SlideShare a Scribd company logo
1 of 6
Download to read offline
Comparison of Brans Promethee multicriteria
decision method and Promethee modified by authors
for the optimization of an erosion control integral
plan in Chaco area in Salta province (Argentine)
J. B. Grau (1), J. M. AntĂłn (1), F. Colombo (2), L. de los RĂ­os (2), J. M. Cisneros (3), A. Tarquis (1)
(1) E. T. S. I. AgrĂłnomos- Universidad PolitĂŠcnica de Madrid (Spain) (2) Escuela de Negocios- Universidad CatĂłlica de
Salta (Argentina) (3) Facultad de AgronomĂ­a y Veterinaria-Universidad Nacional de RĂ­o Cuarto (Argentina)
E-mail: j.grau@upm.es
Abstract- Chaco area is situated in the Province of Salta at
North West of Argentine. The desertification is a big problem.
In order to mitigate the problem it is necessary to take into
account not only pedologic criteria but the economical,
environmental, cultural and sociological criteria. Six sub zones
have been established following previous studies. Eight criteria
and six alternatives have been introduced in the model.
Following the results of the study carried out by a collaborative
project between UPM and UCS financed by AECID (1) were
established several initial matrix. Brans Promethee Multicriteria
Decision Method (MCDM) was applied and the authors
modified that method introducing weights like in Electre
Method.
I. INTRODUCTION
The Salta Province has 155.000 km2
and 1 million
population, it is at NW of Argentine (NOA) having latitudes
around 25ÂşS, it has rain from 400 to 800 mm/year. It has a
low density of population in small cities and Indian places
“puestos” or “colonias”. It has low standards for roads and it
has an environment that is “deteriorating progressively”.
Water is the most critical factor, as much for human and
animal consumption, as for the production system in general
and for the flooding and lack of appropriated infrastructures.
Besides the water, other factors have an important influence
in the erosion and progressive desertification of this region
and environment degradation. Historically the human
exploitation of natural forest to use in the railway and other
activities produced an environment degradation process.
Later on the autochthonous population followed the irrational
wood extraction an over pasture as "modus vivendi"
contributing to make the situation worse. Actually the farms
and big single-crop exploitations in some locations do not
give solution to the desertification problem. Only one integral
plan considering all factors involved and the differences
among sub zones will be an initial point to change the
direction of the desertification process.
A. Criteria, alternatives and Sub zones
The following eight criteria were defined:
Water erosion (WE): The water erosion is important. The
relative water erosion indexes figures in the decisional
matrix.
Eolian erosion (EE): Winds erode, transport and deposit
materials and are effective agents in several areas of this
region.
Implementation Facility (IF): They have been established
taking into account actors’ opinions.
Water Resources (WR): By each alternative have been
considered and the relative results have been taken into this
criterion.
Economical benefits EB): The relative economical benefits
using each alternative in a period of 25 years have been
obtained as shown in the matrix with figures from 1 to 10.
Hand power (HP): We have considered that would be
satisfactory to give employment to the majority of it
population. For that, we have considered this criterion as of
“more is better” kind.
Environmental Impacts (EI): They have been considered in
each sub zone the environmental impacts according with the
alternative adopted.
Social Acceptance (SA): The figures included in this
criterion have been obtained from the results of different
forums and meeting with institutions, organizations and
native people.
Five alternatives have been retained:
A) Autochthonous forest: mainly “Quebracho Blanco” and
“Quebracho Colorado” forest species.
B) High value forest: mainly teak, ebony, walnut tree, cherry
tree, lignum vitae, eucalyptus, etc
C) Traditional farms with extensive agriculture and
livestock mixed with autochthonous forest modified and
several foraging plants.
D) Erosion control Crop with agriculture use.
E) Erosion control crop with industrial use (biomass).
Following the experience and the local acknowledge, the area
has been divided in 6 sub zones: Las Lajitas, La Estrella,
Pichanal, Martin Hickmann, Rivadavia banda sur and JoaquĂ­n
V. Gonzalez.
II. METHODOLOGY
We have used the Preference Ranking Organization Method
(The PROMETHEE Method for Multiple Criteria Decision-
Making) by Ref. [4, 13, 14]. This is an outranking method, as
516978-1-4244-3760-3/09/$25.00 c 2009 IEEE
ELECTRE due to Roy [11, 12] or A.H.P. due to Saaty [15,
16, 17]. Following Ref. [4, 13, 14] two possibilities are
offered, PROMETHEE I provides a partial preorder and
PROMETHEE II a total preorder on the set of possible
alternatives. Different types of criteria have been adopted.
Type I and Type III with different threshold (m). Type I is the
usual Criterion. With this criterion if f(a) = f(b) this is
indifference between a and b. If this is not the case the
decision-maker has a strict preference for the action having
greatest value. Type III is the Criterion with Linear
Preference. Such an extension of the notion of criterion
allows the decision-maker to prefer progressively a to b for
progressively larger deviations between f(a) and f(b). The
preference increases linearly until deviation equals m, after
this value the preference is strict. For m the values 2, 4 and 6
have been taken.
The authors have modified the PROMETHEE method using
the weights of the criteria following the ELECTRE I Method
[6, 1, 2, 3, 7, 8, 9, 10]. In the case I have been adopted the
same weights for all sub zones and in the case II different
weights
Besides, some modifications have been considered in the data
of the initial matrixes.
Finally, MathCad has been used to program the calculus.
We show below, like example, the application to sub zone
"La Estrella".
EROSION AND DESERTIFICATION INTEGRAL CONTROL PLAN USING PROMETHEE
1( )SUB ZONE LA ESTRELLA ORIGIN 1
CRITERION: 1.-water erosion index 2.- eolian erosion index, 3.- Implementation
facility 4.-Water Resources, 5.- Economical Benefits, 6.- Hand power,
7.-Environmental Impacts, 8.- Social Acceptance
Indice Isubj:
mĂĄs es mejor Isubj = 1
mĂĄs es peor Isubj = -1
alternatives i
1 2 3 4 5
t
7
6
1
8
5
2
8
6
7
6
5
4
5
9
6
5
3
3
6
4
8
9
3
9
2
2
6
4
5
6
5
6
3
2
8
5
8
6
4
8
W
0.20
0.15
0.15
0.10
0.10
0.10
0.10
0.10
I
1
1
1
1
1
1
1
1
Alternatives:
i = 1 ....5 . with x >= 0, if not with |x|
A- functions of criterion-parameter and type elected for each criterion j:
following Ref. [4]
j = 1 type III, m=2, j = 2 type III, m=4, j=3 type III, m=4, j=4 type I j = 5 type I ,
j = 6 type III, m=6 , j=7 type III,m=6 j=8 type III, m=2
p1 x( ) if x 2
x
2
, 1,
p2 x( ) if x 4
x
4
, 1,
p4 x( ) if x 0 0, 1,( )
p3 x( ) if x 6
x
6
, 1,
p j x,( ) y x
z p1 y( ) j 1if
z p2 y( ) j 2if
z p2 y( ) j 3if
z p4 y( ) j 4if
z p4 y( ) j 5if
z p3 y( ) j 6if
z p3 y( ) j 7if
z p1 y( ) j 8if
z
x 8 7.9, 8..
10 5 0 5 10
0
0.5
1
p 2 x,( )
x
With this outranking graph,
functiĂłn of preference adopted:
P i ii, j,( ) if Ij
tj i,
tj ii,
. 0 0, p j tj i,
tj ii,
,,
A.- Results following initial methods of Ref [4]:
Índixes q(i,ii) of preferences (π(i,ii) Brans&Vincke),
giving outranking graphs according with values:
q i ii,( )
1
8
j
P i ii, j,( )
=
8
i 1 5.. ii 1 5.. qqi ii,
q i ii,( )
qq
0
0.25
0.5
0.208
0.458
0.229
0
0.281
0.094
0.469
0.448
0.281
0
0.042
0.208
0.438
0.333
0.406
0
0.5
0.458
0.354
0.156
0.021
0
=
Outgoing flow: fp i( )
1
5
ii
q i ii,( )
=
fppi
fp i( )
fpp
1.573
1.219
1.344
0.365
1.635
=
fm i( )
1
5
ii
q ii i,( )
=
fmmi
fm i( ) fmm
1.417
1.073
0.979
1.677
0.99
=
Incoming flow:
PROMETHEE II (clasification of alternatives by Total Preorder,
Each alternative obtain one value(more is better):
fd i( ) fp i( ) fm i( ) fddi
fd i( ) fdd
0.156
0.146
0.365
1.313
0.646
=
PROMETHEE I (clasification of alternatives by Partial Preorden):
pr i ii,( ) z 1
z 0 fp i( ) fp ii( )( ) fm i( ) fm ii( )( ).if
z 1 fp i( ) fp ii( )>( ) fm i( ) fm ii( )<( ).( ) fp i( ) fp ii( )>( ) fm i( ) fm ii( )( ).( ) fp i( ) fp ii( )( ) fm i( ) fm ii( )<( ).( )if
prri ii,
pr i ii,( )
Alternative E is preferred (E C A B D).
prr
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
=
B Results following the method modified by Ref [6] in order to weigh comparativment the criteria
with similar weights to ELECTRE-I:
q Preference Index (π Ref. [4]), gives outranking graph by values:
q i ii,( )
1
8
j
P i ii, j,( ) Wj
.
=
qqi ii,
q i ii,( ) 5.
i 1 5.. ii 1 5..
qq
0
1.25
2.25
1.083
2.083
0.917
0
1.188
0.438
2.063
2.479
1.813
0
0.167
0.958
2.5
2.083
1.938
0
2.375
2.583
2.167
0.688
0.083
0
=
:Outgoing flow: fp i( )
1
5
ii
q i ii,( )
=
fppi
fp i( )
fpp
1.696
1.463
1.213
0.354
1.496
=
Incoming flow: fm i( )
1
5
ii
q ii i,( )
=
fmmi
fm i( ) fmm
1.333
0.921
1.083
1.779
1.104
=
PROMETHEE II (clasification of alternatives by Total Preorder)
fd i( ) fp i( ) fm i( ) fddi
fd i( ) fdd
0.363
0.542
0.129
1.425
0.392
=
PROMETHEE I (clasification of alternatives by Partial Preorden):
pr i ii,( ) z 1
z 0 fp i( ) fp ii( )( ) fm i( ) fm ii( )( ).if
z 1 fp i( ) fp ii( )>( ) fm i( ) fm ii( )<( ).( ) fp i( ) fp ii( )>( ) fm i( ) fm ii( )( ).( ) fp i( ) fp ii( )( ) fm i( ) fm ii( )<( ).( )if
where, pr(i,ii) = 1 tell us that alternative i is preference (outranks) to alternative j, pr(i,ii) = 0 is
indifference, y pr(i,ii) = -1 are incomparable, that may be obtained by pr(ii,i) .
prri ii,
pr i ii,( )
prr
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
= Alternative B is preferred (B E A C D).
2009 7th IEEE International Conference on Industrial Informatics (INDIN 2009) 517
III. RESULTS
1. Sub zone Martin Hickman
1.1. ALTERNATIVE1:
Table I shows the values to Martin Hickman sub-zone. It has
been included the type of pseudo-criteria used and the
threshold (m) for the type III [4].
TABLE I
DECISIONAL MATRIX FOR MARTIN HICKMAN, ALTERNATIVE 1
Alternative WE EE IF WR EB HP EI SA
A 9 8 5 8 7 2 8 2
B 7 5 7 5 6 8 6 5
C 4 2 8 4 8 8 1 9
D 3 3 6 4 6 7 5 6
E 3 3 2 6 8 6 5 8
Weight 0,2 0,2 0,05 0,1 0,1 0,1 0,15 0,1
Type of criterion III III III I I III III III
Thresholds 2 4 4 2 2 4
Two procedures have been applied in order to obtain
alternative preorder:
A: Initial method of Ref. [4].
B: Method modified by Ref. [6].
1.1.A. Results by Ref. [4] method. The preorder is shown in
Fig. 1.
A B C E D
Fig. 1 Graph sub zone Martin Hickman, alternative 1.1A, Promethee II.
1.1. B Results following Ref. [9] method are shown in Fig. 2.
A B E C D
Fig. 2: Graphs sub zone Martin Hickman 1.1B Promethee II, modified.
1.2 ALTERNATIVE 2: Other value of criteria, same weight,
pseudocriteria and thresholds (Table II andy Fig. 3 and 4).
TABLE II
DECISIONAL MATRIX FOR MARTIN HICKMAN, ALTERNATIVE 2.
Alternative WE EE IF WR EB HP EI SA
A 9 8 5 8 7 7 8 2
B 7 5 7 5 8 8 6 5
C 7 5 8 4 8 8 6 9
D 3 3 6 4 6 7 5 6
E 3 3 8 6 8 6 5 8
Weight 0,2 0,2 0,05 0,1 0,1 0,1 0,15 0,1
Type of criterion III III III I I III III III
Thresholds 2 4 4 2 2 4
1.2. A. Results by method of Ref. [4] method. The preorder
is shown in Fig. 3.
C A B E D
Fig. 3: Graphs sub zone Martin Hickman, alternative 1.2.A . Promethee II
1.2. B. Results following Ref [9] method are shown in Fig. 4.
A C B E D
Fig. 4: Graphs sub zone Martin Hickman, alternative 1.2.B. Promethee II,
modified.
Changing the weights (0,2 – 0,15 – 0,15 – 0,10 – 0,10 – 0,10
– 0,10 – 0,10), the results are:
1.1.A
A B C E D
1.1.B
A B C E D
1.2.A
C A B E D
1.2.B
A C B E D
2. Sub zone LA ESTRELLA
2.1. ALTERNATIVE 1: Decisional matrix is shown in Table
III.
TABLE III
DECISIONAL MATRIX FOR LA ESTRELLA, ALTERNATIVE 1.
Alternative WE EE IF WR EB HP EI SA
A 7 6 1 8 5 2 8 6
B 7 6 5 4 5 9 6 5
C 3 3 6 4 8 9 3 9
D 2 2 6 4 5 6 5 6
E 3 2 8 5 8 6 4 8
Weight 0,15 0,15 0,15 0,1 0,15 0,1 0,1 0,1
Type of criterion III III III I I III III III
Thresholds 2 4 4 6 6 2
2.1A. Results by Ref [4] method. The preorder is shown in
Fig. 5.
E C A B D
Fig. 5: Graph sub zone La Estrella alternative 2.1A Promethee II
2.1B. Results following Ref [6] method are shown in Fig. 6.
E C B A D
Fig. 6: Graphs sub zone La Estrella alternative 2.1B Promethee II, modified.
2.2. ALTERNATIVE 2: Changing some criteria values and
maintaining weights (Table IV).
TABLE IV
DECISIONAL MATRIX FOR LA ESTRELLA, ALTERNATIVE 2.
Alternative WE EE IF WR EB HP EI SA
A 7 6 5 8 5 6 8 6
B 7 6 5 4 5 9 6 5
C 3 3 6 4 8 9 3 9
D 2 2 6 4 5 6 5 6
E 3 2 8 5 8 6 4 8
Weight 0,15 0,15 0,15 0,1 0,15 0,1 0,1 0,1
Type of criterion III III III I I III III III
Thresholds 2 4 4 6 6 2
2.2A. Results by Ref. [4] method. The preorder is shown in
Fig. 7.
A E C B D
Fig. 7: Graph sub zone La Estrella, alternative 2.2A, Promethee II.
2.2B.Results following Ref [6] method is shown in Fig. 8.
A E C B D
Fig. 8: Graph sub zone La Estrella alternativa 2.2B, Promethee II modified.
Changing weights (0,20 – 0,15 – 0,15 – 0,10 – 0,10 – 0,10 –
0,10 – 0,10) the results are:
2.1.A
E C A B D
518 2009 7th IEEE International Conference on Industrial Informatics (INDIN 2009)
2.1.B
B E A C D
2.2.A
A E C B D
2.2.B
A B E C D
3. Sub zone RIVADAVIA SUR
3.1. ALTERNATIVA 1: Initial matrix is shown in Table V.
TABLE V
DECISIONAL MATRIX FOR RIVADAVIA SUR, ALTERNATIVE 1.
Alternative WE EE IF WR EB HP EI SA
A 8 5 1 9 5 7 9 6
B 6 6 6 5 5 8 6 5
C 3 2 2 4 8 9 1 9
D 2 2 5 4 6 7 5 6
E 3 3 8 5 8 6 4 8
Weight 0,25 0,1 0,1 0,05 0,1 0,1 0,2 0,1
Type of criterion III III III I I III III III
Thresholds 2 4 4 2 2 4
3.1A. Results following Ref [4] method is shown in Fig. 9.
E A B C D
Fig. 9: Graph sub zone Rivadavia Sur, alternative 3.1A, Promethee II.
3.1B. Results following Ref. [6] method in Fig. 10.
A B E C D
Fig. 10: Graph sub zone Rivadavia Sur, alternative 3.1B, Promethee II,
modified.
3.2. ALTERNATIVE 2: Changing some criteria values and
maintaining weights (Table VI).
TABLE VI
DECISIONAL MATRIX FOR RIVADAVIA SUR, ALTERNATIVE 2.
Alternative WE EE IF WR EB HP EI SA
A 8 5 6 9 5 7 9 6
B 6 6 6 5 5 8 6 5
C 3 2 2 4 8 9 1 9
D 2 2 5 4 6 7 5 6
E 3 3 8 5 8 6 4 8
Weight 0,25 0,1 0,1 0,05 0,1 0,1 0,2 0,1
Type of criterion III III III I I III III III
Thresholds 2 4 4 2 2 4
3.2A. Results following Ref. [4] method in shown in Fig. 11.
A E B C D
Fig. 11: Graph sub zone Rivadavia Sur, alternative 3.2A, Promethee II.
3.2B. Results following Ref. [6] is in Fig. 12.
A B E C D
Fig. 12: Graph sub zone Rivadavia Sur, alternative 3.2B, Promethee II,
modified.
Changing weights (0,2 – 0,15 – 0,15 – 0,10 – 0,10 – 0,10 –
0,10 – 0,10) the results are:
3.1.A
E A B C D
3.1.B
A B E C D
3.2.A
A E B C D
3.2.B
A B E C D
4. Sub zone PICHANAL
4.1. ALTERNATIVE 1: Initial matrix is shown in Table VII.
TABLE VII
DECISIONAL MATRIX FOR PICHANAL, ALTERNATIVE 1.
Alternative WE EE IF WR EB HP EI SA
A 6 6 1 7 5 2 8 2
B 6 5 4 4 5 8 6 5
C 3 2 9 4 8 9 1 9
D 2 2 6 4 5 7 5 6
E 3 2 8 5 8 6 4 8
Weight 0.20 0.15 0.10 0.10 0.20 0.05 0.05 0.15
Type of criterion III III III I I III III III
Thresholds 2 2 4 4 2 2 4
4.1A. Results following Ref. [4] is shown in Fig. 13.
E C B A D
Fig. 13: Graph sub zone Pichanal, alternative 4.1A, Promethee II.
4.1B. Results following Ref [6] is shown in Fig. 14.
E C A B D
Fig. 14: Graph sub zone Pichanal, alternative 4.1B, Promethee II, modified.
4.2. ALTERNATIVE 2: With other values same weights
(Table VIII).
TABLE VIII
DECISIONAL MATRIX FOR PICHANAL, ALTERNATIVE 2.
Alternative WE EE IF WR EB HP EI SA
A 6 6 5 7 5 7 8 2
B 6 5 4 4 5 8 6 5
C 5 2 9 4 8 9 1 9
D 2 2 6 4 5 7 5 6
E 3 2 8 5 8 6 4 8
Weight 0.20 0.15 0.10 0.10 0.20 0.05 0.05 0.15
Type of criterion III III III I I III III III
Thresholds 2 2 4 4 2 2 4
4.2A. Results following Ref [4] is in Fig. 15.
C A E B D
Fig. 15: Graph sub zone Pichanal, alternative 4.2A, Promethee II.
4.2B. Results following Ref [4] is shown in Fig. 16.
C E A B D
Fig. 16: Graph sub zone Pichanal, alternative 4.2B, Promethee II, modified.
With other weights (0,2 – 0,15 – 0,15 – 0,10 – 0,10 – 0,10 –
0,10 – 0,10) the results are:
4.1.A
E C B A D
4.1.B
E B C A D
4.2.A
C A E B D
4.2.B
A C E B D
5. Sub zone JOAQUIN V. GONZALEZ
5.1. ALTERNATIVE 1: Initial matrix is shown in Table IX.
2009 7th IEEE International Conference on Industrial Informatics (INDIN 2009) 519
TABLE IX
DECISIONAL MATRIX FOR JOAQUIN V. GONZÁLEZ, ALTERNATIVE 1.
Alternative WE EE IF WR EB HP EI SA
A 6 6 1 7 7 2 9 2
B 6 5 6 4 7 8 6 5
C 3 4 9 4 8 9 4 9
D 2 2 7 4 5 7 5 6
E 3 2 8 4 8 6 4 8
Weight 0,2 0,15 0,1 0,1 0,15 0,1 0,1 0,1
Type of criterion III III III I I III III III
Thresholds 2 4 4 2 2 4
5.1A. Results following Ref. [4] is shown in Fig. 17.
C B E A D
Fig. 17: Graph sub zone Joaquin V. Gonzalez, alternative 5.1A, Promethee
II.
5.1B. Results following Ref. [6] is in Fig. 18.
C B A E D
Fig. 18: Graph sub zone Joaquin V. Gonzalez, alternative 5.1B, Promethee II,
modified.
5.2. ALTERNATIVE 2: Other values and same weights
(Table X).
TABLE X
DECISIONAL MATRIX FOR JOAQUIN V. GONZÁLEZ, ALTERNATIVE 2.
Alternative WE EE IF WR EB HP EI SA
A 6 6 3 7 7 4 9 2
B 6 5 6 4 7 8 6 5
C 5 4 9 4 8 9 4 9
D 2 2 7 4 5 7 5 6
E 3 2 8 4 8 6 4 8
Weight 0,2 0,15 0,1 0,1 0,15 0,1 0,1 0,1
Type of criterion III III III I I III III III
Thresholds 2 4 4 2 2 4
5.2A. Results following Ref. [4] is shown in Fig. 19.
C B A E D
Fig. 19: Graph sub zone Joaquin V. Gonzalez, alternative 5.2A, Promethee
II.
5.2B. Results following Ref. [6] is in Fig. 20.
C A B E D
Fig. 20: Graph sub zone Joaquin V. Gonzalez, alternative 5.2B, Promethee II,
modified.
With other weights (0,2 – 0,15 – 0,15 – 0,10 – 0,10 – 0,10 –
0,10 – 0,10) the results are:
5.1.A
C B E A D
5.1.B
C B A E D
5.2.A
C B A E D
5.2.B
C B A E D
6. Sub zone LAS LAJITAS:
6.1. ALTERNATIVE 1: Initial matrix is shown in Table XI.
TABLE XI
DECISIONAL MATRIX FOR LAS LAJITAS, ALTERNATIVE 1.
Alternative WE EE IF WR EB HP EI SA
A 3 6 1 3 3 3 4 2
B 3 4 3 3 5 8 3 5
C 2 3 9 4 8 9 1 9
D 2 2 6 4 5 7 1 6
E 2 2 8 4 8 6 1 8
Weight 0,2 0,05 0,1 0,2 0,2 0,15 0,05 0,1
Type of criterion III III III I I III III III
Thresholds 2 4 4 6 6 2
6.1A. Results following Ref. [4] method is in Fig. 21.
C E D B A
Fig. 21: Graph sub zone Las Lajitas, alternative 6.1A, Promethee II.
6.1B. Results following Ref. [6] method is shown in Fig. 22.
C E D B A
Fig. 22: Graph sub zone Las Lajitas, alternative 6.1B, Promethee II,
modified.
6.2. ALTERNATIVE 2: Other values and same weights
(Table XII).
TABLE XII
DECISIONAL MATRIX FOR LAS LAJITAS, ALTERNATIVE 2.
Alternative WE EE IF WR EB HP EI SA
A 3 6 1 3 3 2 4 2
B 3 4 3 3 5 8 3 5
C 2 3 9 4 8 9 1 9
D 2 2 6 4 5 7 1 6
E 2 2 8 4 8 6 1 8
Weight 0,2 0,05 0,1 0,2 0,2 0,15 0,05 0,1
Type of criterion III III III I I III III III
Thresholds 2 4 4 6 6 2
6.2A. Results following Ref. [4] method is shown in Fig. 23.
C E D B A
Fig. 23: Graph sub zone Las Lajitas, alternative 6.2A, Promethee II.
6.2B. Results following Ref. [6] method is in Fig. 24.
C E D B A
Fig. 24: Graph sub zone Las Lajitas, alternative 6.2B, Promethee II,
modified.
Changing weights (0,2 – 0,15 – 0,15 – 0,10 – 0,10 – 0,10 –
0,10 – 0,10) the results are:
6.1.A
C E D B A
6.1.B
C E B D A
6.2.A
C E D B A
6.2.B
C E B D A
IV. CONCLUSIONS
Following the results mentioned above (Table XIII), we can
obtain as conclusions that the PROMETHEE method is a
very useful tool to elaborate a erosion control integral Plan. It
is robust as we have confirmed changing a little the relative
preference. Besides, with both methods similar results have
been obtained.
520 2009 7th IEEE International Conference on Industrial Informatics (INDIN 2009)
TABLE XIII
SUMMARY RESULTS OF PROMETHEE METHODS APPLICATION TO EROSION
CONTROL PLANS IN SALTA PROVINCE (ARGENTINE).
Subzone Martin
Hickman
La
Estrella
Rivadavia
Banda Sur
Pichanal J. V.
GonzĂĄlez
Las
LajitasMethod
PROMETHEE, applying variable weights in each sub zone
1.A A E E E C C
1.B A E A E C C
2.A C A A C C C
2.B A A A C C C
PROMETHEE, applying the same weights in each sub zone
1.A A E E E C C
1.B A B A E C C
2.A C A A C C C
2.B A A A A C C
Note: 1.A and 2.A : Following the initial method of Ref. [4], 1.B and 2.B:
Following method modified by the authors [6].
For this purposes, we would recommend to use Promethee II
modified using the ELECTRE I weights. Besides, with usual
criterion and type III pseudocriterion have been obtained the
best results. We could recommend to Salta Government the
following actions:
Las Lajitas: extensive farming and livestock. If it is only
farming it could be with crop rotation. The livestock should
be with natural forestry and foraging plants.
La Estrella: We can combine Autochthonous and high value
forestry with biomass production.
Pichanal: Similar to Las Lajitas.
Martin Hickman: Autochthonous forestry, combined with
some crop rotation and livestock like Las Lajitas.
Rivadavia Banda Sur: Similar to La Estrella.
Joaquin V. Gonzalez: Similar to Las Lajitas combined in
some areas with high value forestry.
ACKNOWLEDGMENT
We thank to “Agencia Española para la Cooperación
Internacional y el Desarrollo” (AECID) by the financing
support of the project A/013294/07 titled "ELABORACION
DE UN PLAN INTEGRAL DE LUCHA CONTRA LA
DESERTIZACION Y LA EROSION EN EL CHACO
SALTEÑO (ARGENTINA)"
REFERENCES
[1] J. M. AntĂłn, J. B. Grau; Madrid-Valencia high-speed rail line: a route
selection; ICC Transport 157, pgs, 153-161: August 2004, London.
[2] J. B. Grau, J. M. AntĂłn, A. M. Tarquis; Election of water resources
management entity using a multi-criteria decision (MCD) method in
Salta province (Argentine); Proceedings WMSCI, Volume: I, pgs: 30-
35; 2008, Orlando, Florida, USA.
[3] J. M. AntĂłn, Juan B. Grau, Elena SĂĄnchez; Compromise Programming
Calibration for financial analysis of firms of a common sector of
business, case study for a set of Spanish banks in 1995.; Applied
Financial Economics; 2006 ,U.K.
[4] J.P. Brans; Ph. Vincke, A Preferent ranking Organization Method. The
PROMETHEE Method for Multiple Criteria Decision-Making,
Management Science, Vol. 31, NÂş 6, 647-656, June 1985.
[5] J. B. Grau, “Curso: Métodos matemáticos para la toma de decisiones”,
Escuela de Postgrado de la Facultad de Ciencias Naturales, Universidad
Nacional de Salta, Argentina, 2003.
[6] J. B. Grau, J. M. Antón, A. M. Tarquis, D. C. Sánchez, “MCDM
Methods for Waste Management Planning in a Rural Área”, CITSA
2007, Vol. 134, pp. 193-209.
[7] J. M. Antón, E. Ballestero, C. Bielza. “Compromise-based approach to
road project selection in Madrid metropolitan area”. J. of the O. R.
Society of Japan, Vol.46, NÂş 1, 2003, pp. 99-122.
[8] J. M. Antón, J. B. Grau, D. Andina. “Electre and AHP MCDM Method
and the Official choice Applied to High-Speed Railway Layout
alternative election”. W.S.E.A.S. Transactions on Business and
Economics, Issue 1, Vol.1, Jan. 2004, pp. 64-69.
[9] J. M. Antón, J. B. Grau, E. Sánchez. “Compromise Programming in
Financial Analysis for Strategic Management”. Transactions of WAC-
2004, Vol. 17, USA, 2004, pp. 555–560.
[10]J. M. Anton, J. B. Grau, E. Sanchez. Compromise programming
calibration for financial analysis of firms of a common sector of
business, case study for a set of Spanish banks in 1995. Applied financial
economic, pp. 445-461, 2007.
[11]B. Roy, D. Bouyssou. AidÊ Multicritère à la DÊcision: MÊthodes et cas.
Economica, Paris 1993.
[12]B. Roy. Méthodologie Multicritère d’Aide à la Décision. Economica,
Paris, 1985.
[13]J.P. Brans, Ph. Vincke, B. Mareschal, “How to select and how to rank
projects: The PROMETHEE method”. European J. of Operational
Research, vol. 44, nÂş 1, 1986, pp. 138-228.
[14]J. P. Brans, B. Mareschal. “The PROMCALC and GAIA Decision
Support System for Multicriteria Decision Aid”, Decision Support
Systems, Vol. 12, 1994, pp 297-310.
[15]T. Saaty. The Analytic Hierarchy Process, Mac Graw-Hill, New York,
1980 and 1988.
[16]T. Saaty. Multicriteria Decision Making: The Analytic Hierarchy
Process, AHP Series (extended edition), Vol. 1, RWS Publications,
Pittsburg USA, 1996.
[17]T. Saaty. Decision Making for Leaders, AHP Series (extended edition),
Vol. 2, RWS Publications, Pittsburgh USA, 1996.
2009 7th IEEE International Conference on Industrial Informatics (INDIN 2009) 521

More Related Content

Similar to modelo plan de negocio automatizado

For Domestic Wastewater Treatment, Finding Optimum Conditions by Particle Swa...
For Domestic Wastewater Treatment, Finding Optimum Conditions by Particle Swa...For Domestic Wastewater Treatment, Finding Optimum Conditions by Particle Swa...
For Domestic Wastewater Treatment, Finding Optimum Conditions by Particle Swa...Agriculture Journal IJOEAR
 
A strategy for estimating the components of the carbon and water budgets for ...
A strategy for estimating the components of the carbon and water budgets for ...A strategy for estimating the components of the carbon and water budgets for ...
A strategy for estimating the components of the carbon and water budgets for ...Integrated Carbon Observation System (ICOS)
 
IMWA2011_Turner_311
IMWA2011_Turner_311IMWA2011_Turner_311
IMWA2011_Turner_311Alison Turner
 
Abdel1
Abdel1Abdel1
Abdel1maryamho
 
4 Review on Different Evapotranspiration Empirical Equations
4 Review on Different Evapotranspiration Empirical Equations4 Review on Different Evapotranspiration Empirical Equations
4 Review on Different Evapotranspiration Empirical EquationsINFOGAIN PUBLICATION
 
An optimal design of current conveyors using a hybrid-based metaheuristic alg...
An optimal design of current conveyors using a hybrid-based metaheuristic alg...An optimal design of current conveyors using a hybrid-based metaheuristic alg...
An optimal design of current conveyors using a hybrid-based metaheuristic alg...IJECEIAES
 
Energy-Environment Integration Framework
Energy-Environment Integration FrameworkEnergy-Environment Integration Framework
Energy-Environment Integration FrameworkRudolf Husar
 
2018 National Tanks Conference & Exposition: HRSC Data Visualization
2018 National Tanks Conference & Exposition: HRSC Data Visualization2018 National Tanks Conference & Exposition: HRSC Data Visualization
2018 National Tanks Conference & Exposition: HRSC Data VisualizationAntea Group
 
State of the art on Life Cycle Assessment for Solid Waste Management
State of the art on Life Cycle Assessment for Solid Waste ManagementState of the art on Life Cycle Assessment for Solid Waste Management
State of the art on Life Cycle Assessment for Solid Waste ManagementYashpujara00955
 
Complexity of the water-Food-Energy Nexus in ISIE 2015
Complexity of the water-Food-Energy Nexus in ISIE 2015Complexity of the water-Food-Energy Nexus in ISIE 2015
Complexity of the water-Food-Energy Nexus in ISIE 2015Cristina Madrid Lopez
 
Gy3312241229
Gy3312241229Gy3312241229
Gy3312241229IJERA Editor
 
Fao modelling system for agricultural impacts of climate change
Fao modelling system for agricultural impacts of climate changeFao modelling system for agricultural impacts of climate change
Fao modelling system for agricultural impacts of climate changeMaroi Tsouli Fathi
 
EcoTas13 BradEvans e-MAST
EcoTas13 BradEvans e-MASTEcoTas13 BradEvans e-MAST
EcoTas13 BradEvans e-MASTTERN Australia
 
Oliver Sola 7486
Oliver Sola 7486Oliver Sola 7486
Oliver Sola 7486ecocity2008
 
Global Sensitivity Analysis for the Calibration of a Fully-distributed Hydrol...
Global Sensitivity Analysis for the Calibration of a Fully-distributed Hydrol...Global Sensitivity Analysis for the Calibration of a Fully-distributed Hydrol...
Global Sensitivity Analysis for the Calibration of a Fully-distributed Hydrol...Mauricio Zambrano-Bigiarini
 
An ecological assessment of food waste composting using a hybrid life cycle a...
An ecological assessment of food waste composting using a hybrid life cycle a...An ecological assessment of food waste composting using a hybrid life cycle a...
An ecological assessment of food waste composting using a hybrid life cycle a...Ramy Salemdeeb
 
Monday, November 30, 2015 at 449 PM Page 1User Zhijing.docx
Monday, November 30, 2015 at 449 PM   Page 1User Zhijing.docxMonday, November 30, 2015 at 449 PM   Page 1User Zhijing.docx
Monday, November 30, 2015 at 449 PM Page 1User Zhijing.docxmoirarandell
 
CAN CROP MANAGEMENT IMPROVE EMISSIONS SAVINGS?: PRELIMINARY RESULTS OF THE OP...
CAN CROP MANAGEMENT IMPROVE EMISSIONS SAVINGS?: PRELIMINARY RESULTS OF THE OP...CAN CROP MANAGEMENT IMPROVE EMISSIONS SAVINGS?: PRELIMINARY RESULTS OF THE OP...
CAN CROP MANAGEMENT IMPROVE EMISSIONS SAVINGS?: PRELIMINARY RESULTS OF THE OP...Bioenergy Crops
 
Watershed Diagnostics for Improved Adoption of Management Practices: Integrat...
Watershed Diagnostics for Improved Adoption of Management Practices: Integrat...Watershed Diagnostics for Improved Adoption of Management Practices: Integrat...
Watershed Diagnostics for Improved Adoption of Management Practices: Integrat...National Institute of Food and Agriculture
 

Similar to modelo plan de negocio automatizado (20)

For Domestic Wastewater Treatment, Finding Optimum Conditions by Particle Swa...
For Domestic Wastewater Treatment, Finding Optimum Conditions by Particle Swa...For Domestic Wastewater Treatment, Finding Optimum Conditions by Particle Swa...
For Domestic Wastewater Treatment, Finding Optimum Conditions by Particle Swa...
 
A strategy for estimating the components of the carbon and water budgets for ...
A strategy for estimating the components of the carbon and water budgets for ...A strategy for estimating the components of the carbon and water budgets for ...
A strategy for estimating the components of the carbon and water budgets for ...
 
IMWA2011_Turner_311
IMWA2011_Turner_311IMWA2011_Turner_311
IMWA2011_Turner_311
 
Abdel1
Abdel1Abdel1
Abdel1
 
4 Review on Different Evapotranspiration Empirical Equations
4 Review on Different Evapotranspiration Empirical Equations4 Review on Different Evapotranspiration Empirical Equations
4 Review on Different Evapotranspiration Empirical Equations
 
An optimal design of current conveyors using a hybrid-based metaheuristic alg...
An optimal design of current conveyors using a hybrid-based metaheuristic alg...An optimal design of current conveyors using a hybrid-based metaheuristic alg...
An optimal design of current conveyors using a hybrid-based metaheuristic alg...
 
Energy-Environment Integration Framework
Energy-Environment Integration FrameworkEnergy-Environment Integration Framework
Energy-Environment Integration Framework
 
2018 National Tanks Conference & Exposition: HRSC Data Visualization
2018 National Tanks Conference & Exposition: HRSC Data Visualization2018 National Tanks Conference & Exposition: HRSC Data Visualization
2018 National Tanks Conference & Exposition: HRSC Data Visualization
 
State of the art on Life Cycle Assessment for Solid Waste Management
State of the art on Life Cycle Assessment for Solid Waste ManagementState of the art on Life Cycle Assessment for Solid Waste Management
State of the art on Life Cycle Assessment for Solid Waste Management
 
Complexity of the water-Food-Energy Nexus in ISIE 2015
Complexity of the water-Food-Energy Nexus in ISIE 2015Complexity of the water-Food-Energy Nexus in ISIE 2015
Complexity of the water-Food-Energy Nexus in ISIE 2015
 
Gy3312241229
Gy3312241229Gy3312241229
Gy3312241229
 
Fao modelling system for agricultural impacts of climate change
Fao modelling system for agricultural impacts of climate changeFao modelling system for agricultural impacts of climate change
Fao modelling system for agricultural impacts of climate change
 
EcoTas13 BradEvans e-MAST
EcoTas13 BradEvans e-MASTEcoTas13 BradEvans e-MAST
EcoTas13 BradEvans e-MAST
 
Oliver Sola 7486
Oliver Sola 7486Oliver Sola 7486
Oliver Sola 7486
 
Global Sensitivity Analysis for the Calibration of a Fully-distributed Hydrol...
Global Sensitivity Analysis for the Calibration of a Fully-distributed Hydrol...Global Sensitivity Analysis for the Calibration of a Fully-distributed Hydrol...
Global Sensitivity Analysis for the Calibration of a Fully-distributed Hydrol...
 
CO2 sequestration in forest plantations
CO2 sequestration in forest plantationsCO2 sequestration in forest plantations
CO2 sequestration in forest plantations
 
An ecological assessment of food waste composting using a hybrid life cycle a...
An ecological assessment of food waste composting using a hybrid life cycle a...An ecological assessment of food waste composting using a hybrid life cycle a...
An ecological assessment of food waste composting using a hybrid life cycle a...
 
Monday, November 30, 2015 at 449 PM Page 1User Zhijing.docx
Monday, November 30, 2015 at 449 PM   Page 1User Zhijing.docxMonday, November 30, 2015 at 449 PM   Page 1User Zhijing.docx
Monday, November 30, 2015 at 449 PM Page 1User Zhijing.docx
 
CAN CROP MANAGEMENT IMPROVE EMISSIONS SAVINGS?: PRELIMINARY RESULTS OF THE OP...
CAN CROP MANAGEMENT IMPROVE EMISSIONS SAVINGS?: PRELIMINARY RESULTS OF THE OP...CAN CROP MANAGEMENT IMPROVE EMISSIONS SAVINGS?: PRELIMINARY RESULTS OF THE OP...
CAN CROP MANAGEMENT IMPROVE EMISSIONS SAVINGS?: PRELIMINARY RESULTS OF THE OP...
 
Watershed Diagnostics for Improved Adoption of Management Practices: Integrat...
Watershed Diagnostics for Improved Adoption of Management Practices: Integrat...Watershed Diagnostics for Improved Adoption of Management Practices: Integrat...
Watershed Diagnostics for Improved Adoption of Management Practices: Integrat...
 

More from Alexs Prince Vargas

More from Alexs Prince Vargas (17)

GuĂ­a taller
GuĂ­a taller GuĂ­a taller
GuĂ­a taller
 
GuĂ­a taller
GuĂ­a taller GuĂ­a taller
GuĂ­a taller
 
Magnetismo
MagnetismoMagnetismo
Magnetismo
 
ElectrodinĂĄmica
ElectrodinĂĄmicaElectrodinĂĄmica
ElectrodinĂĄmica
 
Guía taller n° 5
Guía taller n° 5Guía taller n° 5
Guía taller n° 5
 
GravitaciĂłn universal
GravitaciĂłn universalGravitaciĂłn universal
GravitaciĂłn universal
 
Guía taller n° 4
Guía taller n° 4Guía taller n° 4
Guía taller n° 4
 
Guía de taller n° 1
Guía de taller n° 1Guía de taller n° 1
Guía de taller n° 1
 
DinĂĄmica de la partĂ­cula
DinĂĄmica de la partĂ­culaDinĂĄmica de la partĂ­cula
DinĂĄmica de la partĂ­cula
 
Perfil del docente
Perfil del docentePerfil del docente
Perfil del docente
 
SĂ­labo fĂ­sica ii
SĂ­labo fĂ­sica iiSĂ­labo fĂ­sica ii
SĂ­labo fĂ­sica ii
 
Internet
InternetInternet
Internet
 
Historia del internet
Historia del internetHistoria del internet
Historia del internet
 
modelo de plan de negocios automatizado
modelo de plan de negocios automatizadomodelo de plan de negocios automatizado
modelo de plan de negocios automatizado
 
modelo Plan de negocios automatizado
modelo Plan de negocios automatizadomodelo Plan de negocios automatizado
modelo Plan de negocios automatizado
 
plan de modelo de negocios automatizado
plan de modelo de negocios automatizadoplan de modelo de negocios automatizado
plan de modelo de negocios automatizado
 
modelo de plan de negocios automatizado
modelo de plan de negocios automatizadomodelo de plan de negocios automatizado
modelo de plan de negocios automatizado
 

Recently uploaded

The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Trucks in Minnesota
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Sheetaleventcompany
 

Recently uploaded (20)

The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 

modelo plan de negocio automatizado

  • 1. Comparison of Brans Promethee multicriteria decision method and Promethee modified by authors for the optimization of an erosion control integral plan in Chaco area in Salta province (Argentine) J. B. Grau (1), J. M. AntĂłn (1), F. Colombo (2), L. de los RĂ­os (2), J. M. Cisneros (3), A. Tarquis (1) (1) E. T. S. I. AgrĂłnomos- Universidad PolitĂŠcnica de Madrid (Spain) (2) Escuela de Negocios- Universidad CatĂłlica de Salta (Argentina) (3) Facultad de AgronomĂ­a y Veterinaria-Universidad Nacional de RĂ­o Cuarto (Argentina) E-mail: j.grau@upm.es Abstract- Chaco area is situated in the Province of Salta at North West of Argentine. The desertification is a big problem. In order to mitigate the problem it is necessary to take into account not only pedologic criteria but the economical, environmental, cultural and sociological criteria. Six sub zones have been established following previous studies. Eight criteria and six alternatives have been introduced in the model. Following the results of the study carried out by a collaborative project between UPM and UCS financed by AECID (1) were established several initial matrix. Brans Promethee Multicriteria Decision Method (MCDM) was applied and the authors modified that method introducing weights like in Electre Method. I. INTRODUCTION The Salta Province has 155.000 km2 and 1 million population, it is at NW of Argentine (NOA) having latitudes around 25ÂşS, it has rain from 400 to 800 mm/year. It has a low density of population in small cities and Indian places “puestos” or “colonias”. It has low standards for roads and it has an environment that is “deteriorating progressively”. Water is the most critical factor, as much for human and animal consumption, as for the production system in general and for the flooding and lack of appropriated infrastructures. Besides the water, other factors have an important influence in the erosion and progressive desertification of this region and environment degradation. Historically the human exploitation of natural forest to use in the railway and other activities produced an environment degradation process. Later on the autochthonous population followed the irrational wood extraction an over pasture as "modus vivendi" contributing to make the situation worse. Actually the farms and big single-crop exploitations in some locations do not give solution to the desertification problem. Only one integral plan considering all factors involved and the differences among sub zones will be an initial point to change the direction of the desertification process. A. Criteria, alternatives and Sub zones The following eight criteria were defined: Water erosion (WE): The water erosion is important. The relative water erosion indexes figures in the decisional matrix. Eolian erosion (EE): Winds erode, transport and deposit materials and are effective agents in several areas of this region. Implementation Facility (IF): They have been established taking into account actors’ opinions. Water Resources (WR): By each alternative have been considered and the relative results have been taken into this criterion. Economical benefits EB): The relative economical benefits using each alternative in a period of 25 years have been obtained as shown in the matrix with figures from 1 to 10. Hand power (HP): We have considered that would be satisfactory to give employment to the majority of it population. For that, we have considered this criterion as of “more is better” kind. Environmental Impacts (EI): They have been considered in each sub zone the environmental impacts according with the alternative adopted. Social Acceptance (SA): The figures included in this criterion have been obtained from the results of different forums and meeting with institutions, organizations and native people. Five alternatives have been retained: A) Autochthonous forest: mainly “Quebracho Blanco” and “Quebracho Colorado” forest species. B) High value forest: mainly teak, ebony, walnut tree, cherry tree, lignum vitae, eucalyptus, etc C) Traditional farms with extensive agriculture and livestock mixed with autochthonous forest modified and several foraging plants. D) Erosion control Crop with agriculture use. E) Erosion control crop with industrial use (biomass). Following the experience and the local acknowledge, the area has been divided in 6 sub zones: Las Lajitas, La Estrella, Pichanal, Martin Hickmann, Rivadavia banda sur and JoaquĂ­n V. Gonzalez. II. METHODOLOGY We have used the Preference Ranking Organization Method (The PROMETHEE Method for Multiple Criteria Decision- Making) by Ref. [4, 13, 14]. This is an outranking method, as 516978-1-4244-3760-3/09/$25.00 c 2009 IEEE
  • 2. ELECTRE due to Roy [11, 12] or A.H.P. due to Saaty [15, 16, 17]. Following Ref. [4, 13, 14] two possibilities are offered, PROMETHEE I provides a partial preorder and PROMETHEE II a total preorder on the set of possible alternatives. Different types of criteria have been adopted. Type I and Type III with different threshold (m). Type I is the usual Criterion. With this criterion if f(a) = f(b) this is indifference between a and b. If this is not the case the decision-maker has a strict preference for the action having greatest value. Type III is the Criterion with Linear Preference. Such an extension of the notion of criterion allows the decision-maker to prefer progressively a to b for progressively larger deviations between f(a) and f(b). The preference increases linearly until deviation equals m, after this value the preference is strict. For m the values 2, 4 and 6 have been taken. The authors have modified the PROMETHEE method using the weights of the criteria following the ELECTRE I Method [6, 1, 2, 3, 7, 8, 9, 10]. In the case I have been adopted the same weights for all sub zones and in the case II different weights Besides, some modifications have been considered in the data of the initial matrixes. Finally, MathCad has been used to program the calculus. We show below, like example, the application to sub zone "La Estrella". EROSION AND DESERTIFICATION INTEGRAL CONTROL PLAN USING PROMETHEE 1( )SUB ZONE LA ESTRELLA ORIGIN 1 CRITERION: 1.-water erosion index 2.- eolian erosion index, 3.- Implementation facility 4.-Water Resources, 5.- Economical Benefits, 6.- Hand power, 7.-Environmental Impacts, 8.- Social Acceptance Indice Isubj: mĂĄs es mejor Isubj = 1 mĂĄs es peor Isubj = -1 alternatives i 1 2 3 4 5 t 7 6 1 8 5 2 8 6 7 6 5 4 5 9 6 5 3 3 6 4 8 9 3 9 2 2 6 4 5 6 5 6 3 2 8 5 8 6 4 8 W 0.20 0.15 0.15 0.10 0.10 0.10 0.10 0.10 I 1 1 1 1 1 1 1 1 Alternatives: i = 1 ....5 . with x >= 0, if not with |x| A- functions of criterion-parameter and type elected for each criterion j: following Ref. [4] j = 1 type III, m=2, j = 2 type III, m=4, j=3 type III, m=4, j=4 type I j = 5 type I , j = 6 type III, m=6 , j=7 type III,m=6 j=8 type III, m=2 p1 x( ) if x 2 x 2 , 1, p2 x( ) if x 4 x 4 , 1, p4 x( ) if x 0 0, 1,( ) p3 x( ) if x 6 x 6 , 1, p j x,( ) y x z p1 y( ) j 1if z p2 y( ) j 2if z p2 y( ) j 3if z p4 y( ) j 4if z p4 y( ) j 5if z p3 y( ) j 6if z p3 y( ) j 7if z p1 y( ) j 8if z x 8 7.9, 8.. 10 5 0 5 10 0 0.5 1 p 2 x,( ) x With this outranking graph, functiĂłn of preference adopted: P i ii, j,( ) if Ij tj i, tj ii, . 0 0, p j tj i, tj ii, ,, A.- Results following initial methods of Ref [4]: Índixes q(i,ii) of preferences (π(i,ii) Brans&Vincke), giving outranking graphs according with values: q i ii,( ) 1 8 j P i ii, j,( ) = 8 i 1 5.. ii 1 5.. qqi ii, q i ii,( ) qq 0 0.25 0.5 0.208 0.458 0.229 0 0.281 0.094 0.469 0.448 0.281 0 0.042 0.208 0.438 0.333 0.406 0 0.5 0.458 0.354 0.156 0.021 0 = Outgoing flow: fp i( ) 1 5 ii q i ii,( ) = fppi fp i( ) fpp 1.573 1.219 1.344 0.365 1.635 = fm i( ) 1 5 ii q ii i,( ) = fmmi fm i( ) fmm 1.417 1.073 0.979 1.677 0.99 = Incoming flow: PROMETHEE II (clasification of alternatives by Total Preorder, Each alternative obtain one value(more is better): fd i( ) fp i( ) fm i( ) fddi fd i( ) fdd 0.156 0.146 0.365 1.313 0.646 = PROMETHEE I (clasification of alternatives by Partial Preorden): pr i ii,( ) z 1 z 0 fp i( ) fp ii( )( ) fm i( ) fm ii( )( ).if z 1 fp i( ) fp ii( )>( ) fm i( ) fm ii( )<( ).( ) fp i( ) fp ii( )>( ) fm i( ) fm ii( )( ).( ) fp i( ) fp ii( )( ) fm i( ) fm ii( )<( ).( )if prri ii, pr i ii,( ) Alternative E is preferred (E C A B D). prr 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 = B Results following the method modified by Ref [6] in order to weigh comparativment the criteria with similar weights to ELECTRE-I: q Preference Index (π Ref. [4]), gives outranking graph by values: q i ii,( ) 1 8 j P i ii, j,( ) Wj . = qqi ii, q i ii,( ) 5. i 1 5.. ii 1 5.. qq 0 1.25 2.25 1.083 2.083 0.917 0 1.188 0.438 2.063 2.479 1.813 0 0.167 0.958 2.5 2.083 1.938 0 2.375 2.583 2.167 0.688 0.083 0 = :Outgoing flow: fp i( ) 1 5 ii q i ii,( ) = fppi fp i( ) fpp 1.696 1.463 1.213 0.354 1.496 = Incoming flow: fm i( ) 1 5 ii q ii i,( ) = fmmi fm i( ) fmm 1.333 0.921 1.083 1.779 1.104 = PROMETHEE II (clasification of alternatives by Total Preorder) fd i( ) fp i( ) fm i( ) fddi fd i( ) fdd 0.363 0.542 0.129 1.425 0.392 = PROMETHEE I (clasification of alternatives by Partial Preorden): pr i ii,( ) z 1 z 0 fp i( ) fp ii( )( ) fm i( ) fm ii( )( ).if z 1 fp i( ) fp ii( )>( ) fm i( ) fm ii( )<( ).( ) fp i( ) fp ii( )>( ) fm i( ) fm ii( )( ).( ) fp i( ) fp ii( )( ) fm i( ) fm ii( )<( ).( )if where, pr(i,ii) = 1 tell us that alternative i is preference (outranks) to alternative j, pr(i,ii) = 0 is indifference, y pr(i,ii) = -1 are incomparable, that may be obtained by pr(ii,i) . prri ii, pr i ii,( ) prr 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 = Alternative B is preferred (B E A C D). 2009 7th IEEE International Conference on Industrial Informatics (INDIN 2009) 517
  • 3. III. RESULTS 1. Sub zone Martin Hickman 1.1. ALTERNATIVE1: Table I shows the values to Martin Hickman sub-zone. It has been included the type of pseudo-criteria used and the threshold (m) for the type III [4]. TABLE I DECISIONAL MATRIX FOR MARTIN HICKMAN, ALTERNATIVE 1 Alternative WE EE IF WR EB HP EI SA A 9 8 5 8 7 2 8 2 B 7 5 7 5 6 8 6 5 C 4 2 8 4 8 8 1 9 D 3 3 6 4 6 7 5 6 E 3 3 2 6 8 6 5 8 Weight 0,2 0,2 0,05 0,1 0,1 0,1 0,15 0,1 Type of criterion III III III I I III III III Thresholds 2 4 4 2 2 4 Two procedures have been applied in order to obtain alternative preorder: A: Initial method of Ref. [4]. B: Method modified by Ref. [6]. 1.1.A. Results by Ref. [4] method. The preorder is shown in Fig. 1. A B C E D Fig. 1 Graph sub zone Martin Hickman, alternative 1.1A, Promethee II. 1.1. B Results following Ref. [9] method are shown in Fig. 2. A B E C D Fig. 2: Graphs sub zone Martin Hickman 1.1B Promethee II, modified. 1.2 ALTERNATIVE 2: Other value of criteria, same weight, pseudocriteria and thresholds (Table II andy Fig. 3 and 4). TABLE II DECISIONAL MATRIX FOR MARTIN HICKMAN, ALTERNATIVE 2. Alternative WE EE IF WR EB HP EI SA A 9 8 5 8 7 7 8 2 B 7 5 7 5 8 8 6 5 C 7 5 8 4 8 8 6 9 D 3 3 6 4 6 7 5 6 E 3 3 8 6 8 6 5 8 Weight 0,2 0,2 0,05 0,1 0,1 0,1 0,15 0,1 Type of criterion III III III I I III III III Thresholds 2 4 4 2 2 4 1.2. A. Results by method of Ref. [4] method. The preorder is shown in Fig. 3. C A B E D Fig. 3: Graphs sub zone Martin Hickman, alternative 1.2.A . Promethee II 1.2. B. Results following Ref [9] method are shown in Fig. 4. A C B E D Fig. 4: Graphs sub zone Martin Hickman, alternative 1.2.B. Promethee II, modified. Changing the weights (0,2 – 0,15 – 0,15 – 0,10 – 0,10 – 0,10 – 0,10 – 0,10), the results are: 1.1.A A B C E D 1.1.B A B C E D 1.2.A C A B E D 1.2.B A C B E D 2. Sub zone LA ESTRELLA 2.1. ALTERNATIVE 1: Decisional matrix is shown in Table III. TABLE III DECISIONAL MATRIX FOR LA ESTRELLA, ALTERNATIVE 1. Alternative WE EE IF WR EB HP EI SA A 7 6 1 8 5 2 8 6 B 7 6 5 4 5 9 6 5 C 3 3 6 4 8 9 3 9 D 2 2 6 4 5 6 5 6 E 3 2 8 5 8 6 4 8 Weight 0,15 0,15 0,15 0,1 0,15 0,1 0,1 0,1 Type of criterion III III III I I III III III Thresholds 2 4 4 6 6 2 2.1A. Results by Ref [4] method. The preorder is shown in Fig. 5. E C A B D Fig. 5: Graph sub zone La Estrella alternative 2.1A Promethee II 2.1B. Results following Ref [6] method are shown in Fig. 6. E C B A D Fig. 6: Graphs sub zone La Estrella alternative 2.1B Promethee II, modified. 2.2. ALTERNATIVE 2: Changing some criteria values and maintaining weights (Table IV). TABLE IV DECISIONAL MATRIX FOR LA ESTRELLA, ALTERNATIVE 2. Alternative WE EE IF WR EB HP EI SA A 7 6 5 8 5 6 8 6 B 7 6 5 4 5 9 6 5 C 3 3 6 4 8 9 3 9 D 2 2 6 4 5 6 5 6 E 3 2 8 5 8 6 4 8 Weight 0,15 0,15 0,15 0,1 0,15 0,1 0,1 0,1 Type of criterion III III III I I III III III Thresholds 2 4 4 6 6 2 2.2A. Results by Ref. [4] method. The preorder is shown in Fig. 7. A E C B D Fig. 7: Graph sub zone La Estrella, alternative 2.2A, Promethee II. 2.2B.Results following Ref [6] method is shown in Fig. 8. A E C B D Fig. 8: Graph sub zone La Estrella alternativa 2.2B, Promethee II modified. Changing weights (0,20 – 0,15 – 0,15 – 0,10 – 0,10 – 0,10 – 0,10 – 0,10) the results are: 2.1.A E C A B D 518 2009 7th IEEE International Conference on Industrial Informatics (INDIN 2009)
  • 4. 2.1.B B E A C D 2.2.A A E C B D 2.2.B A B E C D 3. Sub zone RIVADAVIA SUR 3.1. ALTERNATIVA 1: Initial matrix is shown in Table V. TABLE V DECISIONAL MATRIX FOR RIVADAVIA SUR, ALTERNATIVE 1. Alternative WE EE IF WR EB HP EI SA A 8 5 1 9 5 7 9 6 B 6 6 6 5 5 8 6 5 C 3 2 2 4 8 9 1 9 D 2 2 5 4 6 7 5 6 E 3 3 8 5 8 6 4 8 Weight 0,25 0,1 0,1 0,05 0,1 0,1 0,2 0,1 Type of criterion III III III I I III III III Thresholds 2 4 4 2 2 4 3.1A. Results following Ref [4] method is shown in Fig. 9. E A B C D Fig. 9: Graph sub zone Rivadavia Sur, alternative 3.1A, Promethee II. 3.1B. Results following Ref. [6] method in Fig. 10. A B E C D Fig. 10: Graph sub zone Rivadavia Sur, alternative 3.1B, Promethee II, modified. 3.2. ALTERNATIVE 2: Changing some criteria values and maintaining weights (Table VI). TABLE VI DECISIONAL MATRIX FOR RIVADAVIA SUR, ALTERNATIVE 2. Alternative WE EE IF WR EB HP EI SA A 8 5 6 9 5 7 9 6 B 6 6 6 5 5 8 6 5 C 3 2 2 4 8 9 1 9 D 2 2 5 4 6 7 5 6 E 3 3 8 5 8 6 4 8 Weight 0,25 0,1 0,1 0,05 0,1 0,1 0,2 0,1 Type of criterion III III III I I III III III Thresholds 2 4 4 2 2 4 3.2A. Results following Ref. [4] method in shown in Fig. 11. A E B C D Fig. 11: Graph sub zone Rivadavia Sur, alternative 3.2A, Promethee II. 3.2B. Results following Ref. [6] is in Fig. 12. A B E C D Fig. 12: Graph sub zone Rivadavia Sur, alternative 3.2B, Promethee II, modified. Changing weights (0,2 – 0,15 – 0,15 – 0,10 – 0,10 – 0,10 – 0,10 – 0,10) the results are: 3.1.A E A B C D 3.1.B A B E C D 3.2.A A E B C D 3.2.B A B E C D 4. Sub zone PICHANAL 4.1. ALTERNATIVE 1: Initial matrix is shown in Table VII. TABLE VII DECISIONAL MATRIX FOR PICHANAL, ALTERNATIVE 1. Alternative WE EE IF WR EB HP EI SA A 6 6 1 7 5 2 8 2 B 6 5 4 4 5 8 6 5 C 3 2 9 4 8 9 1 9 D 2 2 6 4 5 7 5 6 E 3 2 8 5 8 6 4 8 Weight 0.20 0.15 0.10 0.10 0.20 0.05 0.05 0.15 Type of criterion III III III I I III III III Thresholds 2 2 4 4 2 2 4 4.1A. Results following Ref. [4] is shown in Fig. 13. E C B A D Fig. 13: Graph sub zone Pichanal, alternative 4.1A, Promethee II. 4.1B. Results following Ref [6] is shown in Fig. 14. E C A B D Fig. 14: Graph sub zone Pichanal, alternative 4.1B, Promethee II, modified. 4.2. ALTERNATIVE 2: With other values same weights (Table VIII). TABLE VIII DECISIONAL MATRIX FOR PICHANAL, ALTERNATIVE 2. Alternative WE EE IF WR EB HP EI SA A 6 6 5 7 5 7 8 2 B 6 5 4 4 5 8 6 5 C 5 2 9 4 8 9 1 9 D 2 2 6 4 5 7 5 6 E 3 2 8 5 8 6 4 8 Weight 0.20 0.15 0.10 0.10 0.20 0.05 0.05 0.15 Type of criterion III III III I I III III III Thresholds 2 2 4 4 2 2 4 4.2A. Results following Ref [4] is in Fig. 15. C A E B D Fig. 15: Graph sub zone Pichanal, alternative 4.2A, Promethee II. 4.2B. Results following Ref [4] is shown in Fig. 16. C E A B D Fig. 16: Graph sub zone Pichanal, alternative 4.2B, Promethee II, modified. With other weights (0,2 – 0,15 – 0,15 – 0,10 – 0,10 – 0,10 – 0,10 – 0,10) the results are: 4.1.A E C B A D 4.1.B E B C A D 4.2.A C A E B D 4.2.B A C E B D 5. Sub zone JOAQUIN V. GONZALEZ 5.1. ALTERNATIVE 1: Initial matrix is shown in Table IX. 2009 7th IEEE International Conference on Industrial Informatics (INDIN 2009) 519
  • 5. TABLE IX DECISIONAL MATRIX FOR JOAQUIN V. GONZÁLEZ, ALTERNATIVE 1. Alternative WE EE IF WR EB HP EI SA A 6 6 1 7 7 2 9 2 B 6 5 6 4 7 8 6 5 C 3 4 9 4 8 9 4 9 D 2 2 7 4 5 7 5 6 E 3 2 8 4 8 6 4 8 Weight 0,2 0,15 0,1 0,1 0,15 0,1 0,1 0,1 Type of criterion III III III I I III III III Thresholds 2 4 4 2 2 4 5.1A. Results following Ref. [4] is shown in Fig. 17. C B E A D Fig. 17: Graph sub zone Joaquin V. Gonzalez, alternative 5.1A, Promethee II. 5.1B. Results following Ref. [6] is in Fig. 18. C B A E D Fig. 18: Graph sub zone Joaquin V. Gonzalez, alternative 5.1B, Promethee II, modified. 5.2. ALTERNATIVE 2: Other values and same weights (Table X). TABLE X DECISIONAL MATRIX FOR JOAQUIN V. GONZÁLEZ, ALTERNATIVE 2. Alternative WE EE IF WR EB HP EI SA A 6 6 3 7 7 4 9 2 B 6 5 6 4 7 8 6 5 C 5 4 9 4 8 9 4 9 D 2 2 7 4 5 7 5 6 E 3 2 8 4 8 6 4 8 Weight 0,2 0,15 0,1 0,1 0,15 0,1 0,1 0,1 Type of criterion III III III I I III III III Thresholds 2 4 4 2 2 4 5.2A. Results following Ref. [4] is shown in Fig. 19. C B A E D Fig. 19: Graph sub zone Joaquin V. Gonzalez, alternative 5.2A, Promethee II. 5.2B. Results following Ref. [6] is in Fig. 20. C A B E D Fig. 20: Graph sub zone Joaquin V. Gonzalez, alternative 5.2B, Promethee II, modified. With other weights (0,2 – 0,15 – 0,15 – 0,10 – 0,10 – 0,10 – 0,10 – 0,10) the results are: 5.1.A C B E A D 5.1.B C B A E D 5.2.A C B A E D 5.2.B C B A E D 6. Sub zone LAS LAJITAS: 6.1. ALTERNATIVE 1: Initial matrix is shown in Table XI. TABLE XI DECISIONAL MATRIX FOR LAS LAJITAS, ALTERNATIVE 1. Alternative WE EE IF WR EB HP EI SA A 3 6 1 3 3 3 4 2 B 3 4 3 3 5 8 3 5 C 2 3 9 4 8 9 1 9 D 2 2 6 4 5 7 1 6 E 2 2 8 4 8 6 1 8 Weight 0,2 0,05 0,1 0,2 0,2 0,15 0,05 0,1 Type of criterion III III III I I III III III Thresholds 2 4 4 6 6 2 6.1A. Results following Ref. [4] method is in Fig. 21. C E D B A Fig. 21: Graph sub zone Las Lajitas, alternative 6.1A, Promethee II. 6.1B. Results following Ref. [6] method is shown in Fig. 22. C E D B A Fig. 22: Graph sub zone Las Lajitas, alternative 6.1B, Promethee II, modified. 6.2. ALTERNATIVE 2: Other values and same weights (Table XII). TABLE XII DECISIONAL MATRIX FOR LAS LAJITAS, ALTERNATIVE 2. Alternative WE EE IF WR EB HP EI SA A 3 6 1 3 3 2 4 2 B 3 4 3 3 5 8 3 5 C 2 3 9 4 8 9 1 9 D 2 2 6 4 5 7 1 6 E 2 2 8 4 8 6 1 8 Weight 0,2 0,05 0,1 0,2 0,2 0,15 0,05 0,1 Type of criterion III III III I I III III III Thresholds 2 4 4 6 6 2 6.2A. Results following Ref. [4] method is shown in Fig. 23. C E D B A Fig. 23: Graph sub zone Las Lajitas, alternative 6.2A, Promethee II. 6.2B. Results following Ref. [6] method is in Fig. 24. C E D B A Fig. 24: Graph sub zone Las Lajitas, alternative 6.2B, Promethee II, modified. Changing weights (0,2 – 0,15 – 0,15 – 0,10 – 0,10 – 0,10 – 0,10 – 0,10) the results are: 6.1.A C E D B A 6.1.B C E B D A 6.2.A C E D B A 6.2.B C E B D A IV. CONCLUSIONS Following the results mentioned above (Table XIII), we can obtain as conclusions that the PROMETHEE method is a very useful tool to elaborate a erosion control integral Plan. It is robust as we have confirmed changing a little the relative preference. Besides, with both methods similar results have been obtained. 520 2009 7th IEEE International Conference on Industrial Informatics (INDIN 2009)
  • 6. TABLE XIII SUMMARY RESULTS OF PROMETHEE METHODS APPLICATION TO EROSION CONTROL PLANS IN SALTA PROVINCE (ARGENTINE). Subzone Martin Hickman La Estrella Rivadavia Banda Sur Pichanal J. V. GonzĂĄlez Las LajitasMethod PROMETHEE, applying variable weights in each sub zone 1.A A E E E C C 1.B A E A E C C 2.A C A A C C C 2.B A A A C C C PROMETHEE, applying the same weights in each sub zone 1.A A E E E C C 1.B A B A E C C 2.A C A A C C C 2.B A A A A C C Note: 1.A and 2.A : Following the initial method of Ref. [4], 1.B and 2.B: Following method modified by the authors [6]. For this purposes, we would recommend to use Promethee II modified using the ELECTRE I weights. Besides, with usual criterion and type III pseudocriterion have been obtained the best results. We could recommend to Salta Government the following actions: Las Lajitas: extensive farming and livestock. If it is only farming it could be with crop rotation. The livestock should be with natural forestry and foraging plants. La Estrella: We can combine Autochthonous and high value forestry with biomass production. Pichanal: Similar to Las Lajitas. Martin Hickman: Autochthonous forestry, combined with some crop rotation and livestock like Las Lajitas. Rivadavia Banda Sur: Similar to La Estrella. Joaquin V. Gonzalez: Similar to Las Lajitas combined in some areas with high value forestry. ACKNOWLEDGMENT We thank to “Agencia EspaĂąola para la CooperaciĂłn Internacional y el Desarrollo” (AECID) by the financing support of the project A/013294/07 titled "ELABORACION DE UN PLAN INTEGRAL DE LUCHA CONTRA LA DESERTIZACION Y LA EROSION EN EL CHACO SALTEÑO (ARGENTINA)" REFERENCES [1] J. M. AntĂłn, J. B. Grau; Madrid-Valencia high-speed rail line: a route selection; ICC Transport 157, pgs, 153-161: August 2004, London. [2] J. B. Grau, J. M. AntĂłn, A. M. Tarquis; Election of water resources management entity using a multi-criteria decision (MCD) method in Salta province (Argentine); Proceedings WMSCI, Volume: I, pgs: 30- 35; 2008, Orlando, Florida, USA. [3] J. M. AntĂłn, Juan B. Grau, Elena SĂĄnchez; Compromise Programming Calibration for financial analysis of firms of a common sector of business, case study for a set of Spanish banks in 1995.; Applied Financial Economics; 2006 ,U.K. [4] J.P. Brans; Ph. Vincke, A Preferent ranking Organization Method. The PROMETHEE Method for Multiple Criteria Decision-Making, Management Science, Vol. 31, NÂş 6, 647-656, June 1985. [5] J. B. Grau, “Curso: MĂŠtodos matemĂĄticos para la toma de decisiones”, Escuela de Postgrado de la Facultad de Ciencias Naturales, Universidad Nacional de Salta, Argentina, 2003. [6] J. B. Grau, J. M. AntĂłn, A. M. Tarquis, D. C. SĂĄnchez, “MCDM Methods for Waste Management Planning in a Rural Área”, CITSA 2007, Vol. 134, pp. 193-209. [7] J. M. AntĂłn, E. Ballestero, C. Bielza. “Compromise-based approach to road project selection in Madrid metropolitan area”. J. of the O. R. Society of Japan, Vol.46, NÂş 1, 2003, pp. 99-122. [8] J. M. AntĂłn, J. B. Grau, D. Andina. “Electre and AHP MCDM Method and the Official choice Applied to High-Speed Railway Layout alternative election”. W.S.E.A.S. Transactions on Business and Economics, Issue 1, Vol.1, Jan. 2004, pp. 64-69. [9] J. M. AntĂłn, J. B. Grau, E. SĂĄnchez. “Compromise Programming in Financial Analysis for Strategic Management”. Transactions of WAC- 2004, Vol. 17, USA, 2004, pp. 555–560. [10]J. M. Anton, J. B. Grau, E. Sanchez. Compromise programming calibration for financial analysis of firms of a common sector of business, case study for a set of Spanish banks in 1995. Applied financial economic, pp. 445-461, 2007. [11]B. Roy, D. Bouyssou. AidĂŠ Multicritère Ă  la DĂŠcision: MĂŠthodes et cas. Economica, Paris 1993. [12]B. Roy. MĂŠthodologie Multicritère d’Aide Ă  la DĂŠcision. Economica, Paris, 1985. [13]J.P. Brans, Ph. Vincke, B. Mareschal, “How to select and how to rank projects: The PROMETHEE method”. European J. of Operational Research, vol. 44, nÂş 1, 1986, pp. 138-228. [14]J. P. Brans, B. Mareschal. “The PROMCALC and GAIA Decision Support System for Multicriteria Decision Aid”, Decision Support Systems, Vol. 12, 1994, pp 297-310. [15]T. Saaty. The Analytic Hierarchy Process, Mac Graw-Hill, New York, 1980 and 1988. [16]T. Saaty. Multicriteria Decision Making: The Analytic Hierarchy Process, AHP Series (extended edition), Vol. 1, RWS Publications, Pittsburg USA, 1996. [17]T. Saaty. Decision Making for Leaders, AHP Series (extended edition), Vol. 2, RWS Publications, Pittsburgh USA, 1996. 2009 7th IEEE International Conference on Industrial Informatics (INDIN 2009) 521