  1. 1. Dubai, U.A.E Tel: +971502108442 Email: osama.jaber91@yahoo.com Osama Jaber ____________________________________________________________ PERSONAL INFORMATION: Date & place of Birth: June, 1991 – Sharjah, UAE Nationality: Jordanian. . Languages: Arabic: Native, English: Fluent Work Experience. Nov 2013 to date: ADC Energy Systems LLC: As a turnkey contractor in the fields of Cooling Plants, Energy Services, Grain Handling and Infrastructure, ADC continuously work on bringing industrial application to good conclusion through continuous engagements with all stakeholders starting with the client and his representatives, in partnership with our suppliers, service providers and our own talented team, and through the practice of detailed attention and care to conclude matters successfully. Project Engineer: Site Engineers work on a project from the initial brief, through the design and development stage, to the testing and commissioning activities up to hand over the project. Key Responsibilities: • In charge of generating methods and work plan on 2 weeks look-ahead and working towards achieving planned activities. • Responsible for day-to-day running of the discipline activities. • Responsible for raising, discussing and approving manpower plans for discipline and revising the manpower schedule based on 2 weeks look-ahead. • To review discipline drawings, prepare shop drawings, and analytically comment on discipline design. • Review of project technical documents; project technical specifications, owner project requirements, tender drawings and estimates. • Carry out design calculations using state-of-the-art software’s to find out design requirements. • Preparations of drawings (Civil/Mechanical/Electrical) through each stage as per project scope of work. • Procurement log: tool where we can track our procured materials ordered on site.
  2. 2. projects: SAADIYAT DCP-4 COOLING PLANT New York University - UAE Employer: Tourism Developement & Investment Company (TDIC) Client: PAL Technology Services LLC Consultant: Architects Crang & Boake Inc. MEP Consultant: The Three Factors (EN3) Design Capacity: 13,500 TR Chillers + 2,500 TR TES Tank Year of Completion: F-2014 - Prepare Operation and maintenance manuals. - Review ‘As Built’ drawings. - Witnesses testing and commissioning and performance of plant. SARAYA DEVELOPEMENT DCP ABU DHABI CORNICHE – UAE Employer: AL DAR PROPERTIES P.J.S.C Client: PAL Technology Services LLC Consultant: Architects Crang & Boake Inc. MEP Consultant: The Three Factors (EN3) Design Capacity: 20,000 TR Chillers Year of Completion: F-2016 - Extract BOQs from design drawings for procurement purposes. - Prepare coordination drawings for installation of equipments at site. - Carry out constructability review during design stages. - Confer with engineers and other personnel to implement operating procedures, resolve system malfunctions, and provide technical information. - Reviews materials and equipment to ensure that they are in accordance with the specifications. - Specify system components to ensure conformance with engineering design and performance specifications. - Reviews shop drawings to ensure that they are in accordance with the design and that they are coordinated. - Oversee installation, operation, maintenance, and repair to ensure that machines and equipment are installed and functioning according to specifications. Reverse Osmosis Polishing Plant - Lusail Qatar. Owner: MARAFEQ QATAR EPC Contractor: ADC Energy Systems LLC & BUTEC MEP Consultant: The Three Factors (EN3) Design Capacity: 6,600 m3/day Year of Completion: F-2016 - Prepare process design concepts for polishing TSE (Treated Sewage Effluent) to meet the water quality required for DCP. - Prepare and develop PFD, P&ID ,SLD & Schematic drawings required for the project. - Extract BOQ for all equipments, items & materials required for installation and in line with design basis and specifications. - Procure all materials & items with coordination of technical department. - Preparation of Coordination drawings with existing services at site. - Preparation of Operating & maintenance manuals. - Develop installation, testing & commissioning procedure.
  3. 3. Education • 2008-2013 University of Jordan B.SC Chemical engineering • 2005-2008 Al-Shola Private School (Sharjah, U.A.E.) High School Computer Skills - Microsoft Office: (Excel, Word, Power Point,Outlook) - ASPEN HYSYS - AUTOCAD - Peachtree Program for issuing of Local Purchase Order (LPO) - ERP Software REFERENCE Up On your request

×