SlideShare a Scribd company logo
1 of 29
How to write a winning bid?
Maya van der Steenhoven
Welkom
1
CONTENT
 14:00 Opening
– Maya van der Steenhoven
 14:15 EU subsidies: Kaders, doelstellingen, kansen en consortiumvorming
– Joost Holleman HUDSON FINANCIAL INCENTIVES
 15:30 Praktijkcasus ELENA subsidie Stadsverwarmingsbedrijf Purmerend
– Marie se Tetteroo-Mathijsen
 15:30 – 15:45 PAUZE
 15.45 Parallelsessies ronde 1
– PDA, EFRO, EIB & HORIZON
– FINANCIERINGEN
 16.15 Parallelsessies ronde 2 (2 sessies)
 17:00 AFSLUITING
 17.00 Borrel
Onderwerpen van vanmiddag
3
WAT KUNNEN
FINANCIELE
INSTRUMENTEN
BETEKENEN
VOOR DE
REALISATIE VAN
WARME
PROJECTEN IN
NEDERLAND
BINNEN WELKE
EUROPESE
STRUCTUUR
VALLEN DEZE
FINANCIELE
INSTRUMENTEN
HOE WERKEN
DEZE FINANCIELE
INSTRUMENTEN?
HOW TO MAKE A
WINNING BID?
Is Europese financiering ingewikkeld?
4
│ 5
3 categories
of regions
< 75 % of EU average
GDP/capita*
*index EU27=100
75-90 %
> 90 %
Regional GDP figures: 2006-07-08
© EuroGeographics Association for the administrative boundaries
EU lange termijn doelstellingen
6
• Smart Grids
• Energy Efficiency
• European Infrastructure
• International Cooperation
Proces…….een lange adem
7
Feasability study
(±2 maanden)
Aanvraag voorbereiden
(±2 maanden)
Aanvraag
ingediend
Start project
Aanvraag goedgekeurd
(binnen 3-6 maanden) Project
Gereed
24 – 36 maanden
Na start
Project financieel
Afgerond 6 maanden na
afloop project
Eerste Voorschot
Na 6 maanden
Tussentijdse
rapportage
na 12 maanden
Waar zit het geld voor warmte?
959 miljard
8
SMART CITIES
EIB – ELENA – HORIZON - SUBSIDIES
9
PDA
Feasability
Consortium
Financals
EFRO
INTERREG
Innovatie
HORIZON
Business Case Voorbereiding Uitvoering &
Realisatie
Voornamelijk financiering
Subsidies & Incentives
EIB
EU Structural funds Budget verdeling 2014-2020
ESF / EFRO / INTERREG
*index EU27=100
10
INTERREG
11
Thema’s in EU Operationele programma’s
12
PDA
Project
Development
Assistance
EIB
EIB
Financiering
MLEI PDA, Market uptake PDA, ELENA
13
HORIZON
2020
EIB
PDA Project Development Assistance
14
TOPICS
 ENERGY Efficiency
– EE CALLS
 Competitive Low-Carbon energy
– LCE CALLS
 Smart Cities
– SCC Calls
 ACTIONS
– B CALLS
SCOPE / content
 Technology development
 Pilot / Demonstration
 Financing solutions (PDA)
HORIZON 2020 call update
15
EE 13: Technology for district heating & Cooling
EE 14: Removing market barriers to uptake efficient heating & Cooling solutions
EE 18: New technologies for utilization of heat recovery
EE 21: Development and market roll-out of innovative energy services and financial
schemes for sutainable energy
LCE 2: Developing the next generation technologies of renewable electricity and
heating/cooling
LCE 3: Demonstration of renewable electricity and heating/cooling technologies
LCE 4: Market uptake of emerging renewable heating & Cooling technologies
SCC: Smart cities
B.1.2: Heating & Cooling
District Heating & cooling selection
16
Financial routes
 MLEI PDA
– 1 A 2 AANVRAGEN NEDERLAND naar Nederland in eerste ronde
– DEADLINE 5 JUNI
– DEADLINE 2015
 ELENA
– Meerdere projecten per land
– GEEN DEADLINE
 HORIZON
– INNOVATIE (MEERDERE DEADLINES)
– PILOT & DEMONSTRATIE
– R&D / Industriële research, samenwerking over de grenzen
– Mathematische kans 1:10, 25% - > 75%
 KANSEN VOOR WEST
– INNOVATIE
– PILOT & DEMONSTRATIE
– ENERGIE PROJECTEN
– Mathematische kans 1:8
Chance of succes?
Onderlinge concurrentie! Samenwerken?
18
Voorbeeld MLEI PDA 2011 - 2012
19
How to make a winning bid!
Subsidie
selectie
Context &
feasability
Building
the
project
Writing the
proposal
Final
version
Evaluatie
• Elke subsidie
aanvraag is een
competitie
– Sales pitch
– Toon alles aan met
bewijs
– Robuuste organisatie
• Ver vooruit plannen
Subsidie selectie
 Welke subsidies zijn er mogelijk?
 Bezoek info dagen
 Interne / externe hulp?
 Maak een subsidie landschap voor je organisatie / projecten;
meerdere opties op meerdere tijdstippen
 Lange termijnplanning
Context & Feasability
 Wat zijn de contouren van het project, De noodzakelijke “one pager”
 Voldoet het aan de toegangseisen van de subsidie “entrance criteria”
 Hoe scoort het project op de Kwalitatieve criteria / Qualitative criteria
 Waarom is dit project beter dan eerdere en vergelijkbare projecten
 Wie zijn belangrijke partners in het project en waarom
 Wat zijn de resultaten van het project (kwantificeerbaar)
 Disseminatie effect? Lighthouse dimension?
 Innovatie meestal een belangrijk onderdeel van het project, is het innovatief
genoeg?
 Analyseer oude calls
 Maak een grove inschatting hoe het project scoort t.o.v. je competitie
 Samenwerken in de keten
GO / NOGO
Building the project
 Detail onderzoek naar vergelijkbare bestaande betere projecten
 Onderzoek “added value” van het project / Welke gaps zijn er?
 Project kosten & planning
 Consortium bouw (penvoerder)
 Risico’s voor partners in kaart brengen
 Wat is het effect van het subsidie bedrag (additionaliteit)
– Bigger, better, faster
 Disseminatie verder uitwerken
 Contacten markt: zijn er vergelijkbare initiatieven
 Draft outline - > contact met subsidieverlener
 Is het project “value for money”
 Bezoek info dagen in Brussel / Nederland
Laatste kans om het niet te doen
Writing the proposal
 Scherpe analyse aanvraagformulier + noodzakelijke documenten
 Start met een draft management summary de structuur van de aanvraag “one
pager”
 Verdeel het werk onder de consortium leden
 Projectmatige aanpak
 Welke tijdslijnen houden we aan voor het schrijven van de aanvraag (vakantie
periodes)
 Vermijd eigen vakjargon "We talk a language the rest of the world doesn't
understand,”
 Describe how it meets the criteria set out in the call
 Demonstrate how it is aligned with the objectives of your college or institution
 Vanuit welke entiteit wordt er aangeboden vanuit de partners?
Writing the proposal
 Duidelijke taal: Niet te veel, niet te weinig een goede balans
 Ga er niet van uit dat de subsidieverlener het begrijpt neem ze mee in het verhaal
 Kom met voorbeelden, vergelijkbare uitkomsten
 Heb je ervaring met vergelijkbare projecten? Krijgt de subsidieverlener vetrouwen
in realisatie van het project
 Risico’s zijn geen sluitpost. Demonstrate that an initial assessment of project risks
has been undertaken
 Een plaatje zegt meer dan een paar alineas tekst
 Cijfers moeten kloppen, schreifvouten en het verhaal moet als een huis staan
 Neem niet aan dat de subsidieverlener alles begrijpt “ You have to explain
yourself”
 Maak een aanvraag vanuit het perspectief van de subsidieverlener
Moving towards a final version
 Checklist voor indiening voor alle consortium leden
 Stel niet tot het laatst alles uit
 Hou alle kikkers in de kruiwagen; backup scenario
 1st FULL draft; Feedback van alle consortium leden ver voor
deadline
 Revise, rewrite, delete
 2nd draft
 Let op met last minute uploads
 Ondertekening
Evaluatie
 3 - 6 maanden evaluatie door subsidieverlener
 Revisie van project
 Wijzigingen? Open communicatie - > oplossingsgericht
 Contractondertekening
 Project start na indiening aanvraag of pas na contract ondertekening
Verloren? Feedback - > Herindiening?
Gewonnen? Klaar maken voor administratie!
PRESENTATION GIVEN BY HUDSON ON MARCH 13 AT LOCAL GOVERNMENT MEETING

More Related Content

Similar to PRESENTATION GIVEN BY HUDSON ON MARCH 13 AT LOCAL GOVERNMENT MEETING

Presentatie PNO | Workshop: Subsidieprogramma Horizon2020 en het bedrijfsleven
Presentatie PNO | Workshop: Subsidieprogramma Horizon2020 en het bedrijfsleven Presentatie PNO | Workshop: Subsidieprogramma Horizon2020 en het bedrijfsleven
Presentatie PNO | Workshop: Subsidieprogramma Horizon2020 en het bedrijfsleven
Flevum
 
Iwt beneluxconferentie infopol_25_mei11[1]
Iwt beneluxconferentie infopol_25_mei11[1]Iwt beneluxconferentie infopol_25_mei11[1]
Iwt beneluxconferentie infopol_25_mei11[1]
Jean-Louis Dalle
 
Voorbereiden Ipc Aanvraag 2010 1(Eng)
Voorbereiden Ipc Aanvraag 2010 1(Eng)Voorbereiden Ipc Aanvraag 2010 1(Eng)
Voorbereiden Ipc Aanvraag 2010 1(Eng)
Venturespring
 
Projecten Functies 21 01 2010
Projecten Functies 21 01 2010Projecten Functies 21 01 2010
Projecten Functies 21 01 2010
Siep Littooij
 

Similar to PRESENTATION GIVEN BY HUDSON ON MARCH 13 AT LOCAL GOVERNMENT MEETING (20)

Presentatie PNO | Workshop: Subsidieprogramma Horizon2020 en het bedrijfsleven
Presentatie PNO | Workshop: Subsidieprogramma Horizon2020 en het bedrijfsleven Presentatie PNO | Workshop: Subsidieprogramma Horizon2020 en het bedrijfsleven
Presentatie PNO | Workshop: Subsidieprogramma Horizon2020 en het bedrijfsleven
 
Starting Ipc V02
Starting Ipc V02Starting Ipc V02
Starting Ipc V02
 
IPC next step
IPC next stepIPC next step
IPC next step
 
2. Olivier Ongkiehong - Rijksdienst voor Ondernemend Nederland
2. Olivier Ongkiehong - Rijksdienst voor Ondernemend Nederland2. Olivier Ongkiehong - Rijksdienst voor Ondernemend Nederland
2. Olivier Ongkiehong - Rijksdienst voor Ondernemend Nederland
 
Starting IPC V01
Starting IPC V01Starting IPC V01
Starting IPC V01
 
Iwt beneluxconferentie infopol_25_mei11[1]
Iwt beneluxconferentie infopol_25_mei11[1]Iwt beneluxconferentie infopol_25_mei11[1]
Iwt beneluxconferentie infopol_25_mei11[1]
 
Voorbereiden Ipc Aanvraag 2010
Voorbereiden Ipc Aanvraag 2010Voorbereiden Ipc Aanvraag 2010
Voorbereiden Ipc Aanvraag 2010
 
Voorbereiden Ipc Aanvraag 2010 1(Eng)
Voorbereiden Ipc Aanvraag 2010 1(Eng)Voorbereiden Ipc Aanvraag 2010 1(Eng)
Voorbereiden Ipc Aanvraag 2010 1(Eng)
 
Infosessie LA-trajecten oproep 2017-2018
Infosessie LA-trajecten oproep 2017-2018Infosessie LA-trajecten oproep 2017-2018
Infosessie LA-trajecten oproep 2017-2018
 
Projecten Functies 21 01 2010
Projecten Functies 21 01 2010Projecten Functies 21 01 2010
Projecten Functies 21 01 2010
 
Eco innovation subsidie
Eco innovation subsidieEco innovation subsidie
Eco innovation subsidie
 
RAAK Int, Lectorenplatform 280909
RAAK Int, Lectorenplatform 280909RAAK Int, Lectorenplatform 280909
RAAK Int, Lectorenplatform 280909
 
ICT en Subsidies - De Breed en Partners - 24 maart 2015
ICT en Subsidies - De Breed en Partners - 24 maart 2015ICT en Subsidies - De Breed en Partners - 24 maart 2015
ICT en Subsidies - De Breed en Partners - 24 maart 2015
 
Tips en tricks voor het schrijven van een IWT subsidieaanvraag.
Tips en tricks voor het schrijven van een IWT subsidieaanvraag.Tips en tricks voor het schrijven van een IWT subsidieaanvraag.
Tips en tricks voor het schrijven van een IWT subsidieaanvraag.
 
Kick Off Fl E Invoicing 7 Okt 2008 V4 Deel2
Kick Off Fl E Invoicing 7 Okt 2008 V4 Deel2Kick Off Fl E Invoicing 7 Okt 2008 V4 Deel2
Kick Off Fl E Invoicing 7 Okt 2008 V4 Deel2
 
Geef je plannen een boost
Geef je plannen een boostGeef je plannen een boost
Geef je plannen een boost
 
RTE presentatie Week van de Financiering 2016 - Eindhoven
RTE presentatie Week van de Financiering 2016 - EindhovenRTE presentatie Week van de Financiering 2016 - Eindhoven
RTE presentatie Week van de Financiering 2016 - Eindhoven
 
20170321 presentatie innovatiesubsidies (Katie Van den Bulck)
20170321 presentatie innovatiesubsidies (Katie Van den Bulck)20170321 presentatie innovatiesubsidies (Katie Van den Bulck)
20170321 presentatie innovatiesubsidies (Katie Van den Bulck)
 
Financieringsmogelijkheden voor Games
Financieringsmogelijkheden voor GamesFinancieringsmogelijkheden voor Games
Financieringsmogelijkheden voor Games
 
Werkplan Diict
Werkplan DiictWerkplan Diict
Werkplan Diict
 

More from Joost Holleman

More from Joost Holleman (20)

Warmtecongres 2015 financiering
Warmtecongres 2015 financieringWarmtecongres 2015 financiering
Warmtecongres 2015 financiering
 
2nd generation of design tools for ocean energy devices and arrays developmen...
2nd generation of design tools for ocean energy devices and arrays developmen...2nd generation of design tools for ocean energy devices and arrays developmen...
2nd generation of design tools for ocean energy devices and arrays developmen...
 
scaling up in the ocean energy sector to arrays
scaling up in the ocean energy sector to arrays scaling up in the ocean energy sector to arrays
scaling up in the ocean energy sector to arrays
 
Lce 10-2017- reducing the cost of pv electricity
Lce 10-2017- reducing the cost of pv electricity Lce 10-2017- reducing the cost of pv electricity
Lce 10-2017- reducing the cost of pv electricity
 
Innovfin technology transfer financing facility (ttff)
Innovfin technology transfer financing facility (ttff) Innovfin technology transfer financing facility (ttff)
Innovfin technology transfer financing facility (ttff)
 
Innovfin piloting co investments by business angels
Innovfin piloting co investments by business angelsInnovfin piloting co investments by business angels
Innovfin piloting co investments by business angels
 
Mit update april 2015
Mit update april 2015Mit update april 2015
Mit update april 2015
 
EU FUNDS Ukraine 1.4 update nov 2014
EU FUNDS Ukraine 1.4 update nov 2014EU FUNDS Ukraine 1.4 update nov 2014
EU FUNDS Ukraine 1.4 update nov 2014
 
EU Budget Sweden 2014-2020 update November 2014
EU Budget Sweden  2014-2020 update November 2014EU Budget Sweden  2014-2020 update November 2014
EU Budget Sweden 2014-2020 update November 2014
 
EU Budget Spain 2014-2020 update November 2014
EU Budget Spain  2014-2020 update November 2014EU Budget Spain  2014-2020 update November 2014
EU Budget Spain 2014-2020 update November 2014
 
EU Budget Slovakia 2014-2020 update November 2014
EU Budget Slovakia  2014-2020 update November 2014EU Budget Slovakia  2014-2020 update November 2014
EU Budget Slovakia 2014-2020 update November 2014
 
EU Budget Romania 2014-2020 update November 2014
EU Budget Romania 2014-2020 update November 2014EU Budget Romania 2014-2020 update November 2014
EU Budget Romania 2014-2020 update November 2014
 
EU Budget Hungary 2014-2020 update November 2014
EU Budget Hungary 2014-2020 update November 2014EU Budget Hungary 2014-2020 update November 2014
EU Budget Hungary 2014-2020 update November 2014
 
EU Budget Greece 2014-2020 update November 2014
EU Budget Greece 2014-2020 update November 2014EU Budget Greece 2014-2020 update November 2014
EU Budget Greece 2014-2020 update November 2014
 
EU Budget Germany 2014-2020 update November 2014
EU Budget Germany 2014-2020 update November 2014EU Budget Germany 2014-2020 update November 2014
EU Budget Germany 2014-2020 update November 2014
 
EU Budget Finland 2014-2020 update November 2014
EU Budget Finland 2014-2020 update November 2014EU Budget Finland 2014-2020 update November 2014
EU Budget Finland 2014-2020 update November 2014
 
EU Budget Czech Republic 2014-2020 update November 2014
EU Budget Czech Republic 2014-2020 update November 2014EU Budget Czech Republic 2014-2020 update November 2014
EU Budget Czech Republic 2014-2020 update November 2014
 
EU Budget Cyprus 2014-2020 update November 2014
EU Budget Cyprus 2014-2020 update November 2014EU Budget Cyprus 2014-2020 update November 2014
EU Budget Cyprus 2014-2020 update November 2014
 
EU Budget Croatia 2014-2020 update November 2014
EU Budget Croatia 2014-2020 update November 2014EU Budget Croatia 2014-2020 update November 2014
EU Budget Croatia 2014-2020 update November 2014
 
EU Budget Bulgaria 2014-2020 update November 2014
EU Budget Bulgaria 2014-2020 update November 2014EU Budget Bulgaria 2014-2020 update November 2014
EU Budget Bulgaria 2014-2020 update November 2014
 

PRESENTATION GIVEN BY HUDSON ON MARCH 13 AT LOCAL GOVERNMENT MEETING

  • 1. How to write a winning bid?
  • 2. Maya van der Steenhoven Welkom 1
  • 3. CONTENT  14:00 Opening – Maya van der Steenhoven  14:15 EU subsidies: Kaders, doelstellingen, kansen en consortiumvorming – Joost Holleman HUDSON FINANCIAL INCENTIVES  15:30 Praktijkcasus ELENA subsidie Stadsverwarmingsbedrijf Purmerend – Marie se Tetteroo-Mathijsen  15:30 – 15:45 PAUZE  15.45 Parallelsessies ronde 1 – PDA, EFRO, EIB & HORIZON – FINANCIERINGEN  16.15 Parallelsessies ronde 2 (2 sessies)  17:00 AFSLUITING  17.00 Borrel
  • 4. Onderwerpen van vanmiddag 3 WAT KUNNEN FINANCIELE INSTRUMENTEN BETEKENEN VOOR DE REALISATIE VAN WARME PROJECTEN IN NEDERLAND BINNEN WELKE EUROPESE STRUCTUUR VALLEN DEZE FINANCIELE INSTRUMENTEN HOE WERKEN DEZE FINANCIELE INSTRUMENTEN? HOW TO MAKE A WINNING BID?
  • 5. Is Europese financiering ingewikkeld? 4
  • 6. │ 5 3 categories of regions < 75 % of EU average GDP/capita* *index EU27=100 75-90 % > 90 % Regional GDP figures: 2006-07-08 © EuroGeographics Association for the administrative boundaries
  • 7. EU lange termijn doelstellingen 6 • Smart Grids • Energy Efficiency • European Infrastructure • International Cooperation
  • 8. Proces…….een lange adem 7 Feasability study (±2 maanden) Aanvraag voorbereiden (±2 maanden) Aanvraag ingediend Start project Aanvraag goedgekeurd (binnen 3-6 maanden) Project Gereed 24 – 36 maanden Na start Project financieel Afgerond 6 maanden na afloop project Eerste Voorschot Na 6 maanden Tussentijdse rapportage na 12 maanden
  • 9. Waar zit het geld voor warmte? 959 miljard 8 SMART CITIES
  • 10. EIB – ELENA – HORIZON - SUBSIDIES 9 PDA Feasability Consortium Financals EFRO INTERREG Innovatie HORIZON Business Case Voorbereiding Uitvoering & Realisatie Voornamelijk financiering Subsidies & Incentives EIB
  • 11. EU Structural funds Budget verdeling 2014-2020 ESF / EFRO / INTERREG *index EU27=100 10
  • 13. Thema’s in EU Operationele programma’s 12
  • 15. PDA Project Development Assistance 14
  • 16. TOPICS  ENERGY Efficiency – EE CALLS  Competitive Low-Carbon energy – LCE CALLS  Smart Cities – SCC Calls  ACTIONS – B CALLS SCOPE / content  Technology development  Pilot / Demonstration  Financing solutions (PDA) HORIZON 2020 call update 15
  • 17. EE 13: Technology for district heating & Cooling EE 14: Removing market barriers to uptake efficient heating & Cooling solutions EE 18: New technologies for utilization of heat recovery EE 21: Development and market roll-out of innovative energy services and financial schemes for sutainable energy LCE 2: Developing the next generation technologies of renewable electricity and heating/cooling LCE 3: Demonstration of renewable electricity and heating/cooling technologies LCE 4: Market uptake of emerging renewable heating & Cooling technologies SCC: Smart cities B.1.2: Heating & Cooling District Heating & cooling selection 16
  • 19.  MLEI PDA – 1 A 2 AANVRAGEN NEDERLAND naar Nederland in eerste ronde – DEADLINE 5 JUNI – DEADLINE 2015  ELENA – Meerdere projecten per land – GEEN DEADLINE  HORIZON – INNOVATIE (MEERDERE DEADLINES) – PILOT & DEMONSTRATIE – R&D / Industriële research, samenwerking over de grenzen – Mathematische kans 1:10, 25% - > 75%  KANSEN VOOR WEST – INNOVATIE – PILOT & DEMONSTRATIE – ENERGIE PROJECTEN – Mathematische kans 1:8 Chance of succes? Onderlinge concurrentie! Samenwerken? 18
  • 20. Voorbeeld MLEI PDA 2011 - 2012 19
  • 21. How to make a winning bid! Subsidie selectie Context & feasability Building the project Writing the proposal Final version Evaluatie • Elke subsidie aanvraag is een competitie – Sales pitch – Toon alles aan met bewijs – Robuuste organisatie • Ver vooruit plannen
  • 22. Subsidie selectie  Welke subsidies zijn er mogelijk?  Bezoek info dagen  Interne / externe hulp?  Maak een subsidie landschap voor je organisatie / projecten; meerdere opties op meerdere tijdstippen  Lange termijnplanning
  • 23. Context & Feasability  Wat zijn de contouren van het project, De noodzakelijke “one pager”  Voldoet het aan de toegangseisen van de subsidie “entrance criteria”  Hoe scoort het project op de Kwalitatieve criteria / Qualitative criteria  Waarom is dit project beter dan eerdere en vergelijkbare projecten  Wie zijn belangrijke partners in het project en waarom  Wat zijn de resultaten van het project (kwantificeerbaar)  Disseminatie effect? Lighthouse dimension?  Innovatie meestal een belangrijk onderdeel van het project, is het innovatief genoeg?  Analyseer oude calls  Maak een grove inschatting hoe het project scoort t.o.v. je competitie  Samenwerken in de keten GO / NOGO
  • 24. Building the project  Detail onderzoek naar vergelijkbare bestaande betere projecten  Onderzoek “added value” van het project / Welke gaps zijn er?  Project kosten & planning  Consortium bouw (penvoerder)  Risico’s voor partners in kaart brengen  Wat is het effect van het subsidie bedrag (additionaliteit) – Bigger, better, faster  Disseminatie verder uitwerken  Contacten markt: zijn er vergelijkbare initiatieven  Draft outline - > contact met subsidieverlener  Is het project “value for money”  Bezoek info dagen in Brussel / Nederland Laatste kans om het niet te doen
  • 25. Writing the proposal  Scherpe analyse aanvraagformulier + noodzakelijke documenten  Start met een draft management summary de structuur van de aanvraag “one pager”  Verdeel het werk onder de consortium leden  Projectmatige aanpak  Welke tijdslijnen houden we aan voor het schrijven van de aanvraag (vakantie periodes)  Vermijd eigen vakjargon "We talk a language the rest of the world doesn't understand,”  Describe how it meets the criteria set out in the call  Demonstrate how it is aligned with the objectives of your college or institution  Vanuit welke entiteit wordt er aangeboden vanuit de partners?
  • 26. Writing the proposal  Duidelijke taal: Niet te veel, niet te weinig een goede balans  Ga er niet van uit dat de subsidieverlener het begrijpt neem ze mee in het verhaal  Kom met voorbeelden, vergelijkbare uitkomsten  Heb je ervaring met vergelijkbare projecten? Krijgt de subsidieverlener vetrouwen in realisatie van het project  Risico’s zijn geen sluitpost. Demonstrate that an initial assessment of project risks has been undertaken  Een plaatje zegt meer dan een paar alineas tekst  Cijfers moeten kloppen, schreifvouten en het verhaal moet als een huis staan  Neem niet aan dat de subsidieverlener alles begrijpt “ You have to explain yourself”  Maak een aanvraag vanuit het perspectief van de subsidieverlener
  • 27. Moving towards a final version  Checklist voor indiening voor alle consortium leden  Stel niet tot het laatst alles uit  Hou alle kikkers in de kruiwagen; backup scenario  1st FULL draft; Feedback van alle consortium leden ver voor deadline  Revise, rewrite, delete  2nd draft  Let op met last minute uploads  Ondertekening
  • 28. Evaluatie  3 - 6 maanden evaluatie door subsidieverlener  Revisie van project  Wijzigingen? Open communicatie - > oplossingsgericht  Contractondertekening  Project start na indiening aanvraag of pas na contract ondertekening Verloren? Feedback - > Herindiening? Gewonnen? Klaar maken voor administratie!