10 Tips for Implementing an
Effective Audit Program
Principal, Manager of
Tellevate’s Compliance
Services
– Certified environmental and
management systems auditor
– Previous experience as a
Regulatory Environmental
Engineer
– B.S. Manufacturing
Engineering, Boston University
Areas of expertise:
• Environmental
compliance
program support
• Air quality
compliance
• Multi-media
compliance
auditing
• Management
systems
• Agency
consultation and
litigation support
10/30/2015 For the MECC – Chicago 2
Nick Steinke, P.E., CPEA, SFP
10/30/2015 For the MECC – Chicago 3
1. Obtain Management Support for
Established Project Objectives
Implementing an Effective Audit
Program
• Management Support is Key
• Use Management Priorities to Establish
Program Objectives
• Program Objective Considerations
• Compliance
• Continual Improvement
• Technical Assistance and Training
10/30/2015 For the MECC – Chicago 4
2. Define the Audit Scope and
Protocol
Implementing an Effective Audit
Program
• Regulatory Scope
• Permits, Plans
• EMS?
• Protocol
• Content: Questions?
Checklists? Lists?
• Citations/References
• Updates
10/30/2015 For the MECC – Chicago 5
3. Include Root Cause Analysis
and Other Key Metrics
Implementing an Effective Audit
Program
• Root Cause Analysis
• Map to EMS -> Business Processes
• Prioritize Findings
• Emergency | Regulatory | Policy | BMP
• Environmental Media Area
• Location (Facility? Building? Room?)
• Responsible Organization/Program Area
10/30/2015 For the MECC – Chicago 6
4. Consider Technical
Assistance and Training
Implementing an Effective Audit
Program
• Plant Participation and Buy-In
• Corrective and Preventive Action
Timeframe
• Cost-Effective
• Promotes Open Communication
• Supports Root Cause Analysis
• Overall Program Success
10/30/2015 For the MECC – Chicago 7
5. Leverage Technology
Implementing an Effective Audit
Program
• Data Collection
• Reporting
• Analysis
• Framework for Consistency
• Protocol Integration, Updates,
Customization
• Communication
• Within the Organization
• With Management
10/30/2015 For the MECC – Chicago 8
6. Establish Formal Reporting
Process and Timeframe
Implementing an Effective Audit
Program
• Report Content
• Clear
• Concise
• Objective
• Clearly Distinguish Findings and
Recommendations
• Timeframe, Corrective Action and
Liability
10/30/2015 For the MECC – Chicago 9
7. Establish Formal Corrective
Action Process
Implementing an Effective Audit
Program
• Audit Findings -> Report -> Now What?
• Timeframe
• Liability of Long/Undefined Internal
Process
• Roles and Responsibilities
• Corrective and Preventive Action
(Address the Root Cause)
10/30/2015 For the MECC – Chicago 10
8. Use Qualified Auditors
Implementing an Effective Audit
Program
• Credibility
• Audit Quality
• Technical Assistance
• External Auditors
• Benchmarking
• Overcome Institutional Norms,
Constraints
• Stakeholder Perception
• Community and Regulator Perception
10/30/2015 For the MECC – Chicago 11
9. Use Risk-Based Approach
Implementing an Effective Audit
Program
• Resource Considerations v.
Considerable Audit Protocol
• Focus Auditor Resources on Issues
with Greatest Risk
• Environmental Impact and Regulatory
Liability – What Else?
• EMS Alignment Keeps Process
Consistent with Organization Goals
10/30/2015 For the MECC – Chicago 12
10. Document Formal Audit
Program
Implementing an Effective Audit
Program
• Clearly Define and Communicate
Program Objectives and Approach
• Establish Accountability
• Define Roles and Responsibilities
• Audit Program Manual/Procedures
QUESTIONS?
Nick Steinke
402.730.1660
nsteinke@tellevate.com
9/15/2015 For the Baltimore AR Fall National Meeting 13

More Related Content

Similar to Nick Steinke, Tellevate, 10 Tips for Implementing an Effective Audit Program, Midwest Environmental Compliance Conference, Chicago, October 29-30, 2015

Enterprise Roleout Change-Kirch Final-compress 2.1
Enterprise Roleout Change-Kirch Final-compress 2.1Enterprise Roleout Change-Kirch Final-compress 2.1
Enterprise Roleout Change-Kirch Final-compress 2.1Cathy Kirch
 
PDE Week 5: Developing an Evaluation Plan
PDE Week 5: Developing an Evaluation PlanPDE Week 5: Developing an Evaluation Plan
PDE Week 5: Developing an Evaluation Plankpravera
 
REDD_5.1_M_E_Framework.pptx
REDD_5.1_M_E_Framework.pptxREDD_5.1_M_E_Framework.pptx
REDD_5.1_M_E_Framework.pptxSajidMarickar1
 
ME_Framework.pptx
ME_Framework.pptxME_Framework.pptx
ME_Framework.pptxlovelampsys
 
APWASpring2015 presentation-Final
APWASpring2015 presentation-FinalAPWASpring2015 presentation-Final
APWASpring2015 presentation-FinalZahid Khan, PE, PMP
 
8.1 Plan Quality Management
8.1 Plan Quality Management8.1 Plan Quality Management
8.1 Plan Quality ManagementDavidMcLachlan1
 
6_Kimberly Todd - QA and QC.pptx
6_Kimberly Todd - QA and QC.pptx6_Kimberly Todd - QA and QC.pptx
6_Kimberly Todd - QA and QC.pptxJoiGirish1
 
Your project selected_for_audit_sip18_project_auditors
Your project selected_for_audit_sip18_project_auditorsYour project selected_for_audit_sip18_project_auditors
Your project selected_for_audit_sip18_project_auditorsJoy Gumz
 
8.0 Project Quality Management Overview
8.0 Project Quality Management Overview8.0 Project Quality Management Overview
8.0 Project Quality Management OverviewDavidMcLachlan1
 
The IT PMO - A Handbook for Federal Programs
The IT PMO - A Handbook for Federal ProgramsThe IT PMO - A Handbook for Federal Programs
The IT PMO - A Handbook for Federal ProgramsVergys
 
10.3 Monitor Communication
10.3 Monitor Communication10.3 Monitor Communication
10.3 Monitor CommunicationDavidMcLachlan1
 
2010 SACSCOC Administrative Program Review - with handouts
2010 SACSCOC Administrative Program Review - with handouts2010 SACSCOC Administrative Program Review - with handouts
2010 SACSCOC Administrative Program Review - with handoutsDavid Onder
 
Is your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackIs your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackProject Management Solutions
 
Iso 9001:2015 internal auditor Course
Iso 9001:2015  internal auditor Course Iso 9001:2015  internal auditor Course
Iso 9001:2015 internal auditor Course Atif Alhaj
 
Toward an integration of Web accessibility into testing processes
Toward an integration of Web accessibility into testing processesToward an integration of Web accessibility into testing processes
Toward an integration of Web accessibility into testing processesGrupo HULAT
 
IWMW 2003 b4 QA for web sites (5 - The QA Focus Perspective)
IWMW 2003 b4 QA for web sites (5 - The QA Focus Perspective)IWMW 2003 b4 QA for web sites (5 - The QA Focus Perspective)
IWMW 2003 b4 QA for web sites (5 - The QA Focus Perspective)IWMW
 
Project Integration Management.pptx
Project Integration Management.pptxProject Integration Management.pptx
Project Integration Management.pptxMUST
 
Continuous Quality Improvement (CQI)
Continuous Quality Improvement (CQI)Continuous Quality Improvement (CQI)
Continuous Quality Improvement (CQI)Siti Sahati
 

Similar to Nick Steinke, Tellevate, 10 Tips for Implementing an Effective Audit Program, Midwest Environmental Compliance Conference, Chicago, October 29-30, 2015 (20)

8.3 Control Quality
8.3 Control Quality8.3 Control Quality
8.3 Control Quality
 
Enterprise Roleout Change-Kirch Final-compress 2.1
Enterprise Roleout Change-Kirch Final-compress 2.1Enterprise Roleout Change-Kirch Final-compress 2.1
Enterprise Roleout Change-Kirch Final-compress 2.1
 
PDE Week 5: Developing an Evaluation Plan
PDE Week 5: Developing an Evaluation PlanPDE Week 5: Developing an Evaluation Plan
PDE Week 5: Developing an Evaluation Plan
 
REDD_5.1_M_E_Framework.pptx
REDD_5.1_M_E_Framework.pptxREDD_5.1_M_E_Framework.pptx
REDD_5.1_M_E_Framework.pptx
 
ME_Framework.pptx
ME_Framework.pptxME_Framework.pptx
ME_Framework.pptx
 
APWASpring2015 presentation-Final
APWASpring2015 presentation-FinalAPWASpring2015 presentation-Final
APWASpring2015 presentation-Final
 
8.1 Plan Quality Management
8.1 Plan Quality Management8.1 Plan Quality Management
8.1 Plan Quality Management
 
6_Kimberly Todd - QA and QC.pptx
6_Kimberly Todd - QA and QC.pptx6_Kimberly Todd - QA and QC.pptx
6_Kimberly Todd - QA and QC.pptx
 
Your project selected_for_audit_sip18_project_auditors
Your project selected_for_audit_sip18_project_auditorsYour project selected_for_audit_sip18_project_auditors
Your project selected_for_audit_sip18_project_auditors
 
8.0 Project Quality Management Overview
8.0 Project Quality Management Overview8.0 Project Quality Management Overview
8.0 Project Quality Management Overview
 
The IT PMO - A Handbook for Federal Programs
The IT PMO - A Handbook for Federal ProgramsThe IT PMO - A Handbook for Federal Programs
The IT PMO - A Handbook for Federal Programs
 
10.3 Monitor Communication
10.3 Monitor Communication10.3 Monitor Communication
10.3 Monitor Communication
 
2010 SACSCOC Administrative Program Review - with handouts
2010 SACSCOC Administrative Program Review - with handouts2010 SACSCOC Administrative Program Review - with handouts
2010 SACSCOC Administrative Program Review - with handouts
 
Is your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackIs your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on track
 
Iso 9001:2015 internal auditor Course
Iso 9001:2015  internal auditor Course Iso 9001:2015  internal auditor Course
Iso 9001:2015 internal auditor Course
 
Toward an integration of Web accessibility into testing processes
Toward an integration of Web accessibility into testing processesToward an integration of Web accessibility into testing processes
Toward an integration of Web accessibility into testing processes
 
8.2 Manage Quality
8.2 Manage Quality8.2 Manage Quality
8.2 Manage Quality
 
IWMW 2003 b4 QA for web sites (5 - The QA Focus Perspective)
IWMW 2003 b4 QA for web sites (5 - The QA Focus Perspective)IWMW 2003 b4 QA for web sites (5 - The QA Focus Perspective)
IWMW 2003 b4 QA for web sites (5 - The QA Focus Perspective)
 
Project Integration Management.pptx
Project Integration Management.pptxProject Integration Management.pptx
Project Integration Management.pptx
 
Continuous Quality Improvement (CQI)
Continuous Quality Improvement (CQI)Continuous Quality Improvement (CQI)
Continuous Quality Improvement (CQI)
 

More from Kevin Perry

Brunetti, Rick, KDHE, Regional Air Issues Roundtable, MECC, 2016, Overland Park
Brunetti, Rick, KDHE, Regional Air Issues Roundtable,  MECC, 2016, Overland ParkBrunetti, Rick, KDHE, Regional Air Issues Roundtable,  MECC, 2016, Overland Park
Brunetti, Rick, KDHE, Regional Air Issues Roundtable, MECC, 2016, Overland ParkKevin Perry
 
Shanahan, Matt, Burns & McDonnell, RCRA Update Proposed Hazardous Waste Gener...
Shanahan, Matt, Burns & McDonnell, RCRA Update Proposed Hazardous Waste Gener...Shanahan, Matt, Burns & McDonnell, RCRA Update Proposed Hazardous Waste Gener...
Shanahan, Matt, Burns & McDonnell, RCRA Update Proposed Hazardous Waste Gener...Kevin Perry
 
Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...
Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...
Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...Kevin Perry
 
Chavez, Nikki, iSi Environmental, Form R Tips and Trip Ups, MECC, 2016, Overl...
Chavez, Nikki, iSi Environmental, Form R Tips and Trip Ups, MECC, 2016, Overl...Chavez, Nikki, iSi Environmental, Form R Tips and Trip Ups, MECC, 2016, Overl...
Chavez, Nikki, iSi Environmental, Form R Tips and Trip Ups, MECC, 2016, Overl...Kevin Perry
 
Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...
Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...
Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...Kevin Perry
 
Sturgess, Steve, MDNR, Missouri Risk-Based Corrective Action Long-Term Stewar...
Sturgess, Steve, MDNR, Missouri Risk-Based Corrective Action Long-Term Stewar...Sturgess, Steve, MDNR, Missouri Risk-Based Corrective Action Long-Term Stewar...
Sturgess, Steve, MDNR, Missouri Risk-Based Corrective Action Long-Term Stewar...Kevin Perry
 
Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...
Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...
Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...Kevin Perry
 
Muth, Emily, OPPD, Environmental Compliance and Information Systems, MECC, 20...
Muth, Emily, OPPD, Environmental Compliance and Information Systems, MECC, 20...Muth, Emily, OPPD, Environmental Compliance and Information Systems, MECC, 20...
Muth, Emily, OPPD, Environmental Compliance and Information Systems, MECC, 20...Kevin Perry
 
Wanzenried, Brian, Gavilon, Strategic Planning for Environmental Staffing, ME...
Wanzenried, Brian, Gavilon, Strategic Planning for Environmental Staffing, ME...Wanzenried, Brian, Gavilon, Strategic Planning for Environmental Staffing, ME...
Wanzenried, Brian, Gavilon, Strategic Planning for Environmental Staffing, ME...Kevin Perry
 
Cozad, David, US EPA, Dernovish, David, KDHE, Duggan, Tim, MO AGO, Tormey, Ed...
Cozad, David, US EPA, Dernovish, David, KDHE, Duggan, Tim, MO AGO, Tormey, Ed...Cozad, David, US EPA, Dernovish, David, KDHE, Duggan, Tim, MO AGO, Tormey, Ed...
Cozad, David, US EPA, Dernovish, David, KDHE, Duggan, Tim, MO AGO, Tormey, Ed...Kevin Perry
 
Pendergrass, Gary, GeoEngineers, CCR Rule Compliance Innovative Geophysics to...
Pendergrass, Gary, GeoEngineers, CCR Rule Compliance Innovative Geophysics to...Pendergrass, Gary, GeoEngineers, CCR Rule Compliance Innovative Geophysics to...
Pendergrass, Gary, GeoEngineers, CCR Rule Compliance Innovative Geophysics to...Kevin Perry
 
Hindin, David, US EPA, OECI, Next Generation Compliance Water and Waste Examp...
Hindin, David, US EPA, OECI, Next Generation Compliance Water and Waste Examp...Hindin, David, US EPA, OECI, Next Generation Compliance Water and Waste Examp...
Hindin, David, US EPA, OECI, Next Generation Compliance Water and Waste Examp...Kevin Perry
 
Meerian, Marcus, KDHE, Overview of Revisions to the UST Regulations, MECC, 20...
Meerian, Marcus, KDHE, Overview of Revisions to the UST Regulations, MECC, 20...Meerian, Marcus, KDHE, Overview of Revisions to the UST Regulations, MECC, 20...
Meerian, Marcus, KDHE, Overview of Revisions to the UST Regulations, MECC, 20...Kevin Perry
 
Hieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland Park
Hieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland ParkHieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland Park
Hieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland ParkKevin Perry
 
Johnson, Susan, IDNR, Making Hazardous/Non-Hazardous Waste Determinations, ME...
Johnson, Susan, IDNR, Making Hazardous/Non-Hazardous Waste Determinations, ME...Johnson, Susan, IDNR, Making Hazardous/Non-Hazardous Waste Determinations, ME...
Johnson, Susan, IDNR, Making Hazardous/Non-Hazardous Waste Determinations, ME...Kevin Perry
 
Andracsek, Robynn, Burns & McDonnell, What Every EHS Staff should Know about ...
Andracsek, Robynn, Burns & McDonnell, What Every EHS Staff should Know about ...Andracsek, Robynn, Burns & McDonnell, What Every EHS Staff should Know about ...
Andracsek, Robynn, Burns & McDonnell, What Every EHS Staff should Know about ...Kevin Perry
 
Brunetti, Rick, KDHE, Regional Air Issues Roundtable, MECC, Kansas City
Brunetti, Rick, KDHE, Regional Air Issues Roundtable, MECC, Kansas CityBrunetti, Rick, KDHE, Regional Air Issues Roundtable, MECC, Kansas City
Brunetti, Rick, KDHE, Regional Air Issues Roundtable, MECC, Kansas CityKevin Perry
 
Funderburg, Lisa, Stinson Leonard Street, Compliance Tools Top Ten Tips When ...
Funderburg, Lisa, Stinson Leonard Street, Compliance Tools Top Ten Tips When ...Funderburg, Lisa, Stinson Leonard Street, Compliance Tools Top Ten Tips When ...
Funderburg, Lisa, Stinson Leonard Street, Compliance Tools Top Ten Tips When ...Kevin Perry
 
Grice, Lisa, Ramboll, Corporate Sustainability Where the Rest of the Company ...
Grice, Lisa, Ramboll, Corporate Sustainability Where the Rest of the Company ...Grice, Lisa, Ramboll, Corporate Sustainability Where the Rest of the Company ...
Grice, Lisa, Ramboll, Corporate Sustainability Where the Rest of the Company ...Kevin Perry
 
Jay, Mike, US EPA, Regional Air Issues Roundtable, MECC, Kansas City
Jay, Mike, US EPA, Regional Air Issues Roundtable, MECC, Kansas CityJay, Mike, US EPA, Regional Air Issues Roundtable, MECC, Kansas City
Jay, Mike, US EPA, Regional Air Issues Roundtable, MECC, Kansas CityKevin Perry
 

More from Kevin Perry (20)

Brunetti, Rick, KDHE, Regional Air Issues Roundtable, MECC, 2016, Overland Park
Brunetti, Rick, KDHE, Regional Air Issues Roundtable,  MECC, 2016, Overland ParkBrunetti, Rick, KDHE, Regional Air Issues Roundtable,  MECC, 2016, Overland Park
Brunetti, Rick, KDHE, Regional Air Issues Roundtable, MECC, 2016, Overland Park
 
Shanahan, Matt, Burns & McDonnell, RCRA Update Proposed Hazardous Waste Gener...
Shanahan, Matt, Burns & McDonnell, RCRA Update Proposed Hazardous Waste Gener...Shanahan, Matt, Burns & McDonnell, RCRA Update Proposed Hazardous Waste Gener...
Shanahan, Matt, Burns & McDonnell, RCRA Update Proposed Hazardous Waste Gener...
 
Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...
Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...
Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...
 
Chavez, Nikki, iSi Environmental, Form R Tips and Trip Ups, MECC, 2016, Overl...
Chavez, Nikki, iSi Environmental, Form R Tips and Trip Ups, MECC, 2016, Overl...Chavez, Nikki, iSi Environmental, Form R Tips and Trip Ups, MECC, 2016, Overl...
Chavez, Nikki, iSi Environmental, Form R Tips and Trip Ups, MECC, 2016, Overl...
 
Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...
Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...
Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...
 
Sturgess, Steve, MDNR, Missouri Risk-Based Corrective Action Long-Term Stewar...
Sturgess, Steve, MDNR, Missouri Risk-Based Corrective Action Long-Term Stewar...Sturgess, Steve, MDNR, Missouri Risk-Based Corrective Action Long-Term Stewar...
Sturgess, Steve, MDNR, Missouri Risk-Based Corrective Action Long-Term Stewar...
 
Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...
Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...
Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...
 
Muth, Emily, OPPD, Environmental Compliance and Information Systems, MECC, 20...
Muth, Emily, OPPD, Environmental Compliance and Information Systems, MECC, 20...Muth, Emily, OPPD, Environmental Compliance and Information Systems, MECC, 20...
Muth, Emily, OPPD, Environmental Compliance and Information Systems, MECC, 20...
 
Wanzenried, Brian, Gavilon, Strategic Planning for Environmental Staffing, ME...
Wanzenried, Brian, Gavilon, Strategic Planning for Environmental Staffing, ME...Wanzenried, Brian, Gavilon, Strategic Planning for Environmental Staffing, ME...
Wanzenried, Brian, Gavilon, Strategic Planning for Environmental Staffing, ME...
 
Cozad, David, US EPA, Dernovish, David, KDHE, Duggan, Tim, MO AGO, Tormey, Ed...
Cozad, David, US EPA, Dernovish, David, KDHE, Duggan, Tim, MO AGO, Tormey, Ed...Cozad, David, US EPA, Dernovish, David, KDHE, Duggan, Tim, MO AGO, Tormey, Ed...
Cozad, David, US EPA, Dernovish, David, KDHE, Duggan, Tim, MO AGO, Tormey, Ed...
 
Pendergrass, Gary, GeoEngineers, CCR Rule Compliance Innovative Geophysics to...
Pendergrass, Gary, GeoEngineers, CCR Rule Compliance Innovative Geophysics to...Pendergrass, Gary, GeoEngineers, CCR Rule Compliance Innovative Geophysics to...
Pendergrass, Gary, GeoEngineers, CCR Rule Compliance Innovative Geophysics to...
 
Hindin, David, US EPA, OECI, Next Generation Compliance Water and Waste Examp...
Hindin, David, US EPA, OECI, Next Generation Compliance Water and Waste Examp...Hindin, David, US EPA, OECI, Next Generation Compliance Water and Waste Examp...
Hindin, David, US EPA, OECI, Next Generation Compliance Water and Waste Examp...
 
Meerian, Marcus, KDHE, Overview of Revisions to the UST Regulations, MECC, 20...
Meerian, Marcus, KDHE, Overview of Revisions to the UST Regulations, MECC, 20...Meerian, Marcus, KDHE, Overview of Revisions to the UST Regulations, MECC, 20...
Meerian, Marcus, KDHE, Overview of Revisions to the UST Regulations, MECC, 20...
 
Hieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland Park
Hieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland ParkHieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland Park
Hieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland Park
 
Johnson, Susan, IDNR, Making Hazardous/Non-Hazardous Waste Determinations, ME...
Johnson, Susan, IDNR, Making Hazardous/Non-Hazardous Waste Determinations, ME...Johnson, Susan, IDNR, Making Hazardous/Non-Hazardous Waste Determinations, ME...
Johnson, Susan, IDNR, Making Hazardous/Non-Hazardous Waste Determinations, ME...
 
Andracsek, Robynn, Burns & McDonnell, What Every EHS Staff should Know about ...
Andracsek, Robynn, Burns & McDonnell, What Every EHS Staff should Know about ...Andracsek, Robynn, Burns & McDonnell, What Every EHS Staff should Know about ...
Andracsek, Robynn, Burns & McDonnell, What Every EHS Staff should Know about ...
 
Brunetti, Rick, KDHE, Regional Air Issues Roundtable, MECC, Kansas City
Brunetti, Rick, KDHE, Regional Air Issues Roundtable, MECC, Kansas CityBrunetti, Rick, KDHE, Regional Air Issues Roundtable, MECC, Kansas City
Brunetti, Rick, KDHE, Regional Air Issues Roundtable, MECC, Kansas City
 
Funderburg, Lisa, Stinson Leonard Street, Compliance Tools Top Ten Tips When ...
Funderburg, Lisa, Stinson Leonard Street, Compliance Tools Top Ten Tips When ...Funderburg, Lisa, Stinson Leonard Street, Compliance Tools Top Ten Tips When ...
Funderburg, Lisa, Stinson Leonard Street, Compliance Tools Top Ten Tips When ...
 
Grice, Lisa, Ramboll, Corporate Sustainability Where the Rest of the Company ...
Grice, Lisa, Ramboll, Corporate Sustainability Where the Rest of the Company ...Grice, Lisa, Ramboll, Corporate Sustainability Where the Rest of the Company ...
Grice, Lisa, Ramboll, Corporate Sustainability Where the Rest of the Company ...
 
Jay, Mike, US EPA, Regional Air Issues Roundtable, MECC, Kansas City
Jay, Mike, US EPA, Regional Air Issues Roundtable, MECC, Kansas CityJay, Mike, US EPA, Regional Air Issues Roundtable, MECC, Kansas City
Jay, Mike, US EPA, Regional Air Issues Roundtable, MECC, Kansas City
 

Recently uploaded

VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurVIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurSuhani Kapoor
 
Environmental Management System - ISO 14001:2015-
Environmental Management System      - ISO 14001:2015-Environmental Management System      - ISO 14001:2015-
Environmental Management System - ISO 14001:2015-Kawther MEKNI
 
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012sapnasaifi408
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...Suhani Kapoor
 
VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...Suhani Kapoor
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for fooddrsk203
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130Suhani Kapoor
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"syalehistoricalreview
 
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call GirlsHi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girlsssuser7cb4ff
 

Recently uploaded (20)

VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurVIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
 
Environmental Management System - ISO 14001:2015-
Environmental Management System      - ISO 14001:2015-Environmental Management System      - ISO 14001:2015-
Environmental Management System - ISO 14001:2015-
 
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
 
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi NcrCall Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
 
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
 
VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for food
 
Green Banking
Green Banking Green Banking
Green Banking
 
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
 
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
 
FULL ENJOY Call Girls In kashmiri gate (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In  kashmiri gate (Delhi) Call Us 9953056974FULL ENJOY Call Girls In  kashmiri gate (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In kashmiri gate (Delhi) Call Us 9953056974
 
Sustainable Packaging
Sustainable PackagingSustainable Packaging
Sustainable Packaging
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"s
 
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls ServicesGandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
 
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
 
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCREscort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
 
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call GirlsHi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
 

Nick Steinke, Tellevate, 10 Tips for Implementing an Effective Audit Program, Midwest Environmental Compliance Conference, Chicago, October 29-30, 2015

  • 1. Midwest Environmental Compliance Conference Chicago, IL – October 30, 2015 10 Tips for Implementing an Effective Audit Program
  • 2. Principal, Manager of Tellevate’s Compliance Services – Certified environmental and management systems auditor – Previous experience as a Regulatory Environmental Engineer – B.S. Manufacturing Engineering, Boston University Areas of expertise: • Environmental compliance program support • Air quality compliance • Multi-media compliance auditing • Management systems • Agency consultation and litigation support 10/30/2015 For the MECC – Chicago 2 Nick Steinke, P.E., CPEA, SFP
  • 3. 10/30/2015 For the MECC – Chicago 3 1. Obtain Management Support for Established Project Objectives Implementing an Effective Audit Program • Management Support is Key • Use Management Priorities to Establish Program Objectives • Program Objective Considerations • Compliance • Continual Improvement • Technical Assistance and Training
  • 4. 10/30/2015 For the MECC – Chicago 4 2. Define the Audit Scope and Protocol Implementing an Effective Audit Program • Regulatory Scope • Permits, Plans • EMS? • Protocol • Content: Questions? Checklists? Lists? • Citations/References • Updates
  • 5. 10/30/2015 For the MECC – Chicago 5 3. Include Root Cause Analysis and Other Key Metrics Implementing an Effective Audit Program • Root Cause Analysis • Map to EMS -> Business Processes • Prioritize Findings • Emergency | Regulatory | Policy | BMP • Environmental Media Area • Location (Facility? Building? Room?) • Responsible Organization/Program Area
  • 6. 10/30/2015 For the MECC – Chicago 6 4. Consider Technical Assistance and Training Implementing an Effective Audit Program • Plant Participation and Buy-In • Corrective and Preventive Action Timeframe • Cost-Effective • Promotes Open Communication • Supports Root Cause Analysis • Overall Program Success
  • 7. 10/30/2015 For the MECC – Chicago 7 5. Leverage Technology Implementing an Effective Audit Program • Data Collection • Reporting • Analysis • Framework for Consistency • Protocol Integration, Updates, Customization • Communication • Within the Organization • With Management
  • 8. 10/30/2015 For the MECC – Chicago 8 6. Establish Formal Reporting Process and Timeframe Implementing an Effective Audit Program • Report Content • Clear • Concise • Objective • Clearly Distinguish Findings and Recommendations • Timeframe, Corrective Action and Liability
  • 9. 10/30/2015 For the MECC – Chicago 9 7. Establish Formal Corrective Action Process Implementing an Effective Audit Program • Audit Findings -> Report -> Now What? • Timeframe • Liability of Long/Undefined Internal Process • Roles and Responsibilities • Corrective and Preventive Action (Address the Root Cause)
  • 10. 10/30/2015 For the MECC – Chicago 10 8. Use Qualified Auditors Implementing an Effective Audit Program • Credibility • Audit Quality • Technical Assistance • External Auditors • Benchmarking • Overcome Institutional Norms, Constraints • Stakeholder Perception • Community and Regulator Perception
  • 11. 10/30/2015 For the MECC – Chicago 11 9. Use Risk-Based Approach Implementing an Effective Audit Program • Resource Considerations v. Considerable Audit Protocol • Focus Auditor Resources on Issues with Greatest Risk • Environmental Impact and Regulatory Liability – What Else? • EMS Alignment Keeps Process Consistent with Organization Goals
  • 12. 10/30/2015 For the MECC – Chicago 12 10. Document Formal Audit Program Implementing an Effective Audit Program • Clearly Define and Communicate Program Objectives and Approach • Establish Accountability • Define Roles and Responsibilities • Audit Program Manual/Procedures