKumarShahi_FaryalQasimCase Study 1_PrafullaKumarShahi_FaryalQasim
Case Study 1_PrafullaKumarShahi_FaryalQasim
 
Maccounting midwestofficeproducts
Maccounting midwestofficeproductsMaccounting midwestofficeproducts
Maccounting midwestofficeproducts
 
DonnerCompany
DonnerCompanyDonnerCompany
DonnerCompany
 
Unilever in Brazil - For Low Income Consumers
Unilever in Brazil - For Low Income ConsumersUnilever in Brazil - For Low Income Consumers
Unilever in Brazil - For Low Income Consumers
 
Ocean Carriers Case Report
Ocean Carriers Case ReportOcean Carriers Case Report
Ocean Carriers Case Report
 
Eli Lilly and Company, Inc. Case Analysis
Eli Lilly and Company, Inc. Case AnalysisEli Lilly and Company, Inc. Case Analysis
Eli Lilly and Company, Inc. Case Analysis
 

Viewers also liked (7)

Cranberry
CranberryCranberry
Cranberry
 
NCC_Case_Study_1
NCC_Case_Study_1NCC_Case_Study_1
NCC_Case_Study_1
 
National Cranberry Co Op Presentation V3 Final 2
National Cranberry Co Op Presentation V3 Final 2National Cranberry Co Op Presentation V3 Final 2
National Cranberry Co Op Presentation V3 Final 2
 
PepsiCo Full Report
PepsiCo Full ReportPepsiCo Full Report
PepsiCo Full Report
 
Pepsi case study
Pepsi case studyPepsi case study
Pepsi case study
 
PepsiCo 2014 Presentation
PepsiCo 2014 Presentation PepsiCo 2014 Presentation
PepsiCo 2014 Presentation
 
Pepsico ppt
Pepsico pptPepsico ppt
Pepsico ppt
 

More from Rajendra Inani

Dcv iimiccdvsallocfinal
Dcv   iimiccdvsallocfinalDcv   iimiccdvsallocfinal
Dcv iimiccdvsallocfinal
Rajendra Inani
 
Trans share inc - case study submission 12 sep 09 v1.1
Trans share inc - case study submission 12 sep 09 v1.1Trans share inc - case study submission 12 sep 09 v1.1
Trans share inc - case study submission 12 sep 09 v1.1
Rajendra Inani
 
Merrimack tractors analysis - final
Merrimack tractors   analysis - finalMerrimack tractors   analysis - final
Merrimack tractors analysis - final
Rajendra Inani
 
Maharashtra state road development corporation
Maharashtra state road development corporationMaharashtra state road development corporation
Maharashtra state road development corporation
Rajendra Inani
 
Group 8 epgp - meeting management - communication presentation
Group 8   epgp - meeting management - communication presentationGroup 8   epgp - meeting management - communication presentation
Group 8 epgp - meeting management - communication presentation
Rajendra Inani
 
Fra coca - cola case study
Fra   coca - cola case studyFra   coca - cola case study
Fra coca - cola case study
Rajendra Inani
 
Explore indore rajendra inani
Explore indore   rajendra inaniExplore indore   rajendra inani
Explore indore rajendra inani
Rajendra Inani
 
Epgp bm brand_extensions_ppt
Epgp bm brand_extensions_pptEpgp bm brand_extensions_ppt
Epgp bm brand_extensions_ppt
Rajendra Inani
 
Epgp(one year) 2009-10_fsr_group4_03.12.09
Epgp(one year) 2009-10_fsr_group4_03.12.09Epgp(one year) 2009-10_fsr_group4_03.12.09
Epgp(one year) 2009-10_fsr_group4_03.12.09
Rajendra Inani
 
Epgp term v mos group assignment april 2010
Epgp term v mos  group assignment april 2010Epgp term v mos  group assignment april 2010
Epgp term v mos group assignment april 2010
Rajendra Inani
 
Epgp (one year) 2009-dell assignment_#1_19jan10
Epgp (one year) 2009-dell assignment_#1_19jan10Epgp (one year) 2009-dell assignment_#1_19jan10
Epgp (one year) 2009-dell assignment_#1_19jan10
Rajendra Inani
 
Epgp (one year) 2009-10_mos_ assignment_#1_18jan10
Epgp (one year) 2009-10_mos_ assignment_#1_18jan10Epgp (one year) 2009-10_mos_ assignment_#1_18jan10
Epgp (one year) 2009-10_mos_ assignment_#1_18jan10
Rajendra Inani
 
Epgp (one year) 2009-10_mos_ assignment_#1_5jan10
Epgp (one year) 2009-10_mos_ assignment_#1_5jan10Epgp (one year) 2009-10_mos_ assignment_#1_5jan10
Epgp (one year) 2009-10_mos_ assignment_#1_5jan10
Rajendra Inani
 
Epgp (one year) 2009-10_cost management_group assignement_case i_25nov09
Epgp (one year) 2009-10_cost management_group assignement_case i_25nov09Epgp (one year) 2009-10_cost management_group assignement_case i_25nov09
Epgp (one year) 2009-10_cost management_group assignement_case i_25nov09
Rajendra Inani
 
Epgp (one year) 2009-10_cf_ assignment_#4_19jan10
Epgp (one year) 2009-10_cf_ assignment_#4_19jan10Epgp (one year) 2009-10_cf_ assignment_#4_19jan10
Epgp (one year) 2009-10_cf_ assignment_#4_19jan10
Rajendra Inani
 
Epgp (one year) 2009-10_cf_ assignment_#3_14jan10
Epgp (one year) 2009-10_cf_ assignment_#3_14jan10Epgp (one year) 2009-10_cf_ assignment_#3_14jan10
Epgp (one year) 2009-10_cf_ assignment_#3_14jan10
Rajendra Inani
 
Epgp (one year) 2009-10_cf_ assignment_#2_6jan10
Epgp (one year) 2009-10_cf_ assignment_#2_6jan10Epgp (one year) 2009-10_cf_ assignment_#2_6jan10
Epgp (one year) 2009-10_cf_ assignment_#2_6jan10
Rajendra Inani
 
Epgp 09 10 -fra term 1 - end term submission - rajendra inani
Epgp 09 10 -fra  term 1 - end term submission - rajendra inaniEpgp 09 10 -fra  term 1 - end term submission - rajendra inani
Epgp 09 10 -fra term 1 - end term submission - rajendra inani
Rajendra Inani
 
Epgp 09 10 -cfl project - term 1 - group viii
Epgp 09 10 -cfl project - term 1 - group viiiEpgp 09 10 -cfl project - term 1 - group viii
Epgp 09 10 -cfl project - term 1 - group viii
Rajendra Inani
 

More from Rajendra Inani (20)

Dcv iimiccdvsallocfinal
Dcv   iimiccdvsallocfinalDcv   iimiccdvsallocfinal
Dcv iimiccdvsallocfinal
 
Trans share inc - case study submission 12 sep 09 v1.1
Trans share inc - case study submission 12 sep 09 v1.1Trans share inc - case study submission 12 sep 09 v1.1
Trans share inc - case study submission 12 sep 09 v1.1
 
Msrdc case study
Msrdc case studyMsrdc case study
Msrdc case study
 
Merrimack tractors analysis - final
Merrimack tractors   analysis - finalMerrimack tractors   analysis - final
Merrimack tractors analysis - final
 
Maharashtra state road development corporation
Maharashtra state road development corporationMaharashtra state road development corporation
Maharashtra state road development corporation
 
Group 8 epgp - meeting management - communication presentation
Group 8   epgp - meeting management - communication presentationGroup 8   epgp - meeting management - communication presentation
Group 8 epgp - meeting management - communication presentation
 
Fra coca - cola case study
Fra   coca - cola case studyFra   coca - cola case study
Fra coca - cola case study
 
Explore indore rajendra inani
Explore indore   rajendra inaniExplore indore   rajendra inani
Explore indore rajendra inani
 
Epgp bm brand_extensions_ppt
Epgp bm brand_extensions_pptEpgp bm brand_extensions_ppt
Epgp bm brand_extensions_ppt
 
Epgp(one year) 2009-10_fsr_group4_03.12.09
Epgp(one year) 2009-10_fsr_group4_03.12.09Epgp(one year) 2009-10_fsr_group4_03.12.09
Epgp(one year) 2009-10_fsr_group4_03.12.09
 
Epgp term v mos group assignment april 2010
Epgp term v mos  group assignment april 2010Epgp term v mos  group assignment april 2010
Epgp term v mos group assignment april 2010
 
Epgp (one year) 2009-dell assignment_#1_19jan10
Epgp (one year) 2009-dell assignment_#1_19jan10Epgp (one year) 2009-dell assignment_#1_19jan10
Epgp (one year) 2009-dell assignment_#1_19jan10
 
Epgp (one year) 2009-10_mos_ assignment_#1_18jan10
Epgp (one year) 2009-10_mos_ assignment_#1_18jan10Epgp (one year) 2009-10_mos_ assignment_#1_18jan10
Epgp (one year) 2009-10_mos_ assignment_#1_18jan10
 
Epgp (one year) 2009-10_mos_ assignment_#1_5jan10
Epgp (one year) 2009-10_mos_ assignment_#1_5jan10Epgp (one year) 2009-10_mos_ assignment_#1_5jan10
Epgp (one year) 2009-10_mos_ assignment_#1_5jan10
 
Epgp (one year) 2009-10_cost management_group assignement_case i_25nov09
Epgp (one year) 2009-10_cost management_group assignement_case i_25nov09Epgp (one year) 2009-10_cost management_group assignement_case i_25nov09
Epgp (one year) 2009-10_cost management_group assignement_case i_25nov09
 
Epgp (one year) 2009-10_cf_ assignment_#4_19jan10
Epgp (one year) 2009-10_cf_ assignment_#4_19jan10Epgp (one year) 2009-10_cf_ assignment_#4_19jan10
Epgp (one year) 2009-10_cf_ assignment_#4_19jan10
 
Epgp (one year) 2009-10_cf_ assignment_#3_14jan10
Epgp (one year) 2009-10_cf_ assignment_#3_14jan10Epgp (one year) 2009-10_cf_ assignment_#3_14jan10
Epgp (one year) 2009-10_cf_ assignment_#3_14jan10
 
Epgp (one year) 2009-10_cf_ assignment_#2_6jan10
Epgp (one year) 2009-10_cf_ assignment_#2_6jan10Epgp (one year) 2009-10_cf_ assignment_#2_6jan10
Epgp (one year) 2009-10_cf_ assignment_#2_6jan10
 
Epgp 09 10 -fra term 1 - end term submission - rajendra inani
Epgp 09 10 -fra  term 1 - end term submission - rajendra inaniEpgp 09 10 -fra  term 1 - end term submission - rajendra inani
Epgp 09 10 -fra term 1 - end term submission - rajendra inani
 
Epgp 09 10 -cfl project - term 1 - group viii
Epgp 09 10 -cfl project - term 1 - group viiiEpgp 09 10 -cfl project - term 1 - group viii
Epgp 09 10 -cfl project - term 1 - group viii
 

Som national cranberry-cooperative

  • 1. Current Process Flow Capacity 25~27 1200 (bbl/hr) `- `- `- 17~24 2000 D1. Holding Bins (Wet) Process A. Trucks B. Weighing C. Dumpors Arrival D2. Holding Bins (Dry) E. Destoning `- `- `- 17~24 2000 4500 1~16 4000 Problems: Options to be evaluated Too much waiting time for Trucks From Process flow its is evident that DRYING capacity is th Managing Overtime 1. Addition of 1 Dryer 2. Addition of 2 Dryers 3. Converting Dry berry holding bins into Wet berry holdin Assuming that Deliveries during 9/20~ 10/9 represent distribution of entire deliveries in PEAK period Avg Deliveries A 16,380 Standard Deviation d 1939 Capacity of A+ 3d will meet 99.7% of Peak load deliveries Capacity of A+ 2d will meet 96% of Peak load deliveries If we build for 3d, we might end up having underutilisation of MOST of the season, and meet PEAK time demand which occure In such situations invetsing for capacity of additiona 3d will Not be justified. Since we don’t have entire Frequency distribution of deliveries, we assume that Avg+ 2d will be the optimal capacity to Target Target Daily deliveries (bbl) 20258 20000 Hourly incoming berries 1818 Assumption: Berries received only for 07:00~18:00, trucks Hourly incoming Wetberries 1273
  • 2. 1500 600 1200~1350 G. Drying I. Milling F. Dechaffing H. Seprator J. Shipping 3000 at DRYING capacity is the bottleneck; Hence DRYER must be added. ns into Wet berry holding bins f Peak load deliveries Capacity of A+ d will meet 68% of Peak load deliveries me demand which occures very rarely say 2~3 times. ptimal capacity to Target. for 07:00~18:00, trucks are coming at even rate
  • 3. Time Incoming berries Berries Processed Inventory Build Up Trucks in Waiting 7:00 1273 600 673 8:00 1273 600 1345 9:00 1273 600 2018 10:00 1273 600 2691 11:00 1273 600 3364 AM 12:00 1273 600 4036 13:00 1273 600 4709 14:00 1273 600 5382 9 15:00 1273 600 6055 18 16:00 1273 600 6727 27 17:00 1273 600 7400 36 18:00 1273 600 8073 45 19:00 0 600 7473 20:00 0 600 6873 21:00 0 600 6273 22:00 0 600 5673 23:00 0 600 5073 PM 0:00 0 600 4473 1:00 0 600 3873 2:00 0 600 3273 3:00 0 600 2673 4:00 0 600 2073 AM 5:00 0 600 1473 Total 15273 Peak Season Labour Cost calculation From Inventory Build up, it will be necessary to run the plant till 05:00 am; hence we will need worker to work till in Third Shif Timing of Shifts No. of Workers Shift 1 7:00 15:00 16 Shift 2 15:00 23:00 1 General 11:00 19:00 36 Total Labour/day 53 Peak demand days 1 5Sept~31 Oct 46 Total Labour/Season Weighted Reg. Labour Wages 5.3 Weighted OT Labour Wages 7.9 Labor Cost Totsl Labour Cost 212,019.21 Timing of Shifts No. of Workers Shift 1 7:00 15:00 16 Shift 2 15:00 23:00 1 Shift 3 23:00 7:00 12 General 11:00 19:00 36 Total Labour/day 65 Peak demand days 1 5Sept~31 Oct 46 Total Labour/Season Weighted Reg. Labour Wages 5.3 Weighted OT Labour Wages 7.9
  • 4. Labor Cost Totsl Labour Cost 200,132.55
  • 5. Inventory Build up will remain in Holding Unit, Dechaffing unit which precedes Drying Block= 3200+ 1500=4700 Once the capacity of Holding Bins and Dechaffing unit is lost Trucks will be required to wait till HOLDING capacity Frees up. Berries will be HOLD in trucks here after as Holding Unit and Dechaffing capacity exhausted. 4700 These Trucks will need to wait 9000 8000 7000 6000 5000 4000 Inventory Build 3000 Up 2000 1000 0 7:00 9:00 0:00 1:00 3:00 8:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 2:00 4:00 5:00 It indicates that even after operating for 22 hrs plant will not be able to process all berries receieved on particular day It will build up additional inventory for next day, and likely damage to portion of WET berries, which is unacceptable. ker to work till in Third Shift 23:00~07:00 Reg. Labour Hrs OT Hrs 128 60 8 0 288 240 424 300 CURRENT 19504 13800 PLAN 102856 109163.21 Reg. Labour Hrs OT Hrs 128 60 8 0 96 0 288 144 Proposed 519 204 PLAN- additing 23874 9384 3 rd shift
  • 6. PLAN- additing 3 rd shift 125901.57 74230.98
  • 7. 1500=4700 DING capacity Frees up. d on particular day h is unacceptable.
  • 8.
  • 9. Addition of 1 Dryer: Processing rate= Time Incoming berries Berries Processed Inventory Build Up Trucks in Waiting 7:00 1273 800 473 8:00 1273 800 945 9:00 1273 800 1418 10:00 1273 800 1891 11:00 1273 800 2364 AM 12:00 1273 800 2836 13:00 1273 800 3309 14:00 1273 800 3782 15:00 1273 800 4255 16:00 1273 800 4727 0 17:00 1273 800 5200 7 18:00 1273 800 5673 20 19:00 0 800 4873 20:00 0 800 4073 21:00 0 800 3273 22:00 0 800 2473 23:00 0 800 1673 PM 0:00 0 800 873 1:00 0 800 73 2:00 0 3:00 0 4:00 0 AM 5:00 0 Total 15273 15200 Peak Season Labour Cost calculation From Inventory Build up, it will be necessary to run the plant till 05:00 am; hence we will need worker to work till in Third Shif Timing of Shifts No. of Workers Shift 1 7:00 15:00 16 Shift 2 15:00 23:00 1 General 11:00 19:00 36 Total Labour/day 53 Peak demand days 1 5Sept~31 Oct 46 Total Labour/Season Weighted Reg. Labour Wages 5.3 Weighted OT Labour Wages 7.9 Labor Cost Total Labour Cost 194,553.09 Savings in Labour Cost 17,466.11 Cost of 1 Dryer 20000 Recovery Period (yrs or Season) 1.15
  • 10. 800 Inventory Build up will remain in Holding Unit, Dechaffing unit which precedes Drying Block= 3200+ 1500=4700 Once the capacity of Holding Bins and Dechaffing unit is lost Trucks will be required to wait till HOLDING capacity Frees up. Berries will be HOLD in trucks here after as Holding Unit and Dechaffing capacity exhausted. 4700 These Trucks will need to wait 6000 5000 4000 3000 2000 Inventory Build Up 1000 0 1:00 2:00 3:00 4:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 0:00 5:00 It indicates that only after operating for 18 hrs plant will be able to process all berries receieved on particular day ker to work till in Third Shift 23:00~07:00 Reg. Labour Hrs OT Hrs 128 60 8 0 288 192 424 252 CURRENT 19504 11592 PLAN 102856 91697.09
  • 11. 1500=4700 DING capacity Frees up. particular day
  • 12. Addition of 1 Dryer: Processing rate= Time Incoming berries Berries Processed Inventory Build Up Trucks in Waiting 7:00 1273 1000 273 8:00 1273 1000 545 9:00 1273 1000 818 10:00 1273 1000 1091 11:00 1273 1000 1364 AM 12:00 1273 1000 1636 13:00 1273 1000 1909 14:00 1273 1000 2182 15:00 1273 1000 2455 16:00 1273 1000 2727 17:00 1273 1000 3000 18:00 1273 1000 3273 19:00 0 1000 2273 20:00 0 1000 1273 21:00 0 1000 273 22:00 0 273 0 23:00 0 PM 0:00 0 1:00 0 2:00 0 3:00 0 4:00 0 AM 5:00 0 Total 15273 15273 Peak Season Labour Cost calculation From Inventory Build up, it will be necessary to run the plant till 05:00 am; hence we will need worker to work till in Third Shif Timing of Shifts No. of Workers Shift 1 7:00 15:00 16 Shift 2 15:00 23:00 1 General 11:00 19:00 36 Total Labour/day 53 Peak demand days 1 5Sept~31 Oct 46 Total Labour/Season Weighted Reg. Labour Wages 5.3 Weighted OT Labour Wages 7.9 Labor Cost Total Labour Cost 177,086.98 Savings in Labour Cost 34,932.23 Cost of 1 Dryer 40000 Recovery Period (yrs or Season) 1.15
  • 13. 1000 Inventory Build up will remain in Holding Unit, Dechaffing unit which precedes Drying Block= 3200+ 1500=4700 Once the capacity of Holding Bins and Dechaffing unit is lost Trucks will be required to wait till HOLDING capacity Frees up. Berries will be NOT BE HOLD in trucks since Holding Unit and Dechaffing capacity is NEVER exhausted. 3500 3000 2500 2000 1500 1000 Inventory Build Up 500 0 -500 8:00 0:00 1:00 2:00 3:00 4:00 7:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 5:00 It indicates that only after operating for 15 hrs plant will be able to process all berries receieved on particular day ker to work till in Third Shift 23:00~07:00 Reg. Labour Hrs OT Hrs 128 60 8 0 288 144 424 204 CURRENT 19504 9384 PLAN 102856 74230.98
  • 14. 1500=4700 DING capacity Frees up. particular day
  • 15. Current Processing Capacity of Dry Berries 1350 (Seprator) Input rate of Dry Berries 545 Hence we can assume that no invento Bins to be converted for Wet Berries (4~16) 3250 Time Incoming berries Berries Processed Inventory Build Up Trucks in Waiting 7:00 1273 600 673 8:00 1273 600 1345 9:00 1273 600 2018 10:00 1273 600 2691 11:00 1273 600 3364 AM 12:00 1273 600 4036 13:00 1273 600 4709 14:00 1273 600 5382 15:00 1273 600 6055 16:00 1273 600 6727 17:00 1273 600 7400 18:00 1273 600 8073 2 19:00 0 600 7473 20:00 0 600 6873 21:00 0 600 6273 22:00 0 600 5673 23:00 0 600 5073 PM 0:00 0 600 4473 1:00 0 600 3873 2:00 0 600 3273 3:00 0 600 2673 4:00 0 600 2073 AM 5:00 0 600 1473 Total 15273 Peak Season Labour Cost calculation From Inventory Build up, it will be necessary to run the plant till 05:00 am; hence we will need worker to work till in Third Shif Timing of Shifts No. of Workers Shift 1 7:00 15:00 16 Shift 2 15:00 23:00 1 General 11:00 19:00 36 Total Labour/day 53 Peak demand days 1 5Sept~31 Oct 46 Total Labour/Season Weighted Reg. Labour Wages 5.3 Weighted OT Labour Wages 7.9 Labor Cost Totsl Labour Cost 212,019.21 Timing of Shifts No. of Workers Shift 1 7:00 15:00 16 Shift 2 15:00 23:00 1 Shift 3 23:00 7:00 12 General 11:00 19:00 36 Total Labour/day 65 Peak demand days 1 5Sept~31 Oct 46
  • 16. Total Labour/Season Weighted Reg. Labour Wages 5.3 Weighted OT Labour Wages 7.9 Labor Cost Totsl Labour Cost 200,132.55 Savings in Labour Cost 0.00 Cost of Bins Conversion 7500 Recovery Period (yrs or Season) NA
  • 17. can assume that no inventory Build up in Dry Berries Processing. Additionaly Destoning Capacity can be used as Temporary Holding Capaci Inventory Build up will remain in Holding Unit, Dechaffing unit which precedes Drying Block= 3200+ 1500+3250=7950 Once the capacity of Holding Bins and Dechaffing unit is lost Trucks will be required to wait till HOLDING capacity Frees up. Berries will be HOLD in trucks here after as Holding Unit and Dechaffing capacity exhausted. 4700 These Trucks will need to wait 9000 8000 7000 6000 5000 4000 Inventory Build 3000 Up 2000 1000 0 7:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 0:00 1:00 3:00 8:00 2:00 4:00 5:00 It indicates that even after operating for 22 hrs plant will not be able to process all berries receieved on particular day It will build up additional inventory for next day, and likely damage to portion of WET berries, which is unacceptable. ker to work till in Third Shift 23:00~07:00 Reg. Labour Hrs OT Hrs 128 60 8 0 288 240 424 300 CURRENT 19504 13800 PLAN 102856 109163.21 Reg. Labour Hrs OT Hrs 128 60 8 0 96 0 288 144 Proposed 519 204 PLAN- additing 3 rd shift
  • 18. Proposed PLAN- additing 23874 9384 3 rd shift 125901.57 74230.98
  • 19. Temporary Holding Capacity 1500+3250=7950 DING capacity Frees up. d on particular day h is unacceptable.
  • 20.
  • 21. Current Option 1 Labour Cost Trucks Waiting Labour Cost Trucks Waiting 212,019.21 45 194,553.09 20 Savings in Labour Cost 0.00 17,466.11 Investment 0.00 20,000.00 Period for Returns NA 1.15 Does it process all Berries NO YES Addional Capacity NO YES From above performance parametersOption 2 i.e. Adding two dryers should be excercised We should also note that in Future Seprator (capacity 1350 bbls/hr) can be Bottleneck.
  • 22. Option 2 Option 3 Labour Cost Trucks Waiting Labour Cost Trucks Waiting 177,086.98 0 200,132.55 2 34,932.23 11,886.66 40,000.00 7,500.00 1.15 NA YES NO YES NO