SlideShare a Scribd company logo
1 of 10
Download to read offline
EXPRESSION OF INTEREST
FOR ELECTRICAL CONTRACTOR AGENCY
FOR PLASTIVISION INDIA 2020
16-20 January 2020
BEC, MUMBAI
Ref No: PVI2020/EC-07
CONTENTS
1. PARTICULARS
2. PRICING SCHEDULE
3. TERMS AND CONDITIONS
About THE ALL INDIA PLASTICS MANUFACTURERS’ ASSOCIATION
The All India Plastics Manufacturers’ Association – popularly known as AIPMA – Was founded by
Industry visionaries 70 years ago making it the old & the largest Apex Body of the Plastic Industry
in India, which has expanded and progressed by leaps and bounds in all fields of Plastics having
Head Office in most prestigious, centrally located commercial localities in Mumbai, and Regional
Offices in Delhi, Chennai, Ahmedabad and Kolkata.
With more than 2500 direct members AIPMA has 22000 members through the Affiliated
Associations from all over India, representing more than 175 cities on various segment of the
industry such as polymer manufacturers, machinery manufacturers, processors, moulds & dies
makers, traders, exporters, manufacturers, processors, moulds & consultants, institutions and
many more. 90% of Membership of AIPMA is from MSME Sector.
In its pursuit to achieve the growth excellence, AIPMA organizes National as well as International
Seminars, Exhibitions, Lecture Meetings, Conferences, Buyer & Seller Meet, Training Programmes
and Trade fairs.
About PLASTIVISION INDIA 2020
11th Edition of PLASTIVISION INDIA-2020 International Exhibition and Conference, 16-20
January, 2020 is scheduled in Mumbai with participation from more than 1500 Unique Global
Companies covering 100000 sqm area transacting business with more than 2000
core Businessmen from 25+ countries across the globe.
 1500 Exhibitors.
 Participation of 25+ Countries with 1,25,000 Business Visitors.
 Live Demonstration of Machines for Moulds, Printing & Packaging Products.
 Emerged as one of the top 10 global Plastics Exhibition.
 To be mounted and spread across 90,000+ sq. mtrs area.
 Business worth 2000 crores expected to be generated.
 Visitors & Buyers expected from over 61 countries
EXPRESSION OF INTEREST
SECTION 1: PARTICULARS
TIME SCHEDULE & ADMINISTRATION ARRANGEMENTS
In the EOI particulars as well as the Terms & Conditions, AIPMA – All India Plastics Manufacturers’
Association will be referred to as “The Organizers”.
Time and Date for return of EOI: 18.00 hrs, 22nd February 2019
B. CONDITIONS APPLYING TO THIS EOI
1. Alterations to EOI
None of the EOI document formats and wording may be altered by the applicant. Any
modification that the applicant may consider necessary is to be detailed in a separate covering
letter accompanying the EOI. Applicants are responsible for ensuring that they have completed
the EOI fully and accurately and that prices quoted are arithmetically correct for the units
stated. Any amendments/corrections made by the applicant on their bid should be initialed by
them.
2. Receipt of EOI
EOI will be received up to the time and date stated above. Those received before that date will
be retained, unopened, until then. Please ensure that your EOI is delivered no later than the
appointed time on the due date. The organizer does not undertake to consider EOI received
after that time.
3. Acceptance of EOI
By issuing this invitation the organizers does not bind itself to accept the lowest or any EOI. It
also reserves the right not to award a contract or to offer more than one contracts without
assigning any reason whatsoever.
4. Mandatory Requirements
The EOI documents may include mandatory requirements, which are detailed in this invitation
to EOI. It is important that suppliers read these carefully and authorize acceptance of these
requirements. Failure to comply with any applicable mandatory requirements will mean
exclusion from the selection process.
5. Documentation
The applicant is expected to examine all instructions, forms, terms and specifications in the
invitation to EOI documents and check they are complete in all respects. Applicants should
submit a full proposal, stating how all the requirements are to be met. The EOI must contain
sufficient information to enable the organizers to evaluate accurately any proposed solution.
Applicants are requested to answer all questions raised in the EOI document and in the order
laid out.
EXPRESSION OF INTEREST
6. Variants and Qualifications
The Organizers reserves the right to discuss, confidentially, any aspect of the EOI with the
respective applicant prior to any award of contract to clarify matters. At any time prior to the
deadline for receipt, the organizers may amend the EOI documents. Any such amendment will
be notified in writing to all prospective applicants. In order to give prospective applicants
reasonable time in which to take the amendment into account in preparing their EOI, the
organizers may, at its discretion, extend the deadline for receipt.
You may not alter any of the documents. The applicant may submit to the organizers issues
relating to the specification which require clarification. It is the responsibility of the incumbent
contractor to advise the organizers of any material facts / information which may have an
impact on this project. All final rights for selection & rejection of EOI or Bid will be at the
discretion of organising committee of PVI 2020.
7. Agreement
You are further advised that nothing herein or in any other communication made between the
organizers and any other party, or any part thereof, shall be taken as constituting a contract,
agreement or representation between the organizers and any other party (save for a formal
award of contract made in writing) nor shall they be taken as constituting a contract,
agreement or representation that a contract shall be offered in accordance herewith or not at
all.
8. Confidentiality
The applicant shall treat these documents and the information contained therein as private and
confidential, and the fact that an invitation has been issued shall not be disclosed to any third
party without the written consent of the organizers. The applicant shall take all necessary
precautions to ensure that all confidential information is treated as such and not disclosed or
used other than for the purpose of this EOI exercise by the applicant.
9. Services
For all Services and requirements asked for in the EOI, a professional presentation has to be
submitted to the organizers. The final quality to be produce shall not deviate from the
submitted quality ordered by the organizers.
All bids should be sealed and sent to below mentioned address and same via e-mail to
MR. ANJUM BASTAWALA (SR. EXHIBITION MANAGER) at anjum@plastivision.org
PLASTIVISION INDIA 2020
THE ALL INDIA PLASTICS MANUFACTURERS’ ASSOCIATION
1st Floor, AIPMA House, A-52, Street No. 1,
M.I.D.C. Marol, Andheri (East),
Mumbai - 400 093, Maharashtra, INDIA.
Tel. No. : +91 22 6777 8899
All offers and associated documents must arrive at the above address no later than:
18.00 hrs, 22nd February 2019
EXPRESSION OF INTEREST
10. Questions
Any questions or correspondence relating to the EOI or the submission of bids should be
submitted by e-mail to:
MR. ANJUM BASTAWALA (SR. EXHIBITION MANAGER)
PLASTIVISION INDIA 2020
anjum@plastivision.org
11. Contract Award Criteria
The contractor award will be primarily based on value for money. Although value for money is
a crucial factor in determining the outcome of the EOI process, evaluating the most cost
effective bid will also take into consideration the following criteria before final decision is
made:
 Large Scale Exhibition Management experience
 Technical experience
 Quality Outcome
 Logistical Supervising and arrangements
 Resources available
 Project management Skills
 Practicality of proposed Services Execution
12. Any conditions that the contractor may seek to impose shall be excluded and not part of the
contract unless each of these conditions has been specifically agreed to in writing by the
organizer.
13. All goods supplied to the organizers under any agreement arising out of this EOI shall at the
time of sale and delivery conform to all legal requirements and health and safety standards.
14. Notification of Award - The organizers will notify acceptance in writing to the successful
applicant. If the contract is agreed on, the organizers will notify successful applicant as soon
as possible.
15. Full Service Requirement for Exhibitors
The organizers expect a full service from the rewarded applicant this includes:
 Servicing the organizers before during and after the event on-site
 Expectation of international standards with regards to service, material and knowledge of
the staff
 The Services provided should be first class quality, punctuality without any delay and
excuse.
 Being one point of contact for the organizers.
 In case of dealing with a third party, complete handling, controlling and supervising of the
respective third party has to go via the rewarded applicant – the rewarded applicant will
be the one point contact, not the third party.
 The organisers will not hold any liability whatsoever in respect of third party contract
awarded by the applicant.
EXPRESSION OF INTEREST
SECTION 2: PRICING SCHEDULE
LIST OF SERVICES TO BE OFFERED
 Laying of cables of all size & capacity
 Distribution board
 Circuit breaker
 Work to be executed by licensed electrician
 Work to be supervised by Electrical Engineer & Electrical Supervisor
 Maintenance / Coordination of entire work of Electricity at BCEC.
 Testing commissioning & Energizing of Electricity Connections
 All co-ordination for connecting the load from feeder pillar or from nearest sources or from
transformer room located in & and around the hall shall be the responsibility of the Contractor.
 All liaison work with BCEC / Government Electrical Department shall be the responsibility of the
Contractor.
 Contractor shall be responsible to check and report any excess load drawn by the Exhibitor other than
as per requisition.
 Steel ramp, footbridge, over bridge/cable tray must be laid where ever required in Consultation with
the organizers
 General lighting of the hall shall be coordinated / maintained liaison with BCEC & the same will be the
responsibility of the contractor
 To arrange & maintain 24 hours power supply where ever required by arranging direct cable from
CONNECTED LOAD SWITCH CAPACITY WIRE / CABLE
CAPACITY
SERVICE CHARGES FOR
PROVIDING
TEMPORARY CABLE
INCLUDING SWITCH
BOARD (MCB)
RATE
For LOAD 1KW to 5KW 16 A - MCB Unit 4 sq. mm copper
cable
Per KW
For LOAD 6 KW to 10 KW 25 A - MCB Unit 4 sq. mm copper
cable Per KW
For LOAD 11 KW to 15 KW 32 A - MCB Unit 6 sq. mm copper
cable Per KW
For LOAD 16 KW to 20 KW 40/63 A - MCB Unit 10 sq. mm copper
cable Per KW
EXPRESSION OF INTEREST
For LOAD 21 KW to 30 KW 63 A - MCB Unit 16 sq. mm copper
cable Per KW
For LOAD 31 KW to 40 KW 80/100 A - MCB Unit 25 sq. mm copper
cable
Per KW
For LOAD 41 KW to 50 KW 100 A - MCCB Unit 35 sq. mm copper
cable
Per KW
For LOAD 51 KW to 60 KW 125 A - MCCB Unit 50 sq. mm copper
cable
Per KW
For LOAD 61 KW to 70 KW 160/200 A - MCCB Unit 70 sq. mm copper
cable
Per KW
For LOAD 71 KW to 80 KW 200 A - MCCB Unit 95 sq. mm copper
cable
Per KW
For LOAD 81 KW to 90 KW 200 A - MCCB Unit 120 sq. mm
copper cable
Per KW
For LOAD 91 KW to 100
KW
250 A - MCCB Unit 120 sq. mm
copper cable
Per KW
For LOAD 101 KW to 120
KW
250 A - MCCB Unit / SFU
Unit
150 sq. mm
copper cable
Per KW
For LOAD 121 KW to 140
KW
250 /400 A - MCCB Unit /
SFU Unit
185 sq. mm
copper cable
Per KW
For LOAD 141 KW to 160
KW
400 A - MCCB Unit / SFU
Unit
240 sq. mm
copper cable
Per KW
For LOAD 161 KW to 180
KW
400 A - MCCB Unit / SFU
Unit
240 sq. mm
copper cable
Per KW
For LOAD 181 KW to 200
KW
400 A - MCCB Unit / SFU
Unit
300 sq. mm
copper cable
Per KW
For LOAD 201 KW to 220
KW
400 A - MCCB Unit / SFU
Unit
300 sq. mm
copper cable
Per KW
For LOAD 221 KW to 250
KW
400 A - MCCB Unit / SFU
Unit
400 sq. mm
copper cable
Per KW
For LOAD 241 KW to 260
KW
400 / 630 A - MCCB Unit /
SFU Unit
400 sq. mm
copper cable
Per KW
EXPRESSION OF INTEREST
For LOAD 261 KW to 280
KW 2 SOURCE SUPPLY
400 / 630 A - MCCB Unit /
SFU Unit
400 sq. mm
copper cable
Per KW
For LOAD 281 KW to 300
KW 2 SOURCE SUPPLY
400 / 630 A - MCCB Unit /
SFU Unit
400 sq. mm
copper cable
Per KW
For LOAD 301 KW to 350
KW 2 SOURCE SUPPLY
400 /630 A - MCCB Unit /
SFU Unit
400 sq. mm
copper cable
Per KW
For LOAD 351 KW to 400
KW 2 SOURCE SUPPLY
630 A - MCCB Unit / SFU
Unit
400 sq. mm
copper cable
Per KW
For LOAD 401 KW & above
2 SOURCE SUPPLY
630 A - MCCB Unit / SFU
Unit
400 sq. mm
copper cable
Per KW
The rates must include all the necessary arrangements to be done in order to provide connections
inside the halls of BCEC such as preparation of earthing pit systems, installation of changeover
switches etc.
We also require following technical details from you
 Total Electricity Supply Capacity at Venue = __________
 Technical Layout Plan of Electrical Distribution Grid of Each Hall = ___________
 Technical Layout Plan of Power sources available at Venue = _______________
Payment Terms
To be proposed by the bidder
EXPRESSION OF INTEREST
SECTION 3: TERMS & CONDITIONS
1. Prices Quoted
a. Prices quoted should cover all relevant Services as defined in the price scheduling terms with all
technical specifications as indicated including manpower (as well as those required during the
preparation), all travel and stay to the fair venue and on-site set-up and dismantling.
b. All legitimate costs accruable during the construction period including the set-up to dismantling
periods are to be calculated into the prices. Such legitimate costs that are to be considered shall
include expenses such as food, taxes, insurance charges, administrative, general costs for set-up
/ dismantling and applicable transportation and related costs and all ancillaries relevant to the
fulfillment of the contract that shall be borne by the contractor.
2. Insurance
It is the contractor’s or agency’s responsibility to acquire insurance policy with full coverage,
especially full accident coverage and also for ensuring additional protection through an
insurance policy to cover him, his company permanent & temp staff, and third parties involved
against damage of property and personal injury, theft, fire and damages caused during shipping
and transportation, during the set-up right through the dismantling period.
3. Safety Instructions
All materials and supplies from set-up to dismantling periods shall be in accordance to the safety
regulations of the local fair authorities and / or venue authorities. At the set-up of facilities,
especially buildings, all applicable regulations at the event site must be observed.
4. Handing-Over the work
a. The completed contracted work scopes shall be handed over to the organizers or to the
appointed Organizers Representative before the stipulated time given by the Organizers.
b. In case the contractor is unable to hand-over by the stipulated time as above, for exceeding the
time limit, a penalty for non-fulfillment of the contract of Rs. 50,000/hour shall be imposed.
5. Dismantling
The contractor shall ensure that the exhibitor’s sub-contractors and / or employees do not
remove any item belonging to the organizers, or other parties, from the organizers or premises it
uses such as stand. The contractor shall be liable for the cost of any property so removed and
shall indemnify the organizers, its HQ and subsidiaries in full against all loss, damage and liability
resulting from such removal.
The dismantling should be within official move-out period and has to be completed by the due
time according to official show schedule (on the basis that the organizers and / or hall
authorities have not appointed another time-limit.)
EXPRESSION OF INTEREST
6. Extra Cost
Any other extra costs that are not explicitly stated in the Call for Quotations-Contract / Technical
Specifications shall be calculated, by the contractor, into the Prices in total.
7. General Terms & Conditions:
 The Contractor / Agency must have sufficient material to execute the job at Bombay Convention
& Exhibition Center, Mumbai & shall also submit the following:
o Name & address of the ware house where the material is stored (if any).
o The ware house/ workshop will be inspected by the AIPMA Officials or their
representative.
o Profile of promoters & project team member’s
 The contractor shall submit the details of their executing staff with their contact details.
 Contractor / Agency shall give detail of logistic support for transportation of material & man
power owned by them or exclusively hired by them for this show.
 List of equipment owned by them for executing the job.
 List of similar work executed by them in the past with the contact detail of organizers
 If the contractor is out sourcing their material the name of the sourcing agency shall be
provided.
 Also submit the statutory requirements such as:
o Registered GST Number
o Income Tax PAN no.
o Registration with ESIC
o Registration with Provident Fund
8. Legal Liability
 The quotation is only valid if it is legally signed without any alterations and completely meets the
organizer’s call for quotation requirements. All prices are valid until the last dismantling day of
the venue is completed and such completion approved by the organisers.
 After awarding of EOI, if the contractor’s performance does not meet the organizers
expectations, the organizer shall reserve the right to terminate the contractor’s service, cancel
the contract and re-award the contract to another bidder.
 The agency will ensure that the execution of work is carried out to the satisfaction of fair
architect & organiser
 Rates applicable will be inclusive of to & fro transportation & handling charges.
 All material & supply shall be of BIS specification.
 All liasoning work with Govt. dept. / ground management shall be the contractor’s responsibility.
 On successful bidding process selected contractor agency will enter into separate contract
having detail rules & regulation.
 CONTRACT RESOLUTION - Should the sponsor fail to respect its obligations, the AIPMA can
terminate the Sponsorship agreement without any obligation to compensate the sponsor.
EXPRESSION OF INTEREST
Note:
(*)
Actual dates and times will be stipulated when the contract is awarded.
Accepted by:
Signature: ________________
Date: ____________________
Name/Designation: ___________________________________________________
For and on behalf of: __________________________________________________
(NAME OF COMPANY WITH STAMP)
DISCLAIMER
This request for EOI is not an offer by AIPMA (PVI 2020), but an invitation to receive responses from eligible companies for
providing services for organising the event. No contractual obligation whatsoever shall arise from the EOI process unless
and until a formal contract is signed and executed between AIPMA and the bidder concerned. This EOI is being issued with
no financial commitment and AIPMA reserves the right to withdraw the EOI and change or vary any part thereof or
foreclose the same at any stage.

More Related Content

What's hot

Eoi first aid ambulance
Eoi first aid   ambulanceEoi first aid   ambulance
Eoi first aid ambulanceplastivision
 
Eoi special structures hangars
Eoi special structures hangarsEoi special structures hangars
Eoi special structures hangarsplastivision
 
Eoi registration services
Eoi registration servicesEoi registration services
Eoi registration servicesplastivision
 
Eoi cctv surveillance
Eoi cctv surveillanceEoi cctv surveillance
Eoi cctv surveillanceplastivision
 
Eoi horticulture landscaping
Eoi horticulture   landscapingEoi horticulture   landscaping
Eoi horticulture landscapingplastivision
 
Eoi badges, pvc pouches, wrist bands & lanyards agency
Eoi badges, pvc pouches, wrist bands & lanyards agencyEoi badges, pvc pouches, wrist bands & lanyards agency
Eoi badges, pvc pouches, wrist bands & lanyards agencyplastivision
 
Eoi catering agency
Eoi catering agencyEoi catering agency
Eoi catering agencyplastivision
 
Eoi event activation & btl agency
Eoi event activation & btl agencyEoi event activation & btl agency
Eoi event activation & btl agencyplastivision
 
Eoi indoor & outdoor venue branding
Eoi indoor & outdoor venue brandingEoi indoor & outdoor venue branding
Eoi indoor & outdoor venue brandingplastivision
 
Eoi sponsorship sales agency
Eoi sponsorship sales agencyEoi sponsorship sales agency
Eoi sponsorship sales agencyplastivision
 
Bid document for Solar in Himachal Pradesh
Bid document for Solar in Himachal PradeshBid document for Solar in Himachal Pradesh
Bid document for Solar in Himachal PradeshHeadway Solar
 
Tender Document for Solar Project in Himachal Pradesh
Tender Document for Solar Project in Himachal PradeshTender Document for Solar Project in Himachal Pradesh
Tender Document for Solar Project in Himachal PradeshHeadway Solar
 
Enlistment rules2014 07 (1)
Enlistment rules2014 07 (1)Enlistment rules2014 07 (1)
Enlistment rules2014 07 (1)Ptpg Stuc
 
Solar Tenders by Maven PK
Solar Tenders by Maven PK Solar Tenders by Maven PK
Solar Tenders by Maven PK Maven PK
 

What's hot (20)

Eoi first aid ambulance
Eoi first aid   ambulanceEoi first aid   ambulance
Eoi first aid ambulance
 
Eoi special structures hangars
Eoi special structures hangarsEoi special structures hangars
Eoi special structures hangars
 
Eoi registration services
Eoi registration servicesEoi registration services
Eoi registration services
 
Eoi pr agency
Eoi pr agencyEoi pr agency
Eoi pr agency
 
Eoi cctv surveillance
Eoi cctv surveillanceEoi cctv surveillance
Eoi cctv surveillance
 
Eoi horticulture landscaping
Eoi horticulture   landscapingEoi horticulture   landscaping
Eoi horticulture landscaping
 
Eoi logistics
Eoi logisticsEoi logistics
Eoi logistics
 
Eoi badges, pvc pouches, wrist bands & lanyards agency
Eoi badges, pvc pouches, wrist bands & lanyards agencyEoi badges, pvc pouches, wrist bands & lanyards agency
Eoi badges, pvc pouches, wrist bands & lanyards agency
 
Eoi manpower
Eoi manpowerEoi manpower
Eoi manpower
 
Eoi catering agency
Eoi catering agencyEoi catering agency
Eoi catering agency
 
Eoi event activation & btl agency
Eoi event activation & btl agencyEoi event activation & btl agency
Eoi event activation & btl agency
 
Eoi indoor & outdoor venue branding
Eoi indoor & outdoor venue brandingEoi indoor & outdoor venue branding
Eoi indoor & outdoor venue branding
 
Eoi av equipments
Eoi av equipmentsEoi av equipments
Eoi av equipments
 
Eoi sponsorship sales agency
Eoi sponsorship sales agencyEoi sponsorship sales agency
Eoi sponsorship sales agency
 
Whole Life Cycle Cost
Whole Life Cycle CostWhole Life Cycle Cost
Whole Life Cycle Cost
 
Bid document for Solar in Himachal Pradesh
Bid document for Solar in Himachal PradeshBid document for Solar in Himachal Pradesh
Bid document for Solar in Himachal Pradesh
 
Tender Document for Solar Project in Himachal Pradesh
Tender Document for Solar Project in Himachal PradeshTender Document for Solar Project in Himachal Pradesh
Tender Document for Solar Project in Himachal Pradesh
 
Enlistment rules2014 07 (1)
Enlistment rules2014 07 (1)Enlistment rules2014 07 (1)
Enlistment rules2014 07 (1)
 
Resumel
ResumelResumel
Resumel
 
Solar Tenders by Maven PK
Solar Tenders by Maven PK Solar Tenders by Maven PK
Solar Tenders by Maven PK
 

Similar to Eoi electrical contractor

Eoi professional conference management agency
Eoi professional conference management agencyEoi professional conference management agency
Eoi professional conference management agencyplastivision
 
StandardTenderDocument-14122020.pdf
StandardTenderDocument-14122020.pdfStandardTenderDocument-14122020.pdf
StandardTenderDocument-14122020.pdfPSENTHILMURUGAN2
 
NOTICE INVITING TENDER
NOTICE INVITING TENDERNOTICE INVITING TENDER
NOTICE INVITING TENDERLaxman Chaldas
 
Tendernotice_1 (1).pdf
Tendernotice_1 (1).pdfTendernotice_1 (1).pdf
Tendernotice_1 (1).pdfssusera91051
 
Tendernotice_1.pdf
Tendernotice_1.pdfTendernotice_1.pdf
Tendernotice_1.pdfssusera91051
 
1545313910708_TENDER_NOTICE_LAD.pdf
1545313910708_TENDER_NOTICE_LAD.pdf1545313910708_TENDER_NOTICE_LAD.pdf
1545313910708_TENDER_NOTICE_LAD.pdfEphremZeleke3
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selectionanojan kanagarathnam
 
Mechanisms to implement wind energy projects “egyptian experience”
Mechanisms to implement wind energy projects “egyptian experience”Mechanisms to implement wind energy projects “egyptian experience”
Mechanisms to implement wind energy projects “egyptian experience”RCREEE
 
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...Joy Irman
 
1658466483_Supply_of_Stationery_Items_English.pdf
1658466483_Supply_of_Stationery_Items_English.pdf1658466483_Supply_of_Stationery_Items_English.pdf
1658466483_Supply_of_Stationery_Items_English.pdfAMITTRIPATHI182
 
16 tender document khawaja fareed university 09112017
16   tender document khawaja fareed university 0911201716   tender document khawaja fareed university 09112017
16 tender document khawaja fareed university 09112017Salman Kharal
 
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)Gensol Engineering Limited
 
Mode of Tendering.pptx
 Mode of Tendering.pptx Mode of Tendering.pptx
Mode of Tendering.pptxssuser4ae21a
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Harish Sharma
 

Similar to Eoi electrical contractor (17)

Eoi professional conference management agency
Eoi professional conference management agencyEoi professional conference management agency
Eoi professional conference management agency
 
StandardTenderDocument-14122020.pdf
StandardTenderDocument-14122020.pdfStandardTenderDocument-14122020.pdf
StandardTenderDocument-14122020.pdf
 
NOTICE INVITING TENDER
NOTICE INVITING TENDERNOTICE INVITING TENDER
NOTICE INVITING TENDER
 
Document samples
Document samplesDocument samples
Document samples
 
Tendernotice_1 (1).pdf
Tendernotice_1 (1).pdfTendernotice_1 (1).pdf
Tendernotice_1 (1).pdf
 
Tendernotice_1.pdf
Tendernotice_1.pdfTendernotice_1.pdf
Tendernotice_1.pdf
 
1545313910708_TENDER_NOTICE_LAD.pdf
1545313910708_TENDER_NOTICE_LAD.pdf1545313910708_TENDER_NOTICE_LAD.pdf
1545313910708_TENDER_NOTICE_LAD.pdf
 
Ak contract management
Ak contract managementAk contract management
Ak contract management
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selection
 
Mechanisms to implement wind energy projects “egyptian experience”
Mechanisms to implement wind energy projects “egyptian experience”Mechanisms to implement wind energy projects “egyptian experience”
Mechanisms to implement wind energy projects “egyptian experience”
 
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
 
1658466483_Supply_of_Stationery_Items_English.pdf
1658466483_Supply_of_Stationery_Items_English.pdf1658466483_Supply_of_Stationery_Items_English.pdf
1658466483_Supply_of_Stationery_Items_English.pdf
 
16 tender document khawaja fareed university 09112017
16   tender document khawaja fareed university 0911201716   tender document khawaja fareed university 09112017
16 tender document khawaja fareed university 09112017
 
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
 
Mode of Tendering.pptx
 Mode of Tendering.pptx Mode of Tendering.pptx
Mode of Tendering.pptx
 
1217 loc tenders
1217 loc tenders1217 loc tenders
1217 loc tenders
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
 

Recently uploaded

Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfmuskan1121w
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxAbhayThakur200703
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 

Recently uploaded (20)

Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdf
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptx
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 

Eoi electrical contractor

  • 1. EXPRESSION OF INTEREST FOR ELECTRICAL CONTRACTOR AGENCY FOR PLASTIVISION INDIA 2020 16-20 January 2020 BEC, MUMBAI Ref No: PVI2020/EC-07 CONTENTS 1. PARTICULARS 2. PRICING SCHEDULE 3. TERMS AND CONDITIONS About THE ALL INDIA PLASTICS MANUFACTURERS’ ASSOCIATION The All India Plastics Manufacturers’ Association – popularly known as AIPMA – Was founded by Industry visionaries 70 years ago making it the old & the largest Apex Body of the Plastic Industry in India, which has expanded and progressed by leaps and bounds in all fields of Plastics having Head Office in most prestigious, centrally located commercial localities in Mumbai, and Regional Offices in Delhi, Chennai, Ahmedabad and Kolkata. With more than 2500 direct members AIPMA has 22000 members through the Affiliated Associations from all over India, representing more than 175 cities on various segment of the industry such as polymer manufacturers, machinery manufacturers, processors, moulds & dies makers, traders, exporters, manufacturers, processors, moulds & consultants, institutions and many more. 90% of Membership of AIPMA is from MSME Sector. In its pursuit to achieve the growth excellence, AIPMA organizes National as well as International Seminars, Exhibitions, Lecture Meetings, Conferences, Buyer & Seller Meet, Training Programmes and Trade fairs. About PLASTIVISION INDIA 2020 11th Edition of PLASTIVISION INDIA-2020 International Exhibition and Conference, 16-20 January, 2020 is scheduled in Mumbai with participation from more than 1500 Unique Global Companies covering 100000 sqm area transacting business with more than 2000 core Businessmen from 25+ countries across the globe.  1500 Exhibitors.  Participation of 25+ Countries with 1,25,000 Business Visitors.  Live Demonstration of Machines for Moulds, Printing & Packaging Products.  Emerged as one of the top 10 global Plastics Exhibition.  To be mounted and spread across 90,000+ sq. mtrs area.  Business worth 2000 crores expected to be generated.  Visitors & Buyers expected from over 61 countries
  • 2. EXPRESSION OF INTEREST SECTION 1: PARTICULARS TIME SCHEDULE & ADMINISTRATION ARRANGEMENTS In the EOI particulars as well as the Terms & Conditions, AIPMA – All India Plastics Manufacturers’ Association will be referred to as “The Organizers”. Time and Date for return of EOI: 18.00 hrs, 22nd February 2019 B. CONDITIONS APPLYING TO THIS EOI 1. Alterations to EOI None of the EOI document formats and wording may be altered by the applicant. Any modification that the applicant may consider necessary is to be detailed in a separate covering letter accompanying the EOI. Applicants are responsible for ensuring that they have completed the EOI fully and accurately and that prices quoted are arithmetically correct for the units stated. Any amendments/corrections made by the applicant on their bid should be initialed by them. 2. Receipt of EOI EOI will be received up to the time and date stated above. Those received before that date will be retained, unopened, until then. Please ensure that your EOI is delivered no later than the appointed time on the due date. The organizer does not undertake to consider EOI received after that time. 3. Acceptance of EOI By issuing this invitation the organizers does not bind itself to accept the lowest or any EOI. It also reserves the right not to award a contract or to offer more than one contracts without assigning any reason whatsoever. 4. Mandatory Requirements The EOI documents may include mandatory requirements, which are detailed in this invitation to EOI. It is important that suppliers read these carefully and authorize acceptance of these requirements. Failure to comply with any applicable mandatory requirements will mean exclusion from the selection process. 5. Documentation The applicant is expected to examine all instructions, forms, terms and specifications in the invitation to EOI documents and check they are complete in all respects. Applicants should submit a full proposal, stating how all the requirements are to be met. The EOI must contain sufficient information to enable the organizers to evaluate accurately any proposed solution. Applicants are requested to answer all questions raised in the EOI document and in the order laid out.
  • 3. EXPRESSION OF INTEREST 6. Variants and Qualifications The Organizers reserves the right to discuss, confidentially, any aspect of the EOI with the respective applicant prior to any award of contract to clarify matters. At any time prior to the deadline for receipt, the organizers may amend the EOI documents. Any such amendment will be notified in writing to all prospective applicants. In order to give prospective applicants reasonable time in which to take the amendment into account in preparing their EOI, the organizers may, at its discretion, extend the deadline for receipt. You may not alter any of the documents. The applicant may submit to the organizers issues relating to the specification which require clarification. It is the responsibility of the incumbent contractor to advise the organizers of any material facts / information which may have an impact on this project. All final rights for selection & rejection of EOI or Bid will be at the discretion of organising committee of PVI 2020. 7. Agreement You are further advised that nothing herein or in any other communication made between the organizers and any other party, or any part thereof, shall be taken as constituting a contract, agreement or representation between the organizers and any other party (save for a formal award of contract made in writing) nor shall they be taken as constituting a contract, agreement or representation that a contract shall be offered in accordance herewith or not at all. 8. Confidentiality The applicant shall treat these documents and the information contained therein as private and confidential, and the fact that an invitation has been issued shall not be disclosed to any third party without the written consent of the organizers. The applicant shall take all necessary precautions to ensure that all confidential information is treated as such and not disclosed or used other than for the purpose of this EOI exercise by the applicant. 9. Services For all Services and requirements asked for in the EOI, a professional presentation has to be submitted to the organizers. The final quality to be produce shall not deviate from the submitted quality ordered by the organizers. All bids should be sealed and sent to below mentioned address and same via e-mail to MR. ANJUM BASTAWALA (SR. EXHIBITION MANAGER) at anjum@plastivision.org PLASTIVISION INDIA 2020 THE ALL INDIA PLASTICS MANUFACTURERS’ ASSOCIATION 1st Floor, AIPMA House, A-52, Street No. 1, M.I.D.C. Marol, Andheri (East), Mumbai - 400 093, Maharashtra, INDIA. Tel. No. : +91 22 6777 8899 All offers and associated documents must arrive at the above address no later than: 18.00 hrs, 22nd February 2019
  • 4. EXPRESSION OF INTEREST 10. Questions Any questions or correspondence relating to the EOI or the submission of bids should be submitted by e-mail to: MR. ANJUM BASTAWALA (SR. EXHIBITION MANAGER) PLASTIVISION INDIA 2020 anjum@plastivision.org 11. Contract Award Criteria The contractor award will be primarily based on value for money. Although value for money is a crucial factor in determining the outcome of the EOI process, evaluating the most cost effective bid will also take into consideration the following criteria before final decision is made:  Large Scale Exhibition Management experience  Technical experience  Quality Outcome  Logistical Supervising and arrangements  Resources available  Project management Skills  Practicality of proposed Services Execution 12. Any conditions that the contractor may seek to impose shall be excluded and not part of the contract unless each of these conditions has been specifically agreed to in writing by the organizer. 13. All goods supplied to the organizers under any agreement arising out of this EOI shall at the time of sale and delivery conform to all legal requirements and health and safety standards. 14. Notification of Award - The organizers will notify acceptance in writing to the successful applicant. If the contract is agreed on, the organizers will notify successful applicant as soon as possible. 15. Full Service Requirement for Exhibitors The organizers expect a full service from the rewarded applicant this includes:  Servicing the organizers before during and after the event on-site  Expectation of international standards with regards to service, material and knowledge of the staff  The Services provided should be first class quality, punctuality without any delay and excuse.  Being one point of contact for the organizers.  In case of dealing with a third party, complete handling, controlling and supervising of the respective third party has to go via the rewarded applicant – the rewarded applicant will be the one point contact, not the third party.  The organisers will not hold any liability whatsoever in respect of third party contract awarded by the applicant.
  • 5. EXPRESSION OF INTEREST SECTION 2: PRICING SCHEDULE LIST OF SERVICES TO BE OFFERED  Laying of cables of all size & capacity  Distribution board  Circuit breaker  Work to be executed by licensed electrician  Work to be supervised by Electrical Engineer & Electrical Supervisor  Maintenance / Coordination of entire work of Electricity at BCEC.  Testing commissioning & Energizing of Electricity Connections  All co-ordination for connecting the load from feeder pillar or from nearest sources or from transformer room located in & and around the hall shall be the responsibility of the Contractor.  All liaison work with BCEC / Government Electrical Department shall be the responsibility of the Contractor.  Contractor shall be responsible to check and report any excess load drawn by the Exhibitor other than as per requisition.  Steel ramp, footbridge, over bridge/cable tray must be laid where ever required in Consultation with the organizers  General lighting of the hall shall be coordinated / maintained liaison with BCEC & the same will be the responsibility of the contractor  To arrange & maintain 24 hours power supply where ever required by arranging direct cable from CONNECTED LOAD SWITCH CAPACITY WIRE / CABLE CAPACITY SERVICE CHARGES FOR PROVIDING TEMPORARY CABLE INCLUDING SWITCH BOARD (MCB) RATE For LOAD 1KW to 5KW 16 A - MCB Unit 4 sq. mm copper cable Per KW For LOAD 6 KW to 10 KW 25 A - MCB Unit 4 sq. mm copper cable Per KW For LOAD 11 KW to 15 KW 32 A - MCB Unit 6 sq. mm copper cable Per KW For LOAD 16 KW to 20 KW 40/63 A - MCB Unit 10 sq. mm copper cable Per KW
  • 6. EXPRESSION OF INTEREST For LOAD 21 KW to 30 KW 63 A - MCB Unit 16 sq. mm copper cable Per KW For LOAD 31 KW to 40 KW 80/100 A - MCB Unit 25 sq. mm copper cable Per KW For LOAD 41 KW to 50 KW 100 A - MCCB Unit 35 sq. mm copper cable Per KW For LOAD 51 KW to 60 KW 125 A - MCCB Unit 50 sq. mm copper cable Per KW For LOAD 61 KW to 70 KW 160/200 A - MCCB Unit 70 sq. mm copper cable Per KW For LOAD 71 KW to 80 KW 200 A - MCCB Unit 95 sq. mm copper cable Per KW For LOAD 81 KW to 90 KW 200 A - MCCB Unit 120 sq. mm copper cable Per KW For LOAD 91 KW to 100 KW 250 A - MCCB Unit 120 sq. mm copper cable Per KW For LOAD 101 KW to 120 KW 250 A - MCCB Unit / SFU Unit 150 sq. mm copper cable Per KW For LOAD 121 KW to 140 KW 250 /400 A - MCCB Unit / SFU Unit 185 sq. mm copper cable Per KW For LOAD 141 KW to 160 KW 400 A - MCCB Unit / SFU Unit 240 sq. mm copper cable Per KW For LOAD 161 KW to 180 KW 400 A - MCCB Unit / SFU Unit 240 sq. mm copper cable Per KW For LOAD 181 KW to 200 KW 400 A - MCCB Unit / SFU Unit 300 sq. mm copper cable Per KW For LOAD 201 KW to 220 KW 400 A - MCCB Unit / SFU Unit 300 sq. mm copper cable Per KW For LOAD 221 KW to 250 KW 400 A - MCCB Unit / SFU Unit 400 sq. mm copper cable Per KW For LOAD 241 KW to 260 KW 400 / 630 A - MCCB Unit / SFU Unit 400 sq. mm copper cable Per KW
  • 7. EXPRESSION OF INTEREST For LOAD 261 KW to 280 KW 2 SOURCE SUPPLY 400 / 630 A - MCCB Unit / SFU Unit 400 sq. mm copper cable Per KW For LOAD 281 KW to 300 KW 2 SOURCE SUPPLY 400 / 630 A - MCCB Unit / SFU Unit 400 sq. mm copper cable Per KW For LOAD 301 KW to 350 KW 2 SOURCE SUPPLY 400 /630 A - MCCB Unit / SFU Unit 400 sq. mm copper cable Per KW For LOAD 351 KW to 400 KW 2 SOURCE SUPPLY 630 A - MCCB Unit / SFU Unit 400 sq. mm copper cable Per KW For LOAD 401 KW & above 2 SOURCE SUPPLY 630 A - MCCB Unit / SFU Unit 400 sq. mm copper cable Per KW The rates must include all the necessary arrangements to be done in order to provide connections inside the halls of BCEC such as preparation of earthing pit systems, installation of changeover switches etc. We also require following technical details from you  Total Electricity Supply Capacity at Venue = __________  Technical Layout Plan of Electrical Distribution Grid of Each Hall = ___________  Technical Layout Plan of Power sources available at Venue = _______________ Payment Terms To be proposed by the bidder
  • 8. EXPRESSION OF INTEREST SECTION 3: TERMS & CONDITIONS 1. Prices Quoted a. Prices quoted should cover all relevant Services as defined in the price scheduling terms with all technical specifications as indicated including manpower (as well as those required during the preparation), all travel and stay to the fair venue and on-site set-up and dismantling. b. All legitimate costs accruable during the construction period including the set-up to dismantling periods are to be calculated into the prices. Such legitimate costs that are to be considered shall include expenses such as food, taxes, insurance charges, administrative, general costs for set-up / dismantling and applicable transportation and related costs and all ancillaries relevant to the fulfillment of the contract that shall be borne by the contractor. 2. Insurance It is the contractor’s or agency’s responsibility to acquire insurance policy with full coverage, especially full accident coverage and also for ensuring additional protection through an insurance policy to cover him, his company permanent & temp staff, and third parties involved against damage of property and personal injury, theft, fire and damages caused during shipping and transportation, during the set-up right through the dismantling period. 3. Safety Instructions All materials and supplies from set-up to dismantling periods shall be in accordance to the safety regulations of the local fair authorities and / or venue authorities. At the set-up of facilities, especially buildings, all applicable regulations at the event site must be observed. 4. Handing-Over the work a. The completed contracted work scopes shall be handed over to the organizers or to the appointed Organizers Representative before the stipulated time given by the Organizers. b. In case the contractor is unable to hand-over by the stipulated time as above, for exceeding the time limit, a penalty for non-fulfillment of the contract of Rs. 50,000/hour shall be imposed. 5. Dismantling The contractor shall ensure that the exhibitor’s sub-contractors and / or employees do not remove any item belonging to the organizers, or other parties, from the organizers or premises it uses such as stand. The contractor shall be liable for the cost of any property so removed and shall indemnify the organizers, its HQ and subsidiaries in full against all loss, damage and liability resulting from such removal. The dismantling should be within official move-out period and has to be completed by the due time according to official show schedule (on the basis that the organizers and / or hall authorities have not appointed another time-limit.)
  • 9. EXPRESSION OF INTEREST 6. Extra Cost Any other extra costs that are not explicitly stated in the Call for Quotations-Contract / Technical Specifications shall be calculated, by the contractor, into the Prices in total. 7. General Terms & Conditions:  The Contractor / Agency must have sufficient material to execute the job at Bombay Convention & Exhibition Center, Mumbai & shall also submit the following: o Name & address of the ware house where the material is stored (if any). o The ware house/ workshop will be inspected by the AIPMA Officials or their representative. o Profile of promoters & project team member’s  The contractor shall submit the details of their executing staff with their contact details.  Contractor / Agency shall give detail of logistic support for transportation of material & man power owned by them or exclusively hired by them for this show.  List of equipment owned by them for executing the job.  List of similar work executed by them in the past with the contact detail of organizers  If the contractor is out sourcing their material the name of the sourcing agency shall be provided.  Also submit the statutory requirements such as: o Registered GST Number o Income Tax PAN no. o Registration with ESIC o Registration with Provident Fund 8. Legal Liability  The quotation is only valid if it is legally signed without any alterations and completely meets the organizer’s call for quotation requirements. All prices are valid until the last dismantling day of the venue is completed and such completion approved by the organisers.  After awarding of EOI, if the contractor’s performance does not meet the organizers expectations, the organizer shall reserve the right to terminate the contractor’s service, cancel the contract and re-award the contract to another bidder.  The agency will ensure that the execution of work is carried out to the satisfaction of fair architect & organiser  Rates applicable will be inclusive of to & fro transportation & handling charges.  All material & supply shall be of BIS specification.  All liasoning work with Govt. dept. / ground management shall be the contractor’s responsibility.  On successful bidding process selected contractor agency will enter into separate contract having detail rules & regulation.  CONTRACT RESOLUTION - Should the sponsor fail to respect its obligations, the AIPMA can terminate the Sponsorship agreement without any obligation to compensate the sponsor.
  • 10. EXPRESSION OF INTEREST Note: (*) Actual dates and times will be stipulated when the contract is awarded. Accepted by: Signature: ________________ Date: ____________________ Name/Designation: ___________________________________________________ For and on behalf of: __________________________________________________ (NAME OF COMPANY WITH STAMP) DISCLAIMER This request for EOI is not an offer by AIPMA (PVI 2020), but an invitation to receive responses from eligible companies for providing services for organising the event. No contractual obligation whatsoever shall arise from the EOI process unless and until a formal contract is signed and executed between AIPMA and the bidder concerned. This EOI is being issued with no financial commitment and AIPMA reserves the right to withdraw the EOI and change or vary any part thereof or foreclose the same at any stage.