Flexible Planning
By : Mohamed El Kady
Sales & operations Planning
Agenda
 SAP Flexible Planning Overview
 Outline the differences between Standard SOP and
Flexible Planning
 Create sales and production plans
 Use the forecast tool
 Create planning types, macros and events
 Perform resource planning and rough-cut capacity
analysis
 Use mass processing
 Transfer planning results to Demand Management
SAP Flexible Planning Overview
SAP Flexible Planning Overview (cont.)
 Sales & Operations Planning (SOP) is a flexible
forecasting and planning tool with which sales ,
production, and other supply chain and logistics targets
can be set.
 The basis for this is provided by historical, existing,
and/or estimated future data.
 Resource planning can also be carried out to determine
the amounts of the work center capacities and other
resources required to meet these targets.
 SOP supports both the high-level planning of complex
planning hierarchies and the detailed planning of finished
products
SAP Flexible Planning Overview (cont.)
Outline the differences between Standard
SOP and Flexible Planning
Outline the differences between Standard
SOP and Flexible Planning (Cont.)
 Sales & Operations Planning is made up of two
elements: flexible planning and standard SOP.
 The above table shows you the differences between
them.
 To access flexible planning, select Logistics Logistics
Controlling Flexible planning.
 To access standard SOP, select Logistics Production
SOP.
 You can copy the planning table of standard SOP and
then modify it to suit your company's needs.
Create sales and production plans
 Takes a monthly look at product groups at
least 6- 12 months across the planning
horizon.
 Some companies go out as far as 18 months.
Sales Plan
  Jan Feb Mar Apr May June Jul Aug
Forecast 100 100 100 120 120 120 120 130
Actual sales 90 95 85          
Difference -10 -5 -15          
Cum. difference   -15 -30          
Wallace: 2nd
edition Sales & Operations Planning
Production Plan
  Jan Feb Mar Apr May June Jul Aug
Planned
production 100 100 100 110 120 120 120 130
Actual production 98 100 101          
Difference -2 0 1          
Cum. difference   -2 -1          
Wallace: 2nd
edition Sales & Operations Planning
Inventory Plan
  Jan Feb Mar Apr May June Jul Aug
Planned
inventory 100 100 100 142 142 142 142 142
Actual inventory 111* 116 132          
Difference 11 16 32          
*January Inventory = 103 Wallace: 2nd
edition Sales & Operations Planning
Jan Feb Mar Apr May June Jul Aug
Forecast 100 100 100 120 120 120 120 130
Acutal sales 90 95 85
Difference -10 -5 -15
Cum. difference -15 -30
Jan Feb Mar Apr May June Jul Aug
Planned production 100 100 100 110 120 120 120 130
Actual production 98 100 101
Difference -2 0 1
Cum. difference -2 -1
Jan Feb Mar Apr May June Jul Aug
Planned inventory 100 100 100 142 142 142 142 142
Actual inventory 111* 116 132
Difference 11 16 32
*January Inventory=103
Comparing actual to forecast
Wallace: 2nd
edition Sales & Operations Planning
Use the forecast tool
Use the forecast tool (Cont.)
Use the forecast tool (Cont.)
 Forecast Models for Different Historical Patterns:
 Constant Constant model
 Constant model with smoothing factor adaptation
 Moving average model
 Weighted moving average model
 Trend Trend model
 (1st-order exponential smoothing)
 2nd-order exponential smoothing model (with and without
parameter optimization)
 Moving average model
 Weighted moving average model
Use the forecast tool (Cont.)
Use the forecast tool (Cont.)
Create planning types, macros and events
Create planning types, macros and events
 The actions you perform to create a planning type are as
follows:
 creating planning type info
 assigning a key figure to a line
 creating lines in the planning table
 defining line attributes
 defining macros
 using special operators to define macros for stock balance,
production, days' supply, and historical totals
 translating planning type, freely defined line, and macro texts
Create planning types, macros and events
Create planning types, macros and events
 You can specify that a macro is to be carried out
automatically for a particular planning type.
 There are three ways to execute a macro automatically:
 The initial macro is run whenever you call up the planning table.
 The default macro is run whenever you regenerate the planning
table, (for example, when you press ENTER), or when you
call up or save the planning table. Caution: This can
result in the macro running several times.
 The final macro is run immediately before the data is saved
Create planning types, macros and events
Create planning types, macros and events
(cont.)
 Events allow you to predict the impact of one-time
events that cannot be deduced from historical data.
Examples of events include:
 Price changes such as promotions
 Special deals with major customers and vendors
 Competitor sales activities
 Management overrides
 Facts based on market intelligence
 You define an event either as a series of percentage
changes ("proportional" events) or as one ormore whole
numbers ("cumulative" events).
Perform resource planning and rough-cut
capacity analysis
Perform resource planning and rough-cut
capacity analysis(Cont.)
 You use rough-cut planning profiles to plan critical
resources. These might be:
 Bottleneck work center
 Material capacities
 Costs of goods transportation or a marketing campaign
 The following resource types are supported:
 Work center capacities
 Materials
 Production resources/tools
 Costs
Perform resource planning and rough-cut
capacity analysis(Cont.)
Perform resource planning and rough-cut
capacity analysis(Cont.)
 You define the determination of capacity load in the
rough-cut planning profile.
 The available capacity is read from the bottleneck work
center defined in the resource table of the rough-cut
profile.
 The capacity load is calculated multiplying the planned
quantity by the total time maintained for the work center
in the rough-cut profile.
 The time span of the profile header is just to model the
capacity load to produce x base quantities on the bases
of time.
Mass Processing
Mass Processing(Cont.)
 Four planning activities can be carried out using the
sequence depicted above:
 Executing a macro
 Forecasting
 Copying key figures from one info structure to another
 Transfer to or from CO-PA
 Transferring SOP data to Demand Management.
Transfer planning results to demand
anagement
Transfer planning results to Demand
Management (cont.)
 You can carry out the transfer of data to Demand
Management either online or in the background.
 There are three basic options for transferring SOP data
to Demand Management:
 You transfer material data from the info structure. Use mass
processing to transfer a range of materials.
 You transfer material data from a product group. The data is
either transferred direct from the materials, or as
proportions of the product group.
 You transfer one material's data. The data is either transferred
direct from the material, or as a proportion of the owner
product group.
Transfer planning results to Demand
Management (cont.)
 A material can be a member of more than one product
group. This means that it can be transferred to Demand
Management more than once. The system issues a
warning if you try to transfer a material from a product
group that has not been marked as the MRP product
group for that material.
 When you carry out the transfer, planned independent
requirements are created in Demand Management
Questions?

More Related Content

What's hot

Sap batch management overview
Sap batch management overviewSap batch management overview
Sap batch management overviewdhl1234
 
Sap pp rough cut capacity planning on sop
Sap pp rough cut capacity planning on sopSap pp rough cut capacity planning on sop
Sap pp rough cut capacity planning on sopKanapon Gunprom
 
Multiple Work Center/Resource Selection and Classification in Master Recipe f...
Multiple Work Center/Resource Selection and Classification in Master Recipe f...Multiple Work Center/Resource Selection and Classification in Master Recipe f...
Multiple Work Center/Resource Selection and Classification in Master Recipe f...Ankit Sharma
 
SAP SOP process flow for production process
SAP SOP process flow for production processSAP SOP process flow for production process
SAP SOP process flow for production processAasif001234
 
SAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna NookellaSAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna Nookellamuralikrishnanookella
 
SAP PP MRP Guide for Beginners
SAP PP MRP Guide for BeginnersSAP PP MRP Guide for Beginners
SAP PP MRP Guide for Beginnerssapdocs. info
 
Pp batch management-presentation
Pp batch management-presentationPp batch management-presentation
Pp batch management-presentationskumar_sap
 
SAP IS Retail Article Master
SAP IS Retail Article MasterSAP IS Retail Article Master
SAP IS Retail Article Mastersameer311299
 
SAP MM Interview questions
SAP MM Interview questionsSAP MM Interview questions
SAP MM Interview questionsIT LearnMore
 
Sd configuration steps for automatic batch determination in delivery
Sd   configuration steps for automatic batch determination in deliverySd   configuration steps for automatic batch determination in delivery
Sd configuration steps for automatic batch determination in deliveryShivaprakash Shastri Hiremath
 
Oracle Advanced Supply chain Planning Setup
Oracle Advanced Supply chain Planning SetupOracle Advanced Supply chain Planning Setup
Oracle Advanced Supply chain Planning SetupMina Lotfy
 
Master data
Master dataMaster data
Master datababloo6
 
Balco ps configuration manual
Balco ps configuration manualBalco ps configuration manual
Balco ps configuration manualJaideep Kulkarni
 
SAP PP End User Document - www.sapdocs.info
SAP PP End User Document - www.sapdocs.infoSAP PP End User Document - www.sapdocs.info
SAP PP End User Document - www.sapdocs.infosapdocs. info
 

What's hot (20)

Sap batch management overview
Sap batch management overviewSap batch management overview
Sap batch management overview
 
SAP Production Planning
SAP Production PlanningSAP Production Planning
SAP Production Planning
 
STO movement Type
STO movement TypeSTO movement Type
STO movement Type
 
Pp interview questions
Pp interview questionsPp interview questions
Pp interview questions
 
Sap pp rough cut capacity planning on sop
Sap pp rough cut capacity planning on sopSap pp rough cut capacity planning on sop
Sap pp rough cut capacity planning on sop
 
Multiple Work Center/Resource Selection and Classification in Master Recipe f...
Multiple Work Center/Resource Selection and Classification in Master Recipe f...Multiple Work Center/Resource Selection and Classification in Master Recipe f...
Multiple Work Center/Resource Selection and Classification in Master Recipe f...
 
SAP SOP process flow for production process
SAP SOP process flow for production processSAP SOP process flow for production process
SAP SOP process flow for production process
 
SAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna NookellaSAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna Nookella
 
Sap pp-user-manual
Sap pp-user-manualSap pp-user-manual
Sap pp-user-manual
 
Qm sampling scheme
Qm sampling schemeQm sampling scheme
Qm sampling scheme
 
SAP PP MRP Guide for Beginners
SAP PP MRP Guide for BeginnersSAP PP MRP Guide for Beginners
SAP PP MRP Guide for Beginners
 
MRP Live on S/4 HANA
MRP Live on S/4 HANAMRP Live on S/4 HANA
MRP Live on S/4 HANA
 
Pp batch management-presentation
Pp batch management-presentationPp batch management-presentation
Pp batch management-presentation
 
SAP IS Retail Article Master
SAP IS Retail Article MasterSAP IS Retail Article Master
SAP IS Retail Article Master
 
SAP MM Interview questions
SAP MM Interview questionsSAP MM Interview questions
SAP MM Interview questions
 
Sd configuration steps for automatic batch determination in delivery
Sd   configuration steps for automatic batch determination in deliverySd   configuration steps for automatic batch determination in delivery
Sd configuration steps for automatic batch determination in delivery
 
Oracle Advanced Supply chain Planning Setup
Oracle Advanced Supply chain Planning SetupOracle Advanced Supply chain Planning Setup
Oracle Advanced Supply chain Planning Setup
 
Master data
Master dataMaster data
Master data
 
Balco ps configuration manual
Balco ps configuration manualBalco ps configuration manual
Balco ps configuration manual
 
SAP PP End User Document - www.sapdocs.info
SAP PP End User Document - www.sapdocs.infoSAP PP End User Document - www.sapdocs.info
SAP PP End User Document - www.sapdocs.info
 

Similar to SAP Flexible Planning

Industrial engineering unit 2 new
Industrial engineering unit 2 newIndustrial engineering unit 2 new
Industrial engineering unit 2 newmohsinmmm
 
Professional Work samples
Professional Work samplesProfessional Work samples
Professional Work samplesdebbiegkatz
 
Walk-Through Demand Sales Time Series Forecasting
Walk-Through Demand Sales Time Series ForecastingWalk-Through Demand Sales Time Series Forecasting
Walk-Through Demand Sales Time Series ForecastingIRJET Journal
 
Cost-Estimation-Techniques unit 2.pptx
Cost-Estimation-Techniques unit 2.pptxCost-Estimation-Techniques unit 2.pptx
Cost-Estimation-Techniques unit 2.pptxSudipBalLama
 
Techniques to Effectively Monitor the Performance of Customers in the Cloud
Techniques to Effectively Monitor the Performance of Customers in the CloudTechniques to Effectively Monitor the Performance of Customers in the Cloud
Techniques to Effectively Monitor the Performance of Customers in the CloudSalesforce Engineering
 
Forecasting Techniques
Forecasting TechniquesForecasting Techniques
Forecasting Techniquesguest865c0e0c
 
Ais Romney 2006 Slides 12 The Production Cycle
Ais Romney 2006 Slides 12 The Production CycleAis Romney 2006 Slides 12 The Production Cycle
Ais Romney 2006 Slides 12 The Production CycleSharing Slides Training
 
Ais Romney 2006 Slides 12 The Production Cycle
Ais Romney 2006 Slides 12 The Production CycleAis Romney 2006 Slides 12 The Production Cycle
Ais Romney 2006 Slides 12 The Production Cyclesharing notes123
 
Leveling production sap-support_intro
Leveling production sap-support_introLeveling production sap-support_intro
Leveling production sap-support_introJaroslaw Gadek, MBA
 
Building a semantic/metrics layer using Calcite
Building a semantic/metrics layer using CalciteBuilding a semantic/metrics layer using Calcite
Building a semantic/metrics layer using CalciteJulian Hyde
 
Sales & Operations Planning Process
Sales & Operations Planning ProcessSales & Operations Planning Process
Sales & Operations Planning ProcessHarshal Badgujar
 
Sales quota planning creating application
Sales quota planning creating applicationSales quota planning creating application
Sales quota planning creating applicationRati Sharma
 
Oracle Sales Quotation Planning
Oracle Sales Quotation PlanningOracle Sales Quotation Planning
Oracle Sales Quotation PlanningAmit Sharma
 
Application Requirements For Rolling Forecasts
Application Requirements For Rolling ForecastsApplication Requirements For Rolling Forecasts
Application Requirements For Rolling ForecastsBen Lamorte
 

Similar to SAP Flexible Planning (20)

Industrial engineering unit 2 new
Industrial engineering unit 2 newIndustrial engineering unit 2 new
Industrial engineering unit 2 new
 
Professional Work samples
Professional Work samplesProfessional Work samples
Professional Work samples
 
11I10PLANNING.pptx
11I10PLANNING.pptx11I10PLANNING.pptx
11I10PLANNING.pptx
 
Npi rpg 22
Npi rpg 22Npi rpg 22
Npi rpg 22
 
Walk-Through Demand Sales Time Series Forecasting
Walk-Through Demand Sales Time Series ForecastingWalk-Through Demand Sales Time Series Forecasting
Walk-Through Demand Sales Time Series Forecasting
 
Sales Planner
Sales PlannerSales Planner
Sales Planner
 
Cost-Estimation-Techniques unit 2.pptx
Cost-Estimation-Techniques unit 2.pptxCost-Estimation-Techniques unit 2.pptx
Cost-Estimation-Techniques unit 2.pptx
 
Techniques to Effectively Monitor the Performance of Customers in the Cloud
Techniques to Effectively Monitor the Performance of Customers in the CloudTechniques to Effectively Monitor the Performance of Customers in the Cloud
Techniques to Effectively Monitor the Performance of Customers in the Cloud
 
Forecasting Techniques
Forecasting TechniquesForecasting Techniques
Forecasting Techniques
 
Forecasting Techniques
Forecasting TechniquesForecasting Techniques
Forecasting Techniques
 
Ais Romney 2006 Slides 12 The Production Cycle
Ais Romney 2006 Slides 12 The Production CycleAis Romney 2006 Slides 12 The Production Cycle
Ais Romney 2006 Slides 12 The Production Cycle
 
Ais Romney 2006 Slides 12 The Production Cycle
Ais Romney 2006 Slides 12 The Production CycleAis Romney 2006 Slides 12 The Production Cycle
Ais Romney 2006 Slides 12 The Production Cycle
 
Leveling production sap-support_intro
Leveling production sap-support_introLeveling production sap-support_intro
Leveling production sap-support_intro
 
Building a semantic/metrics layer using Calcite
Building a semantic/metrics layer using CalciteBuilding a semantic/metrics layer using Calcite
Building a semantic/metrics layer using Calcite
 
Operation management-notes
Operation management-notesOperation management-notes
Operation management-notes
 
sap-apo overview
sap-apo overviewsap-apo overview
sap-apo overview
 
Sales & Operations Planning Process
Sales & Operations Planning ProcessSales & Operations Planning Process
Sales & Operations Planning Process
 
Sales quota planning creating application
Sales quota planning creating applicationSales quota planning creating application
Sales quota planning creating application
 
Oracle Sales Quotation Planning
Oracle Sales Quotation PlanningOracle Sales Quotation Planning
Oracle Sales Quotation Planning
 
Application Requirements For Rolling Forecasts
Application Requirements For Rolling ForecastsApplication Requirements For Rolling Forecasts
Application Requirements For Rolling Forecasts
 

SAP Flexible Planning

  • 1. Flexible Planning By : Mohamed El Kady Sales & operations Planning
  • 2. Agenda  SAP Flexible Planning Overview  Outline the differences between Standard SOP and Flexible Planning  Create sales and production plans  Use the forecast tool  Create planning types, macros and events  Perform resource planning and rough-cut capacity analysis  Use mass processing  Transfer planning results to Demand Management
  • 4. SAP Flexible Planning Overview (cont.)  Sales & Operations Planning (SOP) is a flexible forecasting and planning tool with which sales , production, and other supply chain and logistics targets can be set.  The basis for this is provided by historical, existing, and/or estimated future data.  Resource planning can also be carried out to determine the amounts of the work center capacities and other resources required to meet these targets.  SOP supports both the high-level planning of complex planning hierarchies and the detailed planning of finished products
  • 5. SAP Flexible Planning Overview (cont.)
  • 6. Outline the differences between Standard SOP and Flexible Planning
  • 7. Outline the differences between Standard SOP and Flexible Planning (Cont.)  Sales & Operations Planning is made up of two elements: flexible planning and standard SOP.  The above table shows you the differences between them.  To access flexible planning, select Logistics Logistics Controlling Flexible planning.  To access standard SOP, select Logistics Production SOP.  You can copy the planning table of standard SOP and then modify it to suit your company's needs.
  • 8. Create sales and production plans  Takes a monthly look at product groups at least 6- 12 months across the planning horizon.  Some companies go out as far as 18 months.
  • 9. Sales Plan   Jan Feb Mar Apr May June Jul Aug Forecast 100 100 100 120 120 120 120 130 Actual sales 90 95 85           Difference -10 -5 -15           Cum. difference   -15 -30           Wallace: 2nd edition Sales & Operations Planning
  • 10. Production Plan   Jan Feb Mar Apr May June Jul Aug Planned production 100 100 100 110 120 120 120 130 Actual production 98 100 101           Difference -2 0 1           Cum. difference   -2 -1           Wallace: 2nd edition Sales & Operations Planning
  • 11. Inventory Plan   Jan Feb Mar Apr May June Jul Aug Planned inventory 100 100 100 142 142 142 142 142 Actual inventory 111* 116 132           Difference 11 16 32           *January Inventory = 103 Wallace: 2nd edition Sales & Operations Planning
  • 12. Jan Feb Mar Apr May June Jul Aug Forecast 100 100 100 120 120 120 120 130 Acutal sales 90 95 85 Difference -10 -5 -15 Cum. difference -15 -30 Jan Feb Mar Apr May June Jul Aug Planned production 100 100 100 110 120 120 120 130 Actual production 98 100 101 Difference -2 0 1 Cum. difference -2 -1 Jan Feb Mar Apr May June Jul Aug Planned inventory 100 100 100 142 142 142 142 142 Actual inventory 111* 116 132 Difference 11 16 32 *January Inventory=103 Comparing actual to forecast Wallace: 2nd edition Sales & Operations Planning
  • 14. Use the forecast tool (Cont.)
  • 15. Use the forecast tool (Cont.)  Forecast Models for Different Historical Patterns:  Constant Constant model  Constant model with smoothing factor adaptation  Moving average model  Weighted moving average model  Trend Trend model  (1st-order exponential smoothing)  2nd-order exponential smoothing model (with and without parameter optimization)  Moving average model  Weighted moving average model
  • 16. Use the forecast tool (Cont.)
  • 17. Use the forecast tool (Cont.)
  • 18. Create planning types, macros and events
  • 19. Create planning types, macros and events  The actions you perform to create a planning type are as follows:  creating planning type info  assigning a key figure to a line  creating lines in the planning table  defining line attributes  defining macros  using special operators to define macros for stock balance, production, days' supply, and historical totals  translating planning type, freely defined line, and macro texts
  • 20. Create planning types, macros and events
  • 21. Create planning types, macros and events  You can specify that a macro is to be carried out automatically for a particular planning type.  There are three ways to execute a macro automatically:  The initial macro is run whenever you call up the planning table.  The default macro is run whenever you regenerate the planning table, (for example, when you press ENTER), or when you call up or save the planning table. Caution: This can result in the macro running several times.  The final macro is run immediately before the data is saved
  • 22. Create planning types, macros and events
  • 23. Create planning types, macros and events (cont.)  Events allow you to predict the impact of one-time events that cannot be deduced from historical data. Examples of events include:  Price changes such as promotions  Special deals with major customers and vendors  Competitor sales activities  Management overrides  Facts based on market intelligence  You define an event either as a series of percentage changes ("proportional" events) or as one ormore whole numbers ("cumulative" events).
  • 24. Perform resource planning and rough-cut capacity analysis
  • 25. Perform resource planning and rough-cut capacity analysis(Cont.)  You use rough-cut planning profiles to plan critical resources. These might be:  Bottleneck work center  Material capacities  Costs of goods transportation or a marketing campaign  The following resource types are supported:  Work center capacities  Materials  Production resources/tools  Costs
  • 26. Perform resource planning and rough-cut capacity analysis(Cont.)
  • 27. Perform resource planning and rough-cut capacity analysis(Cont.)  You define the determination of capacity load in the rough-cut planning profile.  The available capacity is read from the bottleneck work center defined in the resource table of the rough-cut profile.  The capacity load is calculated multiplying the planned quantity by the total time maintained for the work center in the rough-cut profile.  The time span of the profile header is just to model the capacity load to produce x base quantities on the bases of time.
  • 29. Mass Processing(Cont.)  Four planning activities can be carried out using the sequence depicted above:  Executing a macro  Forecasting  Copying key figures from one info structure to another  Transfer to or from CO-PA  Transferring SOP data to Demand Management.
  • 30. Transfer planning results to demand anagement
  • 31. Transfer planning results to Demand Management (cont.)  You can carry out the transfer of data to Demand Management either online or in the background.  There are three basic options for transferring SOP data to Demand Management:  You transfer material data from the info structure. Use mass processing to transfer a range of materials.  You transfer material data from a product group. The data is either transferred direct from the materials, or as proportions of the product group.  You transfer one material's data. The data is either transferred direct from the material, or as a proportion of the owner product group.
  • 32. Transfer planning results to Demand Management (cont.)  A material can be a member of more than one product group. This means that it can be transferred to Demand Management more than once. The system issues a warning if you try to transfer a material from a product group that has not been marked as the MRP product group for that material.  When you carry out the transfer, planned independent requirements are created in Demand Management