SlideShare a Scribd company logo
1 of 25
USER MANUAL




 Internet Version
     of iCAST
   Assessment
                                                                       1
Quantitative Safety and Health Assessment Model for IBS Construction
USER MANUAL




                                                                       2
Quantitative Safety and Health Assessment Model for IBS Construction
USER MANUAL




                                         To start using iCAST
                                         Internet Software you
                                         need to go to this
                                         address:


                                         icast.com.my


                                                                       3
Quantitative Safety and Health Assessment Model for IBS Construction
USER MANUAL




                                         Please click
                                         iCAST button to
                                         start using the
                                         software




                                                                       4
Quantitative Safety and Health Assessment Model for IBS Construction
USER MANUAL



                                You need to have User
                                ID and Password to use
                                iCAST.

                                Please contact admin to
                                get your User ID




                                                                       5
Quantitative Safety and Health Assessment Model for IBS Construction
USER MANUAL

       iCAST works with three (3) components
       of assessment
       • Management,
       • Document Check and
       • Site Opperatives

       Each component needs it own User ID.
       So for every single project assessment,
       three (3) User ID will be given to you.

       Please Contact Us to get your three (3)
       User ID and passwords.
                                                                       6
Quantitative Safety and Health Assessment Model for IBS Construction
USER MANUAL




                                                 ID and Project ID
                                                 are two (2) data set
                                                 up by the iCAST
                                                 maintainer.




                                                                        7
Quantitative Safety and Health Assessment Model for IBS Construction
USER MANUAL

                                                 First time login will
                                                 give you this form.
                                                 Please assign the
                                                 User ID to each
                                                 component of
                                                 assessment. This
                                                 option is available
                                                 under Job
                                                 Description




                                                                         8
Quantitative Safety and Health Assessment Model for IBS Construction
USER MANUAL


                                                      Fill all
                                                      information
                                                      required



                                                      Assign this ID
                                                      to a component
                                                      of assessment

                                                      Then click
                                                      Save
                                                                       9
Quantitative Safety and Health Assessment Model for IBS Construction
USER MANUAL



After clicking
Save button
you will get this
on your screen

Then click
Enter System




                                                                            10
     Quantitative Safety and Health Assessment Model for IBS Construction
USER MANUAL
After clicking Save button you will get this on your screen




                                                                              11
       Quantitative Safety and Health Assessment Model for IBS Construction
USER MANUAL




You can LOGOUT at
anytime you wish.

Data will be stored
based on your last
saved
                                                                          12
   Quantitative Safety and Health Assessment Model for IBS Construction
USER MANUAL

                                                      Since the component
You can edit the
                                                      of assessment chosen
information of your
                                                      was Site Operatives,
Current Status
                                                      so you are given Site
                                                      Operatives set of
                                                      questions




                                                                               13
        Quantitative Safety and Health Assessment Model for IBS Construction
USER MANUAL


                                                 Questions are
                                                 nested under
                                                 Critical Factors.

                                                 To get the
                                                 questions, you
                                                 need to click the
                                                 Critical Factor




                                                                       14
Quantitative Safety and Health Assessment Model for IBS Construction
USER MANUAL

                                                     Number of Critical
                                                     Factors for each
                                                     components are:

                                                     • Management = 35
                                                     • Document Check = 28
                                                     • Site Operatives = 24




                                                                          15
Quantitative Safety and Health Assessment Model for IBS Construction
USER MANUAL
                                                     To get the
                                                     questions, you
                                                     need to click the
                                                     Critical Factor

                                                     Critical Factors
                                                     are clickable by
                                                     sequence.

                                                     You must answer
                                                     all questions
                                                     nested under
                                                     Critical Factor 1
                                                     before can click
                                                     Critical Factor 2
                                                                         16
Quantitative Safety and Health Assessment Model for IBS Construction
USER MANUAL


                                                     Once you click
                                                     the first Critical
                                                     Factor, questions
                                                     nested under it
                                                     will appears.



                                                     All questions are
                                                     answered using
                                                     click


                                                                       17
Quantitative Safety and Health Assessment Model for IBS Construction
USER MANUAL

                                                      After finish
                                                      answering,
                                                      please click Save

                                                      Once you click
                                                      Save, all
                                                      answered will be
                                                      stored

                                                      Answers saved
                                                      cannot be edited




                                                                       18
Quantitative Safety and Health Assessment Model for IBS Construction
USER MANUAL
                                      Taking into consideration
                                      that site operatives are
                                      labor that cannot
                                      understand English
                                      properly therefore all
                                      questions for them are in
                                      Bahasa Melayu


                                      All questions under
                                      Management and
                                      Document Check are in
                                      English

                                                                       19
Quantitative Safety and Health Assessment Model for IBS Construction
USER MANUAL




                                      If you click Save button
                                      before finish answering,
                                      reminder will be given

                                      Only after you finish
                                      answering questions for
                                      that particular Critical
                                      Factor then you can click
                                      Save button
                                                                       20
Quantitative Safety and Health Assessment Model for IBS Construction
USER MANUAL

                                            After you finish
                                            answering questions
                                            for that particular
                                            component of
                                            assessment Safety
                                            Performance Index will
                                            be generated based
                                            on answer given.

                                            This is not valid
                                            because iCAST works
                                            by the integration of 3
                                            components

                                                                       21
Quantitative Safety and Health Assessment Model for IBS Construction
USER MANUAL
                                                             You must
                                                             answer all
                                                             components of
                                                             assessment to
                                                             get the actual
                                                             Safety Index


                                                             Safety Index
                                                             based on
                                                             single
                                                             component is
                                                             not valid




                                                                            22
Quantitative Safety and Health Assessment Model for IBS Construction
USER MANUAL




                                            This Safety
                                            Performance Index is
                                            result after finish
                                            answering
                                            Management
                                            Site Operatives




                                                                       23
Quantitative Safety and Health Assessment Model for IBS Construction
USER MANUAL




                                            This Safety
                                            Performance Index is
                                            after finish answering
                                            Management,
                                            Site Operatives
                                            Document Check




                                                                       24
Quantitative Safety and Health Assessment Model for IBS Construction
USER MANUAL




           End of
        iCAST Manual


                                                                       25
Quantitative Safety and Health Assessment Model for IBS Construction

More Related Content

Similar to iCAST User Manual

Directory of-infosec-assured-products
Directory of-infosec-assured-productsDirectory of-infosec-assured-products
Directory of-infosec-assured-products
bertram_wooster
 
Posecco clustering meeting
Posecco clustering meetingPosecco clustering meeting
Posecco clustering meeting
fcleary
 
Cyber_range_whitepaper_cbr_070716_FINAL_DRAFT
Cyber_range_whitepaper_cbr_070716_FINAL_DRAFTCyber_range_whitepaper_cbr_070716_FINAL_DRAFT
Cyber_range_whitepaper_cbr_070716_FINAL_DRAFT
Courtney Brock Rabon, MBA
 
Presentation on component based software engineering(cbse)
Presentation on component based software engineering(cbse)Presentation on component based software engineering(cbse)
Presentation on component based software engineering(cbse)
Chandan Thakur
 
Information Technology Security Techniques Evaluation Criteria For It Secrit...
Information Technology  Security Techniques Evaluation Criteria For It Secrit...Information Technology  Security Techniques Evaluation Criteria For It Secrit...
Information Technology Security Techniques Evaluation Criteria For It Secrit...
Vishnu Kesarwani
 

Similar to iCAST User Manual (20)

Directory of-infosec-assured-products
Directory of-infosec-assured-productsDirectory of-infosec-assured-products
Directory of-infosec-assured-products
 
Posecco clustering meeting
Posecco clustering meetingPosecco clustering meeting
Posecco clustering meeting
 
Cyber_range_whitepaper_cbr_070716_FINAL_DRAFT
Cyber_range_whitepaper_cbr_070716_FINAL_DRAFTCyber_range_whitepaper_cbr_070716_FINAL_DRAFT
Cyber_range_whitepaper_cbr_070716_FINAL_DRAFT
 
Presentation on component based software engineering(cbse)
Presentation on component based software engineering(cbse)Presentation on component based software engineering(cbse)
Presentation on component based software engineering(cbse)
 
Bamboo Continuous Integration Server - Brief
Bamboo Continuous Integration Server - BriefBamboo Continuous Integration Server - Brief
Bamboo Continuous Integration Server - Brief
 
Software Quality Assurance and Testing at NIIT
Software Quality Assurance and Testing at NIITSoftware Quality Assurance and Testing at NIIT
Software Quality Assurance and Testing at NIIT
 
PECB Webinar: ICS Security Management System using ISO 27001 Standard as the ...
PECB Webinar: ICS Security Management System using ISO 27001 Standard as the ...PECB Webinar: ICS Security Management System using ISO 27001 Standard as the ...
PECB Webinar: ICS Security Management System using ISO 27001 Standard as the ...
 
Reliability Instrumented System | Arrelic Insights
Reliability Instrumented System | Arrelic InsightsReliability Instrumented System | Arrelic Insights
Reliability Instrumented System | Arrelic Insights
 
Collaborative lifecycle development for Mobile Software
Collaborative lifecycle development for Mobile Software Collaborative lifecycle development for Mobile Software
Collaborative lifecycle development for Mobile Software
 
Collaborative lifecycle development for Mobile Software
Collaborative lifecycle development for Mobile SoftwareCollaborative lifecycle development for Mobile Software
Collaborative lifecycle development for Mobile Software
 
Embedded systems unit 3 gggggggggggggggg
Embedded systems unit 3 ggggggggggggggggEmbedded systems unit 3 gggggggggggggggg
Embedded systems unit 3 gggggggggggggggg
 
AN EXTENDED SECURITY MEASUREMENT FRAMEWORK FOR OPEN-SOURCE ENTERPRISE RESOURC...
AN EXTENDED SECURITY MEASUREMENT FRAMEWORK FOR OPEN-SOURCE ENTERPRISE RESOURC...AN EXTENDED SECURITY MEASUREMENT FRAMEWORK FOR OPEN-SOURCE ENTERPRISE RESOURC...
AN EXTENDED SECURITY MEASUREMENT FRAMEWORK FOR OPEN-SOURCE ENTERPRISE RESOURC...
 
Integrating security into Continuous Delivery
Integrating security into Continuous DeliveryIntegrating security into Continuous Delivery
Integrating security into Continuous Delivery
 
I017345357
I017345357I017345357
I017345357
 
A Review on Quality Assurance of Component- Based Software System
A Review on Quality Assurance of Component- Based Software SystemA Review on Quality Assurance of Component- Based Software System
A Review on Quality Assurance of Component- Based Software System
 
Fingerprint Based Voting
Fingerprint Based VotingFingerprint Based Voting
Fingerprint Based Voting
 
2010-02 Building Security Architecture Framework
2010-02 Building Security Architecture Framework 2010-02 Building Security Architecture Framework
2010-02 Building Security Architecture Framework
 
Iv2515741577
Iv2515741577Iv2515741577
Iv2515741577
 
Iv2515741577
Iv2515741577Iv2515741577
Iv2515741577
 
Information Technology Security Techniques Evaluation Criteria For It Secrit...
Information Technology  Security Techniques Evaluation Criteria For It Secrit...Information Technology  Security Techniques Evaluation Criteria For It Secrit...
Information Technology Security Techniques Evaluation Criteria For It Secrit...
 

Recently uploaded

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Recently uploaded (20)

How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 

iCAST User Manual

  • 1. USER MANUAL Internet Version of iCAST Assessment 1 Quantitative Safety and Health Assessment Model for IBS Construction
  • 2. USER MANUAL 2 Quantitative Safety and Health Assessment Model for IBS Construction
  • 3. USER MANUAL To start using iCAST Internet Software you need to go to this address: icast.com.my 3 Quantitative Safety and Health Assessment Model for IBS Construction
  • 4. USER MANUAL Please click iCAST button to start using the software 4 Quantitative Safety and Health Assessment Model for IBS Construction
  • 5. USER MANUAL You need to have User ID and Password to use iCAST. Please contact admin to get your User ID 5 Quantitative Safety and Health Assessment Model for IBS Construction
  • 6. USER MANUAL iCAST works with three (3) components of assessment • Management, • Document Check and • Site Opperatives Each component needs it own User ID. So for every single project assessment, three (3) User ID will be given to you. Please Contact Us to get your three (3) User ID and passwords. 6 Quantitative Safety and Health Assessment Model for IBS Construction
  • 7. USER MANUAL ID and Project ID are two (2) data set up by the iCAST maintainer. 7 Quantitative Safety and Health Assessment Model for IBS Construction
  • 8. USER MANUAL First time login will give you this form. Please assign the User ID to each component of assessment. This option is available under Job Description 8 Quantitative Safety and Health Assessment Model for IBS Construction
  • 9. USER MANUAL Fill all information required Assign this ID to a component of assessment Then click Save 9 Quantitative Safety and Health Assessment Model for IBS Construction
  • 10. USER MANUAL After clicking Save button you will get this on your screen Then click Enter System 10 Quantitative Safety and Health Assessment Model for IBS Construction
  • 11. USER MANUAL After clicking Save button you will get this on your screen 11 Quantitative Safety and Health Assessment Model for IBS Construction
  • 12. USER MANUAL You can LOGOUT at anytime you wish. Data will be stored based on your last saved 12 Quantitative Safety and Health Assessment Model for IBS Construction
  • 13. USER MANUAL Since the component You can edit the of assessment chosen information of your was Site Operatives, Current Status so you are given Site Operatives set of questions 13 Quantitative Safety and Health Assessment Model for IBS Construction
  • 14. USER MANUAL Questions are nested under Critical Factors. To get the questions, you need to click the Critical Factor 14 Quantitative Safety and Health Assessment Model for IBS Construction
  • 15. USER MANUAL Number of Critical Factors for each components are: • Management = 35 • Document Check = 28 • Site Operatives = 24 15 Quantitative Safety and Health Assessment Model for IBS Construction
  • 16. USER MANUAL To get the questions, you need to click the Critical Factor Critical Factors are clickable by sequence. You must answer all questions nested under Critical Factor 1 before can click Critical Factor 2 16 Quantitative Safety and Health Assessment Model for IBS Construction
  • 17. USER MANUAL Once you click the first Critical Factor, questions nested under it will appears. All questions are answered using click 17 Quantitative Safety and Health Assessment Model for IBS Construction
  • 18. USER MANUAL After finish answering, please click Save Once you click Save, all answered will be stored Answers saved cannot be edited 18 Quantitative Safety and Health Assessment Model for IBS Construction
  • 19. USER MANUAL Taking into consideration that site operatives are labor that cannot understand English properly therefore all questions for them are in Bahasa Melayu All questions under Management and Document Check are in English 19 Quantitative Safety and Health Assessment Model for IBS Construction
  • 20. USER MANUAL If you click Save button before finish answering, reminder will be given Only after you finish answering questions for that particular Critical Factor then you can click Save button 20 Quantitative Safety and Health Assessment Model for IBS Construction
  • 21. USER MANUAL After you finish answering questions for that particular component of assessment Safety Performance Index will be generated based on answer given. This is not valid because iCAST works by the integration of 3 components 21 Quantitative Safety and Health Assessment Model for IBS Construction
  • 22. USER MANUAL You must answer all components of assessment to get the actual Safety Index Safety Index based on single component is not valid 22 Quantitative Safety and Health Assessment Model for IBS Construction
  • 23. USER MANUAL This Safety Performance Index is result after finish answering Management Site Operatives 23 Quantitative Safety and Health Assessment Model for IBS Construction
  • 24. USER MANUAL This Safety Performance Index is after finish answering Management, Site Operatives Document Check 24 Quantitative Safety and Health Assessment Model for IBS Construction
  • 25. USER MANUAL End of iCAST Manual 25 Quantitative Safety and Health Assessment Model for IBS Construction