2. SUMMARY
Construction of an out-patient health unit at Ngandu
– Mukono District, Uganda.
Start date: August 2014
Completion date: July 2015
Estimated cost – Ushs. 600 million
Funds raised by Rotarians – Ushs. 200 million
Funding gap _ Ushs. 400 million
3. BACKGROUND:
The Rotary Club of Kampala is the oldest Rotary Club
in Uganda.
Founded in May 1957, it meets at Grand Imperial
hotel.
The club is a member of Rotary International, the
world’s largest humanitarian organization.
4. Background
Rotary International has for the last 107 years been
dedicated to helping the world’s under privileged
people in the provision of:-
Health,
Education,
Economic livelihoods;
Promotion of Peace and World Understanding.
5. Background
The Rotary Club of Kampala has carried out a wide
range of community service projects in various parts of
the country, notably:
The Mwana mugimu project at Mulago Hospital.
A power back-up system at Nsambya hospital
An HIV/AIDS patients Rehabilitation Centre at
Lyantonde (salaama shield);
Uganda Heart Institute and many other projects.
6. THE ROTARY HOSPITAL PROJECT
Rtn George Kasedde Mukasa;
donated the land.
It all started over 10 years ago
when Rotarian George Kasedde
Mukasa donated 10 Acres of
Land in Mukono Municipal
Council for the Club to
implement a community service
project.
The Club has decided to build a
fully-fledged hospital, complete
with an out-patient unit, in-
patient unit with male, female
and children wards.
7. THE ROTARY HOSPITAL PROJECT
Rtn Prof Emmanuel Tumusiime
Mutebile, Lauched the Hospital
Construction
The construction of the hospital
shall be phased, starting with the
out-patient unit that is estimated to
cost UGX. 600m.
The out-patient unit comprises of a
minor Operating Theatre, Treatment
Rooms (dental, eye and general
clinics), Offices, a waiting area and
stores.
Construction work was flagged off
by the Governor, Bank of Uganda
Emmanuel Tumusiime Mutebile on
26th July 2014.
The Unit is expected to be completed
by June 2015.
8. THE COST STRUCTURE
The BOQs are broken down as follows:
1. Preliminaries and conditions of contract:
Ushs 7,573,000
2. Foundation, up to Ground Floor slab:
Ushs 129,747,800
3. Walling up to wall-plate level:
Ushs 95,095,000
4. Roofing, including ceiling:
Ushs 95,095,000
9. THE COST STRUCTURE
4. Finishes, doors and windows:
Ushs 189,213,740
5. Plumbing, Electricals and drainage Installations:
Ushs 63,444,080
6. Contingency:
Ushs 51,661,880
Total Cost:
Ushs 631,830,500
10. PARTNERSHIPS
The Rotary Club of Kampala welcomes partnerships
with individuals, institutions and Rotary Clubs in any
of the following areas:
1. Construction of the hospital structures
2. Equipping of the Hospital with medical equipment.
3. Management and running of the Hospital.
4. Provision of medical expertise, training and any
requisite services.