4. 5th Graders
• Used a retinoscope to look into the eye
• Touched and handled pigs’ eyes
• Checked their own vision
• Dissected a pig's eye
An Eye on Science
7. Serious Heart-to-Heart
5th graders invited back to Yale
• Used stethoscopes to listen to heart
beats
• Checked their own pulse (at rest and
after exercise)
• Used a pulse oximeter to monitor their
oxygen saturation levels
• Dissected a pig's heart.
9. The Bare Bones
Grade 6 students
• Looked at all 206 bones in the
human body
• Analyzed and handled both a healthy
human lung and a smoker’s lung
• Yale continues to look for curricular
connections.
11. Race Brook Pennies for Peck
Two Race Brook School brothers drove by
Peck Place School and saw the dumpsters.
They decided they wanted to help.
Soliciting the support of the Race Brook
Student Council, the school ran a drive called
“Pennies for Peck” and collected $386
to help replace lost materials.
13. Screen-Free Week at MLT
Evening activities to encourage turning off
the devices
• Monday: Bowling at Woodlawn Duckpin Bowling
• Tuesday: Nature Hike – Conservation Commission
• Wednesday: Magic by Mike at MLT
• Thursday: Fun Sportz America at MLT
• Friday: Fun at MyGym
14.
15. Governor’s Reading Challenge
• Race Brook was one of 14 elementary
schools
• Based on # of summer reading books
• Friday, May 9th at the State Library
• Governor Malloy and Commissioner
Pryor
• Museum & Capitol
16.
17. Peck Update
• Most of the contractors are finishing --
painting, new ceilings, new lighting, etc.
• Flooring is being delivered (white tile)
• Plans for univents, cabinetry, and roof
passed State and local review.
• Univents and cabinetry went out to bid
(RFP) yesterday
• Roof will go out soon
• Will award contracts in about 2 weeks
• Work will begin shortly thereafter
21. Other Facilities Updates
NOW
• Security Projects bid was awarded --
work has begun
• Roofs for TH and RB – in last stage of
State and local review
• Roofs will go out to bid shortly
• Other projects – ramp at RB, column
supports at THS, concrete work MLT –
after referendum
22. Other Facilities Updates
AFTER Referendum – Tuesday, May 20th
• MLT steps, RB and TH sidewalk repair
• RB abatement and new flooring for
ramp, stage curtains, playground
• Support columns at TH
24. Additional Updates
• Connecticut 1st in Reading on the 12th
Grade NAEP
• Uniform Regional Calendar delayed
until 2016 – 2017; one year additional
extension if your teacher’s contract
needs revision