The document outlines a budget plan for renovating glass walls and installing glass doors at a BPJS office in Timika, Indonesia in 2019. The glass wall renovation budget is Rp56,810,000 and includes preparing materials, installing glass film and labor costs. The glass door installation budget is Rp23,500,000 and includes materials for two frameless glass doors, hardware and labor costs. The total budget for both projects is Rp80,310,000.
Identify Customer Segments to Create Customer Offers for Each Segment - Appli...
Penawaran bpjs kaca-pintu kaca
1. PEKERJAAN : REKONDISI DINDING KACA KANTOR BPJS
LOKASI : JL.CENDERAWASIH SP2-TIMIKA
TAHUN ANGGARAN : 2019
MATERIAL UPAH/ALAT MATERIAL UPAH/ALAT
(e) (f) (g)
= (c) x (d) = (c) x (e) = (e) + (f)
PEKERJAAN SEMENTARA/PERSIAPAN 1.286.800 2.500.000 3.786.800
1. ls 1,00 2.000.000,00Rp 2.000.000,00Rp 2.000.000,00Rp
2. Pemasangan Terpal untuk dinding
-Terpal 6x8m Lbr 2,00 403.200,00Rp 806.400,00Rp 806.400,00Rp
-Terpal 5x7m Lbr 1,00 320.400,00Rp 320.400,00Rp 320.400,00Rp
- Tali Tambang/Plastik Roll 1,00 160.000,00Rp 160.000,00Rp 160.000,00Rp
3. Ongkos Kerja + Peralatan Ls 1,00 2.500.000,00Rp 2.500.000,00Rp 2.500.000,00Rp
PEKERJAAN UTAMA 27.300.000,00Rp 8.225.000,00Rp 41.125.000,00Rp
1. Lbr 26,00 1.050.000,00Rp 27.300.000,00Rp 27.300.000,00Rp
2 Pemasangan Kaca film Roll 2,00 2.800.000,00Rp 5.600.000,00Rp 5.600.000,00Rp
3. Ongkos Kerja + Peralatan Ls 1,00 8.225.000,00Rp 8.225.000,00Rp 8.225.000,00Rp
catatan : (1). TOTAL (REAL COST) ( I + II ) 44.911.800Rp
(2). Profit & Overhead { 15% X (1) } 6.736.770Rp
(3). TOTAL BIAYA { (1) + (2) } 51.648.570Rp
(4). PPN { 10% x (3) } 5.164.857Rp
(5). GRAND TOTAL { (3) + (4) } 56.813.427Rp
(4). PEMBULATAN 56.810.000Rp
Timika, 24 Agustus 2019
Diajukan Oleh
(e)
RENCANA ANGGARAN BIAYA (RAB)
NO URAIAN PEKERJAAN SATU
AN
VOLU
ME
HARGA SATUAN JUMLAH HARGA
TOTAL HARGA
(a) (b) (c) (c) (d)
Direktris
Lima Puluh Enam Juta Delapan Ratus Sepuluh Ribu Rupiah
I.
II.
Pembenahan/Pembersihan ex pecahan
kaca
Pemasangan dinding kaca (aneka
Ukuran)
Spesifikasi Material dan
Penyesuaian dilapangan, akan
mengikuti Permintaan/petunjuk
Terbilang :
C V . ADZKIA
RIO RIYANTI BULO
2. PEKERJAAN : PEMASANGAN PINTU KACA KANTOR BPJS
LOKASI : JL.CENDERAWASIH SP2-TIMIKA
TAHUN ANGGARAN : 2019
MATERIAL UPAH/ALAT MATERIAL UPAH/ALAT
(e) (f) (g)
= (c) x (d) = (c) x (e) = (e) + (f)
PEKERJAAN PINTU KACA 12.776.400 5.802.700 18.579.100
1
a. Kaca tempered 12 mm daun 2,00 1.226.025,00Rp 2.452.050,00Rp 2.452.050,00Rp
b. List aluminium U m2 2,00 53.812,50Rp 107.625,00Rp 107.625,00Rp
c. Floor hinges set 1,00 2.383.875,00Rp 2.383.875,00Rp 2.383.875,00Rp
d. Overpanel set 1,00 1.294.125,00Rp 1.294.125,00Rp 1.294.125,00Rp
e. Top patch fitting set 1,00 885.450,00Rp 885.450,00Rp 885.450,00Rp
f. Bottom patch fitting set 1,00 885.450,00Rp 885.450,00Rp 885.450,00Rp
g. Bottom patch lock + cylinder set 1,00 1.702.800,00Rp 1.702.800,00Rp 1.702.800,00Rp
h. Pull handle set 1,00 3.065.025,00Rp 3.065.025,00Rp 3.065.025,00Rp
2. daun 2,00 2.901.350,00Rp 5.802.700,00Rp 5.802.700,00Rp
catatan :
(1). TOTAL (REAL COST) ( I + II ) 18.579.100Rp
(2). Profit & Overhead { 15% X (1) } 2.786.865Rp
(3). TOTAL BIAYA { (1) + (2) } 21.365.965Rp
(4). PPN { 10% x (3) } 2.136.597Rp
(5). GRAND TOTAL { (3) + (4) } 23.502.562Rp
(4). PEMBULATAN 23.500.000Rp
Timika, 24 Agustus 2019
Diajukan Oleh
RENCANA ANGGARAN BIAYA (RAB)
NO SATU
AN
VOLUM
E
HARGA SATUAN JUMLAH HARGA
TOTAL HARGA
(a) (c) (c) (d) (e)
Spesifikasi Material dan Penyesuaian
dilapangan, akan mengikuti
Permintaan/petunjuk Pemberi Tugas
C V . ADZKIA
RIO RIYANTI BULO
Direktris
URAIAN PEKERJAAN
(b)
Pintu Kaca Frameless 12 mm Lengkap
Ongkos Kerja + Peralatan
Terbilang : Dua Puluh Tiga Juta Lima Ratus Ribu Rupiah