SlideShare a Scribd company logo
1 of 13
UOP OPS 571 Final Exam Guide (New, 2018)
Check this A+ tutorial guideline at
http://www.ops571assignment.com/ops-
571-latest/ops-571-final-exam-guide-(new,-
2018)-latest
For more classes visit
http://www.ops571assignment.com
OPS 571 Final Exam Guide (New, 2018)
1. Which of the following is a measure of
operations and supply management efficiency
used by Wall Street?
Dividend payout ratio
Receivable turnover
Current ratio
Financial leverage
Earnings per share growth
2. An activity-system map is which of the
following?
A diagram that shows how a company's strategy
is delivered to customers
A timeline displaying major planned events
A network guide to route airlines
A facility layout schematic noting what is done
where
A listing of activities that make up a project
3. Which of the following is a total measure of
productivity?
Output/Materials
Output/Labor
Output/(Labor + Capital + Energy)
All of these
Output/Inputs
4. Which of the following approaches to service
design is characterized by having the customer
take a greater role in the production of the
service?
Quality approach
Self-service approach
Production-line approach
Do-it-yourself approach
Personal-attention approach
5. Which of the following basic types of
production layout formats is one that has similar
equipment or functions are grouped together?
Work center layout
Production line layout
Group technology layout
Manufacturing cell layout
Assembly line layout
6. Which of the following is a characteristic that
can be used to guide the design of service
systems?
Services are all similar.
Services cannot be inventoried.
Services businesses are inherently
entrepreneurial.
Even service businesses have internal services.
Quality work means quality service.
7. An advantage of a make-to-stock process is
which of the following?
All units of output are unique.
It features rapid delivery of a standard product.
It combines the best features of other processes.
It responds directly to customer orders.
It allows the firm to avoid inventory costs.
8. Getting an autograph from a famous person
might involve standing in which type of queuing
line structure?
Single channel, single phase
None of these
Single channel, multiphase
Multichannel, multiphase
Multichannel, single phase
9. For an infinite queuing situation, if the arrival
rate for loading trucks is 5 trucks per hour, what
is the mean time between arrivals?
2.5 hours
5 hours
0.2 hour
0.1 hour
None of these
10. An assumption of learning curve theory is
which of the following?
Organizational learning is not included in
learning theory.
The time required to do a task will vary
randomly each time the task is repeated.
Unit time will decrease at an increasing rate.
Learning will not be transferred from one
worker to the next.
The reduction in unit time will follow a
predictable pattern.
11. A company's production process has an 80
percent learning curve rate. The process has
produced 1,000 units to date. A process
refinement is estimated to allow a future
learning curve rate for the identical product of
75 percent. However, the initial unit made using
the new process will take the same amount of
time as the initial unit produced using the old
process. At what point, using the new process,
will the production rate exceed the production
rate achieved by the old process?
Before the 100th unit
Before the 120th unit
Before the 80th unit
Before the 50th unit
Before the 250th unit
12. For which of the following should we use a p-
chart to monitor process quality?
Grades in a freshman "pass/fail" course
Temperatures in a classroom
The dimensions of brick entering a kiln
The weight of fluid in a container
Lengths of boards cut in a mill
13. You have been called in as a consultant to set
up a Kanban control system. The first thing to do
is to determine the number of Kanban card sets
needed. Your research shows that the expected
demand during lead time for a particular
component is 150 per hour. You estimate the
safety stock should be set at 25 percent of the
demand during lead time. The tote trays used as
containers can hold 8 units of stock, and the lead
time it takes to replenish an order is 2 hours.
Which of the following is the number of Kanban
card sets necessary to support this situation?
42
68
89
47
94
14. Which of the following is a fixed-time-period
inventory model?
Just-in-time model
The EOQ model
Periodic system model
The Q model
The least cost method
15. A company is planning for its financing needs
and uses the basic fixed-order-quantity
inventory model. Which of the following is the
total cost (TC) of the inventory given an annual
demand of 10,000, setup cost of $32, a holding
cost per unit per year of $4, an EOQ of 400 units,
and a cost per unit of inventory of $150?
None of these
$1,501,600
$1,498,200
$499,313
$500,687
A. $1,501,600
Q = 400. Average Inventory = Q/2 = 200. Holding
cost/year = $4. Thus, annual holding cost = $800.
Annual set-up cost = 10,000/400 = 25 x $32 =
800. Demand x cost per unit = 10,000 x $150 =
1,500,000. Hence, TC = $1,500,000 + 800 + 800 =
$1,501,600.
16. Which of the following is a principle of work
center scheduling?
Reschedule every day.
Once started, a job can and should be finished
even if unavoidably interrupted.
Assign the first worker to all of the days that
require staffing.
Achieve certainty in standards and routings.
Give work centers less to do then their
maximum.
17. Which of the following is a "focusing step" of
Dr. Eli Goldratt's theory of constraints?
Identify system constraints.
Support system constraints.
If you have no system constraints, make some.
Reduce system constraints.
Reinforce system constraints.
18. In designing a lean production facility layout,
a designer should do which of the following?
Locate flexible workstations offline.
Balance capacity using job shop analysis.
Design for work flow balance.
Always keep operations on a single floor of the
factory.
Link operations through a push system.
19. A simple project listing of five activities and
their respective time estimates are presented
here:
Using CPM, which activities make up the critical
path?
None of these
A, B, D, E
A, D, E
A, C, B, D, E
A, C, D, E
20. A company must perform a maintenance
project consisting of seven activities. The
activities, their predecessors, and their
respective time estimates are presented here:
Using CPM, which activities make up the critical
path?
A, C, B, F, E
None of these
A, B, D, F, G
A, C, E, F, G
A, D, E
21. Which of the following is not a problem
definition tool from the operations consulting
tool kit?
Issue trees
Five forces model
Computer simulation
Customer surveys
Gap analysis
22. Which of the following is not one of the basic
types of forecasting?
Simulation
Causal relationships
Qualitative
Time series analysis
Force field analysis
23. A company has actual unit demand for three
consecutive years of 124, 126, and 135. The
respective forecasts for the same three years are
120, 120, and 130. Which of the following is the
resulting MAD value that can be computed from
these data?
3
1
15
123
5
C MAD = ABS[(124 - 120) + (126 - 120) + (135 -
130)]/3 = 15/3 = 5.
24. From an operational perspective, yield
management is most effective under which of the
following circumstances?
Inventory is perishable.
The firm doing yield management is very
profitable.
Demand cannot be segmented by customer.
Fixed costs are low, and variable costs are high.
The customer is a "captive" of the system.
25. What is transaction processing?
The decision support system used to efficiently
handle multiple transactions
The movement of paperwork through a system
using a decision tree
The scheduling of machinery to minimize time
and scrap
The posting and tracking of the detailed
activities of a business
26. If the actual output of a piece of equipment
during an hour is 500 units and its best
operating level is at a rate of 400 units per hour,
which of the following is the capacity utilization
rate?
0.75
1.00
1.25
1.33
100
27.Which of the following is an input to the
master production schedule (MPS)?
Planned order schedules
The bill of materials
The aggregate plan
The exception report
Inventory records file
28. Which of the following is considered a
primary report in an MRP system?
Cycle counting reports
Performance reports
Planned order schedules
Planning reports
Exception reports
29. The centroid method for plant location uses
which of the following data?
Probabilities and payoffs
Correlation matrix of existing facilities
Volume of goods to be shipped between existing
points
Inbound transportation costs
Transport times between facilities
30. In Hau Lee's uncertainty framework to
classify supply chains, a supply chain for
functional products with an evolving supply
process is called which of the following?
Responsive
Forward looking
Efficient
Risk hedging
Agile

More Related Content

What's hot

Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)beauti123157
 
Which of the following approaches to service design is characterized by havin...
Which of the following approaches to service design is characterized by havin...Which of the following approaches to service design is characterized by havin...
Which of the following approaches to service design is characterized by havin...ramuaa128
 
Which of the following is a focusing step of dr
Which of the following is a focusing step of drWhich of the following is a focusing step of dr
Which of the following is a focusing step of drramuaa129
 
Which of the following is a characteristic that can be used to guide the desi...
Which of the following is a characteristic that can be used to guide the desi...Which of the following is a characteristic that can be used to guide the desi...
Which of the following is a characteristic that can be used to guide the desi...ramuaa128
 
A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...yearstart1
 
Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...ramuaa129
 
Getting an autograph from a famous person might involve standing in which typ...
Getting an autograph from a famous person might involve standing in which typ...Getting an autograph from a famous person might involve standing in which typ...
Getting an autograph from a famous person might involve standing in which typ...ramuaa127
 
In designing a lean production facility layout, a designer should do which of...
In designing a lean production facility layout, a designer should do which of...In designing a lean production facility layout, a designer should do which of...
In designing a lean production facility layout, a designer should do which of...ramuaa127
 
Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...ramuaa130
 
What is transaction processing
What is transaction processingWhat is transaction processing
What is transaction processingramuaa128
 
Which of the following is considered a primary report in an mrp system
Which of the following is considered a primary report in an mrp systemWhich of the following is considered a primary report in an mrp system
Which of the following is considered a primary report in an mrp systemramuaa130
 
Which of the following is a principle of work center scheduling
Which of the following is a principle of work center schedulingWhich of the following is a principle of work center scheduling
Which of the following is a principle of work center schedulingramuaa129
 
For which of the following should we use a p chart to monitor process quality
For which of the following should we use a p chart to monitor process qualityFor which of the following should we use a p chart to monitor process quality
For which of the following should we use a p chart to monitor process qualityyearstart2
 
A company must perform a maintenance project consisting of seven activities
A company must perform a maintenance project consisting of seven activitiesA company must perform a maintenance project consisting of seven activities
A company must perform a maintenance project consisting of seven activitiesyearstart1
 
An advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingAn advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingyearstart2
 

What's hot (15)

Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)
 
Which of the following approaches to service design is characterized by havin...
Which of the following approaches to service design is characterized by havin...Which of the following approaches to service design is characterized by havin...
Which of the following approaches to service design is characterized by havin...
 
Which of the following is a focusing step of dr
Which of the following is a focusing step of drWhich of the following is a focusing step of dr
Which of the following is a focusing step of dr
 
Which of the following is a characteristic that can be used to guide the desi...
Which of the following is a characteristic that can be used to guide the desi...Which of the following is a characteristic that can be used to guide the desi...
Which of the following is a characteristic that can be used to guide the desi...
 
A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...
 
Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...
 
Getting an autograph from a famous person might involve standing in which typ...
Getting an autograph from a famous person might involve standing in which typ...Getting an autograph from a famous person might involve standing in which typ...
Getting an autograph from a famous person might involve standing in which typ...
 
In designing a lean production facility layout, a designer should do which of...
In designing a lean production facility layout, a designer should do which of...In designing a lean production facility layout, a designer should do which of...
In designing a lean production facility layout, a designer should do which of...
 
Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...
 
What is transaction processing
What is transaction processingWhat is transaction processing
What is transaction processing
 
Which of the following is considered a primary report in an mrp system
Which of the following is considered a primary report in an mrp systemWhich of the following is considered a primary report in an mrp system
Which of the following is considered a primary report in an mrp system
 
Which of the following is a principle of work center scheduling
Which of the following is a principle of work center schedulingWhich of the following is a principle of work center scheduling
Which of the following is a principle of work center scheduling
 
For which of the following should we use a p chart to monitor process quality
For which of the following should we use a p chart to monitor process qualityFor which of the following should we use a p chart to monitor process quality
For which of the following should we use a p chart to monitor process quality
 
A company must perform a maintenance project consisting of seven activities
A company must perform a maintenance project consisting of seven activitiesA company must perform a maintenance project consisting of seven activities
A company must perform a maintenance project consisting of seven activities
 
An advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingAn advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the following
 

Similar to Uop ops 571 final exam guide (new, 2018)

For an infinite queuing situation, if the arrival rate for loading trucks is ...
For an infinite queuing situation, if the arrival rate for loading trucks is ...For an infinite queuing situation, if the arrival rate for loading trucks is ...
For an infinite queuing situation, if the arrival rate for loading trucks is ...ramuaa126
 
For an infinite queuing situation, if the arrival rate for loading trucks is ...
For an infinite queuing situation, if the arrival rate for loading trucks is ...For an infinite queuing situation, if the arrival rate for loading trucks is ...
For an infinite queuing situation, if the arrival rate for loading trucks is ...yearstart2
 
For which of the following should we use a p chart to monitor process quality
For which of the following should we use a p chart to monitor process qualityFor which of the following should we use a p chart to monitor process quality
For which of the following should we use a p chart to monitor process qualityramuaa126
 
In hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chainsIn hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chainsramuaa127
 
Which of the following is an input to the master production schedule (mps)
Which of the following is an input to the master production schedule (mps)Which of the following is an input to the master production schedule (mps)
Which of the following is an input to the master production schedule (mps)ramuaa130
 
A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...ramuaa124
 
Ops 571 final exam guide (new, 2018) which of the following is a principle of...
Ops 571 final exam guide (new, 2018) which of the following is a principle of...Ops 571 final exam guide (new, 2018) which of the following is a principle of...
Ops 571 final exam guide (new, 2018) which of the following is a principle of...ramuq12345
 
The centroid method for plant location uses which of the following data
The centroid method for plant location uses which of the following dataThe centroid method for plant location uses which of the following data
The centroid method for plant location uses which of the following dataramuaa128
 
A company must perform a maintenance project consisting of seven activities
A company must perform a maintenance project consisting of seven activitiesA company must perform a maintenance project consisting of seven activities
A company must perform a maintenance project consisting of seven activitiesramuaa124
 
An advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingAn advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingramuaa126
 
From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...ramuaa127
 
An assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the followingAn assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the followingyearstart2
 
An assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the followingAn assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the followingramuaa126
 
In hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chainsIn hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chainsjohann11371
 

Similar to Uop ops 571 final exam guide (new, 2018) (14)

For an infinite queuing situation, if the arrival rate for loading trucks is ...
For an infinite queuing situation, if the arrival rate for loading trucks is ...For an infinite queuing situation, if the arrival rate for loading trucks is ...
For an infinite queuing situation, if the arrival rate for loading trucks is ...
 
For an infinite queuing situation, if the arrival rate for loading trucks is ...
For an infinite queuing situation, if the arrival rate for loading trucks is ...For an infinite queuing situation, if the arrival rate for loading trucks is ...
For an infinite queuing situation, if the arrival rate for loading trucks is ...
 
For which of the following should we use a p chart to monitor process quality
For which of the following should we use a p chart to monitor process qualityFor which of the following should we use a p chart to monitor process quality
For which of the following should we use a p chart to monitor process quality
 
In hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chainsIn hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chains
 
Which of the following is an input to the master production schedule (mps)
Which of the following is an input to the master production schedule (mps)Which of the following is an input to the master production schedule (mps)
Which of the following is an input to the master production schedule (mps)
 
A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...
 
Ops 571 final exam guide (new, 2018) which of the following is a principle of...
Ops 571 final exam guide (new, 2018) which of the following is a principle of...Ops 571 final exam guide (new, 2018) which of the following is a principle of...
Ops 571 final exam guide (new, 2018) which of the following is a principle of...
 
The centroid method for plant location uses which of the following data
The centroid method for plant location uses which of the following dataThe centroid method for plant location uses which of the following data
The centroid method for plant location uses which of the following data
 
A company must perform a maintenance project consisting of seven activities
A company must perform a maintenance project consisting of seven activitiesA company must perform a maintenance project consisting of seven activities
A company must perform a maintenance project consisting of seven activities
 
An advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingAn advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the following
 
From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...
 
An assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the followingAn assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the following
 
An assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the followingAn assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the following
 
In hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chainsIn hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chains
 

More from shyaminfo00

Uop str 581 week 6 individual capstone final exam part 3 new
Uop str 581 week 6 individual capstone final exam part 3 newUop str 581 week 6 individual capstone final exam part 3 new
Uop str 581 week 6 individual capstone final exam part 3 newshyaminfo00
 
Uop str 581 week 4 individual capstone final exam part 2 new
Uop str 581 week 4 individual capstone final exam part 2 newUop str 581 week 4 individual capstone final exam part 2 new
Uop str 581 week 4 individual capstone final exam part 2 newshyaminfo00
 
Uop qrb 501 week 6 signature assignment new
Uop qrb 501 week 6 signature assignment newUop qrb 501 week 6 signature assignment new
Uop qrb 501 week 6 signature assignment newshyaminfo00
 
Uop qrb 501 final exam guide new
Uop qrb 501 final exam guide newUop qrb 501 final exam guide new
Uop qrb 501 final exam guide newshyaminfo00
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017shyaminfo00
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newshyaminfo00
 
Uop qrb 501 week 6 signature assignment new
Uop qrb 501 week 6 signature assignment newUop qrb 501 week 6 signature assignment new
Uop qrb 501 week 6 signature assignment newshyaminfo00
 
Uop qrb 501 final exam guide new
Uop qrb 501 final exam guide newUop qrb 501 final exam guide new
Uop qrb 501 final exam guide newshyaminfo00
 
Uop ops 571 week 6 signature assignment (2 papers) new
Uop ops 571 week 6 signature assignment (2 papers) newUop ops 571 week 6 signature assignment (2 papers) new
Uop ops 571 week 6 signature assignment (2 papers) newshyaminfo00
 
Uop ops 571 week 5 team six sigma yellow belt training part ii (2 ppt) new
Uop ops 571 week 5 team six sigma yellow belt training part ii (2 ppt) newUop ops 571 week 5 team six sigma yellow belt training part ii (2 ppt) new
Uop ops 571 week 5 team six sigma yellow belt training part ii (2 ppt) newshyaminfo00
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017shyaminfo00
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newshyaminfo00
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)shyaminfo00
 
Uop com 295 week 2 knowledge check
Uop com 295 week 2 knowledge checkUop com 295 week 2 knowledge check
Uop com 295 week 2 knowledge checkshyaminfo00
 
Uop com 295 final guide
Uop com 295 final guideUop com 295 final guide
Uop com 295 final guideshyaminfo00
 
Devry mgmt 520 week 5 case study
Devry mgmt 520 week 5 case studyDevry mgmt 520 week 5 case study
Devry mgmt 520 week 5 case studyshyaminfo00
 

More from shyaminfo00 (16)

Uop str 581 week 6 individual capstone final exam part 3 new
Uop str 581 week 6 individual capstone final exam part 3 newUop str 581 week 6 individual capstone final exam part 3 new
Uop str 581 week 6 individual capstone final exam part 3 new
 
Uop str 581 week 4 individual capstone final exam part 2 new
Uop str 581 week 4 individual capstone final exam part 2 newUop str 581 week 4 individual capstone final exam part 2 new
Uop str 581 week 4 individual capstone final exam part 2 new
 
Uop qrb 501 week 6 signature assignment new
Uop qrb 501 week 6 signature assignment newUop qrb 501 week 6 signature assignment new
Uop qrb 501 week 6 signature assignment new
 
Uop qrb 501 final exam guide new
Uop qrb 501 final exam guide newUop qrb 501 final exam guide new
Uop qrb 501 final exam guide new
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
 
Uop qrb 501 week 6 signature assignment new
Uop qrb 501 week 6 signature assignment newUop qrb 501 week 6 signature assignment new
Uop qrb 501 week 6 signature assignment new
 
Uop qrb 501 final exam guide new
Uop qrb 501 final exam guide newUop qrb 501 final exam guide new
Uop qrb 501 final exam guide new
 
Uop ops 571 week 6 signature assignment (2 papers) new
Uop ops 571 week 6 signature assignment (2 papers) newUop ops 571 week 6 signature assignment (2 papers) new
Uop ops 571 week 6 signature assignment (2 papers) new
 
Uop ops 571 week 5 team six sigma yellow belt training part ii (2 ppt) new
Uop ops 571 week 5 team six sigma yellow belt training part ii (2 ppt) newUop ops 571 week 5 team six sigma yellow belt training part ii (2 ppt) new
Uop ops 571 week 5 team six sigma yellow belt training part ii (2 ppt) new
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)
 
Uop com 295 week 2 knowledge check
Uop com 295 week 2 knowledge checkUop com 295 week 2 knowledge check
Uop com 295 week 2 knowledge check
 
Uop com 295 final guide
Uop com 295 final guideUop com 295 final guide
Uop com 295 final guide
 
Devry mgmt 520 week 5 case study
Devry mgmt 520 week 5 case studyDevry mgmt 520 week 5 case study
Devry mgmt 520 week 5 case study
 

Recently uploaded

URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 

Recently uploaded (20)

9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 

Uop ops 571 final exam guide (new, 2018)

  • 1. UOP OPS 571 Final Exam Guide (New, 2018) Check this A+ tutorial guideline at http://www.ops571assignment.com/ops- 571-latest/ops-571-final-exam-guide-(new,- 2018)-latest For more classes visit http://www.ops571assignment.com OPS 571 Final Exam Guide (New, 2018) 1. Which of the following is a measure of operations and supply management efficiency used by Wall Street? Dividend payout ratio Receivable turnover Current ratio Financial leverage Earnings per share growth 2. An activity-system map is which of the following?
  • 2. A diagram that shows how a company's strategy is delivered to customers A timeline displaying major planned events A network guide to route airlines A facility layout schematic noting what is done where A listing of activities that make up a project 3. Which of the following is a total measure of productivity? Output/Materials Output/Labor Output/(Labor + Capital + Energy) All of these Output/Inputs 4. Which of the following approaches to service design is characterized by having the customer take a greater role in the production of the service? Quality approach Self-service approach Production-line approach Do-it-yourself approach Personal-attention approach
  • 3. 5. Which of the following basic types of production layout formats is one that has similar equipment or functions are grouped together? Work center layout Production line layout Group technology layout Manufacturing cell layout Assembly line layout 6. Which of the following is a characteristic that can be used to guide the design of service systems? Services are all similar. Services cannot be inventoried. Services businesses are inherently entrepreneurial. Even service businesses have internal services. Quality work means quality service. 7. An advantage of a make-to-stock process is which of the following? All units of output are unique. It features rapid delivery of a standard product. It combines the best features of other processes. It responds directly to customer orders.
  • 4. It allows the firm to avoid inventory costs. 8. Getting an autograph from a famous person might involve standing in which type of queuing line structure? Single channel, single phase None of these Single channel, multiphase Multichannel, multiphase Multichannel, single phase 9. For an infinite queuing situation, if the arrival rate for loading trucks is 5 trucks per hour, what is the mean time between arrivals? 2.5 hours 5 hours 0.2 hour 0.1 hour None of these 10. An assumption of learning curve theory is which of the following? Organizational learning is not included in learning theory. The time required to do a task will vary randomly each time the task is repeated. Unit time will decrease at an increasing rate.
  • 5. Learning will not be transferred from one worker to the next. The reduction in unit time will follow a predictable pattern. 11. A company's production process has an 80 percent learning curve rate. The process has produced 1,000 units to date. A process refinement is estimated to allow a future learning curve rate for the identical product of 75 percent. However, the initial unit made using the new process will take the same amount of time as the initial unit produced using the old process. At what point, using the new process, will the production rate exceed the production rate achieved by the old process? Before the 100th unit Before the 120th unit Before the 80th unit Before the 50th unit Before the 250th unit 12. For which of the following should we use a p- chart to monitor process quality? Grades in a freshman "pass/fail" course Temperatures in a classroom
  • 6. The dimensions of brick entering a kiln The weight of fluid in a container Lengths of boards cut in a mill 13. You have been called in as a consultant to set up a Kanban control system. The first thing to do is to determine the number of Kanban card sets needed. Your research shows that the expected demand during lead time for a particular component is 150 per hour. You estimate the safety stock should be set at 25 percent of the demand during lead time. The tote trays used as containers can hold 8 units of stock, and the lead time it takes to replenish an order is 2 hours. Which of the following is the number of Kanban card sets necessary to support this situation? 42 68 89 47 94 14. Which of the following is a fixed-time-period inventory model? Just-in-time model The EOQ model Periodic system model The Q model
  • 7. The least cost method 15. A company is planning for its financing needs and uses the basic fixed-order-quantity inventory model. Which of the following is the total cost (TC) of the inventory given an annual demand of 10,000, setup cost of $32, a holding cost per unit per year of $4, an EOQ of 400 units, and a cost per unit of inventory of $150? None of these $1,501,600 $1,498,200 $499,313 $500,687 A. $1,501,600 Q = 400. Average Inventory = Q/2 = 200. Holding cost/year = $4. Thus, annual holding cost = $800. Annual set-up cost = 10,000/400 = 25 x $32 = 800. Demand x cost per unit = 10,000 x $150 = 1,500,000. Hence, TC = $1,500,000 + 800 + 800 = $1,501,600. 16. Which of the following is a principle of work center scheduling? Reschedule every day. Once started, a job can and should be finished
  • 8. even if unavoidably interrupted. Assign the first worker to all of the days that require staffing. Achieve certainty in standards and routings. Give work centers less to do then their maximum. 17. Which of the following is a "focusing step" of Dr. Eli Goldratt's theory of constraints? Identify system constraints. Support system constraints. If you have no system constraints, make some. Reduce system constraints. Reinforce system constraints. 18. In designing a lean production facility layout, a designer should do which of the following? Locate flexible workstations offline. Balance capacity using job shop analysis. Design for work flow balance. Always keep operations on a single floor of the factory. Link operations through a push system. 19. A simple project listing of five activities and their respective time estimates are presented here:
  • 9. Using CPM, which activities make up the critical path? None of these A, B, D, E A, D, E A, C, B, D, E A, C, D, E 20. A company must perform a maintenance project consisting of seven activities. The activities, their predecessors, and their respective time estimates are presented here: Using CPM, which activities make up the critical path? A, C, B, F, E None of these A, B, D, F, G A, C, E, F, G A, D, E 21. Which of the following is not a problem definition tool from the operations consulting tool kit? Issue trees Five forces model Computer simulation
  • 10. Customer surveys Gap analysis 22. Which of the following is not one of the basic types of forecasting? Simulation Causal relationships Qualitative Time series analysis Force field analysis 23. A company has actual unit demand for three consecutive years of 124, 126, and 135. The respective forecasts for the same three years are 120, 120, and 130. Which of the following is the resulting MAD value that can be computed from these data? 3 1 15 123 5 C MAD = ABS[(124 - 120) + (126 - 120) + (135 - 130)]/3 = 15/3 = 5. 24. From an operational perspective, yield
  • 11. management is most effective under which of the following circumstances? Inventory is perishable. The firm doing yield management is very profitable. Demand cannot be segmented by customer. Fixed costs are low, and variable costs are high. The customer is a "captive" of the system. 25. What is transaction processing? The decision support system used to efficiently handle multiple transactions The movement of paperwork through a system using a decision tree The scheduling of machinery to minimize time and scrap The posting and tracking of the detailed activities of a business 26. If the actual output of a piece of equipment during an hour is 500 units and its best operating level is at a rate of 400 units per hour, which of the following is the capacity utilization rate? 0.75 1.00
  • 12. 1.25 1.33 100 27.Which of the following is an input to the master production schedule (MPS)? Planned order schedules The bill of materials The aggregate plan The exception report Inventory records file 28. Which of the following is considered a primary report in an MRP system? Cycle counting reports Performance reports Planned order schedules Planning reports Exception reports 29. The centroid method for plant location uses which of the following data? Probabilities and payoffs Correlation matrix of existing facilities Volume of goods to be shipped between existing points Inbound transportation costs
  • 13. Transport times between facilities 30. In Hau Lee's uncertainty framework to classify supply chains, a supply chain for functional products with an evolving supply process is called which of the following? Responsive Forward looking Efficient Risk hedging Agile