PROJECT HANDLED UNDER CIRIACO CORPORATION
CIRIACO CORPORATION (MAY 07, 2009-MAY 12, 2011)
CANSAGA BAY BRIDGE: CONNECTING MANDAUE AND CONSOLACION
CEBU A 640.3 METERS LONG BRIDGE AMOUNTING TO 2 BILLION
PESO PROJECT WAS AWARDED TO CIRIACO CORPORATION BY DPWH
AFTER A SUCCESSFUL PUBLIC BIDDING. THIS BRIDGE WAS OPENED
LAST 2010
DELFIN ALBANO BRIDGE: ALMOST HALF KILOMETER LONG BRIDGE
CONNECTING 4 PROVINCES OF ISABELA COST 650 MILLION PESOS
HAS MADE TRANSPORTATION CHEAPER AND LESS TRAVEL TIME FOR
ISABELA PEOPLE.
LULLUTAN BRIDGE: 500.6 LINEAL METER BRIDGE IN ISABELA
CROSSING CAGAYAN RIVER CONNECTING BARANGGAY CAMALAGUI
COST 772.924 MILLION PESOS HAVING A LOADING CAPACITY OF 20
TONS.
PROJECT HANDLED UNDER CIRIACO CORPORATION
CIRIACO CORPORATION (MAY 07, 2009-MAY 12, 2011)
MINDANAO-QUIRINO AVE. INTERCHANCGE (G-ARANETA): AN
INTERCHANGE PROJECT CONSISTING OF A FOUR-LANE UNDERPASS
ALONG QUEZON AVENUE CROSSING ARANETA AVENUE, AN AT-GRADE
CROSSING ABOVE THE UNDERPASS FOR ARANETA AVENUE, AND THE
WIDENING OF THE ADJOINING MARIBLO BRIDGE.
ELEVATED U-TURN C-5: IS A ROAD INTERCHANGE IN MAKATI, METRO
MANILA, THE PHILIPPINES. ORIGINALLY A REGULAR FOUR-WAY
INTERSECTION BETWEEN CIRCUMFERENCIAL ROAD 5 (C-5)
AND KALAYAAN AVENUE, IT WAS FITTED IN 2009 WITH THE
COUNTRY'S FIRST ELEVATED U-TURN SLOTS, BUILT IN AN ATTEMPT TO
SPEED UP TRAFFIC ALONG THE C-5 CORRIDOR.

More Related Content

What's hot

Centralia City Light Yelm Hydroelectric Project Presentation
Centralia City Light Yelm Hydroelectric Project PresentationCentralia City Light Yelm Hydroelectric Project Presentation
Centralia City Light Yelm Hydroelectric Project PresentationNisqually River Council
 
Arabian business rta-releases-new-image-of-dubai-
Arabian business rta-releases-new-image-of-dubai-Arabian business rta-releases-new-image-of-dubai-
Arabian business rta-releases-new-image-of-dubai-Prashant Shah
 
Afghan Wireless Celebrates Successful Street Sign Project
Afghan Wireless Celebrates Successful Street Sign ProjectAfghan Wireless Celebrates Successful Street Sign Project
Afghan Wireless Celebrates Successful Street Sign ProjectAfghan Wireless
 
Kalabagh dam update
Kalabagh dam updateKalabagh dam update
Kalabagh dam updateFaizanAli244
 
Infc of infc slideshow april 7 (002)
Infc of infc slideshow april 7 (002)Infc of infc slideshow april 7 (002)
Infc of infc slideshow april 7 (002)jonathan st-pierre
 
20210101 sdg4 med action plan en
20210101 sdg4 med action plan en20210101 sdg4 med action plan en
20210101 sdg4 med action plan enMario Dogliani
 
Towson Revitalization Slideshow
Towson Revitalization SlideshowTowson Revitalization Slideshow
Towson Revitalization SlideshowBurnerv2
 
Kalabagh dam
Kalabagh damKalabagh dam
Kalabagh damamna zia
 
Kalabaag dam
Kalabaag damKalabaag dam
Kalabaag damARM101
 
Issue of Kalabagh Dam in Pakistan
Issue of Kalabagh Dam in PakistanIssue of Kalabagh Dam in Pakistan
Issue of Kalabagh Dam in PakistanBilal Mirani
 
Ferryservicesummary
FerryservicesummaryFerryservicesummary
FerryservicesummaryRose Klein
 
Bhopal shivam pandey
Bhopal shivam pandeyBhopal shivam pandey
Bhopal shivam pandeyshivam pandey
 
Councilman Menor Shipping Container
Councilman Menor Shipping ContainerCouncilman Menor Shipping Container
Councilman Menor Shipping ContainerHonolulu Civil Beat
 
Kalabagh damm
Kalabagh dammKalabagh damm
Kalabagh dammpakisran
 
Mackay Bluewater Trail Projects
Mackay Bluewater Trail Projects Mackay Bluewater Trail Projects
Mackay Bluewater Trail Projects guest387c76
 
Waterfront for All Summit: Workshop 2; Access: Getting to, across and into th...
Waterfront for All Summit: Workshop 2; Access: Getting to, across and into th...Waterfront for All Summit: Workshop 2; Access: Getting to, across and into th...
Waterfront for All Summit: Workshop 2; Access: Getting to, across and into th...Waterfront for All
 
diamir bhasha Dam
diamir bhasha Damdiamir bhasha Dam
diamir bhasha DamMir Haris
 
30945 selly oak leaflet november lres
30945 selly oak leaflet november lres30945 selly oak leaflet november lres
30945 selly oak leaflet november lresMichelle Dudson
 
Kalabagh Dam. Dam For Pakistan's Future!
Kalabagh Dam. Dam For Pakistan's Future!Kalabagh Dam. Dam For Pakistan's Future!
Kalabagh Dam. Dam For Pakistan's Future!Sherdil Amjad
 

What's hot (20)

Centralia City Light Yelm Hydroelectric Project Presentation
Centralia City Light Yelm Hydroelectric Project PresentationCentralia City Light Yelm Hydroelectric Project Presentation
Centralia City Light Yelm Hydroelectric Project Presentation
 
Arabian business rta-releases-new-image-of-dubai-
Arabian business rta-releases-new-image-of-dubai-Arabian business rta-releases-new-image-of-dubai-
Arabian business rta-releases-new-image-of-dubai-
 
Afghan Wireless Celebrates Successful Street Sign Project
Afghan Wireless Celebrates Successful Street Sign ProjectAfghan Wireless Celebrates Successful Street Sign Project
Afghan Wireless Celebrates Successful Street Sign Project
 
Kalabagh dam update
Kalabagh dam updateKalabagh dam update
Kalabagh dam update
 
Infc of infc slideshow april 7 (002)
Infc of infc slideshow april 7 (002)Infc of infc slideshow april 7 (002)
Infc of infc slideshow april 7 (002)
 
20210101 sdg4 med action plan en
20210101 sdg4 med action plan en20210101 sdg4 med action plan en
20210101 sdg4 med action plan en
 
Towson Revitalization Slideshow
Towson Revitalization SlideshowTowson Revitalization Slideshow
Towson Revitalization Slideshow
 
Kalabagh dam
Kalabagh damKalabagh dam
Kalabagh dam
 
Kalabaag dam
Kalabaag damKalabaag dam
Kalabaag dam
 
Issue of Kalabagh Dam in Pakistan
Issue of Kalabagh Dam in PakistanIssue of Kalabagh Dam in Pakistan
Issue of Kalabagh Dam in Pakistan
 
Ferryservicesummary
FerryservicesummaryFerryservicesummary
Ferryservicesummary
 
Bhopal shivam pandey
Bhopal shivam pandeyBhopal shivam pandey
Bhopal shivam pandey
 
Councilman Menor Shipping Container
Councilman Menor Shipping ContainerCouncilman Menor Shipping Container
Councilman Menor Shipping Container
 
Kalabagh damm
Kalabagh dammKalabagh damm
Kalabagh damm
 
Mackay Bluewater Trail Projects
Mackay Bluewater Trail Projects Mackay Bluewater Trail Projects
Mackay Bluewater Trail Projects
 
Waterfront for All Summit: Workshop 2; Access: Getting to, across and into th...
Waterfront for All Summit: Workshop 2; Access: Getting to, across and into th...Waterfront for All Summit: Workshop 2; Access: Getting to, across and into th...
Waterfront for All Summit: Workshop 2; Access: Getting to, across and into th...
 
diamir bhasha Dam
diamir bhasha Damdiamir bhasha Dam
diamir bhasha Dam
 
30945 selly oak leaflet november lres
30945 selly oak leaflet november lres30945 selly oak leaflet november lres
30945 selly oak leaflet november lres
 
DRCOG 2008 RR Sept Oct
DRCOG 2008 RR Sept OctDRCOG 2008 RR Sept Oct
DRCOG 2008 RR Sept Oct
 
Kalabagh Dam. Dam For Pakistan's Future!
Kalabagh Dam. Dam For Pakistan's Future!Kalabagh Dam. Dam For Pakistan's Future!
Kalabagh Dam. Dam For Pakistan's Future!
 

Similar to project portfolio - CC

Preliminary plans for pumped storage at Columbia Gorge
Preliminary plans for pumped storage at Columbia GorgePreliminary plans for pumped storage at Columbia Gorge
Preliminary plans for pumped storage at Columbia GorgeNate Sandvig
 
Akhori dam off channel storage description and its layout
Akhori dam off channel storage description and its layoutAkhori dam off channel storage description and its layout
Akhori dam off channel storage description and its layoutmuk7971
 
Field visit report of Moragahakanda reservoir project
Field visit report of Moragahakanda reservoir project Field visit report of Moragahakanda reservoir project
Field visit report of Moragahakanda reservoir project Deshan Arachchige
 
Kala bagh dam by engr sabir rehman
Kala bagh dam by engr sabir rehmanKala bagh dam by engr sabir rehman
Kala bagh dam by engr sabir rehmansabir rehman
 
Marina barrage
Marina barrageMarina barrage
Marina barragelohbingsen
 
kala bagh dam
kala bagh damkala bagh dam
kala bagh dammuneeb777
 
Nov 21 2018 Bathurst Quay Update Presentation
Nov 21 2018 Bathurst Quay Update Presentation Nov 21 2018 Bathurst Quay Update Presentation
Nov 21 2018 Bathurst Quay Update Presentation Waterfront for All
 
Case Study No. 10-Construction of Box Culverts in the Philippines
Case Study No. 10-Construction of Box Culverts in the PhilippinesCase Study No. 10-Construction of Box Culverts in the Philippines
Case Study No. 10-Construction of Box Culverts in the Philippinesharoldtaylor1113
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli SealinkDesignTeja
 
Bandra worli sealink
Bandra worli sealinkBandra worli sealink
Bandra worli sealinkAmit Kumar
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealinkpeepkya
 
Three gorges dam project
Three gorges dam projectThree gorges dam project
Three gorges dam projectNoor Fatima
 
Infra Presentation as of Sep 28, 2014
Infra Presentation as of Sep 28, 2014Infra Presentation as of Sep 28, 2014
Infra Presentation as of Sep 28, 2014Zaldy Santillan
 

Similar to project portfolio - CC (20)

Preliminary plans for pumped storage at Columbia Gorge
Preliminary plans for pumped storage at Columbia GorgePreliminary plans for pumped storage at Columbia Gorge
Preliminary plans for pumped storage at Columbia Gorge
 
Small dam projects in pakistan
Small dam projects in pakistanSmall dam projects in pakistan
Small dam projects in pakistan
 
Akhori dam off channel storage description and its layout
Akhori dam off channel storage description and its layoutAkhori dam off channel storage description and its layout
Akhori dam off channel storage description and its layout
 
Bakun
BakunBakun
Bakun
 
Field visit report of Moragahakanda reservoir project
Field visit report of Moragahakanda reservoir project Field visit report of Moragahakanda reservoir project
Field visit report of Moragahakanda reservoir project
 
NELSAP NEWS APRIL 2021.pdf
NELSAP NEWS APRIL 2021.pdfNELSAP NEWS APRIL 2021.pdf
NELSAP NEWS APRIL 2021.pdf
 
SE4ALL Doc Fin
SE4ALL Doc FinSE4ALL Doc Fin
SE4ALL Doc Fin
 
Kala bagh dam by engr sabir rehman
Kala bagh dam by engr sabir rehmanKala bagh dam by engr sabir rehman
Kala bagh dam by engr sabir rehman
 
Marina barrage
Marina barrageMarina barrage
Marina barrage
 
Zeshan khan
Zeshan khanZeshan khan
Zeshan khan
 
kala bagh dam
kala bagh damkala bagh dam
kala bagh dam
 
Nov 21 2018 Bathurst Quay Update Presentation
Nov 21 2018 Bathurst Quay Update Presentation Nov 21 2018 Bathurst Quay Update Presentation
Nov 21 2018 Bathurst Quay Update Presentation
 
OmanPower&Water2017_Brochure-2
OmanPower&Water2017_Brochure-2OmanPower&Water2017_Brochure-2
OmanPower&Water2017_Brochure-2
 
Case Study No. 10-Construction of Box Culverts in the Philippines
Case Study No. 10-Construction of Box Culverts in the PhilippinesCase Study No. 10-Construction of Box Culverts in the Philippines
Case Study No. 10-Construction of Box Culverts in the Philippines
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealink
 
Bandra worli sealink
Bandra worli sealinkBandra worli sealink
Bandra worli sealink
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealink
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealink
 
Three gorges dam project
Three gorges dam projectThree gorges dam project
Three gorges dam project
 
Infra Presentation as of Sep 28, 2014
Infra Presentation as of Sep 28, 2014Infra Presentation as of Sep 28, 2014
Infra Presentation as of Sep 28, 2014
 

project portfolio - CC

  • 1. PROJECT HANDLED UNDER CIRIACO CORPORATION CIRIACO CORPORATION (MAY 07, 2009-MAY 12, 2011) CANSAGA BAY BRIDGE: CONNECTING MANDAUE AND CONSOLACION CEBU A 640.3 METERS LONG BRIDGE AMOUNTING TO 2 BILLION PESO PROJECT WAS AWARDED TO CIRIACO CORPORATION BY DPWH AFTER A SUCCESSFUL PUBLIC BIDDING. THIS BRIDGE WAS OPENED LAST 2010 DELFIN ALBANO BRIDGE: ALMOST HALF KILOMETER LONG BRIDGE CONNECTING 4 PROVINCES OF ISABELA COST 650 MILLION PESOS HAS MADE TRANSPORTATION CHEAPER AND LESS TRAVEL TIME FOR ISABELA PEOPLE. LULLUTAN BRIDGE: 500.6 LINEAL METER BRIDGE IN ISABELA CROSSING CAGAYAN RIVER CONNECTING BARANGGAY CAMALAGUI COST 772.924 MILLION PESOS HAVING A LOADING CAPACITY OF 20 TONS.
  • 2. PROJECT HANDLED UNDER CIRIACO CORPORATION CIRIACO CORPORATION (MAY 07, 2009-MAY 12, 2011) MINDANAO-QUIRINO AVE. INTERCHANCGE (G-ARANETA): AN INTERCHANGE PROJECT CONSISTING OF A FOUR-LANE UNDERPASS ALONG QUEZON AVENUE CROSSING ARANETA AVENUE, AN AT-GRADE CROSSING ABOVE THE UNDERPASS FOR ARANETA AVENUE, AND THE WIDENING OF THE ADJOINING MARIBLO BRIDGE. ELEVATED U-TURN C-5: IS A ROAD INTERCHANGE IN MAKATI, METRO MANILA, THE PHILIPPINES. ORIGINALLY A REGULAR FOUR-WAY INTERSECTION BETWEEN CIRCUMFERENCIAL ROAD 5 (C-5) AND KALAYAAN AVENUE, IT WAS FITTED IN 2009 WITH THE COUNTRY'S FIRST ELEVATED U-TURN SLOTS, BUILT IN AN ATTEMPT TO SPEED UP TRAFFIC ALONG THE C-5 CORRIDOR.