1. Pravin Raj
pravinraj_dme@yahoo.co.in
+66-0926181109/+91-9551150853
SV City T1-1205 Bang Phong Phang, Yan Nawa, Bangkok 10120
PERSONAL STATEMENT
Looking for an excellent opportunity to work as a Piping Design Engineer where my talent and
knowledge can be best utilized for the development of the organization.
KEY SKILLS
Technical Skills
o PDS
o AutoCAD
o Microstation
o MS Office
o Pro-E
o Catia
o Ansys
Training Certificates
o CHENNAI PETROLEUM CORPORATION Ltd, Manali. Duration: 30 Days.
o ASHOK LEYLAND Ltd, Ennore. Duration: 14 Days
EDUCATION
o SRM university
B. Tech Mechanical Engineering
o CPCL Polytechnic
Diploma in Mechanical Engineering
o St Mary’s Matriculation Higher Secondary School.
SSLC
2. EMPLOYMENT
Design Engineer Piping
Evergreen Plus Co. Ltd | Bangkok, Thailand
May 2014 >Till Date
Projects
o Biomass Power plant, Bangkok, Thailand, 1X9.8MW
Responsibilities
o Preparation of Line List and Valve List.
o Preparation & Checking of Stress Isometrics.
o Preparation of consolidated BOM.
o Checking of Support Layout
o Checking of Equipment Layout
o Checking of Equipment Drawing & Piping Layout Plans and Elevations.
o Co-ordination with site
CAD Draughtsman
BGR Energy Systems | Chennai, Tamilnadu
March 2011 > April 2014
Projects
o Thermal Power plant, Mettur, 1X600MW
o Kalisindh Thermal Power Plant, Jalawar Rajasthan, 2X600MW
o Krishnapatanam Thermal Power Plant, Andhra Pradesh, 2X660MW
Responsibilities
o Drafting of Equipment Drawing, Equipment Layout & Piping Layout Plans and Elevations.
Preparation of Line List and Valve List.
o Preparation of Stress Isometrics.
o Preparation of Piping Isometrics with BOM for individual pipelines.
o Preparation of Support Layout
o Preparation of individual support sketches as inputs to civil design.
o Assistance in preparation of consolidated BOM.
CAD Draughtsman
Systems & Projects | Chennai,Tamilnadu
January 2010 > Febuary 2011
Projects
o M/S Dev Priya Products Ltd, 1X8 MW Turbine.
o M/S Nivalan Kaukalampo oy, Finland, 1X5 MW Turbine
o M/S Keruuvan Kaukalampo, Finland, 1X5 MW Turbine
o M/S Sunil Sponge Pvt Ltd, 1X6 MW Turbine
o M/S Gujarat Flourochemical Pvt Ltd, 1X5 MW Turbine
o M/S Krishna SSK Pvt Ltd, 1X16 MW Turbine
Responsibilities
o Drafting of Equipment Drawing, Equipment Layout & Piping Layout Plans and Elevations.
Preparation of Line List and Valve List.
o Preparation of Stress Isometrics.
o Preparation of Piping Isometrics with BOM for individual pipelines.
o Preparation of Support Layout
3. o Preparation of individual support sketches as inputs to civil design.
o Assistance in preparation of consolidated BOM.
CAD Draughtsman
Mallya Chemtech Engineers | Chennai,Tamilnadu
December 2006 > January 2010
Projects
o Integrated gas power generation project Republic of Congo (SIPS)
o Offshore oil & gas wellhead platform for cairn energy (SIPS)
o White liquor oxidation plant for Bilt, Orient Paper Mills,
o Century paper mill, Star & West Coast Ncg & Tamil Nadu Paper Ltd (ELOF)
o 10 MV Captive Power Plant for Hothur Ispat (TTPL)
o Deputed to BPCL Kochi Refinery (Jan 2009 – Jan 2010)
Responsibilities
o Drafting of Equipment Drawing, Equipment Layout & Piping Layout Plans and Elevations.
Preparation of Line List and Valve List.
o Preparation of Stress Isometrics.
o Preparation of Piping Isometrics with BOM for individual pipelines.
o Preparation of Support Layout
o Preparation of Asbuilt Drawings.
o Preparation of individual support sketches as inputs to civil design.
o Assistance in preparation of consolidated BOM.
PERSONAL INTERESTS
Traveling | Reading | Chess | Cricket