SlideShare a Scribd company logo
1 of 1
Rajesh Kumar Mahana (M. Tech, Water Resources, IIT Kharagpur)
Mr. Mahana has extensive experience in hydrodynamic and Sediment Transport modelling, both one and two
dimensional, including hydrological and hydraulics analysis for more than 8 years. He had been involved in many
consultancy projects involving estimation of High Flood Levels (HFL), flood inundation simulation, River
morphology and Reservoir sedimentation modelling and dam break modelling, water availability analysis and
rainfall-runoff modelling, design flood estimation (PMF, SPF and different return period) using the state of art
approach like hydro-meteorological and flood frequency approach. Mr. Mahana was involved in mathematical
modelling of reservoir sedimentation of Kuri-1 Hydro-electric project (Bhutan), Thana Plaun HEP on Beas River
in Himachal Pradesh, Upper Karnali HEP, Nepal, Kirthai-I HEP, J&K, Morphological study of Vansadhara river,
Odisha, Flood inundation modelling of Adhiya River Flood protection project in Gujarat, preparation of master
plan for flood and sediment management of Kosi river basin, setting up the 1D and 2D Flood hydrodynamic and
flood forecasting including inundation mapping models, setting up 1D and 2D morphological sediment transport
models, calibrating and validating the established models using historical data etc. He has well versed in
softwares like Mike 11, Mike 21C, Mike Flood, HEC RAS, HEC HMS, HEC SSP etc.
Few Major Assignment
Name of assignment or project: Preparation of Master Plan for Flood and Sediment Management of Kosi
River Basin, Year: 2015 – 2016, Client: FMISC, Govt of Bihar. Position & Activities: Morphological Modeller - 1D
& 2D Hydrodynamic model and Sediment Transport model (Mike 11 & Mike 21C) set up and analysis.
Name of assignment or project: Consultancy services for Adhiya River Flood Protection for DSIR region.
Client: GICC, Gujarat. Positions & Activities: Water Resources Engineer/Modeller - Data Analysis, river
hydrology, channel design and flood inundation modelling using Mike Flood, Client meetings.
Name of assignment or project: Mathematical Model Study for Reservoir Sedimentation Study of Kuri-1 HEP,
Bhutan. Client: DGPC, Bhutan. Position & Activities: Water Resources Engineer/ Modeller – Reservoir
Sedimentation study using Mike 11 and Mike 21C, Client meetings and presentations.
Name of assignment or project: Mathematical Model Study for Reservoir Sedimentation Study of Kirthai-1
HEP, J&K. Client: J&K Power Corporation Ltd. Position & Activities: Water Resources Engineer/ Modeller –
Reservoir Sedimentation study using Mike 11 and Mike 21C, Client meetings and presentations.
Name of assignment or project: Mathematical Model Study for Reservoir Sedimentation Study of Thana Plaun
HEP on Beas River in HP, India. Client: HPPCL. Position & Activities: Morphological Modeller: – Reservoir
sedimentation study using Mike 11 and Mike 21C, estimation of life of reservoir, Client meetings.
Name of assignment or project: Morphological Study for Vansadhara River using Mike 21C Software. Client:
WRD, Govt. of Odisha, Positions & Activities: Morphological Modeller/Water Resources Engineer - Data
Analysis, MIKE 21C Model setup for hydrodynamic and sediment transport, Client meetings.
Name of assignment or project: Consultancy Services for Sediment Modelling Study of Upper Karnali Hydro-
electric Project. Client: GMR Group, India, Position & Activities: Water Resources Engineer/Modeller - Data
Analysis, MIKE 11 Model setup for hydrodynamic and sediment transport modelling,
Name of assignment or project: Lots of hydropower projects for hydrological Study including water availability,
design flood estimation, sedimentation etc. Like Pare (110 MW), Etalin HEP (3197MW), Attunli HEP (680MW),
Hutong-II (1250MW), Subansiri Middle (1600 MW), Bhasmey (54 MW), Sikkim Birahi Ganga (Stage I) (24 MW),
Kabu 16 (20 MW) HEP, Africa, Super Trishuli (40MW) HEP, Nepal etc to name a few. Position & Activities: Dy.
Manager (Hydrology & Hydraulics) – Detailed Hydrological study and technical Due-diligence, CWC clearance, dam
break and sediment modelling using HEC-RAS, rainfall-runoff and design flood estimation using HEC-HMS & HEC-
SSP, client meetings and presentations etc.

More Related Content

What's hot

Real time decision support system krishna and upper bhima river basin system ...
Real time decision support system krishna and upper bhima river basin system ...Real time decision support system krishna and upper bhima river basin system ...
Real time decision support system krishna and upper bhima river basin system ...HydrologyWebsite
 
USING SATELLITE IMAGE TO ANALYZE TECHNICALLY SUKKUR BARRAGE DURING FLOOD IN P...
USING SATELLITE IMAGE TO ANALYZE TECHNICALLY SUKKUR BARRAGE DURING FLOOD IN P...USING SATELLITE IMAGE TO ANALYZE TECHNICALLY SUKKUR BARRAGE DURING FLOOD IN P...
USING SATELLITE IMAGE TO ANALYZE TECHNICALLY SUKKUR BARRAGE DURING FLOOD IN P...Farhan Hussain
 
05 Pumped Storage Brochure Urs
05 Pumped Storage Brochure Urs05 Pumped Storage Brochure Urs
05 Pumped Storage Brochure UrsLes1238
 
Catchment Water Quality Management | eWater.com.au
Catchment Water Quality Management | eWater.com.auCatchment Water Quality Management | eWater.com.au
Catchment Water Quality Management | eWater.com.aueWater
 
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Fairfax County
 
City of Gold Coast - Proposed active transport improvements for Golden Four D...
City of Gold Coast - Proposed active transport improvements for Golden Four D...City of Gold Coast - Proposed active transport improvements for Golden Four D...
City of Gold Coast - Proposed active transport improvements for Golden Four D...sallybayliss
 
EVALUATION OF WATER SHORTAGE IN EAST NILE DELTA
EVALUATION OF WATER SHORTAGE IN EAST NILE DELTAEVALUATION OF WATER SHORTAGE IN EAST NILE DELTA
EVALUATION OF WATER SHORTAGE IN EAST NILE DELTAIAEME Publication
 
DSD-INT 2019 Large scale 2D-river modelling in German waterways-Promny
DSD-INT 2019 Large scale 2D-river modelling in German waterways-PromnyDSD-INT 2019 Large scale 2D-river modelling in German waterways-Promny
DSD-INT 2019 Large scale 2D-river modelling in German waterways-PromnyDeltares
 
Local Case Studies
Local Case StudiesLocal Case Studies
Local Case Studiesriseagrant
 
Vikas_Tandon_Modeling Services Portfolio 02 03 11
Vikas_Tandon_Modeling Services Portfolio 02 03 11Vikas_Tandon_Modeling Services Portfolio 02 03 11
Vikas_Tandon_Modeling Services Portfolio 02 03 11vtandon
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Toronto Public Consultation Unit
 
2011 10 Marine Renewable Energies – Bettina Bockelmann-Evans
2011 10 Marine Renewable Energies – Bettina Bockelmann-Evans 2011 10 Marine Renewable Energies – Bettina Bockelmann-Evans
2011 10 Marine Renewable Energies – Bettina Bockelmann-Evans SevernEstuary
 

What's hot (17)

Real time decision support system krishna and upper bhima river basin system ...
Real time decision support system krishna and upper bhima river basin system ...Real time decision support system krishna and upper bhima river basin system ...
Real time decision support system krishna and upper bhima river basin system ...
 
Scoping meeting presentation 4 29-13
Scoping meeting presentation 4 29-13Scoping meeting presentation 4 29-13
Scoping meeting presentation 4 29-13
 
USING SATELLITE IMAGE TO ANALYZE TECHNICALLY SUKKUR BARRAGE DURING FLOOD IN P...
USING SATELLITE IMAGE TO ANALYZE TECHNICALLY SUKKUR BARRAGE DURING FLOOD IN P...USING SATELLITE IMAGE TO ANALYZE TECHNICALLY SUKKUR BARRAGE DURING FLOOD IN P...
USING SATELLITE IMAGE TO ANALYZE TECHNICALLY SUKKUR BARRAGE DURING FLOOD IN P...
 
05 Pumped Storage Brochure Urs
05 Pumped Storage Brochure Urs05 Pumped Storage Brochure Urs
05 Pumped Storage Brochure Urs
 
Catchment Water Quality Management | eWater.com.au
Catchment Water Quality Management | eWater.com.auCatchment Water Quality Management | eWater.com.au
Catchment Water Quality Management | eWater.com.au
 
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
 
www.ijerd.com
www.ijerd.comwww.ijerd.com
www.ijerd.com
 
A013160108
A013160108A013160108
A013160108
 
City of Gold Coast - Proposed active transport improvements for Golden Four D...
City of Gold Coast - Proposed active transport improvements for Golden Four D...City of Gold Coast - Proposed active transport improvements for Golden Four D...
City of Gold Coast - Proposed active transport improvements for Golden Four D...
 
EVALUATION OF WATER SHORTAGE IN EAST NILE DELTA
EVALUATION OF WATER SHORTAGE IN EAST NILE DELTAEVALUATION OF WATER SHORTAGE IN EAST NILE DELTA
EVALUATION OF WATER SHORTAGE IN EAST NILE DELTA
 
DSD-INT 2019 Large scale 2D-river modelling in German waterways-Promny
DSD-INT 2019 Large scale 2D-river modelling in German waterways-PromnyDSD-INT 2019 Large scale 2D-river modelling in German waterways-Promny
DSD-INT 2019 Large scale 2D-river modelling in German waterways-Promny
 
Local Case Studies
Local Case StudiesLocal Case Studies
Local Case Studies
 
Vikas_Tandon_Modeling Services Portfolio 02 03 11
Vikas_Tandon_Modeling Services Portfolio 02 03 11Vikas_Tandon_Modeling Services Portfolio 02 03 11
Vikas_Tandon_Modeling Services Portfolio 02 03 11
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
 
2011 10 Marine Renewable Energies – Bettina Bockelmann-Evans
2011 10 Marine Renewable Energies – Bettina Bockelmann-Evans 2011 10 Marine Renewable Energies – Bettina Bockelmann-Evans
2011 10 Marine Renewable Energies – Bettina Bockelmann-Evans
 
OredolaOlayinka_2016
OredolaOlayinka_2016OredolaOlayinka_2016
OredolaOlayinka_2016
 
Hydraulic ppt
Hydraulic pptHydraulic ppt
Hydraulic ppt
 

Similar to Short CV-Rajesh

ASIT_CV-RCO_INDIA_Asit_June_2016
ASIT_CV-RCO_INDIA_Asit_June_2016ASIT_CV-RCO_INDIA_Asit_June_2016
ASIT_CV-RCO_INDIA_Asit_June_2016Asit Kumar Adhikary
 
water-resources-development-dam-engineering-water-resources-and-dam-engineeri...
water-resources-development-dam-engineering-water-resources-and-dam-engineeri...water-resources-development-dam-engineering-water-resources-and-dam-engineeri...
water-resources-development-dam-engineering-water-resources-and-dam-engineeri...LeenaMujahed
 
Dr john cv as hydrogeologist
Dr john   cv as hydrogeologist Dr john   cv as hydrogeologist
Dr john cv as hydrogeologist dr john devadas
 
Dr john cv as hydrogeologist
Dr john   cv as hydrogeologist Dr john   cv as hydrogeologist
Dr john cv as hydrogeologist dr john devadas
 
resume_om_Nov2014
resume_om_Nov2014resume_om_Nov2014
resume_om_Nov2014Om Jangid
 
RIVER INTERLINKING (BY CANAL AND TUNNELS)
RIVER INTERLINKING (BY CANAL AND TUNNELS)RIVER INTERLINKING (BY CANAL AND TUNNELS)
RIVER INTERLINKING (BY CANAL AND TUNNELS)IRJET Journal
 
Sustainibility assessment in hydropower project a case study of nyadi hp
Sustainibility assessment in hydropower project a case study of nyadi hpSustainibility assessment in hydropower project a case study of nyadi hp
Sustainibility assessment in hydropower project a case study of nyadi hpSuwash Acharya
 
Karen Edelvang-list of projects
Karen Edelvang-list of projectsKaren Edelvang-list of projects
Karen Edelvang-list of projectsKaren Edelvang
 
Hydraulic Model Studies for Evaluating the Performance of Energy Dissipater’s...
Hydraulic Model Studies for Evaluating the Performance of Energy Dissipater’s...Hydraulic Model Studies for Evaluating the Performance of Energy Dissipater’s...
Hydraulic Model Studies for Evaluating the Performance of Energy Dissipater’s...IRJET Journal
 
Melamchi Water Supply Project
Melamchi Water Supply ProjectMelamchi Water Supply Project
Melamchi Water Supply ProjectChandanGupta201
 

Similar to Short CV-Rajesh (20)

ASIT_CV-RCO_INDIA_Asit_June_2016
ASIT_CV-RCO_INDIA_Asit_June_2016ASIT_CV-RCO_INDIA_Asit_June_2016
ASIT_CV-RCO_INDIA_Asit_June_2016
 
DR_R_MANIVANAN_CV
DR_R_MANIVANAN_CVDR_R_MANIVANAN_CV
DR_R_MANIVANAN_CV
 
Sanjeet Kumar
Sanjeet KumarSanjeet Kumar
Sanjeet Kumar
 
water-resources-development-dam-engineering-water-resources-and-dam-engineeri...
water-resources-development-dam-engineering-water-resources-and-dam-engineeri...water-resources-development-dam-engineering-water-resources-and-dam-engineeri...
water-resources-development-dam-engineering-water-resources-and-dam-engineeri...
 
Dr john cv as hydrogeologist
Dr john   cv as hydrogeologist Dr john   cv as hydrogeologist
Dr john cv as hydrogeologist
 
Dr john cv as hydrogeologist
Dr john   cv as hydrogeologist Dr john   cv as hydrogeologist
Dr john cv as hydrogeologist
 
Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15
 
Hemant_CV
Hemant_CVHemant_CV
Hemant_CV
 
resume_om_Nov2014
resume_om_Nov2014resume_om_Nov2014
resume_om_Nov2014
 
CV-1
CV-1CV-1
CV-1
 
Anil_CV_Recent
Anil_CV_RecentAnil_CV_Recent
Anil_CV_Recent
 
RIVER INTERLINKING (BY CANAL AND TUNNELS)
RIVER INTERLINKING (BY CANAL AND TUNNELS)RIVER INTERLINKING (BY CANAL AND TUNNELS)
RIVER INTERLINKING (BY CANAL AND TUNNELS)
 
Sustainibility assessment in hydropower project a case study of nyadi hp
Sustainibility assessment in hydropower project a case study of nyadi hpSustainibility assessment in hydropower project a case study of nyadi hp
Sustainibility assessment in hydropower project a case study of nyadi hp
 
Karen Edelvang-list of projects
Karen Edelvang-list of projectsKaren Edelvang-list of projects
Karen Edelvang-list of projects
 
Hydraulic Model Studies for Evaluating the Performance of Energy Dissipater’s...
Hydraulic Model Studies for Evaluating the Performance of Energy Dissipater’s...Hydraulic Model Studies for Evaluating the Performance of Energy Dissipater’s...
Hydraulic Model Studies for Evaluating the Performance of Energy Dissipater’s...
 
Flood Routing
Flood RoutingFlood Routing
Flood Routing
 
CV Afzal Ahmed
CV Afzal AhmedCV Afzal Ahmed
CV Afzal Ahmed
 
Hydrologist-CV
Hydrologist-CVHydrologist-CV
Hydrologist-CV
 
RESUME_KALAM
RESUME_KALAMRESUME_KALAM
RESUME_KALAM
 
Melamchi Water Supply Project
Melamchi Water Supply ProjectMelamchi Water Supply Project
Melamchi Water Supply Project
 

Short CV-Rajesh

  • 1. Rajesh Kumar Mahana (M. Tech, Water Resources, IIT Kharagpur) Mr. Mahana has extensive experience in hydrodynamic and Sediment Transport modelling, both one and two dimensional, including hydrological and hydraulics analysis for more than 8 years. He had been involved in many consultancy projects involving estimation of High Flood Levels (HFL), flood inundation simulation, River morphology and Reservoir sedimentation modelling and dam break modelling, water availability analysis and rainfall-runoff modelling, design flood estimation (PMF, SPF and different return period) using the state of art approach like hydro-meteorological and flood frequency approach. Mr. Mahana was involved in mathematical modelling of reservoir sedimentation of Kuri-1 Hydro-electric project (Bhutan), Thana Plaun HEP on Beas River in Himachal Pradesh, Upper Karnali HEP, Nepal, Kirthai-I HEP, J&K, Morphological study of Vansadhara river, Odisha, Flood inundation modelling of Adhiya River Flood protection project in Gujarat, preparation of master plan for flood and sediment management of Kosi river basin, setting up the 1D and 2D Flood hydrodynamic and flood forecasting including inundation mapping models, setting up 1D and 2D morphological sediment transport models, calibrating and validating the established models using historical data etc. He has well versed in softwares like Mike 11, Mike 21C, Mike Flood, HEC RAS, HEC HMS, HEC SSP etc. Few Major Assignment Name of assignment or project: Preparation of Master Plan for Flood and Sediment Management of Kosi River Basin, Year: 2015 – 2016, Client: FMISC, Govt of Bihar. Position & Activities: Morphological Modeller - 1D & 2D Hydrodynamic model and Sediment Transport model (Mike 11 & Mike 21C) set up and analysis. Name of assignment or project: Consultancy services for Adhiya River Flood Protection for DSIR region. Client: GICC, Gujarat. Positions & Activities: Water Resources Engineer/Modeller - Data Analysis, river hydrology, channel design and flood inundation modelling using Mike Flood, Client meetings. Name of assignment or project: Mathematical Model Study for Reservoir Sedimentation Study of Kuri-1 HEP, Bhutan. Client: DGPC, Bhutan. Position & Activities: Water Resources Engineer/ Modeller – Reservoir Sedimentation study using Mike 11 and Mike 21C, Client meetings and presentations. Name of assignment or project: Mathematical Model Study for Reservoir Sedimentation Study of Kirthai-1 HEP, J&K. Client: J&K Power Corporation Ltd. Position & Activities: Water Resources Engineer/ Modeller – Reservoir Sedimentation study using Mike 11 and Mike 21C, Client meetings and presentations. Name of assignment or project: Mathematical Model Study for Reservoir Sedimentation Study of Thana Plaun HEP on Beas River in HP, India. Client: HPPCL. Position & Activities: Morphological Modeller: – Reservoir sedimentation study using Mike 11 and Mike 21C, estimation of life of reservoir, Client meetings. Name of assignment or project: Morphological Study for Vansadhara River using Mike 21C Software. Client: WRD, Govt. of Odisha, Positions & Activities: Morphological Modeller/Water Resources Engineer - Data Analysis, MIKE 21C Model setup for hydrodynamic and sediment transport, Client meetings. Name of assignment or project: Consultancy Services for Sediment Modelling Study of Upper Karnali Hydro- electric Project. Client: GMR Group, India, Position & Activities: Water Resources Engineer/Modeller - Data Analysis, MIKE 11 Model setup for hydrodynamic and sediment transport modelling, Name of assignment or project: Lots of hydropower projects for hydrological Study including water availability, design flood estimation, sedimentation etc. Like Pare (110 MW), Etalin HEP (3197MW), Attunli HEP (680MW), Hutong-II (1250MW), Subansiri Middle (1600 MW), Bhasmey (54 MW), Sikkim Birahi Ganga (Stage I) (24 MW), Kabu 16 (20 MW) HEP, Africa, Super Trishuli (40MW) HEP, Nepal etc to name a few. Position & Activities: Dy. Manager (Hydrology & Hydraulics) – Detailed Hydrological study and technical Due-diligence, CWC clearance, dam break and sediment modelling using HEC-RAS, rainfall-runoff and design flood estimation using HEC-HMS & HEC- SSP, client meetings and presentations etc.