1. Electrical / ELV Draftsman
SUMMARY
Mohammed Aly Mohammed
Motivated, proactive, having strong work ethics and more than twenty (20) years of prolific
experience in Electrical/ELV/Telecom design and engineering for various clients in the Infrastructure
Industry.
Highly versatile and able to maintain composure and competency under work pressure and
deadline-driven environment. Maintain an open-mind policy in dealing with changes and excellent in
team building to further improve quality, efficiency and organization.
PERSONAL DATA:
Name : Mohammed Aly Mohammed
Job : Electrical / ELV Draftsman
Sex : Male
Nationality : Egyptian
Data of birth : 23/05/1968
Family status : Married
Military status : Completed
Mobile :+201142011509
:+201127816413
:+201129910753
Home :+20236941496
Email : mohammedaly68@yahoo.com
Address : 6th of october city – Cairo - Egypt
EXPERIENCE
MAR, 2013 – NOV, 2015
WorleyParsons, Qatar
Title: Instrument/Telecom Draftsman
QEZ3 - SKETCHING DESIGN
Produce Sketching drawing Telecommunication duct bank.
Produce Sketching drawing ELV duct bank.
Produce Sketching drawing SSD duct bank.
QEZ3 - PRELIMINARY ENGINEERING DESIGN
Produce Sketching drawing Telecommunication duct bank.
Produce Sketching drawing ELV duct bank.
Produce Sketching drawing SSD duct bank.
Lusail – QETAIFAN ISLAND SOUTH
Produce engineering design drawing Telecommunication duct bank deliverables associated with
instrumentation/Telecommunication for a project with specific deadlines, including interface with existing
facilities.
Produce engineering design drawing ELV duct bank deliverables associated with instrumentation/
Telecommunication for a project with specific deadlines, including interface with existing facilities.
Produce engineering design drawing SSD duct bank deliverables associated with instrumentation/
Telecommunication for a project with specific deadlines, including interface with existing facilities.
1
2. Electrical / ELV Draftsman
Lusail – PRE-CONTRACT SERVICES INFRASTRUCTURE & HIGHWAY FOR QETAIFAN ISLAND,
COMMERCIAL BOULEVARD & WATERFRONT COMMERCIAL DISTRICT
Produce engineering design drawing Telecommunication duct bank deliverables associated with
instrumentation for a project with specific deadlines, including interface with existing facilities.
Produce engineering design drawing ELV duct bank deliverables associated with instrumentation for a
project with specific deadlines, including interface with existing facilities.
Produce engineering design drawing SSD duct bank deliverables associated with instrumentation for a
project with specific deadlines, including interface with existing facilities.
Responsible for working within the provisions and guidelines of the Quality Assurance system
relevant to the Client and Business Unit.
Preparing drawings / documents for official submission for Q-Tel. Understand and follow HSE
procedures.
Produce engineering design drawing for Fire Alarms, Access Control and CCTV system to different
services buildings such as Substation, Road Tunnel, Fire Escape Stairs, Fire Pump Rooms and Storm
Water Pump Room.
SEP, 2008 – MAR, 2013
Gulf Engineering & Industrial Consultancy ( GEIC ) Qatar
Title: Senior Electrical Draftsman
Job Description:
Preparing lighting & small power layout.
Preparing elec. DB schedules & elec. single line diagram.
Preparing low current systems layout / schematic diagram ( CCTV, Access control, Communication, Public
address, Intercom , SMATV, …………etc)
Preparing Fire Alarm System layout / schematic diagram based on QCDD requirements.
Preparing Infrastructure & Networks plans for HV, MV, LV, ELV, Telecommunication, etc.
Preparing drawings / documents for official submission for KAHRAMAA, Q-Tel and QCDD.
Completed Projects:
Marriott Building (Qatar Foundation)
MIC-BUSINESS & RECREATION COMPLEX (Qatar Petroleum)
OFFSITE WAREHOUSE & DISTRIBUTION CENTRE (Qatar Foundation)
LV Electrical works & ELV Systems for Aquatic and Fisheries Research (PWA-Ashgal)
LV electrical work and Weak current systems for AHLI BANK
Garrafah branch
Mesaieed branch
Al-khor Branch
Al-Rayyan Branch
Industrial Branch
Merqab Branch
New Wakrah Branch
LV Electrical works & ELV Systems FOR PRE -CAST FACTORY FOR BBMC [P1&2]
CP752 SHIFTING & UPGRADING PUMPING STATION PS 25/9A (AHGHAL)
SOUQ AL ALI (AHGHAL)
AL-SHIOKH MOSQUE REFURBISHMENT (PRIVATE ENGINEERING OFFICE)
DEVELOPMENT OF SHOOTING RANGE Bid Pack No: 6 - Miscellaneous Buildings
(PRIVATE ENGINEERING OFFICE)
LOGISIC VILLAGE (GWC)
FACTORY AT INDUSTRIAL AREA (GULF PAPER INDUSTRIES)
2
3. Electrical / ELV Draftsman
May, 2003 –AUG, 2008
Dr.Ahmed Abdel – Warith Consulting Engineers Egypt (AAW)
Title: Electrical Draftsman
Type of Work: Participated in the design of the following projects:
EGYPT:
Wastewater Treatment Plant for new Cairo City.
Service building for police officers
Manshiyet Naser Service Buildings.
Sadat Wastewater treatment plant.
The Egyptian Bank,Abbasiya branch.
Cairo Heights site electrical works.
New Aswan city Pumping station.
Madinaty
SAUDI ARABIA:
Industrial City in ARAR and ASSIER.
Wastewater Treatment Plant for SEDAR city.
Wastewater Treatment plant in Taief and menna.
Industrial Development City.
Shoaiba Shrimp Farm.
QATAR:
Variable speed Treatment Plant.
Medical Center.
Fire Station.
Service Building for Qatar Petroleum.
Mesaied Operation Physical Development plan.
Old and New water Supply.
UAE:
DS-130 Treatment Plant.
DS-126 Treatment Plant.
DS-145 Treatment Plant.
YAMAN:
Water Ground Reservoirs in ASILAH & GAWABI.
OMAN:
SEIYUN & TARIM Sanitation Project.
Nov, 1999 – May, 2003
MORRISON KNUDSEN INTERNATIONAL (MK)
Project: Design/Build telephone Exchange Area Outside Plant Facilities (OSPII)
Title: Cadd Operator
Project Description:
(Approximate Construction Cost 60 million U.S.D.)
The Work covered under this Contract includes, but is not necessarily limited to, the following:
Primary Work:
The Work to be performed under these Contract Documents consists of the final design and construction of
Outside Plant Network Facilities. The site of the Work will be located approximately in Cairo, Alexandria, and Port
Said. The Contractor shall provide the necessary personnel, equipment and facilities (except those to be provided
by Telecom Egypt) to survey, engineer, furnish, install, test and maintain, on a design/build basis, Telephone
Exchange Area Outside Plant as required by this Contract.
3
4. Electrical / ELV Draftsman
The Work under this Contract includes, but is not necessarily limited to the following:
Design and Construction of Outside Plant Facilities consisting of Civil Works, Primary Cable
(copper and fiber), Secondary Cable, Cabinets, Terminals, Wirless Local Loop, and Associated Hardware
My Duties included the following:
Conceptual design drawing production
Detail design construction drawing production
Production of typical and application specific shop drawings
Drawing specifications, zymology, methodology, uniformity, scaling and quality
Conversion of redline to as-built production
Coordination of drawing documentation and distribution
Coordination of drawing tracking/database requirements and documentation control
July 1998 – September 1999
AHMED MANSOUR FOR CONTRACTORS
Company for the projects of OSP department.
Title: CADD Supervisor
Preparing layout maps for large area.
Drawing maps by AutoCAD ver 14.
Drawing Of ( General, Secondary, Conduit And Primary)
Maps For Project Which Include El Rahmanya, Hosh Esa , Osem And Senduon.
Layout Of The Utility On The Digital Maps By The Programs Of AutoCAD Ver14.
Drawing Of As built Maps For Projects
June, 1992 – June 1998.
Digital Cartography Operator, Egyptian Survey Authority, Aerial Survey Department The USAID -
Sponsored IMS Project, Surveying and Mapping components
Title: Operator in the Cartographic Procedures for ESA’s
Production of 1:2500 Digital maps Using ARC/INFO .
Data Conversion
Data Entry by Digitizer & Database Construction .
Editing & Quality Control with ARC/INFO .
Map drawing & Editing with AUTOCAD thorough Digitizing .
PART TIME JOB
Sep, 1996 – Dec 2001
Geo –Data Specialist Regional Observation Center (ROC), Cairo, Egypt.
-Mobinile project
Cairo street geo data base for mobinile co. (sheet scale 1:5000)
Alexandria street gu data base for mobinile co. (sheet scale 1:5000)
Rashed street geo data base for mobinile co. (satellite image IKONS 1.0m)
Domyate street geo data base for mobinile co. (satellite image IKONS 1.0m)
New Cairo street geo data base for mobinile co. (satellite image IKONS 1.0m
Marsa matroh street geo data base for mobinile co. (satellite image IKONS 1.0m
-The Establishment of GIS for urban Planning management of Alexandria gov.
This Turn-key project aims at the design , development and construction of GIS for the
urban planning division and state property division of Alexandria Governorate .
-Base Map of Nile Delta & valley Project
1:00,000 Digital GIS – ready base map was developed for the Nile Delta and valley .
4
5. Electrical / ELV Draftsman
Six GIS layers compose The base map those are the irrigation network, the road network
The railways layer, the urban settlements layer, the administrative boundaries layer and the water bodies layer
(lakes) . The features of each layer were classified into certain class according to the feature classifications of the
1:100,000 topographic maps of the ESA.
-Sinai Development (AL-SALAM canal) project
Reviewing for about 150 contour maps with scale 1:10.000 and contour index 1 meter.
September, 1994 – September, 1996.
Educational Buildings Organization Project - Techno Scient (IBM)
Educational GIS project to capture and store all the topographic maps of Egypt of scale 1:2500 together with a
thorough survey for all Egyptian schools and its buildings to be located over its geographic position on these maps.
Then the GIS were used to analyze these digital maps to define the best locations suitable for establishing a new
educational building.
July, 1994 – September, 1994.
Converting all CAD data layers of Sultanate of Oman into Arc/Info Coverage’s.
CEDARE Project- Information and Decision Support Center (IDSC)
Constructing a GIS unit and a GIS system for CEDARE (Center for Environment and Development for Arab
Region and Europe). The project is a GIS application concerning the environmental impacts of both water and soil
in CEDARE region. The project is implemented on both the national and regional level.
March, 1994 - July 1994.
Oman Project - Cairo Engineering & manufacturing Company.
Production of 1:2500 Digital maps Using ARC/INFO
Editing & Quality Control with ARC/INFO
EDUCATION
Diploma of Survey from “SURVEY INSTITUTE”
Cairo, Egypt, May 1989.
SPECIFIC TECHNICAL EXPERTISE/SPECIALIST COURSES
Software:
Operating Systems: UNIX, OSF /1, Solaris 2.4. DOS.windows
GIS / Drawing
ARC/INFO
AUTOCAD
DAK-ARC/VIEW
INTLICAD
Microsoft Word
Microsoft Excel
5
6. Electrical / ELV Draftsman
Six GIS layers compose The base map those are the irrigation network, the road network
The railways layer, the urban settlements layer, the administrative boundaries layer and the water bodies layer
(lakes) . The features of each layer were classified into certain class according to the feature classifications of the
1:100,000 topographic maps of the ESA.
-Sinai Development (AL-SALAM canal) project
Reviewing for about 150 contour maps with scale 1:10.000 and contour index 1 meter.
September, 1994 – September, 1996.
Educational Buildings Organization Project - Techno Scient (IBM)
Educational GIS project to capture and store all the topographic maps of Egypt of scale 1:2500 together with a
thorough survey for all Egyptian schools and its buildings to be located over its geographic position on these maps.
Then the GIS were used to analyze these digital maps to define the best locations suitable for establishing a new
educational building.
July, 1994 – September, 1994.
Converting all CAD data layers of Sultanate of Oman into Arc/Info Coverage’s.
CEDARE Project- Information and Decision Support Center (IDSC)
Constructing a GIS unit and a GIS system for CEDARE (Center for Environment and Development for Arab
Region and Europe). The project is a GIS application concerning the environmental impacts of both water and soil
in CEDARE region. The project is implemented on both the national and regional level.
March, 1994 - July 1994.
Oman Project - Cairo Engineering & manufacturing Company.
Production of 1:2500 Digital maps Using ARC/INFO
Editing & Quality Control with ARC/INFO
EDUCATION
Diploma of Survey from “SURVEY INSTITUTE”
Cairo, Egypt, May 1989.
SPECIFIC TECHNICAL EXPERTISE/SPECIALIST COURSES
Software:
Operating Systems: UNIX, OSF /1, Solaris 2.4. DOS.windows
GIS / Drawing
ARC/INFO
AUTOCAD
DAK-ARC/VIEW
INTLICAD
Microsoft Word
Microsoft Excel
5