SlideShare a Scribd company logo
1 of 1
Download to read offline
lizmurphy                                                        INTERIOR DESIGN                         RENOVATION DESIGN                               PROJECT MANAGEMENT

                                                      DESIGN
Professional Member, American Society of Interior Designers


   BEFORE                                                 AFTER                                                                                         AFTER




Master Bath Renovation
The homeowners requested a complete make-over of this long, narrow space resulting in a spa-like bathroom with a curbless and doorless shower. The final design employed a linear shower drain
system, under floor radiant heating, a quartz counter on a 36” high vanity with two sink bowls, and two large mirrored medicine cabinets flanked by wall sconces. Low voltage lighting, powerful but
silent ventilation, a private water closet and lots of built-in storage completed the space. An etched design on the shower glass provided privacy without compromising light in the shower, maintaining
an overall spacious feeling.                                                            Credits: Construction Services, The Lieberman Group www.liebermangroupinc.com Photography, Dana Scheller www.schellerandcompany.com



303 Chestnut Road, Sewickley, PA 15143                        PHONE 412-749-6984                      FAX 412-749-1184                  CELL 412-736-0856                     EMAIL liz@lizmurphydesign.com

More Related Content

What's hot

Mark levinson brand overview presentation july 2016 widescreen
Mark levinson brand overview presentation july 2016 widescreenMark levinson brand overview presentation july 2016 widescreen
Mark levinson brand overview presentation july 2016 widescreenaudio-pro-by
 
Des Moines Public Library Franklin Avenue
Des Moines Public Library Franklin AvenueDes Moines Public Library Franklin Avenue
Des Moines Public Library Franklin AvenueObyrneO
 
Narvil hotel case study
Narvil hotel case study Narvil hotel case study
Narvil hotel case study swatz0707
 
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2Darshiini Vig
 
BSCIENCE PROJECT 2 FINAL REPORT
BSCIENCE PROJECT 2 FINAL REPORTBSCIENCE PROJECT 2 FINAL REPORT
BSCIENCE PROJECT 2 FINAL REPORTDarshiini Vig
 
CL final report for proposed Garden
CL final report for proposed GardenCL final report for proposed Garden
CL final report for proposed GardenSchani B
 
Heng zhao portfolio
Heng zhao portfolioHeng zhao portfolio
Heng zhao portfolioHeng Zhao
 
Landscaping details
Landscaping detailsLandscaping details
Landscaping detailsanky987
 
Shenzhen risen opto
Shenzhen risen optoShenzhen risen opto
Shenzhen risen opto限可 陈
 
NOISE CONTROL OF BUILDINGS
NOISE CONTROL OF BUILDINGSNOISE CONTROL OF BUILDINGS
NOISE CONTROL OF BUILDINGS sathish sak
 
"ALL in" Studio
"ALL in" Studio"ALL in" Studio
"ALL in" Studiopyanev
 
Rohan Iksha Brochure - Zricks.com
Rohan Iksha Brochure - Zricks.comRohan Iksha Brochure - Zricks.com
Rohan Iksha Brochure - Zricks.comZricks.com
 

What's hot (17)

Mark levinson brand overview presentation july 2016 widescreen
Mark levinson brand overview presentation july 2016 widescreenMark levinson brand overview presentation july 2016 widescreen
Mark levinson brand overview presentation july 2016 widescreen
 
Des Moines Public Library Franklin Avenue
Des Moines Public Library Franklin AvenueDes Moines Public Library Franklin Avenue
Des Moines Public Library Franklin Avenue
 
Narvil hotel case study
Narvil hotel case study Narvil hotel case study
Narvil hotel case study
 
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
 
BSCIENCE PROJECT 2 FINAL REPORT
BSCIENCE PROJECT 2 FINAL REPORTBSCIENCE PROJECT 2 FINAL REPORT
BSCIENCE PROJECT 2 FINAL REPORT
 
CL final report for proposed Garden
CL final report for proposed GardenCL final report for proposed Garden
CL final report for proposed Garden
 
Heng zhao portfolio
Heng zhao portfolioHeng zhao portfolio
Heng zhao portfolio
 
Landscaping details
Landscaping detailsLandscaping details
Landscaping details
 
Shenzhen risen opto
Shenzhen risen optoShenzhen risen opto
Shenzhen risen opto
 
NOISE CONTROL OF BUILDINGS
NOISE CONTROL OF BUILDINGSNOISE CONTROL OF BUILDINGS
NOISE CONTROL OF BUILDINGS
 
Interiors
InteriorsInteriors
Interiors
 
99k House Competition (bpm Entry 08)
99k House Competition (bpm Entry 08)99k House Competition (bpm Entry 08)
99k House Competition (bpm Entry 08)
 
"ALL in" Studio
"ALL in" Studio"ALL in" Studio
"ALL in" Studio
 
Rohan Iksha Brochure - Zricks.com
Rohan Iksha Brochure - Zricks.comRohan Iksha Brochure - Zricks.com
Rohan Iksha Brochure - Zricks.com
 
Master bath remodel glencoe
Master bath remodel glencoeMaster bath remodel glencoe
Master bath remodel glencoe
 
Water cube
Water cubeWater cube
Water cube
 
Compilation
CompilationCompilation
Compilation
 

Similar to 20x30 boards 6 2012-rev2

Similar to 20x30 boards 6 2012-rev2 (6)

Recent Projects 2010
Recent Projects 2010Recent Projects 2010
Recent Projects 2010
 
Recent Projects
Recent ProjectsRecent Projects
Recent Projects
 
Jannine Hanczarek-Work
Jannine Hanczarek-WorkJannine Hanczarek-Work
Jannine Hanczarek-Work
 
Resident_-_Issue_11
Resident_-_Issue_11Resident_-_Issue_11
Resident_-_Issue_11
 
Feature on Escu House, Grand Designs magazine
Feature on Escu House, Grand Designs magazineFeature on Escu House, Grand Designs magazine
Feature on Escu House, Grand Designs magazine
 
BCJ Architects fact sheet
BCJ Architects fact sheetBCJ Architects fact sheet
BCJ Architects fact sheet
 

20x30 boards 6 2012-rev2

  • 1. lizmurphy INTERIOR DESIGN RENOVATION DESIGN PROJECT MANAGEMENT DESIGN Professional Member, American Society of Interior Designers BEFORE AFTER AFTER Master Bath Renovation The homeowners requested a complete make-over of this long, narrow space resulting in a spa-like bathroom with a curbless and doorless shower. The final design employed a linear shower drain system, under floor radiant heating, a quartz counter on a 36” high vanity with two sink bowls, and two large mirrored medicine cabinets flanked by wall sconces. Low voltage lighting, powerful but silent ventilation, a private water closet and lots of built-in storage completed the space. An etched design on the shower glass provided privacy without compromising light in the shower, maintaining an overall spacious feeling. Credits: Construction Services, The Lieberman Group www.liebermangroupinc.com Photography, Dana Scheller www.schellerandcompany.com 303 Chestnut Road, Sewickley, PA 15143 PHONE 412-749-6984 FAX 412-749-1184 CELL 412-736-0856 EMAIL liz@lizmurphydesign.com