1. Rapid EPC Achievement
Client: Sonatrach
Location: Skikda, Algeria
Scope: FEED; EPC
Status: Completed 2007
Details:
• FEED and EPC of a Grassroots single 4.5 MTPA LNG train along with asso-
ciated LPG and condensate recovery to replace damaged plant
• Based on LNG reference design; Hybrid lump sum contract competitively
bid
Highlights:
• 12 LNG trains completed for Sonatrach
• Challenging location and environment
Skikda LNG
New Train
Algeria