WELCOME TO ICC NATIONAL
CONVENTION
14 ~ 16 AUGUST 2007
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
2
AGENDA
INTRODUCTION
Presenter
• Introduction
• Group Proceeding
• Problem Selection
• Problem Definition
• Analysis
• Corrective Action
• Monitoring
• Standardization
• Achievement
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
MPT PRODUCTDESTINATION
38% 16% 13%3%
Europe Japan
North America Other Region
Local Market
30%
PEP
PEM
PTK
PTM,TPT
PAC
AST
PTW
PTD,PSD
MND,MDE
PCH,PSG
PSM,SPS
PIC
PET
PMM
PSSA,YMSA
MMSA
JPN
Indian Ocean
Pacific
Ocean
MPT= MALAYSIA PIONEER TECHNOLOGY
PIONEERWORLDWIDE
P R O D U C T I O N L A Y O U T
MPT
INTRODUCTION
3
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
MALAYSIA PIONEERTECHNOLOGY
C O M P A N Y P R O F I L E
PIONEER TECH. (M)SDN.BHD
LOCATED AT;
No. 5,TG AGASIND.AREA,
84000MUAR,JOHOR
MALAYSIA
AUG 1993
MUAR RIVER
SPORTS
GROUND
WAREHOUSE PRODUCTION FLOOR
MAIN ROAD - TANJUNG AGAS
ROAD
TO TANGKAK / MELAKA
TANJONG AGASINDUSTRIAL AREA
CAR
PARK
MOTOCYCLE
PARKING
AREA
SPORTS
CENTRE
Build g Space :24,271m (6.0Acres)2
Land Space : 56,656m (14.0 Acres)2
INTRODUCTION
OPERATION STARTED
4
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
5
P I O NE E R P RO DU CT R A N G E
INTRODUCTION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
P I O NE E R P RO DU CT R A N G E
INTRODUCTION
6
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
7
PIONEER TECHNOLOGY (MALAYSIA) SDN.BHD.RECOGNITION
1 Companyin
MalaysiaAttained
ISO/TS 16949
- 29th April 2003-
st
INTRODUCTION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
8
(Open Category Electronic Sector)
The Winnerof
National 5S
Organization
Competition2003
PERSEKITARAN BERKUALITI
5S
PIONEER TECHNOLOGY (MALAYSIA) SDN.BHD.RECOGNITION
INTRODUCTION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
9
Winnerof NPC
ProductivityAward
was hand over by YB Dato Hj. Ahmad
Husni Mahamad Hanadzlah (Deputy
Minister of International Trade & Industry)
to MPT Managing Director Mr. Miyamura
- 15th July2004 -
PIONEER TECHNOLOGY (MALAYSIA) SDN.BHD.RECOGNITION
INTRODUCTION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
10
3 in National ICC
Convention 2004
ElectronicSector
[ NEURON TEAM ]
rd
3rd
Winner
Top 10
Winner
3 Star
Award
PIONEER TECHNOLOGY (MALAYSIA) SDN.BHD.RECOGNITION
INTRODUCTION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
11
Winnerof Johor Industry
QualityAward 2004
(Electronicsector)
Prize were hand over
by Chief Minister or Johor
Dato Hj. Abd. Ghani bin Osman
- 22nd March2005 -
PIONEER TECHNOLOGY (MALAYSIA) SDN.BHD.RECOGNITION
INTRODUCTION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
12
Most PromisingICC
Award
Mini Convention
[ Supernova TEAM ]
- 12th April 2005 -
PIONEER TECHNOLOGY (MALAYSIA) SDN.BHD.RECOGNITION
INTRODUCTION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
13
INTRODUCTION
PIONEER TECHNOLOGY (MALAYSIA) SDN.BHD.RECOGNITION
Awarded Caring
Organization
(IndustrialSector)
Prize were hand over
by Muar District Officer wife
Datin Hajah Rokiah Binti Karim
- 9th November 2006 -
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
14
O R G A N I Z A T I O N C H A R T
MALAYSIA PIONEER TECHNOLOGY
INTRODUCTION
21
Departments
PRODCONTROL DIV
GENERAL DIV
Effective Date :01/04/2007
Human Res.
Admin Dept
Finance Dept
A/I Production
A/I Material
A/I Cont.
Production 1
ME
QC
ECD
QE
PTE
Prod Control
Info System
Material Control
Procurement
FINANCE DIV
PRODUCTION 1 DIV
PRODUCTION 2 DIV
PROCESS INNOVATION
DEPT
QUALITY ENG. DIV
CORPORATE
MANAGEMENT
GROUP
8
Divisions
ENGINEERING&
PRODUCTION
GROUP
MANAGING
DIRECTOR
MR. MIYAMURA
PE1
PE2
PE3
PRODUCTION ENG. DIV
Production 2
IP Dept
PRODUCTION ENG. DIV
PE1
PE2
PE3
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
15
NATURE OF WORK
INTRODUCTION
- Introduce new model in
production line.
- Control new model activity
from Proto to Mass Prod. stage
NEW MODEL INTRODUCTION
PROCESS & JIG DEVELOPEMENT
DOCUMENTATION CONTROL
PRODUCTION SUPPORT
- Designprocess for new model
designed by Japan orSingapore
- Designelectrical and
mechanical jig
- Windows of Engineering documents
for Pioneer world wide
- Support Engineering Section
- Technical support -Problem analysis
- Pass rateimprovement study
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
16
1
WE ARE
HERE
Production
Division 1
Quality Engineering
Division
Production
Division 2
Warehouse
NATURE OF WORK
INTRODUCTION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
17
PEDIVISION
OFFICE SPACE
371.7m
PE =PRODUCTION ENGINEERING
PE DIVISON LAYOUT
INTRODUCTION
WAREHOUSE 3
PE DIVISION PROFILE
Total manpower
Male / Female
Local
Japanese
73
50 / 23
2
71
2.74%
97.26%
2
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
18
TEAM NAME AND MOTTO
INTRODUCTION
Lovely evergreen Bunga Tanjungtree,
with its smallshiny,thicknarrow,
pointed leave, straight trunkand
spreading branches. Mediumlining
andlarge canopy shape. Strong root
base, non-spreading andnon-
collapse. Pale Yellow essential oil of
Bunga Tanjungproduce a sweet and
extremely tenacious floral odour.
TEAM MOTTO
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
19
TEAM LOGO
INTRODUCTION
Strong tree to show our strength as a team.
Floral odour smells to show our commercial values.
Whitein colour to show our clean and tidiness.
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
20
Engineer
Mechanical Eng.
CO LEADER SECRETARY
IDAYU
TECHNICAL
RAZIF
JOHAN
Engineer
Process Eng.
LEADERExecutive Engineer
PE Division
ITHNAIN
FACILITATOR
Supervisor
AIP Dept
NAJIB
ADVISOR
TEAM ORGANIZATION CHART
MIZAN
Engineer
Industrial Eng.
Engineer
Process Eng.
GROUP PROCEEDING
UMI
FACILITY
RIZAL
FACILITY
FALIQ
SOFTWARE
Engineer
F/C Designer
Engineer
Process Eng.
Engineering Clerk
Doc. Clerk
Production
Engineering Division
OCCUPATIONAL BACKGROUND
Main Section :
Member consist :
Education Level :
Working Hour :
6 Engineers&
1 Engineering Clerk
SPM ~ Degree
Normal Shift
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
TEAM PROFILE
JOHAN
MIZAN
IDAYU
FALIQ
RAZIF
RIZAL
UMI
* Experience in Function Checker and CA design
* Experience in Computer skill for 10 years
* Expert in Group Facilitation Skills
* Degree in Electronic Engineering (IE) (2005)
* Diploma in Electronic Computer (2001)
* MOST trainer (2005)
* Degree in Eng(Hons) Electronics majoring in Computer
* CCNA – Cisco level 1
* Certified in Hi-Pot setting level 2
* Degree in Mechanical Engineering (2005)
* Diploma in Mechanical Engineering (1999)
* Certified in Microsoft Access 2000
* Degree in Electrical (Control and Instrumentations)
* Diploma in Electrical Communication ( 2000 )
* Certified in Excellent Clerical Course
* Sijil Pelajaran Malaysia (SPM 1993)
* Certified in Microsoft Access 2000 Advance
* Certificate in LCCI
* Degree in Mechanical Engineering Hons) (2005)
* Diploma in Mechanical Engineering (2001)
* Certificate in PLC (2006)
* Experience as Mechanical Designer
* Experience in Computer Skill for years
* Expert in CAD/CAM
* Expert in technical drawing
* Experience as Software Development
* Experience in Computer Skill for 7 years
* Experience in Pilot Run Coordinator
* Experience in Flash Rom download
* Experience in Computer skills for over 10 years
* Experience in Process Design
* Experience in Java Programming (J2SE &
J2ME)
* Expert in data communication and networking
* Experience as Documentation Clerk
* Experience in Computer Skill for 10 years
* Expert in Work Reference Documentation
Coordinator
* Expert in Main Process Skill & Training
* Experience in troubleshooting and calibration
* Experience in Computer Skill for 5 years
* Experience in process design
* Experience as a Documentation
* Experience in Computer Skill for 15 years
* Expert in Main Process Skill & Training
* Degree in Electrical&Electronics Engineering (Hons)
* Certificate in Microsoft SQL server
* LabView Basic 1 & 2
* Certificate in SPC and 8D Problem Solving
21
GROUP PROCEEDING
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
BUNGA TANJUNG S JOURNEY
MPT- CHAMPION
Gold Award
INTRODUCTION
REGIONAL - GOLD AWARD
BE THE
BEST !
22
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
23
TEAM ACTIVITIES
GROUP PROCEEDING
OCT 05 Effective Presentation Skills
MAR 07
Statistical Process Control
(SPC)
AUG 06
21 Habits In Becoming Effective
Supervisor
NOV 05 Most Training
JUN 07 Basic / Advance PLC Training
MAY 06 Basic Fire Safety Training
MAR 07 Inventor Professional Training
DATE
ACTIVITIES
TRAINEE
MAR 07
Advanced Product Quality
Planning (APQP)
REEMOS MIZAN IDAYU JOHAN RAZIF RIZAL UMI
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
TEAM CONT RIBUTIO N
ALLIGNED TO COMPANY S OBJECTIVE
LEGEND BSC : BALANCE SCORE CARD
To integrate everyone s
capability and pursue a
complete QECD with a
customer view point.
VISION
MISSION
CORPORATE CORE VALUE
D I V I S I O N T A R G E T ( B S C )
To become a company that
encourages all its members to
work as a team, with everyone
customer-focused, integrating
each one s professionalism in
pursuing innovations one after
another.
Fair & Reasonable.
Positive & Active.
Speedy & Flexible.
Financial Customer Job Process
Human
Engineering
24
GROUP PROCEEDING
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
25
HEALTHY ATTENDANCE PERFORMANCE
40
50
60
70
80
90
100
W1 W3 W5 W7 W9 W11 W13 W15 W17 W19 W21 W23 W25 W27 W29 W31
Week of meeting (Apr 06 - Apr 07)
Attendance%
Minute OfMeeting
Bunga Tanjung s Target = > 94%
WEEKLY ATTENDANCE GRAPH
Average Attendance
= 98 %
Attendance Sheet
GROUP PROCEEDING
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
26
TEAM MEMBERSJOB DISTRIBUTION
Method : MATRIX DIAGRAM
ACTIVITIES Materials /Tools
PROJECT PLANNING Brainstorming ,PDCA activity,
Milestone Chart, Job Distribution
PROJECT SELECTION
& DEFINITION
Brainstorming, BSC,
Historical Data
Dept Objective/focus
Brainstorming, Fish Bone Diagram,
Graphical chart, Check Sheet
MONITORING
Check Sheet, Trend Chart,
Review Meeting
STANDARDIZATION
SOP maintenance , Check Sheet,
Training, Trend Chart, Audits,
Reports
ACHIEVEMENT & VALUE
CREATION
ROI data, Respond,
Graphical chart,
Questionnaire,
PRESENTATION
Brainstorming,
presentation facility
Main
Coordinator
Supporter100 % MEMBERS INVOLVEMENT ANDCOMMITMENT !
IMPROVEMENT
OPPORTUNITIES ANALYSIS
CREATIVES & INNOVATIVE
SOLUTIONS/IMPLEMENTATION
Brainstorming, Solution flow,
Decision Matrix table,reports
RIZAL
FALIQ
MIZAN
IDAYU
GROUP PROCEEDING
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
Brainstorming
Discussion
Ideas
Suggestion
Concentrate
BUNGA TANJUNG AT A GLANCE
Data Compilation
27
GROUP PROCEEDING
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
28
EFFECTIVE COMMUNICATION AMONG MEMBERS
Social LinkageEvents from JUN 2006 – JUN 2007
MPT
GUNUNGLEDANG
PENGKALANBALAK
BABA NYONYACAFE
MITC FUNG SENG
GROUP PROCEEDING
Date
19/6/2006
04/08/2006
18/11/2006
03/02/2007
10/03/2007
21/07/2007
23/03/2007
15/05/2007
11/06/2007
Activities
Family Day at
Gunung Ledang
MPT Sport’s Day
Dinner at Classic
Hotel
Birthday Celebration
at Fung Seng
Group Binding
at MPT
Dinner at Baba
Nyonya Cafe
AnnualDinner at
MITC
Dinner at Sabak
Aur
Picnic at Pengkalan
Balak
Coordinator
Umi
Faliq
Idayu
Syahmizan
Rizal
Idayu
Faliq
Razif
Johan
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
29
P D C A C Y C L E
P L A N
SOLUTION &
IMPLEMENTATIONMONITORING
STANDARDIZATION
STANDARDIZATION
MONITORING
DATA COLLECTION
AND GOAL SETTING
PROBLEM/PROJECT
SELECTION
ANALYSIS &
ALTERNATIVE SOLUTION
GROUPFORMATION
A C T I O N
C H E C K D O
GROUP PROCEEDING
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
30
M I L E S T O N E C H A R T
Plan Actual
GROUP PROCEEDING
TARGET COMPLETED
ON SCHEDULE
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
31
PROBLEM SELECTION APPROACH
PROBLEM SELECTION
S T EP 1
COMPANY FOCUS
S T EP 2
AREA OF IMPROVEMENT
S T EP 4
PROBLEM SELECTION
S T EP 3
PROBLEM IDENTIFICATION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
STEP 1 STEP 2 STEP 3 STEP 4Company
Focus CORPORATE FOCUS
P R O B L E M S E L E C T I O N
32
MPT Mission
To integrate everyone s capability and
pursue a complete QECD with a customer
view point
COMPANY FOCUS
MPT Vision
To become a company that encourages all
its members to work as a team, with
everyone customer-focused, integrating
each one s professionalism in pursuing
innovations one after another
PROBLEM SELECTION
uality ost eliverynvironmentE
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
STEP 1 STEP 2 STEP 3 STEP 4Area of
Improvement
Sources for
brainstorming
P R O B L E M S E L E C T I O N
33
PROBLEM SELECTION
CARR Report Data
Engineering
Analysis Report
OQC Reject
Data
Problem Min. of
Meeting
Production Reject
Data
Customer
Feedback
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
STEP 1 STEP 2 STEP 3 STEP 4Problem
Identification
Common problems related to QECD
B R A I N S T O R M I N G
High
Solder
Wastage
7
Dipping
Solder
Quality
9
Auto
insert
problem
10
Dust on
production
14
Part
distribution
delay
4
Workman
-ship
problem
2
Use
different
part
12
Additional
process
request
5
Change
model time
too long
1
Spare
part
receive
late
20Non value
Added
process
19
Incoming
Part NG
15
Shipment
Delay
16
Line layout
not suitable
18
Part
received
not good
13
Sub
material
difficult
to control
3 Equipment
not
reliable
6
Wrong
use
of Part
8
Spare part
cost high
21
Process
design
lead time
too long
22
Sub Material
high cost
11
Rework
cost
17
34
PROBLEM SELECTION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
35
High
Solder
Wastage
7
Dipping
Solder
Quality
9
Auto
insert
problem
10
Dust on
production
14
Part
distribution
delay
4
Workman
-ship
problem
2
Use
different
part
12
Additional
process
request
5
Change
model time
too long
1
Spare
part
receive
late
20Non value
Added
process
19
Incoming
Part NG
15
Shipment
Delay
16
Line layout
not suitable
18
Part
received
not good
13
Sub
material
difficult
to control
3 Equipment
not
reliable
6
Wrong
use
of Part
8
Spare part
cost high
21
Process
design
lead time
too long
22
Sub Material
high cost
11
Rework
cost
17
SIMILAR
PROBLEMS
STEP 1 STEP 2 STEP 3 STEP 4Problem
Identification Common problems related to QECD
PROBLEM SELECTION
B R A I N S T O R M I N G
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
36
High
Solder
Wastage
7
Dipping
Solder
Quality
9
Auto
insert
problem
10
Dust on
production
14
Part
distribution
delay
4
Workman
-ship
problem
2
Use
different
part
12
Change
model time
too long
1
Spare
part
receive
late
20Non value
Added
process
19
Incoming
Part NG
15
Shipment
Delay
16
Line layout
not suitable
18
Part
received
not good
13
Sub
material
difficult
to control
3 Equipment
not
reliable
6
Wrong
use
of Part
8
Spare part
cost high
21
Process
design
lead time
too long
22
Sub Material
high cost
11
Rework
cost
17
Additional
process
request
5
8
8SIMILAR
PROBLEMS
STEP 1 STEP 2 STEP 3 STEP 4Problem
Identification
Common problems related to QECD
PROBLEM SELECTION
B R A I N S T O R M I N G
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
QUALITYCOST ENVIRONMENTDELIVERY
Workman
-ship
problem
Auto
insert
problem
Wrong
use of
part
Non value
Added
process
Dipping
solder
quality
Incoming
part NG
15
10 2
8
19
9
Rework
cost
17
High
solder
wastage
Spare part
cost high
Change
model time
too long
Sub
material
difficult
to control
Additional
process
request
7 3
21 5
1
Process
design
lead time
too long
Part
distribution
delay
Shipment
delay
Spare part
receive
late
22 4
20 16
Dust on
production
Line layout
not suitable
Equipment
not
reliable
14
6
18
TOTAL DATA CARD : 8 TOTAL DATA CARD : 5 TOTAL DATA CARD : 4
TOTAL DATA
CARD : 3
A F F I N I T Y D I A G R A M
Sub
Material
High cost
11 1
37
STEP 1 STEP 2 STEP 3 STEP 4Problem
Identification Common problems related to QECD
PROBLEM SELECTION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
After analyze
the Pareto
chart,
BUNGA
TANJUNG
decided to
focus on
department
COST issues.
100
80
60
40
20
0
40%
65%
85%
No. of Cards
Cost Delivery Environment
%
Quality
8
5
4
3
0
2
4
6
8
10
12
14
16
18
20
38
P A R E T O C H A R T
40%
PROBLEM SELECTION
STEP 1 STEP 2 STEP 3 STEP 4Problem
Identification
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
STEP 1
3
7
8
1
5
2
4
6
CRITERIA
High solder wastage
Sub material difficult
to control
Sub material high cost
Additional process request
Change model time too long
Non value added process
Spare part costhigh
Reworkcost
4x 5x 5x 4x
3
3
4 3
3
23
2
1
2 2
5
3
3
2
3
2
3
23
3
3 2
3
4
3 2 3
2233
12 25 20 12
8 10 10 12
4 15 15 8
8 15 15 8
12 15 15 8
12 20 15 8
12 15 10 12
12 15 10 8
42
40
69
46
50
55
49
45
A
B
LEGEND
A = Votes
B = Ax Weight
Scale
STEP 3 STEP 4Problem
Selection
STEP 2
1
Rank
Within Member
Influence
Customer
Impact
Urgency Lead
Time
Total
Weight
Within Member
Influence
Customer
Impact
Lead
Time
COST PROBLEM
SUB MATERIAL COST
NOTACHIEVED
Urgency
39
PROJECT SELECTION MATRIX
PROBLEM SELECTION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
40
SUB-MATERIAL is the Supporting material s use at production assembly
exclude part such as liquid, glue, tape etc . Usually we purchase from some
vendor around the world in order to support production .
Example of sub material use at production line:
Flux
Solder Wire
Solder Paste
Used at soldering machine
Used for manualsoldering
Used at solder printingmachine
Solder Bar Used at soldering machine
PROBLEM SELECTION
P R O B L E M S E L E C T I O N
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
51000
51500
52000
52500
53000
53500
54000
Apr May June July Aug Sept Oct Nov Dec Jan Feb Mar
41
Monthly Sub-Materials Cost (Apr 05 ~ Mar 06)
Total Cost of Sub-Material Purchase inPioneer
PROBLEM SELECTION
P R O B L E M S E L E C T I O N
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
Antenna
jack
Graph showing usage of top 4 of sub-materials
42
PROBLEM SELECTION
P R O B L E M S E L E C T I O N
Solder Bar is the highest
usage sub-material in
production line
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
43
Based on production forecast the order willbe increasing due to high demand,so the
usage of solder bar is expected to be increased, thus BUNGA TANJUNGconsider to find a
method to reduce the solder bar cost.
PROBLEM SELECTION
P R O J E C T T A R G E T
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
44
PROBLEM SELECTION
P R O B L E M D E F I N I T I O N
What isSolder Bar?
Why we choose Solder Bar?
Why Solder Bar usage too high?
What are the impact of high usage
of Solder Bar to MPT?
• Fusible metal alloy that take a shape of bar,
• Melting point = 210 C,
• Melted in solderingmachine
• Use to join metallicsurfacesof PCBand electronic
components.
• High usage compare to the other
sub-materials.
• MPT production requirement due to high
production
• Cost will be increased.
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
CONCLUSION OF PROJECT SELECTION
45
To promote reduction of sub-
material cost by minimizing
high solder bar cost
PROBLEM SELECTION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
DIVISION STOP TARGET
< Balance Score Card(BSC) >
The balanced scorecard is a management system (not only a measurement system) that
enables organizations to clarify their vision and strategy and translate them into action. It
provides feedback around both the internal business processes and external outcomes in
order to continuously improve strategic performance and results. When fully deployed, the
balanced scorecard transforms strategic planning from an academic exercise into the nerve
center of an enterprise._ Drs Robert Kaplan
What is Balance Score Card(BSC) ?
Balance Score Card ( VISION & STRATEGY )
PROBLEM SELECTION
46
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
RELATION TO DIVISION S TOP TARGET
( B re a kd o w n of B SC St r at eg y M ap )
2HM MBH
TRSN DQ
J ob
process
Q HMHMF
1WO MRHNM DR NTMS DRDQ SHNM NE OQNEHSR 4MOQN D DMS NE B R ENV
MPT
4 OQN D DMS HM BTRSN DQ R SHRE BSHNM MC
5 8 H FD
8 QN NSHNM NE BNRS QDCTBSHNM 4 OQN D DMS NE PT HS 7 ARDQ MBD 143 - 6
4 OQN D DMS HM D O N DD
R SHRE BSHNM
HEC
4MCDODMCDMBD
R 3 1 TA E BSNQ
Q MREDQ NE 8 1 INA 8 TQB RD NODQ SHMF DWO MRHNM
8 QN NSHNM NE QD N TSHNM NE BSH HS
ENQ PT HS
8 8 QNIDBS
1M HQNM DMS BNQQDRONMCDMBD
RSQDMFS DMHMF
OEM
1WO MRHM ATRHMDRR 4M DMSNQ BTQS H DMS
T HS MC OQNCTBSHNM DMFHMDDQ
QDHMENQBD DMS
S ESD 1- 3- 5FB
- BSH HS NE ) 1 0 MC
) EDDCA B R RSD
Q HMHMF NE TCHS RS EE
4MSQNCTBSHNM NE M FD DMS
QD SHNM MC HMSQNCTBSHNM NE
DM HQNM DMS HCC D O M
Q HMHMF NE R RSD DMFHMDDQ
2T MDRR NE RRDRR DMS
R DR , H HNM 5
2 *
OQNEHS ( H HNM 5
2 *
NB R DR H HNM 5
7 1 5 R DR H HNM 5
2 *
TRSN DQ D T SHNM ONHMS
AN D
2 *
1WO MRHNM OQNCTBSHNM
NE MDV B SDFNQ OQNCTBSR
5 DCH DBHD DQ
0 0 R RSD
DHMENQBD DMS NE
Promotion of cost
reduction!
through
Reduce solder barcost
47
PROBLEM SELECTION
BSC – BalanceScore Card
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
48
TO REDUCE 10% COST OF
SOLDER BAR BY AUGUST
2006.
TARGET BASE ON DIVISION
BSC REQUIREMENT & TEAM
MEMBER CAPABILITY.
Balance Score Card
PROBLEM SELECTION
P R O J E C T T A R G E T
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
49
WHAT ?
Solder Bar cost
too high
WHO ?
Production Engineer
METHOD : 5W 1H
WHEN ?
During DIPSoldering
process
WHY ?
Solder bar usage too high
WHERE ?
At production
line
PROBLEM DEFINITION
HOW ?
Due to uncontrolled usage
and no evaluation
P R O B L E M D E F I N I T I O N
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
BENCHMARK ON SOLDER BAR COST REDUCTION
PSG
Legend:
PEM : Pioneer Europe Manufacturing
PEP : Pioneer Europe Portugal
PTM : Pioneer Thailand Manufacturing
PSG : Pioneer Shanghai
PAC : Pioneer Asia Center
PEP
PEM
MPT
PTM
MPT
5.1%
MALAYSIA
PAC PTMPSG PEM
SINGAPORE THAILANDCHINA BELGIUMPORTUGAL
15% 16%18% 13%14%
PEP
Location
Company
Reduction
Benchmark between MPT &Sister company
MPT : Pioneer Malaysia
PAC
50
PROBLEM DEFINITION
E-mail from HQ Japan
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
PROJECT SELECTION PROPOSAL TOMANAGEMENT
Team Project Selection Proposal Approval From Management
51
APPROVED ON 04TH May 2006
PROBLEM DEFINITION
PROPOSED ON 03TH May 2006
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
A N A L Y S I S A P P R O A C H
BRAINSTORMING SESSION
S T E P 1
PRELIMINARY SCREENING
S T E P 2
MOST PROBABLE ROOT CAUSE
VERIFICATION
S T E P 3
52
PROBLEM DEFINITION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
C A U S E S & E F F E C T S A N A LY S I S
53
MANMETHOD
Technician unaware
Man
Power
Instruction not clear
Maintenance
Settings
Dipping MachineSolder
PCB design
MACHINEMATERIAL
ANALYSIS
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
54
C A U S E S & E F F E C T S A N A LY S I S
ANALYSIS
MAN
Technician
unaware
Man Power
WHY
WHY
No enough
skills
WHY
Seldom go
for training
Factor 1
Brainstorming
Not
understand
1
No
knowledge on
solder
2
Fresh
graduates
Attitude
3
Lack of
discipline
4
New
technician
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
55
C A U S E S & E F F E C T S A N A LY S I S
ANALYSIS
METHOD
Instruction
not clear
Maintenance
WHY
WHY
Process not
clearly
mention
WHY
Not familiar
with process
Factor 2
No
standardization
5
No process
indication
6
Limited
time
No periodic
checking
7
No
monitoring
Job
overload
No
rules
8 9
Brainstorming
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
56
C A U S E S & E F F E C T S A N A LY S I S
ANALYSIS
MACHINE
Dipping Machine Setting
WHY
WHY
Running
years
WHY
Old
machine
Factor 3
Conveyor
not stable
10
Conveyor
stop
11
No proper
airflow
No
observation
12
High
temperature
Finger speed
13
Finger speed
not in spec
Temperature
14
Brainstorming
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
C A U S E S & E F F E C T S A N A LY S I S
ANALYSIS
57
MATERIAL
Solder PCB design
WHY
WHY
Expired
solder bar
WHY
Old
stocks
Factor 4
Solder
quality
15
16
Solder
high price
17
Unlimited
use
18
Not consider
solder quality
Brainstorming
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
C A U S E S & E F F E C T S A N A LY S I S
58
MANMETHOD
Technician
unaware
Man
Power
Instruction
not clear
Maintenance
Settings
Dipping Machine
Solder
PCB design
MACHINEMATERIAL
Process not
clearly mention
Job overload
No periodic checking
Expired solder bar
Not consider
solder quality
Finger speed
Not understand
Attitude
No enough skills
New technician
No standardization
Temperature
Conveyor
Not stable
No proper airflow
Running
years
Seldom go for
training
High
temperature
No
observation
Old
machine
Old stocks
Unlimited
use
Limited time
No
monitoring
Not familiar
with process
No process
indication
Lack of
discipline
Fresh
graduates
No rules
Not enough
knowledge
Conveyor
stop
Solder
Machine
Finger
speed not
in spec
ANALYSIS
Solder quality
Solder High Price
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
59
ANALYSIS
P R E L I M I N A R Y S C R E E N I N G
9. No observation Legend : Accepted Eliminate
Observation//Finding Result
2. Not enough
skills
1. Not enough
knowledge
Training Result
3. Lack of discipline
4. Fresh graduates
Basedupon
Supervisor
MAN
MACHINE Result
5. High temperature Based on check
sheet and
standard
6. Solder machine
finger speed not in
spec
8. Old machine
7. Conveyor stop
Observation//Finding
Production
maintenance record
Basedon Asset
Label
Maintenance
Engineer
MATERIAL Result
Basedon material
due date and label.
15. Unlimited use Base on Process
Engineer
Basedon Industrial
Engineer analysis
16. Old stock/materials
Observation//Finding
12. Solder quality
12. No rules
METHOD Result
10. No process indication
Basedon check
sheet
13. Limited time
Observation//Finding
11. Not familiar with
process
14. No monitoring
Base on standard &
regulations
Base on SOP
17. Solder quality
9. No observation
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
C A U S E S & E F F E C T S A N A LY S I S
60
MANMETHOD
Technician
unaware
Man
Power
Instruction
not clear
Maintenance
Settings
Dipping Machine
Solder
PCB design
MACHINEMATERIAL
Process not
clearly mention
Job overload
No periodic checking
Expired solder bar
Not consider
solder quality
Finger speed
Not understand
Attitude
No enough skills
New technician
No standardization
Temperature
Conveyor
Not stable
No proper airflow
Running
years
Seldom go for
training
High
temperature
No
observation
Old
machine
Old stocks
Unlimited
use
Limited time
No
monitoring
Not familiar
with process
No process
indication
Lack of
discipline
Fresh
graduates
No rules
Not enough
knowledge
Conveyor
stop
Solder
Machine
Finger
speed not
in spec
ANALYSIS
Solder quality
Solder High Price
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
61
5432
Method : 5 WHY ANALYSIS
1 Why? Why? Why? Why?
Not enough
knowledge
Lack of
experience
Not
enough
exposure
No
proper
training
given
The
training
system
not
efficient
Analysis 1
FINDING
FINDING DATA
FURTHER
ACTION?
NOT
REQUIRED
ANALYSIS
MOST PROBABLE ROOT CAUSE VERIFICATION
Training manual
has been
issued
Basic knowledge
on solder is
been provided
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
62
54321 Why? Why? Why? Why?
Too much
waste
Due to
solder dross
Due to
oxidization
Solder
quality
Because
of the
solder
composition
Analysis 2
FINDING
FINDING DATA
According to observation
and analysis by engineer
and technician when
cleaning the dross 2 times
per day
Too many dross
have been
produced during
soldering
process
FURTHER
ACTION?
Method : 5 WHY ANALYSIS
ANALYSIS
MOST PROBABLE ROOT CAUSE VERIFICATION
REQUIRED
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
63
54321 Why? Why? Why? Why?
Solder machine
Finger speed
not in spec
No frequent
monitoring
Technician fail
to set finger
speed
Analysis 3
FINDING
FINDING DATA
Dipping time in spec
due to availability of
automatic soldering
machine control list
FURTHER
ACTION?
NOT
REQUIRED
Method : 5 WHY ANALYSIS
Not
mentioned
in
standard
working
procedure
ANALYSIS
MOST PROBABLE ROOT CAUSE VERIFICATION
By referring to check
sheet, finger speed data
is well-maintained
Technician
not aware
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
MOST PROBABLE ROOT CAUSE VERIFICATION
64
FACTOR MOST PROBABLE CAUSE FINDINGS
~ Summaryof Most Probable Root Cause ~
PROBLEM
FURTHER
ACTION
7
Machine Finger speed not in
spec
Automating Soldering
Control List 7
Man No knowledge on
solder
Training provided
4 REQUIRED 7 NOT REQUIRED
Material Part quality
Too many wetdross
produced 4Material Solder quality
Too manydross
produced 4
ANALYSIS
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
Inside soldering machine Solder dross
Solder dross
PROBLEM DEFINITION
WHAT IS SOLDER DROSS?
65
Dross is a mass of solid impurities floating on a molten solder
inside soldering machine.
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
PROBLEM DEFINITION
HOW DOES SOLDER DROSSOCCURS ?
D I P S O L D E R I N G M A C H I N E
Inner View
66
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
PROBLEM DEFINITION
DIP SOLDERING MACHINE - INNER VIEW
EXHAUST
PREHEATING
PREHEATING
FLUXER
CONVEYOR
PRIMARY
WAVE
SECONDARY
WAVE
AIR KNIFE
COOLING FAN
HOW DOES SOLDER DROSSOCCURS ?
67
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
PROBLEM DEFINITION
EXHAUST
PREHEATING
PREHEATING
FLUXER
CONVEYOR
PRIMARY
WAVE
SECONDARY
WAVE
AIR KNIFE
COOLING FAN
DIP SOLDERING MACHINE - INNER VIEW
HOW DOES SOLDER DROSSOCCURS ?
68
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
PRIMARY
WAVE
SECONDARY
WAVE
PROBLEM DEFINITION
PREHEATING
HOW DOES SOLDER DROSSOCCURS ?
69
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
Primary
Wave
Secondary Wave
Melted solder
PROBLEM DEFINITION
PCB = Printed circuit board
DIP SOLDERING MACHINE - INNER VIEW
HOW DOES SOLDER DROSSOCCURS ?
70
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
Secondary Wave
Melted solder
Primary
Wave
PROBLEM DEFINITION
PCB = Printed circuit board
DIP SOLDERING MACHINE - INNER VIEW
71
HOW DOES SOLDER DROSSOCCURS ?
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
DIP SOLDERING MACHINE - INNER VIEW
Secondary WavePrimary
Wave
Melted solder
PROBLEM DEFINITION
HOW DOES SOLDER DROSSOCCURS ?
PCB = Printed circuit board
O2
72
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
DIP SOLDERING MACHINE - INNER VIEW
Secondary WavePrimary
Wave
Melted solder
PROBLEM DEFINITION
PCB = Printed circuit board
O2
73
HOW DOES SOLDER DROSSOCCURS ?
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
DIP SOLDERING MACHINE - INNER VIEW
Secondary WavePrimary
Wave
Melted solder
PROBLEM DEFINITION
PCB = Printed circuit board
O2
74
HOW DOES SOLDER DROSSOCCURS ?
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
DIP SOLDERING MACHINE - INNER VIEW
Secondary WavePrimary
Wave
Melted solder
PROBLEM DEFINITION
PCB = Printed circuit board75
HOW DOES SOLDER DROSSOCCURS ?
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
DIP SOLDERING MACHINE - INNER VIEW
Secondary WavePrimary
Wave
Melted solder
PROBLEM DEFINITION
PCB = Printed circuit board76
HOW DOES SOLDER DROSSOCCURS ?
Solder Dross
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
BUNGA TANJUNG implemented ECRS Checklist as a tool to
measure and decide various ALTERNATIVE solutions
Note: This tools complies to
Productivity Improvement Through Work Study Method
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
ALTERNATIVE SOLUTION
77
ALTERNATIVE
SOLUTIONS
Interrogate DecisionSolution No
Cover soldering machine
to avoid surrounding air flow
to pot.
Possible to implement# 1
Eliminate cooling fan Possible to implement# 2
YES
YES
Evaluate new vendor Based on IE opinion# 4 YES
Machine best setting
Based on ME information,
this already include in
monthly activities
# 3
Study process - batch
production
Need to consider cost
and production
efficiency
# 5
NO
NO
CORRECTIVE ACTION
Cover soldering machine
to avoid surrounding air flow
to pot.
Possible to implement# 1
Eliminate cooling fan Possible to implement# 2
YES
YES
Evaluate new vendor Based on IE opinion# 4
YES
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
78
ALTERNATIVE SOLUTION
CORRECTIVE ACTION
ALTERNATIVE SOLUTION WHAT?
#1
#3
No
Evaluate new solder
composition
Cover soldering machine to
avoid surrounding air flow to
pot
Cover solder
pot
Study and analyze other products
and solder composition
#2 Eliminate cooling fan Delete
cooling fan
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
Selection Criteria:
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
79
ALTERNATIVE SOLUTION
CORRECTIVE ACTION
Cost
Solder Quality
Merit/Demerit Higher merit
Expected Result Reduce solder dross
Cheapest
Satisfactory
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
To prevent solder layer to oxidize:
1. Oxygen from surrounding air will re-act
With the material of solder.
2. The reaction between solder and oxygen
will produce dross.
Objective:
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
ALTERNATIVE SOLUTION
80
CORRECTIVE ACTION
O2
O2
O2
O2
O2
O2
Theoretical	
explanation
ADVANTAGES DISADVANTAGESSELECTION
CRITERIA
Not very effective-
-
-
-
Cost
Expected Result
Solder Quality
Merit/Demerit
Remain the same
RM150.00
Cannot totally eliminate
air from entering
PREVENTAIR FROM
ENTERING POT
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
To eliminate cooling fan inside the solder pot
1. Cooling fan will contribute for extra air
inside solder pot
2. Since lead-free soldering implement in MPT,
this cooling fan can be eliminate because
no re-materialization issue
Objective:
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
ALTERNATIVE SOLUTION
81
CORRECTIVE ACTION
Result – No change
Oxygen from
cooling fan help to
supply oxygen, thus
will contribute on
oxidization process.
Theoretical	
explanation
ADVANTAGES DISADVANTAGESSELECTION
CRITERIA
Expected Result
Solder Quality
Not very effective
Remain the same
-
-
Cost RM0.00
-
Result – No changeMerit/Demerit -
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
To introduce new solder composition:
1. Search for alternatives solder composition
by evaluating other vendors.
2. To protect solder surface layer from oxidize.
Objective:
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
ALTERNATIVE SOLUTION
82
CORRECTIVE ACTION
Alternative composition
Are expected to
Act as a protective layer
To prevent solder from
oxidize
ADVANTAGES DISADVANTAGES
SELECTION
CRITERIA
Less dross-effective
Improve
RM0.00Cost
Solder Quality
Cheaper priceMerit/Demerit
-
-
-
-Expected Result
New composition will act
as protection layer
Theoretical	
explanation
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
SELECTION
CRITERIA
ALTERNATIVE
SOLUTIONS
Expected
Results
Solder
Quality
Cost Merit/
demerit
1. Not Improve
2. Improve
1. High cost
2. Low cost
1. Low merit
2. High Merit
1. Not effective
2. Effective
Total
Weight
Cover Solder
Machine Not Effective
Score:
Not Improve RM150.00 Demerit
1
Eliminate
cooling fan
Score:
Not Improve RM0.00 Demerit
Evaluate New
Vendor
Effective
Score:
Improve MeritRM0.00
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
Not Effective
Evaluate New
Solder Composition
BEST SOLUTION
SELECT SOLUTION
83
CORRECTIVE ACTION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
PROPOSAL
84
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
Letter For TRIAL RUN
Proposal Letter to
Management
Acknowledgement
Letter
CORRECTIVE ACTION
REQUESTED ON 25TH
Jul 2006
APPROVED ON 26TH
Jul 2006
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
85
TECHNICAL ASSESSMENT
1 Solder Must Be RoHS Compliance
What is RoHS : the restriction of the use of certain hazardous
substances in electrical and electronic equipment
RoHS is often referred to as the lead-free directive,
but it restricts the use of the following six substances:
• Lead (Pb)
• Cadmium (Cd)
• Mercury (Hg)
• Hexavalent chromium (Hex-Cr)
• Polybrominated biphenyls (PBB)
• Polybrominated diphenyl ethers (PBDE)
WHEN DID RoHS COME INTO force?
The RoHS Directive and the UK RoHS regulations came
into force on 1 July 2006
CORRECTIVE ACTION
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
86
TECHNICAL ASSESSMENT
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
2 Solder Bar Price Must Be Cheaper than current vendor
Currently MPT only use 1 vendor to supply solder bar :
Current Vendor
CORRECTIVE ACTION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
87
TECHNICAL ASSESSMENT
3 SnCu base
FAIL
Sn + Ag + Cu + x
Sn, Cu Base Solder
OK Other elements
Sn + Cu + x
2 most common Pb-Free solder is SnCu Base and SAC
base. We require SnCu base solder bar.
Other elements
SAC Base Solder
CORRECTIVE ACTION
• MPT requirement for solder is Sn, Cu base
due to PCB and cell design requirement.
• SnCu base will produce less dross
• Relatively Low Cost
• Good temperature cycling resistance
WHY SHOULD WE USE
SN+CU BASE???
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
88
TECHNICAL ASSESSMENT
CORRECTIVE ACTION
Bismuth
Phosphorus
Silicone
Antimony
Dematerialization
issue will cause
solder crack
Phosphorus act as
protection layer from
oxidize
Chemical reaction
from silicon may
reduce oxidization
High melting point
and bad wetting
DecisionCharacteristicElement
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
89
TECHNICAL ASSESSMENT
CORRECTIVE ACTION
Phosphorus Silicone
Phosphorus will act
as a protected layer
after re-act with
oxygen at the
surface.
This layer will
protect other
contents, thus less
dross produce.
Silicone characteristic will
reduce the chemical
reaction for oxidization.
Thus, solder dross is less
produce.
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
90
TECHNICAL ASSESSMENT
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
CORRECTIVE ACTION
From our result, we find 2suitable vendor for our further analysis.
Sn+Cu+Ni+P
Sn + Cu + Si
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
91
MATERIAL EVALUATION
Find new vendor
Testing Requirement spec
Reliability Test
Request for Approval
PR Evaluation
Standardization
Solder Ability Test
Judgement
PR (mass pro)
OK
FAIL
End
CORRECTIVE ACTION
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
92
CORRECTIVE ACTION
MATERIAL EVALUATION
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
Testing Requirement
Specification:
1. Vendor Part Spec
2. Technical Data Spec
3. MSDS Data
4. RoHS Compliance
5. ICP Test Data
6. Quotation
1. Cross section
2. Heat Cycle
3. Pull-up Test
4. Sound Quality Test
5. Solderability Test
Testing Process:
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
93
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
DIFFICULTIES
MATERIAL EVALUATION
CORRECTIVE ACTION
Cut-off in the middle
of leg
CROSS SECTION TEST
Cross section of
Solderability at pin or
leg Is captured using
high Resolution
microscope
RESULT
MATERIAL
EVALUATION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
94
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
DESIGNOF EXPERIMENT
CORRECTIVE ACTION
CHAMBER MACHINE
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
DIFFICULTIES
MATERIAL
EVALUATION
HEAT CYCLE TEST
Heat Cycle Test Specification
Temperature : -30
o
C ~ +80
o
C
Timing : 30 min/cycle
No of Cycle : 500
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
95
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
DIFFICULTIES
CORRECTIVE ACTION
SHEAR TEST
MATERIAL
EVALUATION
200µm
Push
Chip
Solder
Measurement speed
0.12 mm/sec
Measurement speed
0.5 mm/sec
PCB
MATERIAL EVALUATION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
96
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
DIFFICULTIES
CORRECTIVE ACTION
PULL UP TEST
MATERIAL
EVALUATION
MATERIAL EVALUATION
PCB
SOLDER
PART
PULL UP
GAUGE
45
SURFACE
PULL UP EQUIPMENT
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
97
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
DIFFICULTIES
CORRECTIVE ACTION
PULL UP TEST
MATERIAL
EVALUATION
MATERIAL EVALUATION
PCB
SOLDER
PART
PULL UP
GAUGE
45
SURFACE
DURINGTHIS
PROCESS,
THE GAUGE
WILL BE
PUSHED DOWN
AT THE IC LEG
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
98
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
DIFFICULTIES
CORRECTIVE ACTION
9.8 N
PULL UP TEST
MATERIAL
EVALUATION
Measurement speed
0.12 mm/sec
MATERIAL EVALUATION
PCB
SOLDER
PART
PULL UP
GAUGE
45
SURFACE
PUSH UP
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
99
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
DIFFICULTIES
CORRECTIVE ACTION
To check how new solder affect sound quality
MATERIAL
EVALUATION
SOUND QUALITY TEST
MATERIAL EVALUATION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
100
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
DIFFICULTIES
CORRECTIVE ACTION
MATERIAL
EVALUATION
SOUND QUALITY TEST
MATERIAL EVALUATION
ACTUAL TEST
VENUE :
PAC LISTENING
ROOM
DATE :
31 MARCH
2006
ATTENDEES:
K.TAKAYAMA
T.KIMURA
A.KATO
ONG B. H.
JOHAN
MIZAN
IDAYU
RIZAL
Evaluation models:
VSX-516/KUXJ
VSX-916/MYXJ
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
101
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
MATERIAL EVALUATION
CORRECTIVE ACTION
SOLDERABILITY TEST
We checked solder ability at PCBs for solder short and reject solder pin
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
102
Test:
Cross Section
Heat Cycle
Pull-up Test
Sound Test
7
4
4
4
Result 25%
improved
4
4
4
4
54%
improved
CORRECTIVE ACTION
Y VENDORX VENDOR
4
4
4
4
54%
improved
X VENDOR
FROM RELIABILITY AND SOLDER ABILITY
TEST RESULTS
X SOLDER BAR VENDOR
IS SELECTED
MATERIAL EVALUATION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
103
REQUEST NEW SUB-MATERIAL APPROVAL FOR X
SOLDER BAR VENDOR TO PIONEER HQ JAPAN
CORRECTIVE ACTION
MATERIAL EVALUATION
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
Carry-out through implementation of
PILOT RUN(PR) procedure (Internal Control)
5
Judging
PR Result
6 PR Report
2
Scheduling
Arrangement
3 Run PR
7 Documentation
Sampling Check4
Raise PR Request
Form1
CORRECTIVE ACTION
104
MATERIAL EVALUATION
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
105
Process
PR Qty
Target
Testing
Tools
Confirm dross quantity, top-up frequency and solder ability
100 pcs
Improve Solder ability (100%)
1. Performance 2. Reliability Test
Soldering machine
CORRECTIVE ACTION
MATERIAL EVALUATION
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
106
CORRECTIVE ACTION
Outgoing Quality
Control
RESULTS
Production 1
RESULTS
MATERIAL EVALUATION
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
107
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
CORRECTIVE ACTION
MATERIAL EVALUATION
Solder dross less produce due to solder composition:
Sn + Cu + Ni + P
Phosphorus will act as a protected
layer after
Re-act with oxygen at the surface.
This layer will protect other
contents, thus less dross produce.
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
Difficulties Action How Who Result
Difficult to fix
schedule
Prod. Confuse
on new solder
usage
calculation
Arrange meeting
with MPT Prod.
Control, to
discuss on
re-adjusting the
Prod. schedule Solved
Carry-out short
training
session to
clarify the
solder usage
quantity Solved
1.
2.
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
DIFFICULTIES
CORRECTIVE ACTION
108
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
PROBABLE
CAUSE
ALTERNATIVE
SOLUTION
TECHNICAL
ASSESSMENT
PROPOSAL
SELECT
SOLUTION
MATERIAL
EVALUATION
DIFFICULTIES
DIFFICULTIES
CORRECTIVE ACTION
109
???Production confuse on
new solder usage calculation
•Phosphorus level difficult to
maintain during high production
volume.
•Two type of solder bar were
introduced with different
content of phosphorus inside
the composition.
•Training was conducted on
how to balance out phosphorus
level inside solder pot.
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
MONITORING
FLOW
DAILY
SAMPLING DATA
DATA
ASSESSMENT
TEAM MEMBER
WEEKLY REVIEW
RESPONSE
110
MONITORING OF RESULT
MONITORING
PE
MCD
PD1
PD1
PC
PICStart
New vendor
New order
Line selection
Incoming material control
Monitoring
B
PE
ME
ME
PE
PIC
END
Implement check sheet
Top up solderevery 1 hour
Resultmonitoring
Solder dross collection 3 times
B
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
111
MONITORING OF RESULT
MONITORING
FLOW
DAILY
MONITORING
DATA
DATA
ASSESSMENT
TEAM MEMBER
WEEKLY REVIEW
RESPONSE
--- DAILY MONITORING DATA ---
Prod DIV 1,
Line P10
Apr 21 ~ May10
Check sheet
tomeasure Dross
& top up
100 % check for
all production lot.
WHERE WHENMETHOD
MEASURED
WEIGHT WHO
Check Sheet
TOTAL DROSS
IN (KG)
ME/PE
TOTAL TOP UP
SOLDER IN (KG) –
EVERY 1 HOUR
MONITORING
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
MONITORING
FLOW
DAILY
SAMPLING DATA
DATA
ASSESSMENT
TEAM MEMBER
WEEKLY REVIEW
RESPONSE
112
MONITORING OF RESULT
Monthly top up & total solder dross
reduced when using new type of
solder bar (X-Vendor)
Compare to current type (Current-Vendor)
MONITORING
Month
Vendor X- (P37) Y- (P36)
Price/KG (RM) 38.33 48.50
Production Date 7/8 - 29/8 1/8 - 29/8
Production Qty 18620 17800
Monthly Top up/Bar 1200 2311
Monthly Top up/KG 624.00 1150.87
Solder Dross (KG) 114.00 280.50
Monthly Total cost (RM) 23917.92 55817.20
August
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
113
MONITORING OF RESULT
MONITORING
FLOW
DAILY
SAMPLING DATA
DATA
ASSESSMENT
TEAM MEMBER
WEEKLY REVIEW
RESPONSE 0
10000
20000
30000
40000
50000
60000
Cost(RM)
August September October November December January February March April May
Month
X-Vendor (P37)
Current-Vendor (P36)
MONITORING
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
114
MONITORING OF RESULT
MONITORING
FLOW
DAILY
SAMPLING DATA
DATA
ASSESSMENT
TEAM MEMBER
WEEKLY REVIEW
RESPONSE 0
50
100
150
200
250
300
Dross(kg)
August September October November December January February March April May
Month
X-Vendor (P37)
Current-Vendor (P36)
MONITORING
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
115
MONITORING OF RESULT
MONITORING
FLOW
DAILY
SAMPLING DATA
DATA
ASSESSMENT
TEAM MEMBER
WEEKLY REVIEW
RESPONSE 0
5000
10000
15000
20000
25000
ProductionQuantity(pcs)
August September October November December January February March April May
Month
X-Vendor (P37)
Current-Vendor (P36)
MONITORING
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
116
MONITORING OF RESULT
MONITORING
FLOW
DAILY
SAMPLING DATA
DATA
ASSESSMENT
TEAM MEMBER
WEEKLY REVIEW
RESPONSE
MONITORING
Production
Quantity
Total
Top Up / Bar
Total
Top Up / KG
Solder Dross
(KG)
Total Cost
(RM)
Current Vendor X Vendor
134,709.00
119,874.00
9,268.00
12,247.00
6,497.00
4,934.36
983.09
1,695.60
315,108.67
175,974.02
MONITORING RESULT AUGUST 2006 – MAY 2007
Total Cost
(RM)
315,108.67
175,974.02
REDUCE COST
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
MONITORING
FLOW
DAILY
SAMPLING DATA
DATA
ASSESSMENT
TEAM MEMBER
WEEKLY REVIEW
RESPONSE
Team Weekly Review Meeting
Bunga Tanjung done weekly meeting to review line P37 solder bar usage. This is to
evaluate the effectiveness of using new solder bar to improve the solder ability and
reduce 10% of solder bar cost.
Solder bar usage isclosely monitored
during each meeting to identify any
abnormality in production.
117
MONITORING OF RESULT
MONITORING
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
118
MONITORING OF RESULT
C U S T O M E R R E S P O N S E
No more hassle for touch-up
Cost reduction
Supervisor
Procurement General Manager
OQC pass rate increased Excellent !!!
OQC
Operator
MONITORING
FLOW
DAILY
SAMPLING DATA
DATA
ASSESSMENT
TEAM MEMBER
WEEKLY REVIEW
RESPONSE
Productivity increase Less maintenance
Technician
MONITORING
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
IMPLEMENTATION APPROVAL
STANDARDIZATION
119
DOCUMENT
& STORAGE
TRAINING FOLLOW-UP
EVIDENCE
STANDARDI
ZATION
MEETING
IMPLEMENT
APPROVAL
Implementation Letter
Acknowledgement LetterLetter to Management
Dated: 09/08/06 Dated: 10/08/06
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
OUR AGENDA
DATE: 11/05/07
MANAGEMENT
STAFF
MANAGEMENT REVIEW MEETING
STANDARDIZATION
120
MEETING
DOCUMENT
& STORAGE
TRAINING
FOLLOW-UP
EVIDENCE
IMPLEMENT
APPROVAL
STANDARDI
ZATION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
MEETING DOCUMENT
& STORAGE
TRAINING FOLLOW-UP
EVIDENCE
IMPLEMENT
APPROVAL
VISUAL MANAGEMENT & TRAINING
STANDARDIZATION
Basic Solder Training
A training on solder was conducted to ensure
the knowledge of members in related
departments are up to an expected level
Participants: Production Engineering,
Manufacturing Engineering, Machine
maintenance technician.
Contents :
• Basic of solder
• Solder composition,
•Chemical reaction between solder and other
elements
•Temperature and maintenance
121
STANDARDI
ZATION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
MEETING
DOCUMENT
& STORAGE
TRAINING FOLLOW-UP
EVIDENCE
IMPLEMENT
APPROVAL
DOCUMENTATION& STORAGE
STANDARDIZATION
122
Solder sample
taken and sent
for analysis
Results issued
and filing
STANDARDI
ZATION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
MEETING
DOCUMENT
& STORAGE
TRAINING FOLLOW-UP
EVIDENCE
IMPLEMENT
APPROVAL
DOCUMENTATION& STORAGE
STANDARDIZATION
123
STANDARDI
ZATION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
DOCUMENT
& STORAGE
TRAINING FOLLOW-UP
EVIDENCE
MEETINGIMPLEMENT
APPROVAL
PPT= PROCESS PATROLTEAM
FOLLOW UP EVIDENCE
STANDARDIZATION
124
10 months monitoring result
STANDARDI
ZATION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
DOCUMENT
& STORAGE
TRAINING FOLLOW-UP
EVIDENCE
MEETINGIMPLEMENT
APPROVAL
PPT= PROCESS PATROLTEAM
MONITORING
STANDARDIZATION
125
Standardization implementation
Line P36 & P38 for
standardization and
implementation
STANDARD-
IZATION
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
DOCUMENT
& STORAGE
TRAINING FOLLOW-UP
EVIDENCE
MEETINGIMPLEMENT
APPROVAL
PPT= PROCESS PATROLTEAM
MONITORING
STANDARDIZATION
126
STANDARD-
IZATION
Sample of Solder Top-up & Total Dross Checksheet
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
RECOGNITION LETTER
MANAGEMENT RECOGNITION
ACHIEVEMENT
127
ATTAINED ON:
16th MAY 2007
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
TANGIBLE RESULT
X-Vendor 134709
Current-Vendor 119874
Increasing 14835
PRODUCTION QUANTITY
X-vendor 4934.36
Current-Vendor 6497.09
Decreasing 1562.73
TOP UP (KG)
X-Vendor 983.09
Current-Vendor 1695.6
Decreasing 712.51
DROSS QUANTITY (KG)
X-Vendor 175974.02
Current-Vendor 315108.67
Decreasing 39134.65
COST (RM)
ACHIEVEMENT
128
Verified by MPT
Finance
Dept Head
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
INTANGIBLE RESULT
ACHIEVEMENT
129
0
1
2
3
4
5
Before
After
1 2 3 4 5
AveragePoor Weak Good Excellent
[ Rating Scale ]
Source : Self Examination Form
2.1 3.8
NO EVALUATION ITEM
Knowledge of QC
Method & Tools
Understanding of
PDCA Concept
Problem Analysis
Method
BEFORE AFTER
1.9 3.5
1.6 3.5
2.0 3.9
2.0 3.9
2.4 4.0
Planning & Time
management
Problem Solving
Approach
1
2
3
4
5
AVERAGE : 2.0 3.8
6
Communication &
Teamwork
Knowledge of ICC
Method & Tools
Planning
&Time
Management
Communication
& Teamwork Understanding
of PDCA
Concept
Problem
Analysis
Approach
Problem Solving
Approach
Target Achieved!!!
76%
(Actual target = 50%)
SELF ASESSMENT DATA
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
130
PE DIVISION
TEMPLATE DESIGN BY: RAHIZAH HAMDAN
131

More Related Content

Similar to Bunga Tanjung - National ICC Convention 2017 (20)

Resume
ResumeResume
Resume
 
Mohd Sabri Ahmad resume
Mohd Sabri Ahmad resumeMohd Sabri Ahmad resume
Mohd Sabri Ahmad resume
 
6th Mobile Offshore Production Drilling Units call for papers 2017
6th Mobile Offshore Production Drilling Units call for papers 20176th Mobile Offshore Production Drilling Units call for papers 2017
6th Mobile Offshore Production Drilling Units call for papers 2017
 
RAKESH_KUMAR_ANGURAL_14Sep2015(long)
RAKESH_KUMAR_ANGURAL_14Sep2015(long)RAKESH_KUMAR_ANGURAL_14Sep2015(long)
RAKESH_KUMAR_ANGURAL_14Sep2015(long)
 
Gauravkchawla_updated_Profile
Gauravkchawla_updated_ProfileGauravkchawla_updated_Profile
Gauravkchawla_updated_Profile
 
My CV Update 0515
My CV  Update 0515My CV  Update 0515
My CV Update 0515
 
Resume
ResumeResume
Resume
 
M.Pandey( New resume)
M.Pandey( New resume)M.Pandey( New resume)
M.Pandey( New resume)
 
AKD_latest
AKD_latestAKD_latest
AKD_latest
 
Resume Fakhrurrazi new6
Resume Fakhrurrazi new6Resume Fakhrurrazi new6
Resume Fakhrurrazi new6
 
S solanki
S solankiS solanki
S solanki
 
REsume_160801
REsume_160801REsume_160801
REsume_160801
 
RESUME-3
RESUME-3RESUME-3
RESUME-3
 
mohanraj back end resume 2015
mohanraj back end resume 2015mohanraj back end resume 2015
mohanraj back end resume 2015
 
Resume Fadzil-Updated
Resume Fadzil-UpdatedResume Fadzil-Updated
Resume Fadzil-Updated
 
SENTHILKUMAR_resume12-11-2016
SENTHILKUMAR_resume12-11-2016SENTHILKUMAR_resume12-11-2016
SENTHILKUMAR_resume12-11-2016
 
resume Designer instrumentation
resume Designer instrumentationresume Designer instrumentation
resume Designer instrumentation
 
Ankur Resume (2)
Ankur Resume (2)Ankur Resume (2)
Ankur Resume (2)
 
AliahAzlin_JobEmployment_Resume
AliahAzlin_JobEmployment_ResumeAliahAzlin_JobEmployment_Resume
AliahAzlin_JobEmployment_Resume
 
Manikanta_Resume
Manikanta_ResumeManikanta_Resume
Manikanta_Resume
 

More from Johan Irwan Kamarozaman

Leadership insight - Why Employee Resign
Leadership insight - Why Employee ResignLeadership insight - Why Employee Resign
Leadership insight - Why Employee ResignJohan Irwan Kamarozaman
 
How To Get Standing Ovation Presenting Your Ideas
How To Get Standing Ovation Presenting Your IdeasHow To Get Standing Ovation Presenting Your Ideas
How To Get Standing Ovation Presenting Your IdeasJohan Irwan Kamarozaman
 
Developing Your Blueprint to Lead Effectively in the 21st century IEEE WIE...
Developing Your Blueprint to Lead Effectively in the 21st century    IEEE WIE...Developing Your Blueprint to Lead Effectively in the 21st century    IEEE WIE...
Developing Your Blueprint to Lead Effectively in the 21st century IEEE WIE...Johan Irwan Kamarozaman
 
Fundamental of Successful Negotiations (slides)
Fundamental of Successful Negotiations (slides)Fundamental of Successful Negotiations (slides)
Fundamental of Successful Negotiations (slides)Johan Irwan Kamarozaman
 
Leading in the 21st century - How Organization Can Be More Effective In The C...
Leading in the 21st century - How Organization Can Be More Effective In The C...Leading in the 21st century - How Organization Can Be More Effective In The C...
Leading in the 21st century - How Organization Can Be More Effective In The C...Johan Irwan Kamarozaman
 
SALES MASTERY - Mastering the Art of Selling
SALES MASTERY - Mastering the Art of SellingSALES MASTERY - Mastering the Art of Selling
SALES MASTERY - Mastering the Art of SellingJohan Irwan Kamarozaman
 

More from Johan Irwan Kamarozaman (10)

Leading in the 21st century - SIRIM
Leading in the 21st century - SIRIMLeading in the 21st century - SIRIM
Leading in the 21st century - SIRIM
 
Corporate Culture Presentation
Corporate Culture PresentationCorporate Culture Presentation
Corporate Culture Presentation
 
Leadership insight - Why Employee Resign
Leadership insight - Why Employee ResignLeadership insight - Why Employee Resign
Leadership insight - Why Employee Resign
 
Leading in the 21st Century
Leading in the 21st CenturyLeading in the 21st Century
Leading in the 21st Century
 
How To Get Standing Ovation Presenting Your Ideas
How To Get Standing Ovation Presenting Your IdeasHow To Get Standing Ovation Presenting Your Ideas
How To Get Standing Ovation Presenting Your Ideas
 
Developing Your Blueprint to Lead Effectively in the 21st century IEEE WIE...
Developing Your Blueprint to Lead Effectively in the 21st century    IEEE WIE...Developing Your Blueprint to Lead Effectively in the 21st century    IEEE WIE...
Developing Your Blueprint to Lead Effectively in the 21st century IEEE WIE...
 
Fundamental of Successful Negotiations (slides)
Fundamental of Successful Negotiations (slides)Fundamental of Successful Negotiations (slides)
Fundamental of Successful Negotiations (slides)
 
Leading in the 21st century - How Organization Can Be More Effective In The C...
Leading in the 21st century - How Organization Can Be More Effective In The C...Leading in the 21st century - How Organization Can Be More Effective In The C...
Leading in the 21st century - How Organization Can Be More Effective In The C...
 
SALES MASTERY - Mastering the Art of Selling
SALES MASTERY - Mastering the Art of SellingSALES MASTERY - Mastering the Art of Selling
SALES MASTERY - Mastering the Art of Selling
 
Organize your speech
Organize your speechOrganize your speech
Organize your speech
 

Recently uploaded

main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 

Recently uploaded (20)

young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 

Bunga Tanjung - National ICC Convention 2017

  • 1. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 1 WELCOME TO ICC NATIONAL CONVENTION 14 ~ 16 AUGUST 2007
  • 2. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 2 AGENDA INTRODUCTION Presenter • Introduction • Group Proceeding • Problem Selection • Problem Definition • Analysis • Corrective Action • Monitoring • Standardization • Achievement
  • 3. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN MPT PRODUCTDESTINATION 38% 16% 13%3% Europe Japan North America Other Region Local Market 30% PEP PEM PTK PTM,TPT PAC AST PTW PTD,PSD MND,MDE PCH,PSG PSM,SPS PIC PET PMM PSSA,YMSA MMSA JPN Indian Ocean Pacific Ocean MPT= MALAYSIA PIONEER TECHNOLOGY PIONEERWORLDWIDE P R O D U C T I O N L A Y O U T MPT INTRODUCTION 3
  • 4. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN MALAYSIA PIONEERTECHNOLOGY C O M P A N Y P R O F I L E PIONEER TECH. (M)SDN.BHD LOCATED AT; No. 5,TG AGASIND.AREA, 84000MUAR,JOHOR MALAYSIA AUG 1993 MUAR RIVER SPORTS GROUND WAREHOUSE PRODUCTION FLOOR MAIN ROAD - TANJUNG AGAS ROAD TO TANGKAK / MELAKA TANJONG AGASINDUSTRIAL AREA CAR PARK MOTOCYCLE PARKING AREA SPORTS CENTRE Build g Space :24,271m (6.0Acres)2 Land Space : 56,656m (14.0 Acres)2 INTRODUCTION OPERATION STARTED 4
  • 5. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 5 P I O NE E R P RO DU CT R A N G E INTRODUCTION
  • 6. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN P I O NE E R P RO DU CT R A N G E INTRODUCTION 6
  • 7. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 7 PIONEER TECHNOLOGY (MALAYSIA) SDN.BHD.RECOGNITION 1 Companyin MalaysiaAttained ISO/TS 16949 - 29th April 2003- st INTRODUCTION
  • 8. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 8 (Open Category Electronic Sector) The Winnerof National 5S Organization Competition2003 PERSEKITARAN BERKUALITI 5S PIONEER TECHNOLOGY (MALAYSIA) SDN.BHD.RECOGNITION INTRODUCTION
  • 9. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 9 Winnerof NPC ProductivityAward was hand over by YB Dato Hj. Ahmad Husni Mahamad Hanadzlah (Deputy Minister of International Trade & Industry) to MPT Managing Director Mr. Miyamura - 15th July2004 - PIONEER TECHNOLOGY (MALAYSIA) SDN.BHD.RECOGNITION INTRODUCTION
  • 10. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 10 3 in National ICC Convention 2004 ElectronicSector [ NEURON TEAM ] rd 3rd Winner Top 10 Winner 3 Star Award PIONEER TECHNOLOGY (MALAYSIA) SDN.BHD.RECOGNITION INTRODUCTION
  • 11. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 11 Winnerof Johor Industry QualityAward 2004 (Electronicsector) Prize were hand over by Chief Minister or Johor Dato Hj. Abd. Ghani bin Osman - 22nd March2005 - PIONEER TECHNOLOGY (MALAYSIA) SDN.BHD.RECOGNITION INTRODUCTION
  • 12. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 12 Most PromisingICC Award Mini Convention [ Supernova TEAM ] - 12th April 2005 - PIONEER TECHNOLOGY (MALAYSIA) SDN.BHD.RECOGNITION INTRODUCTION
  • 13. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 13 INTRODUCTION PIONEER TECHNOLOGY (MALAYSIA) SDN.BHD.RECOGNITION Awarded Caring Organization (IndustrialSector) Prize were hand over by Muar District Officer wife Datin Hajah Rokiah Binti Karim - 9th November 2006 -
  • 14. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 14 O R G A N I Z A T I O N C H A R T MALAYSIA PIONEER TECHNOLOGY INTRODUCTION 21 Departments PRODCONTROL DIV GENERAL DIV Effective Date :01/04/2007 Human Res. Admin Dept Finance Dept A/I Production A/I Material A/I Cont. Production 1 ME QC ECD QE PTE Prod Control Info System Material Control Procurement FINANCE DIV PRODUCTION 1 DIV PRODUCTION 2 DIV PROCESS INNOVATION DEPT QUALITY ENG. DIV CORPORATE MANAGEMENT GROUP 8 Divisions ENGINEERING& PRODUCTION GROUP MANAGING DIRECTOR MR. MIYAMURA PE1 PE2 PE3 PRODUCTION ENG. DIV Production 2 IP Dept PRODUCTION ENG. DIV PE1 PE2 PE3
  • 15. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 15 NATURE OF WORK INTRODUCTION - Introduce new model in production line. - Control new model activity from Proto to Mass Prod. stage NEW MODEL INTRODUCTION PROCESS & JIG DEVELOPEMENT DOCUMENTATION CONTROL PRODUCTION SUPPORT - Designprocess for new model designed by Japan orSingapore - Designelectrical and mechanical jig - Windows of Engineering documents for Pioneer world wide - Support Engineering Section - Technical support -Problem analysis - Pass rateimprovement study
  • 16. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 16 1 WE ARE HERE Production Division 1 Quality Engineering Division Production Division 2 Warehouse NATURE OF WORK INTRODUCTION
  • 17. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 17 PEDIVISION OFFICE SPACE 371.7m PE =PRODUCTION ENGINEERING PE DIVISON LAYOUT INTRODUCTION WAREHOUSE 3 PE DIVISION PROFILE Total manpower Male / Female Local Japanese 73 50 / 23 2 71 2.74% 97.26% 2
  • 18. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 18 TEAM NAME AND MOTTO INTRODUCTION Lovely evergreen Bunga Tanjungtree, with its smallshiny,thicknarrow, pointed leave, straight trunkand spreading branches. Mediumlining andlarge canopy shape. Strong root base, non-spreading andnon- collapse. Pale Yellow essential oil of Bunga Tanjungproduce a sweet and extremely tenacious floral odour. TEAM MOTTO
  • 19. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 19 TEAM LOGO INTRODUCTION Strong tree to show our strength as a team. Floral odour smells to show our commercial values. Whitein colour to show our clean and tidiness.
  • 20. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 20 Engineer Mechanical Eng. CO LEADER SECRETARY IDAYU TECHNICAL RAZIF JOHAN Engineer Process Eng. LEADERExecutive Engineer PE Division ITHNAIN FACILITATOR Supervisor AIP Dept NAJIB ADVISOR TEAM ORGANIZATION CHART MIZAN Engineer Industrial Eng. Engineer Process Eng. GROUP PROCEEDING UMI FACILITY RIZAL FACILITY FALIQ SOFTWARE Engineer F/C Designer Engineer Process Eng. Engineering Clerk Doc. Clerk Production Engineering Division OCCUPATIONAL BACKGROUND Main Section : Member consist : Education Level : Working Hour : 6 Engineers& 1 Engineering Clerk SPM ~ Degree Normal Shift
  • 21. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN TEAM PROFILE JOHAN MIZAN IDAYU FALIQ RAZIF RIZAL UMI * Experience in Function Checker and CA design * Experience in Computer skill for 10 years * Expert in Group Facilitation Skills * Degree in Electronic Engineering (IE) (2005) * Diploma in Electronic Computer (2001) * MOST trainer (2005) * Degree in Eng(Hons) Electronics majoring in Computer * CCNA – Cisco level 1 * Certified in Hi-Pot setting level 2 * Degree in Mechanical Engineering (2005) * Diploma in Mechanical Engineering (1999) * Certified in Microsoft Access 2000 * Degree in Electrical (Control and Instrumentations) * Diploma in Electrical Communication ( 2000 ) * Certified in Excellent Clerical Course * Sijil Pelajaran Malaysia (SPM 1993) * Certified in Microsoft Access 2000 Advance * Certificate in LCCI * Degree in Mechanical Engineering Hons) (2005) * Diploma in Mechanical Engineering (2001) * Certificate in PLC (2006) * Experience as Mechanical Designer * Experience in Computer Skill for years * Expert in CAD/CAM * Expert in technical drawing * Experience as Software Development * Experience in Computer Skill for 7 years * Experience in Pilot Run Coordinator * Experience in Flash Rom download * Experience in Computer skills for over 10 years * Experience in Process Design * Experience in Java Programming (J2SE & J2ME) * Expert in data communication and networking * Experience as Documentation Clerk * Experience in Computer Skill for 10 years * Expert in Work Reference Documentation Coordinator * Expert in Main Process Skill & Training * Experience in troubleshooting and calibration * Experience in Computer Skill for 5 years * Experience in process design * Experience as a Documentation * Experience in Computer Skill for 15 years * Expert in Main Process Skill & Training * Degree in Electrical&Electronics Engineering (Hons) * Certificate in Microsoft SQL server * LabView Basic 1 & 2 * Certificate in SPC and 8D Problem Solving 21 GROUP PROCEEDING
  • 22. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN BUNGA TANJUNG S JOURNEY MPT- CHAMPION Gold Award INTRODUCTION REGIONAL - GOLD AWARD BE THE BEST ! 22
  • 23. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 23 TEAM ACTIVITIES GROUP PROCEEDING OCT 05 Effective Presentation Skills MAR 07 Statistical Process Control (SPC) AUG 06 21 Habits In Becoming Effective Supervisor NOV 05 Most Training JUN 07 Basic / Advance PLC Training MAY 06 Basic Fire Safety Training MAR 07 Inventor Professional Training DATE ACTIVITIES TRAINEE MAR 07 Advanced Product Quality Planning (APQP) REEMOS MIZAN IDAYU JOHAN RAZIF RIZAL UMI
  • 24. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN TEAM CONT RIBUTIO N ALLIGNED TO COMPANY S OBJECTIVE LEGEND BSC : BALANCE SCORE CARD To integrate everyone s capability and pursue a complete QECD with a customer view point. VISION MISSION CORPORATE CORE VALUE D I V I S I O N T A R G E T ( B S C ) To become a company that encourages all its members to work as a team, with everyone customer-focused, integrating each one s professionalism in pursuing innovations one after another. Fair & Reasonable. Positive & Active. Speedy & Flexible. Financial Customer Job Process Human Engineering 24 GROUP PROCEEDING
  • 25. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 25 HEALTHY ATTENDANCE PERFORMANCE 40 50 60 70 80 90 100 W1 W3 W5 W7 W9 W11 W13 W15 W17 W19 W21 W23 W25 W27 W29 W31 Week of meeting (Apr 06 - Apr 07) Attendance% Minute OfMeeting Bunga Tanjung s Target = > 94% WEEKLY ATTENDANCE GRAPH Average Attendance = 98 % Attendance Sheet GROUP PROCEEDING
  • 26. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 26 TEAM MEMBERSJOB DISTRIBUTION Method : MATRIX DIAGRAM ACTIVITIES Materials /Tools PROJECT PLANNING Brainstorming ,PDCA activity, Milestone Chart, Job Distribution PROJECT SELECTION & DEFINITION Brainstorming, BSC, Historical Data Dept Objective/focus Brainstorming, Fish Bone Diagram, Graphical chart, Check Sheet MONITORING Check Sheet, Trend Chart, Review Meeting STANDARDIZATION SOP maintenance , Check Sheet, Training, Trend Chart, Audits, Reports ACHIEVEMENT & VALUE CREATION ROI data, Respond, Graphical chart, Questionnaire, PRESENTATION Brainstorming, presentation facility Main Coordinator Supporter100 % MEMBERS INVOLVEMENT ANDCOMMITMENT ! IMPROVEMENT OPPORTUNITIES ANALYSIS CREATIVES & INNOVATIVE SOLUTIONS/IMPLEMENTATION Brainstorming, Solution flow, Decision Matrix table,reports RIZAL FALIQ MIZAN IDAYU GROUP PROCEEDING
  • 27. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN Brainstorming Discussion Ideas Suggestion Concentrate BUNGA TANJUNG AT A GLANCE Data Compilation 27 GROUP PROCEEDING
  • 28. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 28 EFFECTIVE COMMUNICATION AMONG MEMBERS Social LinkageEvents from JUN 2006 – JUN 2007 MPT GUNUNGLEDANG PENGKALANBALAK BABA NYONYACAFE MITC FUNG SENG GROUP PROCEEDING Date 19/6/2006 04/08/2006 18/11/2006 03/02/2007 10/03/2007 21/07/2007 23/03/2007 15/05/2007 11/06/2007 Activities Family Day at Gunung Ledang MPT Sport’s Day Dinner at Classic Hotel Birthday Celebration at Fung Seng Group Binding at MPT Dinner at Baba Nyonya Cafe AnnualDinner at MITC Dinner at Sabak Aur Picnic at Pengkalan Balak Coordinator Umi Faliq Idayu Syahmizan Rizal Idayu Faliq Razif Johan
  • 29. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 29 P D C A C Y C L E P L A N SOLUTION & IMPLEMENTATIONMONITORING STANDARDIZATION STANDARDIZATION MONITORING DATA COLLECTION AND GOAL SETTING PROBLEM/PROJECT SELECTION ANALYSIS & ALTERNATIVE SOLUTION GROUPFORMATION A C T I O N C H E C K D O GROUP PROCEEDING
  • 30. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 30 M I L E S T O N E C H A R T Plan Actual GROUP PROCEEDING TARGET COMPLETED ON SCHEDULE
  • 31. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 31 PROBLEM SELECTION APPROACH PROBLEM SELECTION S T EP 1 COMPANY FOCUS S T EP 2 AREA OF IMPROVEMENT S T EP 4 PROBLEM SELECTION S T EP 3 PROBLEM IDENTIFICATION
  • 32. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN STEP 1 STEP 2 STEP 3 STEP 4Company Focus CORPORATE FOCUS P R O B L E M S E L E C T I O N 32 MPT Mission To integrate everyone s capability and pursue a complete QECD with a customer view point COMPANY FOCUS MPT Vision To become a company that encourages all its members to work as a team, with everyone customer-focused, integrating each one s professionalism in pursuing innovations one after another PROBLEM SELECTION uality ost eliverynvironmentE
  • 33. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN STEP 1 STEP 2 STEP 3 STEP 4Area of Improvement Sources for brainstorming P R O B L E M S E L E C T I O N 33 PROBLEM SELECTION CARR Report Data Engineering Analysis Report OQC Reject Data Problem Min. of Meeting Production Reject Data Customer Feedback
  • 34. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN STEP 1 STEP 2 STEP 3 STEP 4Problem Identification Common problems related to QECD B R A I N S T O R M I N G High Solder Wastage 7 Dipping Solder Quality 9 Auto insert problem 10 Dust on production 14 Part distribution delay 4 Workman -ship problem 2 Use different part 12 Additional process request 5 Change model time too long 1 Spare part receive late 20Non value Added process 19 Incoming Part NG 15 Shipment Delay 16 Line layout not suitable 18 Part received not good 13 Sub material difficult to control 3 Equipment not reliable 6 Wrong use of Part 8 Spare part cost high 21 Process design lead time too long 22 Sub Material high cost 11 Rework cost 17 34 PROBLEM SELECTION
  • 35. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 35 High Solder Wastage 7 Dipping Solder Quality 9 Auto insert problem 10 Dust on production 14 Part distribution delay 4 Workman -ship problem 2 Use different part 12 Additional process request 5 Change model time too long 1 Spare part receive late 20Non value Added process 19 Incoming Part NG 15 Shipment Delay 16 Line layout not suitable 18 Part received not good 13 Sub material difficult to control 3 Equipment not reliable 6 Wrong use of Part 8 Spare part cost high 21 Process design lead time too long 22 Sub Material high cost 11 Rework cost 17 SIMILAR PROBLEMS STEP 1 STEP 2 STEP 3 STEP 4Problem Identification Common problems related to QECD PROBLEM SELECTION B R A I N S T O R M I N G
  • 36. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 36 High Solder Wastage 7 Dipping Solder Quality 9 Auto insert problem 10 Dust on production 14 Part distribution delay 4 Workman -ship problem 2 Use different part 12 Change model time too long 1 Spare part receive late 20Non value Added process 19 Incoming Part NG 15 Shipment Delay 16 Line layout not suitable 18 Part received not good 13 Sub material difficult to control 3 Equipment not reliable 6 Wrong use of Part 8 Spare part cost high 21 Process design lead time too long 22 Sub Material high cost 11 Rework cost 17 Additional process request 5 8 8SIMILAR PROBLEMS STEP 1 STEP 2 STEP 3 STEP 4Problem Identification Common problems related to QECD PROBLEM SELECTION B R A I N S T O R M I N G
  • 37. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN QUALITYCOST ENVIRONMENTDELIVERY Workman -ship problem Auto insert problem Wrong use of part Non value Added process Dipping solder quality Incoming part NG 15 10 2 8 19 9 Rework cost 17 High solder wastage Spare part cost high Change model time too long Sub material difficult to control Additional process request 7 3 21 5 1 Process design lead time too long Part distribution delay Shipment delay Spare part receive late 22 4 20 16 Dust on production Line layout not suitable Equipment not reliable 14 6 18 TOTAL DATA CARD : 8 TOTAL DATA CARD : 5 TOTAL DATA CARD : 4 TOTAL DATA CARD : 3 A F F I N I T Y D I A G R A M Sub Material High cost 11 1 37 STEP 1 STEP 2 STEP 3 STEP 4Problem Identification Common problems related to QECD PROBLEM SELECTION
  • 38. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN After analyze the Pareto chart, BUNGA TANJUNG decided to focus on department COST issues. 100 80 60 40 20 0 40% 65% 85% No. of Cards Cost Delivery Environment % Quality 8 5 4 3 0 2 4 6 8 10 12 14 16 18 20 38 P A R E T O C H A R T 40% PROBLEM SELECTION STEP 1 STEP 2 STEP 3 STEP 4Problem Identification
  • 39. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN STEP 1 3 7 8 1 5 2 4 6 CRITERIA High solder wastage Sub material difficult to control Sub material high cost Additional process request Change model time too long Non value added process Spare part costhigh Reworkcost 4x 5x 5x 4x 3 3 4 3 3 23 2 1 2 2 5 3 3 2 3 2 3 23 3 3 2 3 4 3 2 3 2233 12 25 20 12 8 10 10 12 4 15 15 8 8 15 15 8 12 15 15 8 12 20 15 8 12 15 10 12 12 15 10 8 42 40 69 46 50 55 49 45 A B LEGEND A = Votes B = Ax Weight Scale STEP 3 STEP 4Problem Selection STEP 2 1 Rank Within Member Influence Customer Impact Urgency Lead Time Total Weight Within Member Influence Customer Impact Lead Time COST PROBLEM SUB MATERIAL COST NOTACHIEVED Urgency 39 PROJECT SELECTION MATRIX PROBLEM SELECTION
  • 40. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 40 SUB-MATERIAL is the Supporting material s use at production assembly exclude part such as liquid, glue, tape etc . Usually we purchase from some vendor around the world in order to support production . Example of sub material use at production line: Flux Solder Wire Solder Paste Used at soldering machine Used for manualsoldering Used at solder printingmachine Solder Bar Used at soldering machine PROBLEM SELECTION P R O B L E M S E L E C T I O N
  • 41. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 51000 51500 52000 52500 53000 53500 54000 Apr May June July Aug Sept Oct Nov Dec Jan Feb Mar 41 Monthly Sub-Materials Cost (Apr 05 ~ Mar 06) Total Cost of Sub-Material Purchase inPioneer PROBLEM SELECTION P R O B L E M S E L E C T I O N
  • 42. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN Antenna jack Graph showing usage of top 4 of sub-materials 42 PROBLEM SELECTION P R O B L E M S E L E C T I O N Solder Bar is the highest usage sub-material in production line
  • 43. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 43 Based on production forecast the order willbe increasing due to high demand,so the usage of solder bar is expected to be increased, thus BUNGA TANJUNGconsider to find a method to reduce the solder bar cost. PROBLEM SELECTION P R O J E C T T A R G E T
  • 44. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 44 PROBLEM SELECTION P R O B L E M D E F I N I T I O N What isSolder Bar? Why we choose Solder Bar? Why Solder Bar usage too high? What are the impact of high usage of Solder Bar to MPT? • Fusible metal alloy that take a shape of bar, • Melting point = 210 C, • Melted in solderingmachine • Use to join metallicsurfacesof PCBand electronic components. • High usage compare to the other sub-materials. • MPT production requirement due to high production • Cost will be increased.
  • 45. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN CONCLUSION OF PROJECT SELECTION 45 To promote reduction of sub- material cost by minimizing high solder bar cost PROBLEM SELECTION
  • 46. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN DIVISION STOP TARGET < Balance Score Card(BSC) > The balanced scorecard is a management system (not only a measurement system) that enables organizations to clarify their vision and strategy and translate them into action. It provides feedback around both the internal business processes and external outcomes in order to continuously improve strategic performance and results. When fully deployed, the balanced scorecard transforms strategic planning from an academic exercise into the nerve center of an enterprise._ Drs Robert Kaplan What is Balance Score Card(BSC) ? Balance Score Card ( VISION & STRATEGY ) PROBLEM SELECTION 46
  • 47. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN RELATION TO DIVISION S TOP TARGET ( B re a kd o w n of B SC St r at eg y M ap ) 2HM MBH TRSN DQ J ob process Q HMHMF 1WO MRHNM DR NTMS DRDQ SHNM NE OQNEHSR 4MOQN D DMS NE B R ENV MPT 4 OQN D DMS HM BTRSN DQ R SHRE BSHNM MC 5 8 H FD 8 QN NSHNM NE BNRS QDCTBSHNM 4 OQN D DMS NE PT HS 7 ARDQ MBD 143 - 6 4 OQN D DMS HM D O N DD R SHRE BSHNM HEC 4MCDODMCDMBD R 3 1 TA E BSNQ Q MREDQ NE 8 1 INA 8 TQB RD NODQ SHMF DWO MRHNM 8 QN NSHNM NE QD N TSHNM NE BSH HS ENQ PT HS 8 8 QNIDBS 1M HQNM DMS BNQQDRONMCDMBD RSQDMFS DMHMF OEM 1WO MRHM ATRHMDRR 4M DMSNQ BTQS H DMS T HS MC OQNCTBSHNM DMFHMDDQ QDHMENQBD DMS S ESD 1- 3- 5FB - BSH HS NE ) 1 0 MC ) EDDCA B R RSD Q HMHMF NE TCHS RS EE 4MSQNCTBSHNM NE M FD DMS QD SHNM MC HMSQNCTBSHNM NE DM HQNM DMS HCC D O M Q HMHMF NE R RSD DMFHMDDQ 2T MDRR NE RRDRR DMS R DR , H HNM 5 2 * OQNEHS ( H HNM 5 2 * NB R DR H HNM 5 7 1 5 R DR H HNM 5 2 * TRSN DQ D T SHNM ONHMS AN D 2 * 1WO MRHNM OQNCTBSHNM NE MDV B SDFNQ OQNCTBSR 5 DCH DBHD DQ 0 0 R RSD DHMENQBD DMS NE Promotion of cost reduction! through Reduce solder barcost 47 PROBLEM SELECTION BSC – BalanceScore Card
  • 48. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 48 TO REDUCE 10% COST OF SOLDER BAR BY AUGUST 2006. TARGET BASE ON DIVISION BSC REQUIREMENT & TEAM MEMBER CAPABILITY. Balance Score Card PROBLEM SELECTION P R O J E C T T A R G E T
  • 49. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 49 WHAT ? Solder Bar cost too high WHO ? Production Engineer METHOD : 5W 1H WHEN ? During DIPSoldering process WHY ? Solder bar usage too high WHERE ? At production line PROBLEM DEFINITION HOW ? Due to uncontrolled usage and no evaluation P R O B L E M D E F I N I T I O N
  • 50. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN BENCHMARK ON SOLDER BAR COST REDUCTION PSG Legend: PEM : Pioneer Europe Manufacturing PEP : Pioneer Europe Portugal PTM : Pioneer Thailand Manufacturing PSG : Pioneer Shanghai PAC : Pioneer Asia Center PEP PEM MPT PTM MPT 5.1% MALAYSIA PAC PTMPSG PEM SINGAPORE THAILANDCHINA BELGIUMPORTUGAL 15% 16%18% 13%14% PEP Location Company Reduction Benchmark between MPT &Sister company MPT : Pioneer Malaysia PAC 50 PROBLEM DEFINITION E-mail from HQ Japan
  • 51. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN PROJECT SELECTION PROPOSAL TOMANAGEMENT Team Project Selection Proposal Approval From Management 51 APPROVED ON 04TH May 2006 PROBLEM DEFINITION PROPOSED ON 03TH May 2006
  • 52. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN A N A L Y S I S A P P R O A C H BRAINSTORMING SESSION S T E P 1 PRELIMINARY SCREENING S T E P 2 MOST PROBABLE ROOT CAUSE VERIFICATION S T E P 3 52 PROBLEM DEFINITION
  • 53. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN C A U S E S & E F F E C T S A N A LY S I S 53 MANMETHOD Technician unaware Man Power Instruction not clear Maintenance Settings Dipping MachineSolder PCB design MACHINEMATERIAL ANALYSIS
  • 54. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 54 C A U S E S & E F F E C T S A N A LY S I S ANALYSIS MAN Technician unaware Man Power WHY WHY No enough skills WHY Seldom go for training Factor 1 Brainstorming Not understand 1 No knowledge on solder 2 Fresh graduates Attitude 3 Lack of discipline 4 New technician
  • 55. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 55 C A U S E S & E F F E C T S A N A LY S I S ANALYSIS METHOD Instruction not clear Maintenance WHY WHY Process not clearly mention WHY Not familiar with process Factor 2 No standardization 5 No process indication 6 Limited time No periodic checking 7 No monitoring Job overload No rules 8 9 Brainstorming
  • 56. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 56 C A U S E S & E F F E C T S A N A LY S I S ANALYSIS MACHINE Dipping Machine Setting WHY WHY Running years WHY Old machine Factor 3 Conveyor not stable 10 Conveyor stop 11 No proper airflow No observation 12 High temperature Finger speed 13 Finger speed not in spec Temperature 14 Brainstorming
  • 57. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN C A U S E S & E F F E C T S A N A LY S I S ANALYSIS 57 MATERIAL Solder PCB design WHY WHY Expired solder bar WHY Old stocks Factor 4 Solder quality 15 16 Solder high price 17 Unlimited use 18 Not consider solder quality Brainstorming
  • 58. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN C A U S E S & E F F E C T S A N A LY S I S 58 MANMETHOD Technician unaware Man Power Instruction not clear Maintenance Settings Dipping Machine Solder PCB design MACHINEMATERIAL Process not clearly mention Job overload No periodic checking Expired solder bar Not consider solder quality Finger speed Not understand Attitude No enough skills New technician No standardization Temperature Conveyor Not stable No proper airflow Running years Seldom go for training High temperature No observation Old machine Old stocks Unlimited use Limited time No monitoring Not familiar with process No process indication Lack of discipline Fresh graduates No rules Not enough knowledge Conveyor stop Solder Machine Finger speed not in spec ANALYSIS Solder quality Solder High Price
  • 59. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 59 ANALYSIS P R E L I M I N A R Y S C R E E N I N G 9. No observation Legend : Accepted Eliminate Observation//Finding Result 2. Not enough skills 1. Not enough knowledge Training Result 3. Lack of discipline 4. Fresh graduates Basedupon Supervisor MAN MACHINE Result 5. High temperature Based on check sheet and standard 6. Solder machine finger speed not in spec 8. Old machine 7. Conveyor stop Observation//Finding Production maintenance record Basedon Asset Label Maintenance Engineer MATERIAL Result Basedon material due date and label. 15. Unlimited use Base on Process Engineer Basedon Industrial Engineer analysis 16. Old stock/materials Observation//Finding 12. Solder quality 12. No rules METHOD Result 10. No process indication Basedon check sheet 13. Limited time Observation//Finding 11. Not familiar with process 14. No monitoring Base on standard & regulations Base on SOP 17. Solder quality 9. No observation
  • 60. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN C A U S E S & E F F E C T S A N A LY S I S 60 MANMETHOD Technician unaware Man Power Instruction not clear Maintenance Settings Dipping Machine Solder PCB design MACHINEMATERIAL Process not clearly mention Job overload No periodic checking Expired solder bar Not consider solder quality Finger speed Not understand Attitude No enough skills New technician No standardization Temperature Conveyor Not stable No proper airflow Running years Seldom go for training High temperature No observation Old machine Old stocks Unlimited use Limited time No monitoring Not familiar with process No process indication Lack of discipline Fresh graduates No rules Not enough knowledge Conveyor stop Solder Machine Finger speed not in spec ANALYSIS Solder quality Solder High Price
  • 61. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 61 5432 Method : 5 WHY ANALYSIS 1 Why? Why? Why? Why? Not enough knowledge Lack of experience Not enough exposure No proper training given The training system not efficient Analysis 1 FINDING FINDING DATA FURTHER ACTION? NOT REQUIRED ANALYSIS MOST PROBABLE ROOT CAUSE VERIFICATION Training manual has been issued Basic knowledge on solder is been provided
  • 62. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 62 54321 Why? Why? Why? Why? Too much waste Due to solder dross Due to oxidization Solder quality Because of the solder composition Analysis 2 FINDING FINDING DATA According to observation and analysis by engineer and technician when cleaning the dross 2 times per day Too many dross have been produced during soldering process FURTHER ACTION? Method : 5 WHY ANALYSIS ANALYSIS MOST PROBABLE ROOT CAUSE VERIFICATION REQUIRED
  • 63. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 63 54321 Why? Why? Why? Why? Solder machine Finger speed not in spec No frequent monitoring Technician fail to set finger speed Analysis 3 FINDING FINDING DATA Dipping time in spec due to availability of automatic soldering machine control list FURTHER ACTION? NOT REQUIRED Method : 5 WHY ANALYSIS Not mentioned in standard working procedure ANALYSIS MOST PROBABLE ROOT CAUSE VERIFICATION By referring to check sheet, finger speed data is well-maintained Technician not aware
  • 64. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN MOST PROBABLE ROOT CAUSE VERIFICATION 64 FACTOR MOST PROBABLE CAUSE FINDINGS ~ Summaryof Most Probable Root Cause ~ PROBLEM FURTHER ACTION 7 Machine Finger speed not in spec Automating Soldering Control List 7 Man No knowledge on solder Training provided 4 REQUIRED 7 NOT REQUIRED Material Part quality Too many wetdross produced 4Material Solder quality Too manydross produced 4 ANALYSIS
  • 65. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN Inside soldering machine Solder dross Solder dross PROBLEM DEFINITION WHAT IS SOLDER DROSS? 65 Dross is a mass of solid impurities floating on a molten solder inside soldering machine.
  • 66. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN PROBLEM DEFINITION HOW DOES SOLDER DROSSOCCURS ? D I P S O L D E R I N G M A C H I N E Inner View 66
  • 67. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN PROBLEM DEFINITION DIP SOLDERING MACHINE - INNER VIEW EXHAUST PREHEATING PREHEATING FLUXER CONVEYOR PRIMARY WAVE SECONDARY WAVE AIR KNIFE COOLING FAN HOW DOES SOLDER DROSSOCCURS ? 67
  • 68. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN PROBLEM DEFINITION EXHAUST PREHEATING PREHEATING FLUXER CONVEYOR PRIMARY WAVE SECONDARY WAVE AIR KNIFE COOLING FAN DIP SOLDERING MACHINE - INNER VIEW HOW DOES SOLDER DROSSOCCURS ? 68
  • 69. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN PRIMARY WAVE SECONDARY WAVE PROBLEM DEFINITION PREHEATING HOW DOES SOLDER DROSSOCCURS ? 69
  • 70. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN Primary Wave Secondary Wave Melted solder PROBLEM DEFINITION PCB = Printed circuit board DIP SOLDERING MACHINE - INNER VIEW HOW DOES SOLDER DROSSOCCURS ? 70
  • 71. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN Secondary Wave Melted solder Primary Wave PROBLEM DEFINITION PCB = Printed circuit board DIP SOLDERING MACHINE - INNER VIEW 71 HOW DOES SOLDER DROSSOCCURS ?
  • 72. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN DIP SOLDERING MACHINE - INNER VIEW Secondary WavePrimary Wave Melted solder PROBLEM DEFINITION HOW DOES SOLDER DROSSOCCURS ? PCB = Printed circuit board O2 72
  • 73. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN DIP SOLDERING MACHINE - INNER VIEW Secondary WavePrimary Wave Melted solder PROBLEM DEFINITION PCB = Printed circuit board O2 73 HOW DOES SOLDER DROSSOCCURS ?
  • 74. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN DIP SOLDERING MACHINE - INNER VIEW Secondary WavePrimary Wave Melted solder PROBLEM DEFINITION PCB = Printed circuit board O2 74 HOW DOES SOLDER DROSSOCCURS ?
  • 75. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN DIP SOLDERING MACHINE - INNER VIEW Secondary WavePrimary Wave Melted solder PROBLEM DEFINITION PCB = Printed circuit board75 HOW DOES SOLDER DROSSOCCURS ?
  • 76. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN DIP SOLDERING MACHINE - INNER VIEW Secondary WavePrimary Wave Melted solder PROBLEM DEFINITION PCB = Printed circuit board76 HOW DOES SOLDER DROSSOCCURS ? Solder Dross
  • 77. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN BUNGA TANJUNG implemented ECRS Checklist as a tool to measure and decide various ALTERNATIVE solutions Note: This tools complies to Productivity Improvement Through Work Study Method PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES ALTERNATIVE SOLUTION 77 ALTERNATIVE SOLUTIONS Interrogate DecisionSolution No Cover soldering machine to avoid surrounding air flow to pot. Possible to implement# 1 Eliminate cooling fan Possible to implement# 2 YES YES Evaluate new vendor Based on IE opinion# 4 YES Machine best setting Based on ME information, this already include in monthly activities # 3 Study process - batch production Need to consider cost and production efficiency # 5 NO NO CORRECTIVE ACTION Cover soldering machine to avoid surrounding air flow to pot. Possible to implement# 1 Eliminate cooling fan Possible to implement# 2 YES YES Evaluate new vendor Based on IE opinion# 4 YES
  • 78. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES 78 ALTERNATIVE SOLUTION CORRECTIVE ACTION ALTERNATIVE SOLUTION WHAT? #1 #3 No Evaluate new solder composition Cover soldering machine to avoid surrounding air flow to pot Cover solder pot Study and analyze other products and solder composition #2 Eliminate cooling fan Delete cooling fan
  • 79. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN Selection Criteria: PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES 79 ALTERNATIVE SOLUTION CORRECTIVE ACTION Cost Solder Quality Merit/Demerit Higher merit Expected Result Reduce solder dross Cheapest Satisfactory
  • 80. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN To prevent solder layer to oxidize: 1. Oxygen from surrounding air will re-act With the material of solder. 2. The reaction between solder and oxygen will produce dross. Objective: PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES ALTERNATIVE SOLUTION 80 CORRECTIVE ACTION O2 O2 O2 O2 O2 O2 Theoretical explanation ADVANTAGES DISADVANTAGESSELECTION CRITERIA Not very effective- - - - Cost Expected Result Solder Quality Merit/Demerit Remain the same RM150.00 Cannot totally eliminate air from entering PREVENTAIR FROM ENTERING POT
  • 81. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN To eliminate cooling fan inside the solder pot 1. Cooling fan will contribute for extra air inside solder pot 2. Since lead-free soldering implement in MPT, this cooling fan can be eliminate because no re-materialization issue Objective: PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES ALTERNATIVE SOLUTION 81 CORRECTIVE ACTION Result – No change Oxygen from cooling fan help to supply oxygen, thus will contribute on oxidization process. Theoretical explanation ADVANTAGES DISADVANTAGESSELECTION CRITERIA Expected Result Solder Quality Not very effective Remain the same - - Cost RM0.00 - Result – No changeMerit/Demerit -
  • 82. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN To introduce new solder composition: 1. Search for alternatives solder composition by evaluating other vendors. 2. To protect solder surface layer from oxidize. Objective: PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES ALTERNATIVE SOLUTION 82 CORRECTIVE ACTION Alternative composition Are expected to Act as a protective layer To prevent solder from oxidize ADVANTAGES DISADVANTAGES SELECTION CRITERIA Less dross-effective Improve RM0.00Cost Solder Quality Cheaper priceMerit/Demerit - - - -Expected Result New composition will act as protection layer Theoretical explanation
  • 83. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN SELECTION CRITERIA ALTERNATIVE SOLUTIONS Expected Results Solder Quality Cost Merit/ demerit 1. Not Improve 2. Improve 1. High cost 2. Low cost 1. Low merit 2. High Merit 1. Not effective 2. Effective Total Weight Cover Solder Machine Not Effective Score: Not Improve RM150.00 Demerit 1 Eliminate cooling fan Score: Not Improve RM0.00 Demerit Evaluate New Vendor Effective Score: Improve MeritRM0.00 PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES Not Effective Evaluate New Solder Composition BEST SOLUTION SELECT SOLUTION 83 CORRECTIVE ACTION
  • 84. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN PROPOSAL 84 PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES Letter For TRIAL RUN Proposal Letter to Management Acknowledgement Letter CORRECTIVE ACTION REQUESTED ON 25TH Jul 2006 APPROVED ON 26TH Jul 2006
  • 85. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 85 TECHNICAL ASSESSMENT 1 Solder Must Be RoHS Compliance What is RoHS : the restriction of the use of certain hazardous substances in electrical and electronic equipment RoHS is often referred to as the lead-free directive, but it restricts the use of the following six substances: • Lead (Pb) • Cadmium (Cd) • Mercury (Hg) • Hexavalent chromium (Hex-Cr) • Polybrominated biphenyls (PBB) • Polybrominated diphenyl ethers (PBDE) WHEN DID RoHS COME INTO force? The RoHS Directive and the UK RoHS regulations came into force on 1 July 2006 CORRECTIVE ACTION PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES
  • 86. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 86 TECHNICAL ASSESSMENT PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES 2 Solder Bar Price Must Be Cheaper than current vendor Currently MPT only use 1 vendor to supply solder bar : Current Vendor CORRECTIVE ACTION
  • 87. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES 87 TECHNICAL ASSESSMENT 3 SnCu base FAIL Sn + Ag + Cu + x Sn, Cu Base Solder OK Other elements Sn + Cu + x 2 most common Pb-Free solder is SnCu Base and SAC base. We require SnCu base solder bar. Other elements SAC Base Solder CORRECTIVE ACTION • MPT requirement for solder is Sn, Cu base due to PCB and cell design requirement. • SnCu base will produce less dross • Relatively Low Cost • Good temperature cycling resistance WHY SHOULD WE USE SN+CU BASE???
  • 88. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 88 TECHNICAL ASSESSMENT CORRECTIVE ACTION Bismuth Phosphorus Silicone Antimony Dematerialization issue will cause solder crack Phosphorus act as protection layer from oxidize Chemical reaction from silicon may reduce oxidization High melting point and bad wetting DecisionCharacteristicElement PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES
  • 89. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 89 TECHNICAL ASSESSMENT CORRECTIVE ACTION Phosphorus Silicone Phosphorus will act as a protected layer after re-act with oxygen at the surface. This layer will protect other contents, thus less dross produce. Silicone characteristic will reduce the chemical reaction for oxidization. Thus, solder dross is less produce. PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES
  • 90. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 90 TECHNICAL ASSESSMENT PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES CORRECTIVE ACTION From our result, we find 2suitable vendor for our further analysis. Sn+Cu+Ni+P Sn + Cu + Si
  • 91. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 91 MATERIAL EVALUATION Find new vendor Testing Requirement spec Reliability Test Request for Approval PR Evaluation Standardization Solder Ability Test Judgement PR (mass pro) OK FAIL End CORRECTIVE ACTION PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES
  • 92. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 92 CORRECTIVE ACTION MATERIAL EVALUATION PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES Testing Requirement Specification: 1. Vendor Part Spec 2. Technical Data Spec 3. MSDS Data 4. RoHS Compliance 5. ICP Test Data 6. Quotation 1. Cross section 2. Heat Cycle 3. Pull-up Test 4. Sound Quality Test 5. Solderability Test Testing Process:
  • 93. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 93 PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION DIFFICULTIES MATERIAL EVALUATION CORRECTIVE ACTION Cut-off in the middle of leg CROSS SECTION TEST Cross section of Solderability at pin or leg Is captured using high Resolution microscope RESULT MATERIAL EVALUATION
  • 94. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 94 TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION DESIGNOF EXPERIMENT CORRECTIVE ACTION CHAMBER MACHINE PROBABLE CAUSE ALTERNATIVE SOLUTION DIFFICULTIES MATERIAL EVALUATION HEAT CYCLE TEST Heat Cycle Test Specification Temperature : -30 o C ~ +80 o C Timing : 30 min/cycle No of Cycle : 500
  • 95. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 95 PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION DIFFICULTIES CORRECTIVE ACTION SHEAR TEST MATERIAL EVALUATION 200µm Push Chip Solder Measurement speed 0.12 mm/sec Measurement speed 0.5 mm/sec PCB MATERIAL EVALUATION
  • 96. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 96 PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION DIFFICULTIES CORRECTIVE ACTION PULL UP TEST MATERIAL EVALUATION MATERIAL EVALUATION PCB SOLDER PART PULL UP GAUGE 45 SURFACE PULL UP EQUIPMENT
  • 97. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 97 PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION DIFFICULTIES CORRECTIVE ACTION PULL UP TEST MATERIAL EVALUATION MATERIAL EVALUATION PCB SOLDER PART PULL UP GAUGE 45 SURFACE DURINGTHIS PROCESS, THE GAUGE WILL BE PUSHED DOWN AT THE IC LEG
  • 98. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 98 PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION DIFFICULTIES CORRECTIVE ACTION 9.8 N PULL UP TEST MATERIAL EVALUATION Measurement speed 0.12 mm/sec MATERIAL EVALUATION PCB SOLDER PART PULL UP GAUGE 45 SURFACE PUSH UP
  • 99. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 99 PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION DIFFICULTIES CORRECTIVE ACTION To check how new solder affect sound quality MATERIAL EVALUATION SOUND QUALITY TEST MATERIAL EVALUATION
  • 100. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 100 PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION DIFFICULTIES CORRECTIVE ACTION MATERIAL EVALUATION SOUND QUALITY TEST MATERIAL EVALUATION ACTUAL TEST VENUE : PAC LISTENING ROOM DATE : 31 MARCH 2006 ATTENDEES: K.TAKAYAMA T.KIMURA A.KATO ONG B. H. JOHAN MIZAN IDAYU RIZAL Evaluation models: VSX-516/KUXJ VSX-916/MYXJ
  • 101. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 101 PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES MATERIAL EVALUATION CORRECTIVE ACTION SOLDERABILITY TEST We checked solder ability at PCBs for solder short and reject solder pin
  • 102. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES 102 Test: Cross Section Heat Cycle Pull-up Test Sound Test 7 4 4 4 Result 25% improved 4 4 4 4 54% improved CORRECTIVE ACTION Y VENDORX VENDOR 4 4 4 4 54% improved X VENDOR FROM RELIABILITY AND SOLDER ABILITY TEST RESULTS X SOLDER BAR VENDOR IS SELECTED MATERIAL EVALUATION
  • 103. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 103 REQUEST NEW SUB-MATERIAL APPROVAL FOR X SOLDER BAR VENDOR TO PIONEER HQ JAPAN CORRECTIVE ACTION MATERIAL EVALUATION PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES
  • 104. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN Carry-out through implementation of PILOT RUN(PR) procedure (Internal Control) 5 Judging PR Result 6 PR Report 2 Scheduling Arrangement 3 Run PR 7 Documentation Sampling Check4 Raise PR Request Form1 CORRECTIVE ACTION 104 MATERIAL EVALUATION PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES
  • 105. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 105 Process PR Qty Target Testing Tools Confirm dross quantity, top-up frequency and solder ability 100 pcs Improve Solder ability (100%) 1. Performance 2. Reliability Test Soldering machine CORRECTIVE ACTION MATERIAL EVALUATION PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES
  • 106. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 106 CORRECTIVE ACTION Outgoing Quality Control RESULTS Production 1 RESULTS MATERIAL EVALUATION PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES
  • 107. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 107 PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES CORRECTIVE ACTION MATERIAL EVALUATION Solder dross less produce due to solder composition: Sn + Cu + Ni + P Phosphorus will act as a protected layer after Re-act with oxygen at the surface. This layer will protect other contents, thus less dross produce.
  • 108. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN Difficulties Action How Who Result Difficult to fix schedule Prod. Confuse on new solder usage calculation Arrange meeting with MPT Prod. Control, to discuss on re-adjusting the Prod. schedule Solved Carry-out short training session to clarify the solder usage quantity Solved 1. 2. PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES DIFFICULTIES CORRECTIVE ACTION 108
  • 109. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN PROBABLE CAUSE ALTERNATIVE SOLUTION TECHNICAL ASSESSMENT PROPOSAL SELECT SOLUTION MATERIAL EVALUATION DIFFICULTIES DIFFICULTIES CORRECTIVE ACTION 109 ???Production confuse on new solder usage calculation •Phosphorus level difficult to maintain during high production volume. •Two type of solder bar were introduced with different content of phosphorus inside the composition. •Training was conducted on how to balance out phosphorus level inside solder pot.
  • 110. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN MONITORING FLOW DAILY SAMPLING DATA DATA ASSESSMENT TEAM MEMBER WEEKLY REVIEW RESPONSE 110 MONITORING OF RESULT MONITORING PE MCD PD1 PD1 PC PICStart New vendor New order Line selection Incoming material control Monitoring B PE ME ME PE PIC END Implement check sheet Top up solderevery 1 hour Resultmonitoring Solder dross collection 3 times B
  • 111. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 111 MONITORING OF RESULT MONITORING FLOW DAILY MONITORING DATA DATA ASSESSMENT TEAM MEMBER WEEKLY REVIEW RESPONSE --- DAILY MONITORING DATA --- Prod DIV 1, Line P10 Apr 21 ~ May10 Check sheet tomeasure Dross & top up 100 % check for all production lot. WHERE WHENMETHOD MEASURED WEIGHT WHO Check Sheet TOTAL DROSS IN (KG) ME/PE TOTAL TOP UP SOLDER IN (KG) – EVERY 1 HOUR MONITORING
  • 112. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN MONITORING FLOW DAILY SAMPLING DATA DATA ASSESSMENT TEAM MEMBER WEEKLY REVIEW RESPONSE 112 MONITORING OF RESULT Monthly top up & total solder dross reduced when using new type of solder bar (X-Vendor) Compare to current type (Current-Vendor) MONITORING Month Vendor X- (P37) Y- (P36) Price/KG (RM) 38.33 48.50 Production Date 7/8 - 29/8 1/8 - 29/8 Production Qty 18620 17800 Monthly Top up/Bar 1200 2311 Monthly Top up/KG 624.00 1150.87 Solder Dross (KG) 114.00 280.50 Monthly Total cost (RM) 23917.92 55817.20 August
  • 113. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 113 MONITORING OF RESULT MONITORING FLOW DAILY SAMPLING DATA DATA ASSESSMENT TEAM MEMBER WEEKLY REVIEW RESPONSE 0 10000 20000 30000 40000 50000 60000 Cost(RM) August September October November December January February March April May Month X-Vendor (P37) Current-Vendor (P36) MONITORING
  • 114. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 114 MONITORING OF RESULT MONITORING FLOW DAILY SAMPLING DATA DATA ASSESSMENT TEAM MEMBER WEEKLY REVIEW RESPONSE 0 50 100 150 200 250 300 Dross(kg) August September October November December January February March April May Month X-Vendor (P37) Current-Vendor (P36) MONITORING
  • 115. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 115 MONITORING OF RESULT MONITORING FLOW DAILY SAMPLING DATA DATA ASSESSMENT TEAM MEMBER WEEKLY REVIEW RESPONSE 0 5000 10000 15000 20000 25000 ProductionQuantity(pcs) August September October November December January February March April May Month X-Vendor (P37) Current-Vendor (P36) MONITORING
  • 116. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 116 MONITORING OF RESULT MONITORING FLOW DAILY SAMPLING DATA DATA ASSESSMENT TEAM MEMBER WEEKLY REVIEW RESPONSE MONITORING Production Quantity Total Top Up / Bar Total Top Up / KG Solder Dross (KG) Total Cost (RM) Current Vendor X Vendor 134,709.00 119,874.00 9,268.00 12,247.00 6,497.00 4,934.36 983.09 1,695.60 315,108.67 175,974.02 MONITORING RESULT AUGUST 2006 – MAY 2007 Total Cost (RM) 315,108.67 175,974.02 REDUCE COST
  • 117. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN MONITORING FLOW DAILY SAMPLING DATA DATA ASSESSMENT TEAM MEMBER WEEKLY REVIEW RESPONSE Team Weekly Review Meeting Bunga Tanjung done weekly meeting to review line P37 solder bar usage. This is to evaluate the effectiveness of using new solder bar to improve the solder ability and reduce 10% of solder bar cost. Solder bar usage isclosely monitored during each meeting to identify any abnormality in production. 117 MONITORING OF RESULT MONITORING
  • 118. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 118 MONITORING OF RESULT C U S T O M E R R E S P O N S E No more hassle for touch-up Cost reduction Supervisor Procurement General Manager OQC pass rate increased Excellent !!! OQC Operator MONITORING FLOW DAILY SAMPLING DATA DATA ASSESSMENT TEAM MEMBER WEEKLY REVIEW RESPONSE Productivity increase Less maintenance Technician MONITORING
  • 119. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN IMPLEMENTATION APPROVAL STANDARDIZATION 119 DOCUMENT & STORAGE TRAINING FOLLOW-UP EVIDENCE STANDARDI ZATION MEETING IMPLEMENT APPROVAL Implementation Letter Acknowledgement LetterLetter to Management Dated: 09/08/06 Dated: 10/08/06
  • 120. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN OUR AGENDA DATE: 11/05/07 MANAGEMENT STAFF MANAGEMENT REVIEW MEETING STANDARDIZATION 120 MEETING DOCUMENT & STORAGE TRAINING FOLLOW-UP EVIDENCE IMPLEMENT APPROVAL STANDARDI ZATION
  • 121. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN MEETING DOCUMENT & STORAGE TRAINING FOLLOW-UP EVIDENCE IMPLEMENT APPROVAL VISUAL MANAGEMENT & TRAINING STANDARDIZATION Basic Solder Training A training on solder was conducted to ensure the knowledge of members in related departments are up to an expected level Participants: Production Engineering, Manufacturing Engineering, Machine maintenance technician. Contents : • Basic of solder • Solder composition, •Chemical reaction between solder and other elements •Temperature and maintenance 121 STANDARDI ZATION
  • 122. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN MEETING DOCUMENT & STORAGE TRAINING FOLLOW-UP EVIDENCE IMPLEMENT APPROVAL DOCUMENTATION& STORAGE STANDARDIZATION 122 Solder sample taken and sent for analysis Results issued and filing STANDARDI ZATION
  • 123. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN MEETING DOCUMENT & STORAGE TRAINING FOLLOW-UP EVIDENCE IMPLEMENT APPROVAL DOCUMENTATION& STORAGE STANDARDIZATION 123 STANDARDI ZATION
  • 124. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN DOCUMENT & STORAGE TRAINING FOLLOW-UP EVIDENCE MEETINGIMPLEMENT APPROVAL PPT= PROCESS PATROLTEAM FOLLOW UP EVIDENCE STANDARDIZATION 124 10 months monitoring result STANDARDI ZATION
  • 125. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN DOCUMENT & STORAGE TRAINING FOLLOW-UP EVIDENCE MEETINGIMPLEMENT APPROVAL PPT= PROCESS PATROLTEAM MONITORING STANDARDIZATION 125 Standardization implementation Line P36 & P38 for standardization and implementation STANDARD- IZATION
  • 126. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN DOCUMENT & STORAGE TRAINING FOLLOW-UP EVIDENCE MEETINGIMPLEMENT APPROVAL PPT= PROCESS PATROLTEAM MONITORING STANDARDIZATION 126 STANDARD- IZATION Sample of Solder Top-up & Total Dross Checksheet
  • 127. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN RECOGNITION LETTER MANAGEMENT RECOGNITION ACHIEVEMENT 127 ATTAINED ON: 16th MAY 2007
  • 128. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN TANGIBLE RESULT X-Vendor 134709 Current-Vendor 119874 Increasing 14835 PRODUCTION QUANTITY X-vendor 4934.36 Current-Vendor 6497.09 Decreasing 1562.73 TOP UP (KG) X-Vendor 983.09 Current-Vendor 1695.6 Decreasing 712.51 DROSS QUANTITY (KG) X-Vendor 175974.02 Current-Vendor 315108.67 Decreasing 39134.65 COST (RM) ACHIEVEMENT 128 Verified by MPT Finance Dept Head
  • 129. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN INTANGIBLE RESULT ACHIEVEMENT 129 0 1 2 3 4 5 Before After 1 2 3 4 5 AveragePoor Weak Good Excellent [ Rating Scale ] Source : Self Examination Form 2.1 3.8 NO EVALUATION ITEM Knowledge of QC Method & Tools Understanding of PDCA Concept Problem Analysis Method BEFORE AFTER 1.9 3.5 1.6 3.5 2.0 3.9 2.0 3.9 2.4 4.0 Planning & Time management Problem Solving Approach 1 2 3 4 5 AVERAGE : 2.0 3.8 6 Communication & Teamwork Knowledge of ICC Method & Tools Planning &Time Management Communication & Teamwork Understanding of PDCA Concept Problem Analysis Approach Problem Solving Approach Target Achieved!!! 76% (Actual target = 50%) SELF ASESSMENT DATA
  • 130. PE DIVISION TEMPLATE DESIGN BY: RAHIZAH HAMDAN 130