SlideShare a Scribd company logo
1 of 37
Download to read offline
An 
Industrial Training Report 
On 
NTPC Faridabad 
Submitted in Partial Fulfillment of the 
Requirements for the Degree of 
Bachelor of Technology 
In 
Electrical Engineering 
By 
PAWAN AGRAWAL 
Roll No. 1104320028 
Department of Electrical Engineering 
Bundelkhand Institute of Engineering & Technology 
(An Autonomous Institute) 
Jhansi (U.P.) India - 284128 
i
ACKNOWLEDGMENT 
I am very grateful to all those who helped me towards its smooth and efficient completion & under whose guidance this summer training was conducted successfully. I feel highly indebted to all the senior NTPC officials who extended me a constructive help in the technical field. 
I feel especially thankful to 
Mr. K.K. Sharma (Sr. Manager-Chemistry) 
Mrs. Prachi (Electrical Maintenance) 
Mr. N.N. Mishra (AGM- O&M) 
Mr. Manoj Agarwal (DGM-Mechanical Maintenance) 
Mr. Jimmy Joseph (S.S. - C&I) 
Mr. D.C. Tiwari (S.S. - Operation & Fuel handling) 
I gratefully acknowledge all the engineers/staff who gave us their valuable time, encouragement & constructive criticism for familiarising us with all technical aspects of the power plant. 
PAWAN AGRAWAL 
B.Tech Final year 
Electrical Engineering 
Roll no. 1104320028 
ii
CONTENTS 
Cover Page i 
Acknowledgement ii 
Certificate iii 
Contents iv 
List of Figures vi 
List of Tables vii 
1. About The Company 1 
2. Introduction to NTPC Faridabad 3 
2.1 Location 3 
2.2 Major Milestones 3 
2.3 Installed capacity 4 
2.4 Production Inputs 4 
2.5 Requirements 4 
2.6 Anti-Salient Features 4 
3. Basic Working of the Plant 5 
4. Fuels 6 
4.1 Natural Gas 6 
4.2 Naphtha 7 
5. Mechanical Systems 8 
5.1 Gas Turbine 8 
5.2 WHRSG 10 
5.3 Steam Turbine 12 
6. Switchyard 15 
6.1 Circuit Breaker 15 
6.2 Lightening Arrester 15 
6.3 Earthing Switch 16 
6.4 Bus Bar 17 
6.5 Capacitor Voltage Transformer 17 
6.6 Wave Trap 18 
iv
6.7 PLCC 18 
6.8 Current Transformer 19 
6.9 Isolator 19 
7. Generator 20 
7.1 Main Components 20 
7.2 Excitation system 21 
7.3 Generator protection 21 
7.4 Generator cooling system 22 
7.5 Cooling specifications of turbo-generators 22 
8. Transformers 23 
8.1 Transformer accessories 23 
8.2 Cooling of transformers 24 
8.3 Main transformers 25 
9. DC system 26 
9.1 Requirement of DC system 26 
9.2 Description of battery 26 
9.2 Battery Charger 27 
10. Switchgear 27 
10.1 L.T. switchgear 27 
10.2 H.T. switchgear 27 
10.3 Variable Frequency Drive 28 
10.4 Two channel arrangement for synchronous motor 29 
11. Conclusion 30 
References 31 
V
LIST OF FIGURES Page No. 
Fig 1.1 NTPC generation growth 2 
Fig 1.2 NTPC in power sector 2 
Fig 2.1 Plant Overview 3 
Fig 2.2 Plant Layout 4 
Fig 3.1 Combined Cycle Power Generation 5 
Fig 4.1 Pipelines of gas source 6 
Fig 4.2 Naphtha Specifications 7 
Fig 5.1 Working of WHRSG 11 
Fig 6.1 Lightening Arrester 16 
Fig 6.2 Capacitor Voltage Transformer 17 
Fig 6.3 Wave Trap 18 
Fig 6.4 Current Transformer 19 
Fig 6.5 Isolators 19 
Fig 8.1 Three-Phase Transformers 25 
Fig 10.1 Electrical scheme of VFD 28 
Fig 10.2 Two channel arrangement of synchronous motor 29 
vi
LIST OF TABLES Page No. 
Table 5.1 Gas Turbine Specifications 9 
Table 5.2 Gas Turbine Generator Specifications 9 
Table 5.3 WHRSG Specifications 12 
Table 5.4 Specifications of HP Turbine 13 
Table 5.5 Specifications of LP Turbine 13 
Table 5.6 Steam Turbine Generator Specifications 14 
Table 6.1 Specifications of earthing switch 17 
Table 7.1 Generator Specifications 21 
vii
1. ABOUT THE COMPANY 
Corporate Vision: 
“A world class integrated power major, powering India’s growth, with increasing global presence” 
Core Values: (BE COMMITTED) 
B-Business Ethics E- Environmentally & Economically Sustainable C-Customer Focus O-Organizational Pride M-Mutual Respect & Trust M-Motivating Self & Others I-Innovation & Speed T-Total Quality For Excellence T-Transparent & Respected Organization E-Enterprising 
D-Devoted 
NTPC Limited is the largest thermal power generating company of India. A public sector company, it was incorporated in the year 1975 to accelerate power development in the country as a wholly owned company of the Government of India. At present, Government of India holds 89.5% of the total equity shares of the company and the balance 10.5% is held by FIIs, Domestic Banks, Public and others. Within a span of 31 years, NTPC has emerged as a truly national power company, with power generating facilities in all the major regions of the country. NTPC’s core business is engineering, construction and operation of power generating plants. It also provides consultancy in the area of power plant constructions and power generation to companies in India and abroad. 
1
As on date the installed capacity of NTPC is 43,582 MW through its 17 coal based (31,445 MW), 7 gas based (3,955 MW), 3 Hydro based (1,328 MW) and 7 Joint Venture Projects (5,754 MW). 
NTPC’s share on 31 Mar 2007 in the total installed capacity of the country was 20.18% and it contributed 28.50% of the total power generation of the country during 2006-07. 
Fig 1.1 NTPC Generation Growth 
Fig 1.2 NTPC in power sector 
2
2. INTRODUCTION TO NTPC FARIDABAD 
2.1 Location 
Located near village Mujedi & Neemka in Faridabad district of Haryana State. 
2.2 Major Milestones 
 Ever since then honorable Prime Minister Sh. I.K. Gujral laid down the foundation stone on 03rd august 1997. 
 First two units of 138MW were commissioned on 21st Jan 2000 and 22nd March, 2000 and one unit of 156MW was commissioned on 16th July 2001 by Haryana Vidyut Prasaran Nigam. 
 Faridabad project was taken over by NTPC from HVPN on 13th Feb, 2002. 
 It is the only power plant in this country to supply its entire power to a state i.e. Haryana rather than to the national grid. 
Fig 2.1 Plant Overview 
2.3 Installed Capacity 
 Stage I (GT) = 2 X 138 MW 
 Stage II (ST) = 1 X 156 MW 
3
2.4 Production Inputs 
Water Source: 
Rampur Distributaries of Gurgaon Canal 
Fuel: 
1. Natural Gas (Main Fuel) 
(To be piped from HVJ pipeline by GAIL) 
2. Naphtha (Alternate Fuel) 
3. High Speed Diesel 
2.5 Requirements 
 Gas – average 1.58 mcmd at 68.5% PLF & 2.30 mcmd at 100% PLF 
 Natural Gas 6.79 KG/Sec., Naphtha 6.58 KG/Sec 
 Water – 700 tones/ hr / unit 
2.6 Anti-Salient Features 
1. Cost of Generation: Rs. 2.05 / Kwh 
2. Mode of Operation: Base Load 
3. Rated Output: 135 MVA for GTG & 191.6 MVA for STG 
4. Rated Terminal Vol.: 10.5 KV for GTG & 15.75 KV FOR STG 
5. Rated Speed: 3000 rpm 
6. Type of Cooling: Air Cooled 
7. Black start facility: 3.5 MW Diesel Generator Set: 2000 rpm 
8. 1kw power = 1975kcal of fuel 
Fig 2.2 Plant Layout 
4
3. BASIC WORKING OF THE PLANT 
(Combined Cycle Power Generation) 
1. The fuel is fed in the two turbines. 
2. The fuel is burnt in the gas turbines to release the flue gases at high pressure and temperature. These gases rotate the turbine shaft. 
3. The shaft of the turbine is linked to the shaft of the gas turbine generator which leads to the production of energy at the two generators. 
4. The flue gases produced are passed through waste heat recovery steam generators where it passes from super-heaters, evaporators, economizers and condensate preheated. 
5. Water present and flowing in the above devices absorb heat from the hot flue gases and get converted in to high pressure and low pressure steam. 
6. The high pressure steam generated in the WHRSG is passed to the steam turbine and the low pressure steam to LP turbine. 
7. The steam available at the outlet of HP turbine and LP turbine generated in the WHRSG are supplied to the LP turbine. 
8. In the step 6 & 7 the steam supplied to the HP and LP turbines rotates the respective turbine. 
9. These rotors are connected to the rotor of the steam turbine generators by rigid coupling. Therefore due to the rotation of the turbine rotor of the steam turbine generators by rigid coupling. Therefore due to rotation of the turbine rotor, the generator turbine also rotates thereby producing electricity at the generator. 
Hence in 9 steps 432 MW of electricity is produced. 
Fig 3.1 Combined Cycle Power Generation 
5
4. FUELS 
Gas turbines are capable of burning a range of fuels including Naphtha, crude oil and natural gas. Selection of fuel depend upon several factors including availability of fuel, fuel cost cleanliness of the fuel. Natural gas is an ideal fuel because it provides efficiency and reliability with low operation and maintenance cost. Liquid fuels particularly heavy oils; usually contain contaminants, which case corrosion and fouling in gas turbine. Contaminants which cannot be removed from fuel, may leave deposits in gas turbine, which reduces the performance and adds to the maintenance cost. 
Duel fuel system is commonly used, enabling the gas turbine to burn up the fuels when primary fuel sources are not available. Duel fuel system can be designed to fire both fuels simultaneously. 
4.1. Natural gas 
Natural gas is an ideal fuel for se in gas turbine. It contains primarily Methane (CH4) other gases are ethane (C2H6), Nitrogen (N2), Carbon dioxide (CO2) and Sulphur(S). It has following advantages: 
 Clean burning. 
 Availability at lower cost. 
 Particularly free from solid residue. 
 High calorific value of Methane. 
 Low Sulphur content. 
For FGPP, This gas comes from Bombay High through medium of pipelines and one pipeline from Village Chhainsa (Faridabad). 
Fig 4.1 Pipelines of gas source 
6
4.2. Naphtha 
FGPP works on natural gas but if there is shortage of natural gas then plant is to be run on Naphtha. Naphtha as compared to natural gas has less calorific value but there is no alternate fuel other than Naphtha. It is cheaper than any other fuel and the amount of flue gases that comes out of the Naphtha can also be sent out to boiler to boil the water for manufacturing of steam for running the steam turbine. 
Naphtha is highly inflammable and highly explosive fuel. When it makes a mixture with air, it forms a very highly dangerous explosive mixture. When the supply of natural gas cuts off, the pipelines are filled with air. So while using Naphtha, it is necessary to remove that air because it can make explosive mixture with Naphtha. So for flushing this air a high-speed diesel (HSD) is sent to the pipeline, which removes the air present. In this way HSD enters the combustion chamber and working continues. This is the procedure for working of gas turbine when it has to feed on Naphtha without stopping the while plant, which was previously feed on natural gas. 
Naphtha before entering the pipelines undergoes filtration various times so that there should not be any impurity in that when it enters the combustion chamber. The main difference between Naphtha and Natural gas is that, natural gas enters the combustion chamber in the form of gas but Naphtha enters in form of liquid spray. Then it is compressed in it and due to high compression it burns and leaves very highly pressurized flue gases, which in turn is used to rotate the gas turbine. This entire process of using the Naphtha as a fuel is known as Naphtha firing. 
Fig 4.2 Naphtha specification 
7
5. MECHANICAL SYSTEMS 
The main generating unit consists of three main equipments in the plant. They are: 
1. Gas Turbine 
2. Waste Heat Recovery Steam Generator 
3. Steam Turbine 
5.1. Gas Turbine 
It is a single shaft (with line compressive unit). It is a 50 Hz; 135MW machine which runs on natural gas could also be operated on the liquid Naphtha. The gas turbine is very heavy, industrial type, within line compressor multistage flow type. The combustion chamber is of annular type. 
According to the flow of the air compressor is placed first, combustion chamber is next to it and turbine at the end of gas turbine. Two bearings are placed to support the shaft of the machine, these turbines are provided at the compressor starting end, and other are placed at the turbine end. The shaft of the unit is provided with the blades in the turbine region. 
5.1.1. Basic parts of the Gas Turbine: 
1. Compressor: Is a fuel stage axial type. It is provided with a variable inlet guide system to enable efficient operation. Filters are provided at the top of the compressor to filter any unwanted material from entering the turbine. In the compressor region there are 16 stages of blade, one set of blade, one set of blade on shaft and other set of fixed blade comes alternatively. 
2. Combustion chamber: There are two chambers in the gas turbine, one on each side of the shaft, connected vertically and parallel to each other. The combustion chambers are cylindrical in shape and attached to the unit in between the compressor and turbine. 
3. Turbine: It is provided at the end of the gas turbine unit. It consists of four stages of blades it also has the gearing to support the shaft at its end. 
Exhaust of the turbine is connected to the bypass stake which is further connected to WHRSG. The bypass is take is provided with two gates namely diverter damper and gelatin gates. 
5.1.2. Working of the gas turbine: 
During the start-up of generator, it act as motor. The generator is given supply and compressor start working. The function of the compressor is to provide air at the high pressure to combustion chamber, once air is supplied to the combustion fuel is ignited. 
8
Due to the burning of the fuel flue gases are released at high pressure and temperature and thermal expansion of the gases rotates the turbine blades that are connected to the shaft back supply to the generator is then stopped. Fuel supply is slowly increased till the optimum speed (3000 rpm) is attained. Fuel supply is kept constant. The fuel gases after rotating the turbine can be directed to the WHRSG sing diverter damper and gelatin gate. 
5.1.3. Gas Turbine Specifications: 
manufacture 
SEIMENS(Germany); model-V 94.2 
capacity 
137.76 MW 
compressor 
16 stage 
turbine 
4 stages 
burner 
Hybrid dual fuel 
combustors 
SILO type 
Air intake filters 
Pulse cleaning(576 in numbers) 
By pass take 
Vertical 70 m in height 
Ambient temperature 
27 deg c 
Ambient pressure 
1013 Mbar 
Table 5.1 Gas Turbine Specifications 
5.1.4. Gas turbine generator specifications: 
Relative humidity 
60% 
Voltage rating 
10.5 kv 
Power factor 
0.85 lagging 
KVA 
170.12 MVA 
Excitation current 
833 Amp 
Excitation voltage 
410 V 
Insulation type 
Class F micalastic 
Connection type 
AA 
Table 5.2 Gas turbine generator specifications 
9
5.2. Waste Heat Recovery Steam Generator 
The waste heat generator are unfired, heat recovery type design to accept the maximum exhaust temperature along with flue gas flow from the turbine. It is a natural circulation dual unit. All heat transfer surface are of fin type. The feed control system is located in between the economizer and drain to eliminate the possibility of streaming in the economizer and to enable operation with zero approach point thereby increasing in the efficiency of the combine cycle plant. A condensate preheated is added to low temperature zone of WHRB. There are two types of steam produced in this unit (H.P & L.P). 
5.2.1. Basic Parts of WHRSG: 
1. Condensate Preheater: it is present at the end of WHRSG. It is added to lower the temperature of flue gases in addition to increase the thermal efficiency of the plant. It is consist of spiral fined tubes welded to the top and bottom headers. There are maximum rows per module. 
2. Economizers: There are three different types of economizers. These are: 
a) L.P economizer: these tubes act as the economizer of the L.P steam; these are spiral fined tubes welded to the top and bottom headers and have fully drainable design. 
b) H.P economizer: these tube act as economizer for H.P steam, they also have spiral fined tubes welded to the top bottom headers and have fully drainable design. 
3. Evaporator: These are of two types: 
a) L.P evaporator: these tubes act as evaporator for the L.P. steam; these are connected to the L.P. drum and are spiral finned tubes. 
b) H.P evaporator: these tubes act as evaporator for H.P. steam, these are connected to H.P. drum and are placed closure to the turbine exhaust then the L.P. evaporator. These are also spiral fined tubes welded to the top and bottom headers are connected to the H.P. steam drum. 
4. Superheater: 
a) L.P. super heater: these tubes act as super heater for the L.P Steam. These are the fourth heat transfer surface in the direction of the gas flow. These are consisting of finned tubes, welded to the top and bottom headers and have maximum of two rows per module. These are designed for single gas flow on tube side and have fully drainable design. 
b) H.P. super heater 1&2: these tubes act as superheated for the H.P. Steam. These are the first heat transfer surface in the direction of gas flow. These consist of multi pass flow on the side and single flow on the gas side. 
5. Steam drum: these are the two drums placed at the top of WHSRG, these are: 
10
a) L.P. Drum: these drum store the L.P steam produced during the flow of water in the L.P. evaporator. It is small in the size than the H.P drum and has a blow of cork at its top to avoid blasting at high steam pressure. 
b) H.P. Drum: this drum store the H.P steam produced during the flow of water through H.P. super heater. It also has a blow cork for safety purposes. 
5.2.2 Working of the WHRSG: 
The boiler feed pumps feed the water to the HP & LP economizers, where the temperature of the water rises close to the saturation temperature after flowing to the economizers the water is passed to the steam drums through feed control system, then water is taken to the bottom header of the evaporator through the downpipes, here water gets converted into a mixture of steam and water. The mixture is carried to the tubes through rigor pipes. In the drum mixture is passed through centrifugal separators, where water is passed for recirculation through the down pipes. In the super heater steam gets superheated, to control the temperature of steam it is passed through spray type de-superheated is provided between HP economizer 1&2. This steam at the outlet of the super heater is carried to the steam turbine through feed pipes. 
Fig 5.1 Working of WHRSG 
11
5.2.3. WHRSG Specifications: 
Table 5.3 WHRSG Specifications 
5.3. Steam turbine 
The plant is provided with one steam turbine generating unit. The turbine is a 3000 rpm condensing set without any extraction for feed heating. It is a 160 MW, 50 Hz two cylinder condensing type turbines. The first cylinder (H.P) is a single flow type 25 reactions stages and the second cylinder (L.P) is a double flow with 7 reaction stages. It is provide with two main and two LP stop and control valves. The H.P and L.P sections have individual turbine rotors, which are connected to each other, and the generator with rigid couplings. 
5.3.1. Basic parts of Steam Turbine: 
1. H.P. Turbine: It is a single flow type turbine, with horizontal split casing and double shell. The provision of steam inlet temperature and high pressure to admission section is subjected only to low temperature and pressure and pressure effective at the exhaust of the turbine. The high pressure turbine is provided with two main stop and control valves to check and regulate the entry of the steam in to casing. 
12 
S.No. 
Parameter 
HP System 
LP System 
1. 
Design Pressure (bar) 
83 
9 
2. 
working pressure (bar) 
63 
5.5 
3. 
Steam temperature (deg. C) 
488 
207 
4. 
Steam flow (T/hr) 
162.67 
39.1 
5. 
Total heating surface, Superheater (m2) 
8980 
584 
6. 
Total heating surface, water tubes (m2) 
55910 
23859
2. L.P. Turbine: it is a three cell design and has a double flow system for max efficiency. The inner casing caries the first row of stationary blades and is supported on the outer casing so as to allow for thermal expansion. The middle casing rest on four girders, independent of the outer casing. The LP turbine is provided with two control valves. 
3. Bearing: The HP rotor is supported on two bearings, a combined journal bearing close to the coupling with LP rotor. The LP journal bearing at its end. The bearing pedestals are anchored to the foundation and are fixed in position. 
5.3.2. Working of steam turbine: 
The HP steam is fed to the HP section of the steam turbine. The steam passes through the stop and control valves of the HP turbine and enters the inner casing. On entering the inner casing the steam after leaving the HP turbine gets converted into LP steam. This LP steam produced at the WHRSG is passed into the inlet of the double flow LP turbine. On entering the steam once again expands and due to the combined effect of HP&LP rotors, the generator rotor also rotated and electricity is produced. The two outlet of the LP turbine are connected to the condenser where water and steam mixture are connected into water for further use in the WHRSG. 
5.3.2. Specifications of HP Turbine: 
TYPE 
Single flow 
No. of stages 
25 reaction stages 
Total H.P main steam pressure 
76.4 bar 
HP main steam temp. 
528 deg c 
HPT exhaust pressure 
5.1 bar 
HPT exhaust temp. 
175 deg 
Table 5.4 Specifications of HP Turbine 
5.3.3. Specifications of LP Turbine: 
Type 
Double flow 
No. Of stages 
7 reaction stages 
Total LP steam flow 
46 T/hr 
LP main steam pressure 
4.38 bar 
Table 5.5 Specifications of LP Turbine 
13
5.3.5. Steam turbine specification: 
manufacturer 
BHEL(haridwar, India) 
type 
2 cylinder condensing turbine 
capacity 
156.07MW 
Maximum terminal outputs 
160 MW 
Main steam pressure 
76.4 and 4.38 bar 
Condenser vacuum 
-0.92 bar 
speed 
3000 rpm 
Steam turbine generator 
160000 W/188230 VA 
Stator current 
6900 amp 
coolant 
air 
insulation 
Class F 
Power factor 
0.85 lag 
Excitation system 
Brush less excitation 
Rotor voltage 
432 V 
Rotor current 
797 amp 
Table 5.6 Steam turbine specification 
14 
1
6. SWITCHYARD 
The switch yard is the place from where the electricity is send outside. We know that electrical energy can’t be stored like cells, so what we generate should be consumed instantaneously. But as the load is not constant, therefore we generate electricity according to need i.e. the generation depends upon load. It has both outdoor and indoor equipments. 
6.1 Outdoor Equipments 
 Bus Bar 
 Circuit Breaker 
 Lightening Arrester 
 Earth Switch 
 Capacitor Voltage Transformer 
 Wave Trap 
 PLCC 
 Current Transformer 
 Isolators 
 Potential Transformer 
6.2 Indoor Equipments 
 Relays 
 Control Panels 
6.1.1 Bus Bar 
There are three buses viz. two main buses (bus 1 and bus 2) and one transfer bus. The two main buses are further divided into two sections thus giving us a total of five buses. 
Bus bars generally are of high conductive aluminum conforming to IS-5082 or copper of adequate cross section .Bus bar located in air –insulated enclosures & segregated from all other components .Bus bar is preferably cover with polyurethane. 
6.1.2 Circuit Breaker 
The code for circuit breaker is 52. An electric power system needs some form of switchgear in order to operate it safely & efficiently under both normal and abnormal conditions. Circuit breaker is an arrangement by which we can break the circuit or flow of current. A circuit breaker in station serves the same purpose as switch but it has many added and complex features. The basic construction of any circuit breaker requires the separation of contact in an insulating fluid that servers two functions: 
15
 It extinguishes the arc drawn between the contacts when circuit breaker opens. 
 It provides adequate insulation between the contacts and from each contact to earth. 
The insulating fluids commonly used in circuit breakers are: 
 Compressed air 
 Oil which produces hydrogen for arc excitation. 
 Vacuum 
 Sulphur hexafluoride (SF6 ) 
There are two makes of Circuit Breakers used at NTPC Faridabad switchyard: 
i. SF6 Circuit Breaker – manufactured by ALSTOM 
ii. Gas Circuit Breaker – manufactured by CGL 
6.1.3 Lightening Arrester 
These are provided to combat the effect of over voltages and surges caused due to lighting strokes on the transmission lines. These are generally provided at the end near the instrument which we want to protect. The lightening arrestors provide an easy path to the surge current to the ground thereby not letting the Equipments to fail.It saves the transformer and reactor from over voltage and over currents. 
It has a round metal cap type structure on the top called CORONA RING, meant for providing corona losses. 
A meter is provided which indicates the surface leakage and internal grading current of arrester. 
 Green – arrester is healthy 
 Red – arrester is defective 
In case of red, we first de-energize the arrester and then do the operation. 
Fig 6.1 Lightening Arrester 
16
6.1.4 Air Break Earthing Switch 
These are used to ground the circuit and to discharge the CB when CB is in off condition. 
The code of earthling switch is 5, 6, 7.The work of this equipment comes into picture when we want to shut down the supply for maintenance purpose. This help to neutralize the system from induced voltage from extra high voltage. This induced power is up to 2KV in case of 400 KV lines. 
Table 6.1 Specifications of earthing switch 
6.1.5 Capacitor Voltage Transformer (CVT) 
The carrier current equipment can be connected via the capacitor of CVT. Thereby there is no need of separate coupling capacitor. The reactor connected in series with the burden is adjusted to such a value that at supply frequency it resonates with the sum of two capacitors. This eliminates the error. CVT is attached at end of each transmission, line and buses. 
The CVT is used for line voltage measurements on loaded conditions. The basic construction of a cvt is as follows. Each CVT consists of a coupling capacitor (CC) which acts as a voltage driver and an Electro Magnetic Unit (EMU) which transforms the high voltage to standard low voltage. Depending on the system voltage the CC can be a single or a multi stack unit. 245 kV & 420kV CVTs no normally comprise of 2 units. 
Fig 6.2 Capacitor Voltage Transformer 
17 
Make 
Voltage 
Motor volt (ac) 
Control volt (dc) S & S power 245 kV 415 volts 220 volts
The main points of difference between a CVT and a potential transformer (PT) is that in a PT full line voltage is impressed upon the transformer while in cvt line voltage after standard reduction is applied to the transformer. 
It is used for three purposes: 
 Metering 
 Protection 
 PLCC 
6.1.6 Wave Trap 
It is used in PLCC system to trap frequency higher than 50 Hz. It is lightly inductive having very less resistance. It is attached at each end of transmission line. It is of cylindrical shape mounted on top of the transmission line. 
Fig 6.3 Wave Trap 
6.1.7 PLCC (Power Line Carrier Communication) 
In addition to power supply transfer, transmission line is also used for communication purpose. This is done by PLCC system. Here line conductors itself are used as channel for carrying information between two end of line. 
The PLCC system is used to trap the frequency higher than 50 Hz through high inductance and low resistance along with a coupling capacitor. The main components of PLCC are:- 
 Wave trap 
 Co-axial cable 
 CVT 
 PLCC cabinet 
 LMU ( Line matching Unit) 
18
6.1.8 Current Transformer (CT) 
These are used for stepping down AC current from higher value to lower value for measurement, protection and control. Here N2 gas is used to prevent oil from moisture. Its secondary winding has 5 cores. 
Terminal 1,2,4,5  protection 3 Metering Turns ratio – 800/1 
Fig 6.4 Current Transformer 
6.1.9 Isolators 
The isolators can be thought of switches that can either make or break the circuit at the operator’s wish. 
Sequence of operation while opening / closing a circuit: 
While opening: open circuit breaker  open isolator  close earthing switch (if any) 
While closing: ensure circuit breaker is open  close isolator  open earthing switch  close circuit breaker. 
It is used as off line circuit breaker. It is normally used for purpose of isolating a certain portion when required for maintenance. It operates at 2000 A. 
In switchyard there are 3 types of isolators: 
 Line isolator 
 Transfer bus isolator 
 Bus isolator 
Fig 6.5 Isolators 
19
7. GENERATOR 
The transformation of mechanical energy into electrical energy is carried out by the generator. The generator also called the alternator is based upon the principle of electromagnetic induction. The stator houses the armature windings and the rotor houses the field windings. The alternator is a doubly excited system and the field is excited from dc supply whereas the output received from the alternator is ac. 
When the rotor is energised the flux lines emitted by it are cut by the stator windings which induces an emf in them given by 
E = 4.44 f Φ N 
Where f  frequency in Hz 
Φ field strength in webers/m2 
N speed of rotor in rpm 
Turbo generators run at a very high speed hence the no. of poles are generally two or four and have a cylindrical rotor construction with small diameter and long axial length. 
7.1 Main components 
The main components of a generator are the rotor and stator. 
7.1.1 Rotor 
Body: The electrical rotor is the most difficult part of the generator to design. It is an electromagnet and to give it the required strength of magnetic field a large current is required to flow through it. 
Rotor winding: Silver bearing copper is used for the winding with mica as the insulation between conductors. Rotor has hollow conductors with slots to provide for circulation of the cooling gas. 
Rotor balancing: The rotor must then be completely tested for mechanical balance which means that a check is made to see if it will run upto normal speed without vibration. 
7.1.2 Stator 
Stator frame: It is the heaviest load to be transported. The major part is the stator core. This comprises an inner frame and an outer frame. The outer frame is a rigid fabricated structure of welded steel plate. In large generator the outer casing is done in two parts. 
Stator core: it is the heaviest part and is built from a large no. of thin steel plates or punching. 
Stator windings: It is of lap type and employs direct water cooled bar type winding. The stator winding bar is made from glass lapped elementary conductor and hollow conductors. The main insulation is applied by means of mica tape which is wrapped and is compounded with the help of a silicon epoxy compound. 
20
KVA Pf Stator Voltage (V) Stator Current (A) Rotor Voltage (V) Rotor Current (A) Rpm Hz Phase Coolant 247000 0.85 15750 9050 310 2600 3000 50 3 Water (stator)& hydrogen (rotor) 
Table 7.1 Generator Specifications 
7.2 Excitation System 
 Static Excitation System-The generators in stage -1(U-1&U-2) have this excitation system. Static excitation system has slip ring and carbon brush arrangement. It consists of step down transformer, converter and AVR (automatic voltage regulator). 
 Brushless Excitation System –The generators in stage -2(U-3, U-4& &U- 5) have this excitation system. It has two exciters, one is main exciter and other is pilot exciter. 
7.3 Generator Protection 
 Stator Protection- The neutral of star connected winding is connected to primary of neutral grounding transformer, so that earth fault current is limited by over voltage relay. 
 Differential Protection- In case of phase-to-phase fault generator is protected by longitudinal differential relay. 
 Rotor Protection-Rotor winding may be damaged by earth faults or open circuits. The field is biased by a dc voltage, which causes current to flow through the relay for an earth fault anywhere on the field system. 
 Over Speed Protection –Mechanically over speed device that is usually in the form of centrifugally operated rings mounted on the rotor shaft, which fly out and close the stop valves if the speed of the set increase more than 10%. 
 Over Voltage Protection – It is provided with an over voltage relay. The relay is usually induction pattern. The relay open the main circuit break and the field switch if the over voltage persists. 
 Seal Oil System –is a possibility of this hydrogen to come out of gaps, which is very hazardous. So, seal oil is used to seal the gaps so that hydrogen doesn’t come out. 
21
 Lubrication Oil System –Turbine lubrication-oil system seeks to provide proper lubrication of turbo generator bearings and operation of barring gear. Pumps are used to circulate lubrication-oil inside the generator. The oil of the lubrication and the governing system is cooled in the oil coolers. The cooling medium for these coolers is circulating water. 
7.4 Generator Cooling System 
Turbogenerator is provided with an efficient cooling system to avoid excessive heating and consequent wear and tear of its main components during operation. The two main systems employed for cooling are water cooling system and hydrogen cooling system. 
Hydrogen cooling system: Hydrogen is used as a cooling medium in large capacity generator in view of the following feature of hydrogen. When hydrogen is used as a coolant the temperature gradient between the surface to be cooled and the coolant is greatly reduced. This is because of the high coefficient of heat transfer of hydrogen.The cooling system mainly comprises of a gas control stand, a driver, hydrogen control panel, gas purity measuring instrument and an indicating instrument, valves and the sealing system. A great care should be taken so that no oxygen enters the cooling system because hydrogen forms an explosive mixture with air. The purity of hydrogen be maintained as high as 98%.to produce hydrogen in such large quantities a separate plant called the hydrogen plant is also maintained. 
Water cooling system: Turbo generators require water cooling arrangement. The stator winding is cooled by circulation of demineralised water through hollow conductors. The system is designed to maintain a constant rate of cooling water flow to the stator winding at a nominal temperature of 40 deg Celsius. 
7.5 Cooling Specifications of Turbo generators At FGPS 
Stage-I: 
Water as well as hydrogen cooling is present in stage-I turbo generators with following specifications: 
Rotor cooling: Hydrogen gas pressure: 3.5 Kg/cm2, Purity: 98% 
Stator cooling: Water pressure: 3.5 Kg/cm2, Rate of flow of water: 130 m3/hr 
Stage-II & III: 
Only hydrogen cooling is used for both stator and rotor cooling. 
Rotor cooling: Hydrogen gas pressure: 3.5 Kg/cm2, Purity: 98% 
Stator cooling: Hydrogen gas pressure: 2.0 Kg/cm2, Purity: 98% 
22
8. TRANSFORMERS 
The transformer is a device that transfers electrical energy from one electrical circuit to another through the medium of magnetic field and without the change of frequency. It is an electromagnetic energy conversion device, since the energy received by the primary is first converted to magnetic and is then reconverted to electrical energy in the secondary. Thus these windings are not connected electrically but coupled magnetically. Its efficiency is in the range of 97 to 98 %. 
8.1 Transformer accessories 
 Conservator: with the variation of temperature there is a corresponding variation in the volume of oil due to expansion and contraction of oil caused by the temperature change. To account for this, an expansion vessel called the conservator is connected to the outside atmosphere through a dehydrating breather to keep the air in the conservator dry. An oil gauge shows the level of oil in the conservator. 
 Breather: it is provided to prevent the contamination of oil in the conservator by the moisture present in the outside air entering the conservator. The outside air is drawn into the conservator every time the transformer cools down which results in the contraction of the volume occupied by the oil in the conservator. The breather contains a desiccator usually Silica gel which has the property of absorbing moisture from the air. After sometime silica gel gets saturated and then it changes it colour from purple to pink indicating that it has become saturated and hence needs to be replaced or regenerated. 
 Relief vent: In case of severe internal fault in the transformer, the pressure may be built to a very high level which may result in the explosion in the tank. Hence to avoid such condition a relief vent is provided with a bakelite diaphragm which breaks beyond certain pressure and releases the pressure. 
 Bushings: they consist of concentric porcelain discs which are used for insulation and bringing out the terminals of the windings from the tank. 
 Buchcholz relay: this is a protection scheme for the transformer to protect of against anticipated faults. It is applicable to the oil immersed transformer and depends on the fact that transformer breakdowns are always preceded by violent generation of gas which might occur due to sparking or arcing. 
 Temperature indicators: transformers are provided with two temperature indicators that indicate the temperature of the winding and that of the oil in the transformer for an oil filled transformer. 
23
The temperature indicators are also protective in nature whereby the first create an alarm and then trip the respective transformer in case the temperature of the respective parts rises beyond a certain value. 
 Tap changers: these are also provided and are mounted on the transformer. In case some kind of load fluctuations the taps can be changed or adjusted as per the need. There are two types of tap changers: On load tap changer and off load tap changer. 
8.2 Cooling Of Transformers 
Heat is produced in the transformers due to the current flowing in the conductors of the windings and on account of the eddy current in the core and also because of the hysteresis loss. In small dry type transformers the heat is directly dissipated to the atmosphere. In oil immersed systems oil serves as the medium for transferring the heat produced. Because of the difference in the temperatures of the parts of the transformers circulating currents are set. On account of these circulating currents hot oil is moved to the cooler region namely the heat exchanger and the cooler oil is forced towards the hot region. The heat exchangers generally consist of radiators with fins which might be provided with forced or natural type air circulation for removal of heat. 
The oil in oil immersed transformers may also be of forced or natural circulation type. The oil used for cooling is silicone oil or a mixture of naphthalene and paraffin. When forced oil circulation is used then pumps are used for the circulation of the oil. The oil forced air forced type cooling is used in large transformers of very high KVA rating. 
1. Simple Cooling 
AN: Natural cooling by atmospheric circulation, without any special devices. The transformer core and coils are open all round to the air. This method is confined to very small units at a few kV at low voltages. 
AB: In this case the cooling is improved by an air blast, directed by suitable trunking and produced by a fan. 
ON: The great majority of transformers are oil-immersed with natural cooling, i.e. the heat developed in the cores and coils is passed to the oil and thence to the tank walls, from which it is dissipated. 
OB: In this method the cooling of an ON-type transformer is improved by air blast over the outside of the tank. 
OFN: The oil is circulated by pump to natural air coolers. 
OFB: For large transformers artificial cooling may be used. The OFB method comprises a forced circulation of the oil to a refrigerator, where it is cooled by air-blast. 
OW: An oil-immersed transformer of this type is cooled by the circulation of water in cooling tubes situated at the top of the tank but below oil-level. 
OFW: Similar to OFB, except that the refrigerator employs water instead of air blast for cooling the oil, which is circulated by pump from the transformer to the cooler. 
24
2. Mixed Cooling 
ON/OB: As ON, but with alternative additional air-blast cooling. ON/OFN, ON/OFB, ON/OFW, ON/OB/OFB, ON/OW/OFW. 
A transformer may have two or three ratings when more than one method of cooling is provided. For an ON/OB arrangement these ratings are approximately in the ratio 1/1.5; for ON/OB/OFB in the ratio 1/1.5/2. 
8.3 Main Transformers 
i. Generator Transformer: This is a step up transformer. This supply gets its primary supply from generator and its secondary supplies the switchyard from where it is transmitted to grid. This transformer is oil cooled. The primary of this transformer is connected in star. The secondary is connected in delta. These are two in number. 
ii. Station Transformer: This transformer has almost the same rating as the generator transformer. Its primary is connected in delta and secondary in star. It is a step down transformer. These are 4 in number. 
iii. Unit Auxiliary Transformer: This is a step down transformer. The primary receives from generator and secondary supplies a 6.6 KV bus. This is oil cooled. These are 10 in number. 
iv. Neutral Grounded Transformer: This is used to ground the excess voltage if occurs in the secondary of UAT in spite of rated voltage. 
Fig 8.1 3-Phase Transformers 
25
9. D.C SYSTEM 
9.1 Requirement of DC System 
There are some auxiliaries which need to run even when the ac supply fails such as seal oil pumps, the scanner system, valve control, lights, etc. So we require the DC system. 
All the circuit breakers in the power plant operate on DC. The DC system comprises of batteries, chargers & control circuit to maintain a continuous supply for the DC feeders. 
There are five units in unchahar power plant and in each unit separate battery rooms are made from which we have 220V as well as 24V DC supply. 
9.2 Description of battery: 
Capacity = 220 V (1400 AH) / 24 V (400 AH) 
Per unit cell = 2.2 V 
Battery plate: 
Positive terminal = PbO2 
Negative terminal = Pb 
Electrolyte = H2SO4 
Reactions occurring in the battery: 
i. At the time of charging: 
At positive plate – 
PbSO4 + SO4 + 2H2O  PbO2 + 2H2O 
At negative plate – 
PbSO4 + H2  Pb + H2S 
ii. At the time of Discharging: 
At positive plate – 
PbO2 + H2 + H2SO4  PbSO4 + 2 H2O 
At negative plate – 
Pb + SO4  PbSO4 
9.3 Battery charger 
Battery charger normally operates in two modes. 
Float charging: It is constant voltage mode and works as a trickle charger. 
Boost charging: It is constant current mode and works as a quick charger. 
Trickle Charger – It operates at 220V. It is used for continuous charging of the battery. Full time battery is charged by the trickle charger and remains in float condition. 
Quick charger – It is also known as Boost Charger. This is used at the time of overhauling. It operates in two modes – 
i. Constant current (CC) ii. Constant Voltage (CV) 
26
10. SWITCHGEAR 
Switchgear is an electrical functional switch used for starting any drive and provide protection to the drive during on load condition. It is of two types:- 
 Low tension switchgear (below 1000 V) 
 High tension switchgear (above 1000 V) 
10.1 L.T Switchgear 
OPERATING VOLTAGE- 415VOLT 
The main components are: 
 Relays: the purpose of protective relaying system is to operate the circuit breaker so as to disconnect only the faulty equipment from the system as quickly as possible thus minimizing the trouble and damage caused by faults when they do occur. The general relay used is BMR (Bi-Metallic Relay). It trips due to thermal overloading when overcurrent passes through the bimetallic strips causes different expansions in different parts as a result the BMR strip is bent. 
 Contactors: these are used on-load operations under normal conditions. Contactor is a mechanical switching device capable of making carrying and breaking electric current under normal circuit conditions including operating overload conditions 
 Isolators: These are disconnecting switches used for off-load operations. These are operated manually. Before operation power is switched off. Isolators are kept in closed position when the system components are in operation. During any maintenance work isolators are kept open. 
 Fuses: It is a device used in circuit for protecting electrical equipments against overload or short circuit. The fuse wire melts when an excessive current flows in the circuit and thus isolates the faulty device from the supply circuit. 
10.2 H.T. Switchgear 
OPERATING VOLTAGE - 6.6KV 
For low voltage circuits fuses may be used to isolate the faulty circuit. For voltage higher than 3.3 kV isolation is achieved by circuit breaker. 
Requirement of circuit breaker: 
 After occurrence of fault the switchgears must isolate the faulty circuit as quickly as possible i.e. keeping the delay to minimum. 
 It should not operate when an over current flows under healthy condition. 
27
Basic principal of operation of circuit breaker: 
Circuit breaker consists of a fix contact and sliding contact into which moves a moving contact. The end of moving contact it attached to a handle that can be manually operated or may operate automatically with the help of mechanism that has a trip coil energized by secondary of CT. Under normal condition the secondary of CT is not energized sufficiently to trip the coil but under false condition the coil is energized fully to operate the trip coil and the circuit breaker is operated. 
 MOCB (Minimum oil circuit breaker) 
 SF6 (Sulphur hexafluoride circuit breaker) 
Here oil and SF6 are used to quench the arc. 
Bus ducts: 
These serve as interconnection between transformer and switchgear and are non- segregated phase type. These are natural air cooled. 
Bus coupler: 
It acts as interconnection between the two buses. If the supply of one bus fails then the bus coupler connects the two buses and charges the bus from the other bus. 
Different relays used: 
 Motor protection system 
 Earth fault relay 
 Over load relay 
 Lock out relay 
 Check synchronizing relay 
 Differential protection relay 
 Auxiliary relay 
10.3 Variable frequency drive: 
Fig 10.1 Electrical scheme of VFD 
28
The panel in the figure is a variable frequency drive panel. Using variable frequency drive voltage is compensated at low frequencies, the torque at low speeds is improved. To obtain the voltage boost, we require a controlled converter as well as a controlled inverter. 
First the three phase supply from transformer is fed to the controlled rectifier which the ac to dc. The advantage of using a controlled rectifier is that the average value of the output can be controlled by varying the firing angle. Then its output is fed to the inverter which is a type of load commutated inverter. Before passing it to the inverter a reactor is also employed in between this reduces the ripples. The inverter then converts dc to ac and the ac is fed to the synchronous motor. The speed of synchronous motor is fixed and is given by 120 f / p. since the only thing variable in the expression is the frequency which is directly proportional to the speed. Hence the inverter varies the frequency and hence controls the speed of the motor. The controlled rectifier in the circuit is used for voltage control while the load commutated inverter is used for frequency variation. 
10.3.1 Advantages of Variable Frequency Drive: 
1. Speed control is fine as the frequency is varied from 0.5Hz to 47.5 Hz. 
2. Very low starting current as motor starts on reduced voltage. 
3. Power consumption is low. 
4. Motor life is improved 
10.4 Two channel arrangement for synchronous motor: 
The stator of the synchronous motor is given supply using two channels. Normally the motor works on both channels but under some faulty conditions on any one of the channels the other channel can continue working since the motor is required for continuous operation 
Fig 10.2 Two channel arrangement of synchronous motor 
29
11. CONCLUSION 
On completion of my vocational training at NTPC Faridabad, I have come to know about how the very necessity of our lives now a days i.e. how electricity is generated & what all processes are needed to generate and run the plant on a 24x7 basis. 
NTPC Faridabad is one the plants in India to be under highest load factor for the maximum duration of time and that to operating at highest plant efficiencies. This plant is an example in terms of working efficiency and management of resources to all other thermal plants in our country. The operating pf of the NTPC as compared to the rest of country is the highest with 95 % the highest since its inception. 
The training gave me an opportunity to clear my concepts from practical point of view with the availability of machinery of diverse ratings. 
30
REFERENCES 
[1] N.T.P.C. magazines. 
[2] Google 
[3] Wikipedia 
[4] N.T.P.C. Websites. 
31

More Related Content

What's hot

Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC KantiTarun Kumar
 
NTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTNTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTShivam Sharma
 
Project report of kota super thermal power plant
Project report of kota super thermal power plantProject report of kota super thermal power plant
Project report of kota super thermal power plantHîmãńshu Mêęńä
 
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)Rajan Kumar Choudhary
 
Ntpc anta training presentation
Ntpc anta training presentation Ntpc anta training presentation
Ntpc anta training presentation nishant pareek
 
ramgarh gas thermal plant front page by bhagu bhatia
ramgarh gas thermal plant front page by bhagu bhatiaramgarh gas thermal plant front page by bhagu bhatia
ramgarh gas thermal plant front page by bhagu bhatiaBhagu Bhatia Devikot
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)abdul mohammad
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar Dilip kumar
 
SUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTIONSUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTIONAMIT KUMAR
 
PRASHANT ABSTRACT NTPC ANTA
PRASHANT ABSTRACT NTPC ANTAPRASHANT ABSTRACT NTPC ANTA
PRASHANT ABSTRACT NTPC ANTAprashant shukla
 
NTPC faridabad nd badarpur
NTPC faridabad nd badarpurNTPC faridabad nd badarpur
NTPC faridabad nd badarpurShrey Dhasmana
 
CONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTCONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTSubarna Poddar
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipatpratikguptateddy
 
NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training reportsanjeevps12345
 

What's hot (20)

Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC Kanti
 
NTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTNTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPT
 
Project report of kota super thermal power plant
Project report of kota super thermal power plantProject report of kota super thermal power plant
Project report of kota super thermal power plant
 
hard bind arj
hard bind arjhard bind arj
hard bind arj
 
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
 
Ntpc anta training presentation
Ntpc anta training presentation Ntpc anta training presentation
Ntpc anta training presentation
 
ramgarh gas thermal plant front page by bhagu bhatia
ramgarh gas thermal plant front page by bhagu bhatiaramgarh gas thermal plant front page by bhagu bhatia
ramgarh gas thermal plant front page by bhagu bhatia
 
NTPC Dadri Gas plant
NTPC Dadri Gas plantNTPC Dadri Gas plant
NTPC Dadri Gas plant
 
Report ON NTPC DADRI .BY ....EMAM
Report ON NTPC DADRI  .BY ....EMAMReport ON NTPC DADRI  .BY ....EMAM
Report ON NTPC DADRI .BY ....EMAM
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
 
SUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTIONSUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTION
 
PRASHANT ABSTRACT NTPC ANTA
PRASHANT ABSTRACT NTPC ANTAPRASHANT ABSTRACT NTPC ANTA
PRASHANT ABSTRACT NTPC ANTA
 
NTPC faridabad nd badarpur
NTPC faridabad nd badarpurNTPC faridabad nd badarpur
NTPC faridabad nd badarpur
 
CONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTCONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANT
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipat
 
ntpc unchahar
ntpc unchaharntpc unchahar
ntpc unchahar
 
Ntpc Report
Ntpc ReportNtpc Report
Ntpc Report
 
NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training report
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
 

Similar to Final report on ntpc faridabad

Training reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishorTraining reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishorNAVAL KISHOR
 
A summer training report on NTPC
A summer training report on NTPCA summer training report on NTPC
A summer training report on NTPCRanjeet1501
 
A summer traning report on ntpc
A summer traning report on ntpcA summer traning report on ntpc
A summer traning report on ntpcRanjeet1501
 
Maintainence OF STEAM TURBINE
Maintainence OF STEAM TURBINEMaintainence OF STEAM TURBINE
Maintainence OF STEAM TURBINESAI SHARATH GAMPA
 
Nikhil kumar project report ON NTPC KANTI
Nikhil kumar project report ON NTPC KANTINikhil kumar project report ON NTPC KANTI
Nikhil kumar project report ON NTPC KANTINikhil Singh
 
PDB-presentation(1).pptx
PDB-presentation(1).pptxPDB-presentation(1).pptx
PDB-presentation(1).pptxSajibDas40
 
Ranjan NTPC KAHALGAON ppt
Ranjan  NTPC KAHALGAON pptRanjan  NTPC KAHALGAON ppt
Ranjan NTPC KAHALGAON pptRanjan kumar
 
Training Report DCCPP, Dholpur
Training Report DCCPP, Dholpur Training Report DCCPP, Dholpur
Training Report DCCPP, Dholpur Yuvraj Singh
 
Ramgarh Gas Thermal Power Plant (RGTPP) Traning Report
Ramgarh Gas Thermal Power Plant (RGTPP) Traning ReportRamgarh Gas Thermal Power Plant (RGTPP) Traning Report
Ramgarh Gas Thermal Power Plant (RGTPP) Traning ReportIshan Khandelwal
 
rajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-reportrajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-reportRaj Sharma
 

Similar to Final report on ntpc faridabad (20)

Muneer GTPS
Muneer GTPSMuneer GTPS
Muneer GTPS
 
Training reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishorTraining reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishor
 
Report ntpc auraiya
Report ntpc auraiyaReport ntpc auraiya
Report ntpc auraiya
 
A summer training report on NTPC
A summer training report on NTPCA summer training report on NTPC
A summer training report on NTPC
 
A summer traning report on ntpc
A summer traning report on ntpcA summer traning report on ntpc
A summer traning report on ntpc
 
Ntpc report
Ntpc reportNtpc report
Ntpc report
 
ONGC Summer Training Report
ONGC Summer Training ReportONGC Summer Training Report
ONGC Summer Training Report
 
Maintainence OF STEAM TURBINE
Maintainence OF STEAM TURBINEMaintainence OF STEAM TURBINE
Maintainence OF STEAM TURBINE
 
Lovely Amit
Lovely AmitLovely Amit
Lovely Amit
 
Nikhil kumar project report ON NTPC KANTI
Nikhil kumar project report ON NTPC KANTINikhil kumar project report ON NTPC KANTI
Nikhil kumar project report ON NTPC KANTI
 
Ntpc report harsh
Ntpc report  harshNtpc report  harsh
Ntpc report harsh
 
ntpc
ntpcntpc
ntpc
 
PDB-presentation(1).pptx
PDB-presentation(1).pptxPDB-presentation(1).pptx
PDB-presentation(1).pptx
 
Ranjan NTPC KAHALGAON ppt
Ranjan  NTPC KAHALGAON pptRanjan  NTPC KAHALGAON ppt
Ranjan NTPC KAHALGAON ppt
 
Training Report DCCPP, Dholpur
Training Report DCCPP, Dholpur Training Report DCCPP, Dholpur
Training Report DCCPP, Dholpur
 
Ramgarh Gas Thermal Power Plant (RGTPP) Traning Report
Ramgarh Gas Thermal Power Plant (RGTPP) Traning ReportRamgarh Gas Thermal Power Plant (RGTPP) Traning Report
Ramgarh Gas Thermal Power Plant (RGTPP) Traning Report
 
PTPS
PTPSPTPS
PTPS
 
ntpc unchahar
ntpc unchaharntpc unchahar
ntpc unchahar
 
rajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-reportrajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-report
 
Final report
Final reportFinal report
Final report
 

Recently uploaded

Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 

Recently uploaded (20)

Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 

Final report on ntpc faridabad

  • 1. An Industrial Training Report On NTPC Faridabad Submitted in Partial Fulfillment of the Requirements for the Degree of Bachelor of Technology In Electrical Engineering By PAWAN AGRAWAL Roll No. 1104320028 Department of Electrical Engineering Bundelkhand Institute of Engineering & Technology (An Autonomous Institute) Jhansi (U.P.) India - 284128 i
  • 2. ACKNOWLEDGMENT I am very grateful to all those who helped me towards its smooth and efficient completion & under whose guidance this summer training was conducted successfully. I feel highly indebted to all the senior NTPC officials who extended me a constructive help in the technical field. I feel especially thankful to Mr. K.K. Sharma (Sr. Manager-Chemistry) Mrs. Prachi (Electrical Maintenance) Mr. N.N. Mishra (AGM- O&M) Mr. Manoj Agarwal (DGM-Mechanical Maintenance) Mr. Jimmy Joseph (S.S. - C&I) Mr. D.C. Tiwari (S.S. - Operation & Fuel handling) I gratefully acknowledge all the engineers/staff who gave us their valuable time, encouragement & constructive criticism for familiarising us with all technical aspects of the power plant. PAWAN AGRAWAL B.Tech Final year Electrical Engineering Roll no. 1104320028 ii
  • 3. CONTENTS Cover Page i Acknowledgement ii Certificate iii Contents iv List of Figures vi List of Tables vii 1. About The Company 1 2. Introduction to NTPC Faridabad 3 2.1 Location 3 2.2 Major Milestones 3 2.3 Installed capacity 4 2.4 Production Inputs 4 2.5 Requirements 4 2.6 Anti-Salient Features 4 3. Basic Working of the Plant 5 4. Fuels 6 4.1 Natural Gas 6 4.2 Naphtha 7 5. Mechanical Systems 8 5.1 Gas Turbine 8 5.2 WHRSG 10 5.3 Steam Turbine 12 6. Switchyard 15 6.1 Circuit Breaker 15 6.2 Lightening Arrester 15 6.3 Earthing Switch 16 6.4 Bus Bar 17 6.5 Capacitor Voltage Transformer 17 6.6 Wave Trap 18 iv
  • 4. 6.7 PLCC 18 6.8 Current Transformer 19 6.9 Isolator 19 7. Generator 20 7.1 Main Components 20 7.2 Excitation system 21 7.3 Generator protection 21 7.4 Generator cooling system 22 7.5 Cooling specifications of turbo-generators 22 8. Transformers 23 8.1 Transformer accessories 23 8.2 Cooling of transformers 24 8.3 Main transformers 25 9. DC system 26 9.1 Requirement of DC system 26 9.2 Description of battery 26 9.2 Battery Charger 27 10. Switchgear 27 10.1 L.T. switchgear 27 10.2 H.T. switchgear 27 10.3 Variable Frequency Drive 28 10.4 Two channel arrangement for synchronous motor 29 11. Conclusion 30 References 31 V
  • 5. LIST OF FIGURES Page No. Fig 1.1 NTPC generation growth 2 Fig 1.2 NTPC in power sector 2 Fig 2.1 Plant Overview 3 Fig 2.2 Plant Layout 4 Fig 3.1 Combined Cycle Power Generation 5 Fig 4.1 Pipelines of gas source 6 Fig 4.2 Naphtha Specifications 7 Fig 5.1 Working of WHRSG 11 Fig 6.1 Lightening Arrester 16 Fig 6.2 Capacitor Voltage Transformer 17 Fig 6.3 Wave Trap 18 Fig 6.4 Current Transformer 19 Fig 6.5 Isolators 19 Fig 8.1 Three-Phase Transformers 25 Fig 10.1 Electrical scheme of VFD 28 Fig 10.2 Two channel arrangement of synchronous motor 29 vi
  • 6. LIST OF TABLES Page No. Table 5.1 Gas Turbine Specifications 9 Table 5.2 Gas Turbine Generator Specifications 9 Table 5.3 WHRSG Specifications 12 Table 5.4 Specifications of HP Turbine 13 Table 5.5 Specifications of LP Turbine 13 Table 5.6 Steam Turbine Generator Specifications 14 Table 6.1 Specifications of earthing switch 17 Table 7.1 Generator Specifications 21 vii
  • 7. 1. ABOUT THE COMPANY Corporate Vision: “A world class integrated power major, powering India’s growth, with increasing global presence” Core Values: (BE COMMITTED) B-Business Ethics E- Environmentally & Economically Sustainable C-Customer Focus O-Organizational Pride M-Mutual Respect & Trust M-Motivating Self & Others I-Innovation & Speed T-Total Quality For Excellence T-Transparent & Respected Organization E-Enterprising D-Devoted NTPC Limited is the largest thermal power generating company of India. A public sector company, it was incorporated in the year 1975 to accelerate power development in the country as a wholly owned company of the Government of India. At present, Government of India holds 89.5% of the total equity shares of the company and the balance 10.5% is held by FIIs, Domestic Banks, Public and others. Within a span of 31 years, NTPC has emerged as a truly national power company, with power generating facilities in all the major regions of the country. NTPC’s core business is engineering, construction and operation of power generating plants. It also provides consultancy in the area of power plant constructions and power generation to companies in India and abroad. 1
  • 8. As on date the installed capacity of NTPC is 43,582 MW through its 17 coal based (31,445 MW), 7 gas based (3,955 MW), 3 Hydro based (1,328 MW) and 7 Joint Venture Projects (5,754 MW). NTPC’s share on 31 Mar 2007 in the total installed capacity of the country was 20.18% and it contributed 28.50% of the total power generation of the country during 2006-07. Fig 1.1 NTPC Generation Growth Fig 1.2 NTPC in power sector 2
  • 9. 2. INTRODUCTION TO NTPC FARIDABAD 2.1 Location Located near village Mujedi & Neemka in Faridabad district of Haryana State. 2.2 Major Milestones  Ever since then honorable Prime Minister Sh. I.K. Gujral laid down the foundation stone on 03rd august 1997.  First two units of 138MW were commissioned on 21st Jan 2000 and 22nd March, 2000 and one unit of 156MW was commissioned on 16th July 2001 by Haryana Vidyut Prasaran Nigam.  Faridabad project was taken over by NTPC from HVPN on 13th Feb, 2002.  It is the only power plant in this country to supply its entire power to a state i.e. Haryana rather than to the national grid. Fig 2.1 Plant Overview 2.3 Installed Capacity  Stage I (GT) = 2 X 138 MW  Stage II (ST) = 1 X 156 MW 3
  • 10. 2.4 Production Inputs Water Source: Rampur Distributaries of Gurgaon Canal Fuel: 1. Natural Gas (Main Fuel) (To be piped from HVJ pipeline by GAIL) 2. Naphtha (Alternate Fuel) 3. High Speed Diesel 2.5 Requirements  Gas – average 1.58 mcmd at 68.5% PLF & 2.30 mcmd at 100% PLF  Natural Gas 6.79 KG/Sec., Naphtha 6.58 KG/Sec  Water – 700 tones/ hr / unit 2.6 Anti-Salient Features 1. Cost of Generation: Rs. 2.05 / Kwh 2. Mode of Operation: Base Load 3. Rated Output: 135 MVA for GTG & 191.6 MVA for STG 4. Rated Terminal Vol.: 10.5 KV for GTG & 15.75 KV FOR STG 5. Rated Speed: 3000 rpm 6. Type of Cooling: Air Cooled 7. Black start facility: 3.5 MW Diesel Generator Set: 2000 rpm 8. 1kw power = 1975kcal of fuel Fig 2.2 Plant Layout 4
  • 11. 3. BASIC WORKING OF THE PLANT (Combined Cycle Power Generation) 1. The fuel is fed in the two turbines. 2. The fuel is burnt in the gas turbines to release the flue gases at high pressure and temperature. These gases rotate the turbine shaft. 3. The shaft of the turbine is linked to the shaft of the gas turbine generator which leads to the production of energy at the two generators. 4. The flue gases produced are passed through waste heat recovery steam generators where it passes from super-heaters, evaporators, economizers and condensate preheated. 5. Water present and flowing in the above devices absorb heat from the hot flue gases and get converted in to high pressure and low pressure steam. 6. The high pressure steam generated in the WHRSG is passed to the steam turbine and the low pressure steam to LP turbine. 7. The steam available at the outlet of HP turbine and LP turbine generated in the WHRSG are supplied to the LP turbine. 8. In the step 6 & 7 the steam supplied to the HP and LP turbines rotates the respective turbine. 9. These rotors are connected to the rotor of the steam turbine generators by rigid coupling. Therefore due to the rotation of the turbine rotor of the steam turbine generators by rigid coupling. Therefore due to rotation of the turbine rotor, the generator turbine also rotates thereby producing electricity at the generator. Hence in 9 steps 432 MW of electricity is produced. Fig 3.1 Combined Cycle Power Generation 5
  • 12. 4. FUELS Gas turbines are capable of burning a range of fuels including Naphtha, crude oil and natural gas. Selection of fuel depend upon several factors including availability of fuel, fuel cost cleanliness of the fuel. Natural gas is an ideal fuel because it provides efficiency and reliability with low operation and maintenance cost. Liquid fuels particularly heavy oils; usually contain contaminants, which case corrosion and fouling in gas turbine. Contaminants which cannot be removed from fuel, may leave deposits in gas turbine, which reduces the performance and adds to the maintenance cost. Duel fuel system is commonly used, enabling the gas turbine to burn up the fuels when primary fuel sources are not available. Duel fuel system can be designed to fire both fuels simultaneously. 4.1. Natural gas Natural gas is an ideal fuel for se in gas turbine. It contains primarily Methane (CH4) other gases are ethane (C2H6), Nitrogen (N2), Carbon dioxide (CO2) and Sulphur(S). It has following advantages:  Clean burning.  Availability at lower cost.  Particularly free from solid residue.  High calorific value of Methane.  Low Sulphur content. For FGPP, This gas comes from Bombay High through medium of pipelines and one pipeline from Village Chhainsa (Faridabad). Fig 4.1 Pipelines of gas source 6
  • 13. 4.2. Naphtha FGPP works on natural gas but if there is shortage of natural gas then plant is to be run on Naphtha. Naphtha as compared to natural gas has less calorific value but there is no alternate fuel other than Naphtha. It is cheaper than any other fuel and the amount of flue gases that comes out of the Naphtha can also be sent out to boiler to boil the water for manufacturing of steam for running the steam turbine. Naphtha is highly inflammable and highly explosive fuel. When it makes a mixture with air, it forms a very highly dangerous explosive mixture. When the supply of natural gas cuts off, the pipelines are filled with air. So while using Naphtha, it is necessary to remove that air because it can make explosive mixture with Naphtha. So for flushing this air a high-speed diesel (HSD) is sent to the pipeline, which removes the air present. In this way HSD enters the combustion chamber and working continues. This is the procedure for working of gas turbine when it has to feed on Naphtha without stopping the while plant, which was previously feed on natural gas. Naphtha before entering the pipelines undergoes filtration various times so that there should not be any impurity in that when it enters the combustion chamber. The main difference between Naphtha and Natural gas is that, natural gas enters the combustion chamber in the form of gas but Naphtha enters in form of liquid spray. Then it is compressed in it and due to high compression it burns and leaves very highly pressurized flue gases, which in turn is used to rotate the gas turbine. This entire process of using the Naphtha as a fuel is known as Naphtha firing. Fig 4.2 Naphtha specification 7
  • 14. 5. MECHANICAL SYSTEMS The main generating unit consists of three main equipments in the plant. They are: 1. Gas Turbine 2. Waste Heat Recovery Steam Generator 3. Steam Turbine 5.1. Gas Turbine It is a single shaft (with line compressive unit). It is a 50 Hz; 135MW machine which runs on natural gas could also be operated on the liquid Naphtha. The gas turbine is very heavy, industrial type, within line compressor multistage flow type. The combustion chamber is of annular type. According to the flow of the air compressor is placed first, combustion chamber is next to it and turbine at the end of gas turbine. Two bearings are placed to support the shaft of the machine, these turbines are provided at the compressor starting end, and other are placed at the turbine end. The shaft of the unit is provided with the blades in the turbine region. 5.1.1. Basic parts of the Gas Turbine: 1. Compressor: Is a fuel stage axial type. It is provided with a variable inlet guide system to enable efficient operation. Filters are provided at the top of the compressor to filter any unwanted material from entering the turbine. In the compressor region there are 16 stages of blade, one set of blade, one set of blade on shaft and other set of fixed blade comes alternatively. 2. Combustion chamber: There are two chambers in the gas turbine, one on each side of the shaft, connected vertically and parallel to each other. The combustion chambers are cylindrical in shape and attached to the unit in between the compressor and turbine. 3. Turbine: It is provided at the end of the gas turbine unit. It consists of four stages of blades it also has the gearing to support the shaft at its end. Exhaust of the turbine is connected to the bypass stake which is further connected to WHRSG. The bypass is take is provided with two gates namely diverter damper and gelatin gates. 5.1.2. Working of the gas turbine: During the start-up of generator, it act as motor. The generator is given supply and compressor start working. The function of the compressor is to provide air at the high pressure to combustion chamber, once air is supplied to the combustion fuel is ignited. 8
  • 15. Due to the burning of the fuel flue gases are released at high pressure and temperature and thermal expansion of the gases rotates the turbine blades that are connected to the shaft back supply to the generator is then stopped. Fuel supply is slowly increased till the optimum speed (3000 rpm) is attained. Fuel supply is kept constant. The fuel gases after rotating the turbine can be directed to the WHRSG sing diverter damper and gelatin gate. 5.1.3. Gas Turbine Specifications: manufacture SEIMENS(Germany); model-V 94.2 capacity 137.76 MW compressor 16 stage turbine 4 stages burner Hybrid dual fuel combustors SILO type Air intake filters Pulse cleaning(576 in numbers) By pass take Vertical 70 m in height Ambient temperature 27 deg c Ambient pressure 1013 Mbar Table 5.1 Gas Turbine Specifications 5.1.4. Gas turbine generator specifications: Relative humidity 60% Voltage rating 10.5 kv Power factor 0.85 lagging KVA 170.12 MVA Excitation current 833 Amp Excitation voltage 410 V Insulation type Class F micalastic Connection type AA Table 5.2 Gas turbine generator specifications 9
  • 16. 5.2. Waste Heat Recovery Steam Generator The waste heat generator are unfired, heat recovery type design to accept the maximum exhaust temperature along with flue gas flow from the turbine. It is a natural circulation dual unit. All heat transfer surface are of fin type. The feed control system is located in between the economizer and drain to eliminate the possibility of streaming in the economizer and to enable operation with zero approach point thereby increasing in the efficiency of the combine cycle plant. A condensate preheated is added to low temperature zone of WHRB. There are two types of steam produced in this unit (H.P & L.P). 5.2.1. Basic Parts of WHRSG: 1. Condensate Preheater: it is present at the end of WHRSG. It is added to lower the temperature of flue gases in addition to increase the thermal efficiency of the plant. It is consist of spiral fined tubes welded to the top and bottom headers. There are maximum rows per module. 2. Economizers: There are three different types of economizers. These are: a) L.P economizer: these tubes act as the economizer of the L.P steam; these are spiral fined tubes welded to the top and bottom headers and have fully drainable design. b) H.P economizer: these tube act as economizer for H.P steam, they also have spiral fined tubes welded to the top bottom headers and have fully drainable design. 3. Evaporator: These are of two types: a) L.P evaporator: these tubes act as evaporator for the L.P. steam; these are connected to the L.P. drum and are spiral finned tubes. b) H.P evaporator: these tubes act as evaporator for H.P. steam, these are connected to H.P. drum and are placed closure to the turbine exhaust then the L.P. evaporator. These are also spiral fined tubes welded to the top and bottom headers are connected to the H.P. steam drum. 4. Superheater: a) L.P. super heater: these tubes act as super heater for the L.P Steam. These are the fourth heat transfer surface in the direction of the gas flow. These are consisting of finned tubes, welded to the top and bottom headers and have maximum of two rows per module. These are designed for single gas flow on tube side and have fully drainable design. b) H.P. super heater 1&2: these tubes act as superheated for the H.P. Steam. These are the first heat transfer surface in the direction of gas flow. These consist of multi pass flow on the side and single flow on the gas side. 5. Steam drum: these are the two drums placed at the top of WHSRG, these are: 10
  • 17. a) L.P. Drum: these drum store the L.P steam produced during the flow of water in the L.P. evaporator. It is small in the size than the H.P drum and has a blow of cork at its top to avoid blasting at high steam pressure. b) H.P. Drum: this drum store the H.P steam produced during the flow of water through H.P. super heater. It also has a blow cork for safety purposes. 5.2.2 Working of the WHRSG: The boiler feed pumps feed the water to the HP & LP economizers, where the temperature of the water rises close to the saturation temperature after flowing to the economizers the water is passed to the steam drums through feed control system, then water is taken to the bottom header of the evaporator through the downpipes, here water gets converted into a mixture of steam and water. The mixture is carried to the tubes through rigor pipes. In the drum mixture is passed through centrifugal separators, where water is passed for recirculation through the down pipes. In the super heater steam gets superheated, to control the temperature of steam it is passed through spray type de-superheated is provided between HP economizer 1&2. This steam at the outlet of the super heater is carried to the steam turbine through feed pipes. Fig 5.1 Working of WHRSG 11
  • 18. 5.2.3. WHRSG Specifications: Table 5.3 WHRSG Specifications 5.3. Steam turbine The plant is provided with one steam turbine generating unit. The turbine is a 3000 rpm condensing set without any extraction for feed heating. It is a 160 MW, 50 Hz two cylinder condensing type turbines. The first cylinder (H.P) is a single flow type 25 reactions stages and the second cylinder (L.P) is a double flow with 7 reaction stages. It is provide with two main and two LP stop and control valves. The H.P and L.P sections have individual turbine rotors, which are connected to each other, and the generator with rigid couplings. 5.3.1. Basic parts of Steam Turbine: 1. H.P. Turbine: It is a single flow type turbine, with horizontal split casing and double shell. The provision of steam inlet temperature and high pressure to admission section is subjected only to low temperature and pressure and pressure effective at the exhaust of the turbine. The high pressure turbine is provided with two main stop and control valves to check and regulate the entry of the steam in to casing. 12 S.No. Parameter HP System LP System 1. Design Pressure (bar) 83 9 2. working pressure (bar) 63 5.5 3. Steam temperature (deg. C) 488 207 4. Steam flow (T/hr) 162.67 39.1 5. Total heating surface, Superheater (m2) 8980 584 6. Total heating surface, water tubes (m2) 55910 23859
  • 19. 2. L.P. Turbine: it is a three cell design and has a double flow system for max efficiency. The inner casing caries the first row of stationary blades and is supported on the outer casing so as to allow for thermal expansion. The middle casing rest on four girders, independent of the outer casing. The LP turbine is provided with two control valves. 3. Bearing: The HP rotor is supported on two bearings, a combined journal bearing close to the coupling with LP rotor. The LP journal bearing at its end. The bearing pedestals are anchored to the foundation and are fixed in position. 5.3.2. Working of steam turbine: The HP steam is fed to the HP section of the steam turbine. The steam passes through the stop and control valves of the HP turbine and enters the inner casing. On entering the inner casing the steam after leaving the HP turbine gets converted into LP steam. This LP steam produced at the WHRSG is passed into the inlet of the double flow LP turbine. On entering the steam once again expands and due to the combined effect of HP&LP rotors, the generator rotor also rotated and electricity is produced. The two outlet of the LP turbine are connected to the condenser where water and steam mixture are connected into water for further use in the WHRSG. 5.3.2. Specifications of HP Turbine: TYPE Single flow No. of stages 25 reaction stages Total H.P main steam pressure 76.4 bar HP main steam temp. 528 deg c HPT exhaust pressure 5.1 bar HPT exhaust temp. 175 deg Table 5.4 Specifications of HP Turbine 5.3.3. Specifications of LP Turbine: Type Double flow No. Of stages 7 reaction stages Total LP steam flow 46 T/hr LP main steam pressure 4.38 bar Table 5.5 Specifications of LP Turbine 13
  • 20. 5.3.5. Steam turbine specification: manufacturer BHEL(haridwar, India) type 2 cylinder condensing turbine capacity 156.07MW Maximum terminal outputs 160 MW Main steam pressure 76.4 and 4.38 bar Condenser vacuum -0.92 bar speed 3000 rpm Steam turbine generator 160000 W/188230 VA Stator current 6900 amp coolant air insulation Class F Power factor 0.85 lag Excitation system Brush less excitation Rotor voltage 432 V Rotor current 797 amp Table 5.6 Steam turbine specification 14 1
  • 21. 6. SWITCHYARD The switch yard is the place from where the electricity is send outside. We know that electrical energy can’t be stored like cells, so what we generate should be consumed instantaneously. But as the load is not constant, therefore we generate electricity according to need i.e. the generation depends upon load. It has both outdoor and indoor equipments. 6.1 Outdoor Equipments  Bus Bar  Circuit Breaker  Lightening Arrester  Earth Switch  Capacitor Voltage Transformer  Wave Trap  PLCC  Current Transformer  Isolators  Potential Transformer 6.2 Indoor Equipments  Relays  Control Panels 6.1.1 Bus Bar There are three buses viz. two main buses (bus 1 and bus 2) and one transfer bus. The two main buses are further divided into two sections thus giving us a total of five buses. Bus bars generally are of high conductive aluminum conforming to IS-5082 or copper of adequate cross section .Bus bar located in air –insulated enclosures & segregated from all other components .Bus bar is preferably cover with polyurethane. 6.1.2 Circuit Breaker The code for circuit breaker is 52. An electric power system needs some form of switchgear in order to operate it safely & efficiently under both normal and abnormal conditions. Circuit breaker is an arrangement by which we can break the circuit or flow of current. A circuit breaker in station serves the same purpose as switch but it has many added and complex features. The basic construction of any circuit breaker requires the separation of contact in an insulating fluid that servers two functions: 15
  • 22.  It extinguishes the arc drawn between the contacts when circuit breaker opens.  It provides adequate insulation between the contacts and from each contact to earth. The insulating fluids commonly used in circuit breakers are:  Compressed air  Oil which produces hydrogen for arc excitation.  Vacuum  Sulphur hexafluoride (SF6 ) There are two makes of Circuit Breakers used at NTPC Faridabad switchyard: i. SF6 Circuit Breaker – manufactured by ALSTOM ii. Gas Circuit Breaker – manufactured by CGL 6.1.3 Lightening Arrester These are provided to combat the effect of over voltages and surges caused due to lighting strokes on the transmission lines. These are generally provided at the end near the instrument which we want to protect. The lightening arrestors provide an easy path to the surge current to the ground thereby not letting the Equipments to fail.It saves the transformer and reactor from over voltage and over currents. It has a round metal cap type structure on the top called CORONA RING, meant for providing corona losses. A meter is provided which indicates the surface leakage and internal grading current of arrester.  Green – arrester is healthy  Red – arrester is defective In case of red, we first de-energize the arrester and then do the operation. Fig 6.1 Lightening Arrester 16
  • 23. 6.1.4 Air Break Earthing Switch These are used to ground the circuit and to discharge the CB when CB is in off condition. The code of earthling switch is 5, 6, 7.The work of this equipment comes into picture when we want to shut down the supply for maintenance purpose. This help to neutralize the system from induced voltage from extra high voltage. This induced power is up to 2KV in case of 400 KV lines. Table 6.1 Specifications of earthing switch 6.1.5 Capacitor Voltage Transformer (CVT) The carrier current equipment can be connected via the capacitor of CVT. Thereby there is no need of separate coupling capacitor. The reactor connected in series with the burden is adjusted to such a value that at supply frequency it resonates with the sum of two capacitors. This eliminates the error. CVT is attached at end of each transmission, line and buses. The CVT is used for line voltage measurements on loaded conditions. The basic construction of a cvt is as follows. Each CVT consists of a coupling capacitor (CC) which acts as a voltage driver and an Electro Magnetic Unit (EMU) which transforms the high voltage to standard low voltage. Depending on the system voltage the CC can be a single or a multi stack unit. 245 kV & 420kV CVTs no normally comprise of 2 units. Fig 6.2 Capacitor Voltage Transformer 17 Make Voltage Motor volt (ac) Control volt (dc) S & S power 245 kV 415 volts 220 volts
  • 24. The main points of difference between a CVT and a potential transformer (PT) is that in a PT full line voltage is impressed upon the transformer while in cvt line voltage after standard reduction is applied to the transformer. It is used for three purposes:  Metering  Protection  PLCC 6.1.6 Wave Trap It is used in PLCC system to trap frequency higher than 50 Hz. It is lightly inductive having very less resistance. It is attached at each end of transmission line. It is of cylindrical shape mounted on top of the transmission line. Fig 6.3 Wave Trap 6.1.7 PLCC (Power Line Carrier Communication) In addition to power supply transfer, transmission line is also used for communication purpose. This is done by PLCC system. Here line conductors itself are used as channel for carrying information between two end of line. The PLCC system is used to trap the frequency higher than 50 Hz through high inductance and low resistance along with a coupling capacitor. The main components of PLCC are:-  Wave trap  Co-axial cable  CVT  PLCC cabinet  LMU ( Line matching Unit) 18
  • 25. 6.1.8 Current Transformer (CT) These are used for stepping down AC current from higher value to lower value for measurement, protection and control. Here N2 gas is used to prevent oil from moisture. Its secondary winding has 5 cores. Terminal 1,2,4,5  protection 3 Metering Turns ratio – 800/1 Fig 6.4 Current Transformer 6.1.9 Isolators The isolators can be thought of switches that can either make or break the circuit at the operator’s wish. Sequence of operation while opening / closing a circuit: While opening: open circuit breaker  open isolator  close earthing switch (if any) While closing: ensure circuit breaker is open  close isolator  open earthing switch  close circuit breaker. It is used as off line circuit breaker. It is normally used for purpose of isolating a certain portion when required for maintenance. It operates at 2000 A. In switchyard there are 3 types of isolators:  Line isolator  Transfer bus isolator  Bus isolator Fig 6.5 Isolators 19
  • 26. 7. GENERATOR The transformation of mechanical energy into electrical energy is carried out by the generator. The generator also called the alternator is based upon the principle of electromagnetic induction. The stator houses the armature windings and the rotor houses the field windings. The alternator is a doubly excited system and the field is excited from dc supply whereas the output received from the alternator is ac. When the rotor is energised the flux lines emitted by it are cut by the stator windings which induces an emf in them given by E = 4.44 f Φ N Where f  frequency in Hz Φ field strength in webers/m2 N speed of rotor in rpm Turbo generators run at a very high speed hence the no. of poles are generally two or four and have a cylindrical rotor construction with small diameter and long axial length. 7.1 Main components The main components of a generator are the rotor and stator. 7.1.1 Rotor Body: The electrical rotor is the most difficult part of the generator to design. It is an electromagnet and to give it the required strength of magnetic field a large current is required to flow through it. Rotor winding: Silver bearing copper is used for the winding with mica as the insulation between conductors. Rotor has hollow conductors with slots to provide for circulation of the cooling gas. Rotor balancing: The rotor must then be completely tested for mechanical balance which means that a check is made to see if it will run upto normal speed without vibration. 7.1.2 Stator Stator frame: It is the heaviest load to be transported. The major part is the stator core. This comprises an inner frame and an outer frame. The outer frame is a rigid fabricated structure of welded steel plate. In large generator the outer casing is done in two parts. Stator core: it is the heaviest part and is built from a large no. of thin steel plates or punching. Stator windings: It is of lap type and employs direct water cooled bar type winding. The stator winding bar is made from glass lapped elementary conductor and hollow conductors. The main insulation is applied by means of mica tape which is wrapped and is compounded with the help of a silicon epoxy compound. 20
  • 27. KVA Pf Stator Voltage (V) Stator Current (A) Rotor Voltage (V) Rotor Current (A) Rpm Hz Phase Coolant 247000 0.85 15750 9050 310 2600 3000 50 3 Water (stator)& hydrogen (rotor) Table 7.1 Generator Specifications 7.2 Excitation System  Static Excitation System-The generators in stage -1(U-1&U-2) have this excitation system. Static excitation system has slip ring and carbon brush arrangement. It consists of step down transformer, converter and AVR (automatic voltage regulator).  Brushless Excitation System –The generators in stage -2(U-3, U-4& &U- 5) have this excitation system. It has two exciters, one is main exciter and other is pilot exciter. 7.3 Generator Protection  Stator Protection- The neutral of star connected winding is connected to primary of neutral grounding transformer, so that earth fault current is limited by over voltage relay.  Differential Protection- In case of phase-to-phase fault generator is protected by longitudinal differential relay.  Rotor Protection-Rotor winding may be damaged by earth faults or open circuits. The field is biased by a dc voltage, which causes current to flow through the relay for an earth fault anywhere on the field system.  Over Speed Protection –Mechanically over speed device that is usually in the form of centrifugally operated rings mounted on the rotor shaft, which fly out and close the stop valves if the speed of the set increase more than 10%.  Over Voltage Protection – It is provided with an over voltage relay. The relay is usually induction pattern. The relay open the main circuit break and the field switch if the over voltage persists.  Seal Oil System –is a possibility of this hydrogen to come out of gaps, which is very hazardous. So, seal oil is used to seal the gaps so that hydrogen doesn’t come out. 21
  • 28.  Lubrication Oil System –Turbine lubrication-oil system seeks to provide proper lubrication of turbo generator bearings and operation of barring gear. Pumps are used to circulate lubrication-oil inside the generator. The oil of the lubrication and the governing system is cooled in the oil coolers. The cooling medium for these coolers is circulating water. 7.4 Generator Cooling System Turbogenerator is provided with an efficient cooling system to avoid excessive heating and consequent wear and tear of its main components during operation. The two main systems employed for cooling are water cooling system and hydrogen cooling system. Hydrogen cooling system: Hydrogen is used as a cooling medium in large capacity generator in view of the following feature of hydrogen. When hydrogen is used as a coolant the temperature gradient between the surface to be cooled and the coolant is greatly reduced. This is because of the high coefficient of heat transfer of hydrogen.The cooling system mainly comprises of a gas control stand, a driver, hydrogen control panel, gas purity measuring instrument and an indicating instrument, valves and the sealing system. A great care should be taken so that no oxygen enters the cooling system because hydrogen forms an explosive mixture with air. The purity of hydrogen be maintained as high as 98%.to produce hydrogen in such large quantities a separate plant called the hydrogen plant is also maintained. Water cooling system: Turbo generators require water cooling arrangement. The stator winding is cooled by circulation of demineralised water through hollow conductors. The system is designed to maintain a constant rate of cooling water flow to the stator winding at a nominal temperature of 40 deg Celsius. 7.5 Cooling Specifications of Turbo generators At FGPS Stage-I: Water as well as hydrogen cooling is present in stage-I turbo generators with following specifications: Rotor cooling: Hydrogen gas pressure: 3.5 Kg/cm2, Purity: 98% Stator cooling: Water pressure: 3.5 Kg/cm2, Rate of flow of water: 130 m3/hr Stage-II & III: Only hydrogen cooling is used for both stator and rotor cooling. Rotor cooling: Hydrogen gas pressure: 3.5 Kg/cm2, Purity: 98% Stator cooling: Hydrogen gas pressure: 2.0 Kg/cm2, Purity: 98% 22
  • 29. 8. TRANSFORMERS The transformer is a device that transfers electrical energy from one electrical circuit to another through the medium of magnetic field and without the change of frequency. It is an electromagnetic energy conversion device, since the energy received by the primary is first converted to magnetic and is then reconverted to electrical energy in the secondary. Thus these windings are not connected electrically but coupled magnetically. Its efficiency is in the range of 97 to 98 %. 8.1 Transformer accessories  Conservator: with the variation of temperature there is a corresponding variation in the volume of oil due to expansion and contraction of oil caused by the temperature change. To account for this, an expansion vessel called the conservator is connected to the outside atmosphere through a dehydrating breather to keep the air in the conservator dry. An oil gauge shows the level of oil in the conservator.  Breather: it is provided to prevent the contamination of oil in the conservator by the moisture present in the outside air entering the conservator. The outside air is drawn into the conservator every time the transformer cools down which results in the contraction of the volume occupied by the oil in the conservator. The breather contains a desiccator usually Silica gel which has the property of absorbing moisture from the air. After sometime silica gel gets saturated and then it changes it colour from purple to pink indicating that it has become saturated and hence needs to be replaced or regenerated.  Relief vent: In case of severe internal fault in the transformer, the pressure may be built to a very high level which may result in the explosion in the tank. Hence to avoid such condition a relief vent is provided with a bakelite diaphragm which breaks beyond certain pressure and releases the pressure.  Bushings: they consist of concentric porcelain discs which are used for insulation and bringing out the terminals of the windings from the tank.  Buchcholz relay: this is a protection scheme for the transformer to protect of against anticipated faults. It is applicable to the oil immersed transformer and depends on the fact that transformer breakdowns are always preceded by violent generation of gas which might occur due to sparking or arcing.  Temperature indicators: transformers are provided with two temperature indicators that indicate the temperature of the winding and that of the oil in the transformer for an oil filled transformer. 23
  • 30. The temperature indicators are also protective in nature whereby the first create an alarm and then trip the respective transformer in case the temperature of the respective parts rises beyond a certain value.  Tap changers: these are also provided and are mounted on the transformer. In case some kind of load fluctuations the taps can be changed or adjusted as per the need. There are two types of tap changers: On load tap changer and off load tap changer. 8.2 Cooling Of Transformers Heat is produced in the transformers due to the current flowing in the conductors of the windings and on account of the eddy current in the core and also because of the hysteresis loss. In small dry type transformers the heat is directly dissipated to the atmosphere. In oil immersed systems oil serves as the medium for transferring the heat produced. Because of the difference in the temperatures of the parts of the transformers circulating currents are set. On account of these circulating currents hot oil is moved to the cooler region namely the heat exchanger and the cooler oil is forced towards the hot region. The heat exchangers generally consist of radiators with fins which might be provided with forced or natural type air circulation for removal of heat. The oil in oil immersed transformers may also be of forced or natural circulation type. The oil used for cooling is silicone oil or a mixture of naphthalene and paraffin. When forced oil circulation is used then pumps are used for the circulation of the oil. The oil forced air forced type cooling is used in large transformers of very high KVA rating. 1. Simple Cooling AN: Natural cooling by atmospheric circulation, without any special devices. The transformer core and coils are open all round to the air. This method is confined to very small units at a few kV at low voltages. AB: In this case the cooling is improved by an air blast, directed by suitable trunking and produced by a fan. ON: The great majority of transformers are oil-immersed with natural cooling, i.e. the heat developed in the cores and coils is passed to the oil and thence to the tank walls, from which it is dissipated. OB: In this method the cooling of an ON-type transformer is improved by air blast over the outside of the tank. OFN: The oil is circulated by pump to natural air coolers. OFB: For large transformers artificial cooling may be used. The OFB method comprises a forced circulation of the oil to a refrigerator, where it is cooled by air-blast. OW: An oil-immersed transformer of this type is cooled by the circulation of water in cooling tubes situated at the top of the tank but below oil-level. OFW: Similar to OFB, except that the refrigerator employs water instead of air blast for cooling the oil, which is circulated by pump from the transformer to the cooler. 24
  • 31. 2. Mixed Cooling ON/OB: As ON, but with alternative additional air-blast cooling. ON/OFN, ON/OFB, ON/OFW, ON/OB/OFB, ON/OW/OFW. A transformer may have two or three ratings when more than one method of cooling is provided. For an ON/OB arrangement these ratings are approximately in the ratio 1/1.5; for ON/OB/OFB in the ratio 1/1.5/2. 8.3 Main Transformers i. Generator Transformer: This is a step up transformer. This supply gets its primary supply from generator and its secondary supplies the switchyard from where it is transmitted to grid. This transformer is oil cooled. The primary of this transformer is connected in star. The secondary is connected in delta. These are two in number. ii. Station Transformer: This transformer has almost the same rating as the generator transformer. Its primary is connected in delta and secondary in star. It is a step down transformer. These are 4 in number. iii. Unit Auxiliary Transformer: This is a step down transformer. The primary receives from generator and secondary supplies a 6.6 KV bus. This is oil cooled. These are 10 in number. iv. Neutral Grounded Transformer: This is used to ground the excess voltage if occurs in the secondary of UAT in spite of rated voltage. Fig 8.1 3-Phase Transformers 25
  • 32. 9. D.C SYSTEM 9.1 Requirement of DC System There are some auxiliaries which need to run even when the ac supply fails such as seal oil pumps, the scanner system, valve control, lights, etc. So we require the DC system. All the circuit breakers in the power plant operate on DC. The DC system comprises of batteries, chargers & control circuit to maintain a continuous supply for the DC feeders. There are five units in unchahar power plant and in each unit separate battery rooms are made from which we have 220V as well as 24V DC supply. 9.2 Description of battery: Capacity = 220 V (1400 AH) / 24 V (400 AH) Per unit cell = 2.2 V Battery plate: Positive terminal = PbO2 Negative terminal = Pb Electrolyte = H2SO4 Reactions occurring in the battery: i. At the time of charging: At positive plate – PbSO4 + SO4 + 2H2O  PbO2 + 2H2O At negative plate – PbSO4 + H2  Pb + H2S ii. At the time of Discharging: At positive plate – PbO2 + H2 + H2SO4  PbSO4 + 2 H2O At negative plate – Pb + SO4  PbSO4 9.3 Battery charger Battery charger normally operates in two modes. Float charging: It is constant voltage mode and works as a trickle charger. Boost charging: It is constant current mode and works as a quick charger. Trickle Charger – It operates at 220V. It is used for continuous charging of the battery. Full time battery is charged by the trickle charger and remains in float condition. Quick charger – It is also known as Boost Charger. This is used at the time of overhauling. It operates in two modes – i. Constant current (CC) ii. Constant Voltage (CV) 26
  • 33. 10. SWITCHGEAR Switchgear is an electrical functional switch used for starting any drive and provide protection to the drive during on load condition. It is of two types:-  Low tension switchgear (below 1000 V)  High tension switchgear (above 1000 V) 10.1 L.T Switchgear OPERATING VOLTAGE- 415VOLT The main components are:  Relays: the purpose of protective relaying system is to operate the circuit breaker so as to disconnect only the faulty equipment from the system as quickly as possible thus minimizing the trouble and damage caused by faults when they do occur. The general relay used is BMR (Bi-Metallic Relay). It trips due to thermal overloading when overcurrent passes through the bimetallic strips causes different expansions in different parts as a result the BMR strip is bent.  Contactors: these are used on-load operations under normal conditions. Contactor is a mechanical switching device capable of making carrying and breaking electric current under normal circuit conditions including operating overload conditions  Isolators: These are disconnecting switches used for off-load operations. These are operated manually. Before operation power is switched off. Isolators are kept in closed position when the system components are in operation. During any maintenance work isolators are kept open.  Fuses: It is a device used in circuit for protecting electrical equipments against overload or short circuit. The fuse wire melts when an excessive current flows in the circuit and thus isolates the faulty device from the supply circuit. 10.2 H.T. Switchgear OPERATING VOLTAGE - 6.6KV For low voltage circuits fuses may be used to isolate the faulty circuit. For voltage higher than 3.3 kV isolation is achieved by circuit breaker. Requirement of circuit breaker:  After occurrence of fault the switchgears must isolate the faulty circuit as quickly as possible i.e. keeping the delay to minimum.  It should not operate when an over current flows under healthy condition. 27
  • 34. Basic principal of operation of circuit breaker: Circuit breaker consists of a fix contact and sliding contact into which moves a moving contact. The end of moving contact it attached to a handle that can be manually operated or may operate automatically with the help of mechanism that has a trip coil energized by secondary of CT. Under normal condition the secondary of CT is not energized sufficiently to trip the coil but under false condition the coil is energized fully to operate the trip coil and the circuit breaker is operated.  MOCB (Minimum oil circuit breaker)  SF6 (Sulphur hexafluoride circuit breaker) Here oil and SF6 are used to quench the arc. Bus ducts: These serve as interconnection between transformer and switchgear and are non- segregated phase type. These are natural air cooled. Bus coupler: It acts as interconnection between the two buses. If the supply of one bus fails then the bus coupler connects the two buses and charges the bus from the other bus. Different relays used:  Motor protection system  Earth fault relay  Over load relay  Lock out relay  Check synchronizing relay  Differential protection relay  Auxiliary relay 10.3 Variable frequency drive: Fig 10.1 Electrical scheme of VFD 28
  • 35. The panel in the figure is a variable frequency drive panel. Using variable frequency drive voltage is compensated at low frequencies, the torque at low speeds is improved. To obtain the voltage boost, we require a controlled converter as well as a controlled inverter. First the three phase supply from transformer is fed to the controlled rectifier which the ac to dc. The advantage of using a controlled rectifier is that the average value of the output can be controlled by varying the firing angle. Then its output is fed to the inverter which is a type of load commutated inverter. Before passing it to the inverter a reactor is also employed in between this reduces the ripples. The inverter then converts dc to ac and the ac is fed to the synchronous motor. The speed of synchronous motor is fixed and is given by 120 f / p. since the only thing variable in the expression is the frequency which is directly proportional to the speed. Hence the inverter varies the frequency and hence controls the speed of the motor. The controlled rectifier in the circuit is used for voltage control while the load commutated inverter is used for frequency variation. 10.3.1 Advantages of Variable Frequency Drive: 1. Speed control is fine as the frequency is varied from 0.5Hz to 47.5 Hz. 2. Very low starting current as motor starts on reduced voltage. 3. Power consumption is low. 4. Motor life is improved 10.4 Two channel arrangement for synchronous motor: The stator of the synchronous motor is given supply using two channels. Normally the motor works on both channels but under some faulty conditions on any one of the channels the other channel can continue working since the motor is required for continuous operation Fig 10.2 Two channel arrangement of synchronous motor 29
  • 36. 11. CONCLUSION On completion of my vocational training at NTPC Faridabad, I have come to know about how the very necessity of our lives now a days i.e. how electricity is generated & what all processes are needed to generate and run the plant on a 24x7 basis. NTPC Faridabad is one the plants in India to be under highest load factor for the maximum duration of time and that to operating at highest plant efficiencies. This plant is an example in terms of working efficiency and management of resources to all other thermal plants in our country. The operating pf of the NTPC as compared to the rest of country is the highest with 95 % the highest since its inception. The training gave me an opportunity to clear my concepts from practical point of view with the availability of machinery of diverse ratings. 30
  • 37. REFERENCES [1] N.T.P.C. magazines. [2] Google [3] Wikipedia [4] N.T.P.C. Websites. 31