Logical roadmap of evolving PMO
with Organizational Maturity
Introduction
• Nowadays lots of Organization are going for CMMi
assessment to manage their capabilities. The PMO
setup should also colloberate with Organization
maturity level
• This paper will help in driving PMO level as per
Organization maturity level
• Project management as well as process management
will drive Organization maturity level
• Establishing a project management office (PMO) today
is considered one step forward in the maturity level of
an organization,
Overview PMO
• A project management office (PMO) is a unit or
department that specializes in project
management concepts and uses those concepts
to improve the overall project capability of an
organization. Typically, the primary goal of a PMO
is to improve project performance through
standardization and process. Additionally, a PMO
can also provide project support, information,
guidance, and oversight to an organization.
The Levels of a PMO.
CMMi Overview
• CMMI currently addresses three areas of interest:
– Product and service development — CMMI for
Development (CMMI-DEV),
– Service establishment, management, — CMMI for Services
(CMMI-SVC), and
– Product and service acquisition — CMMI for Acquisition
(CMMI-ACQ).
• CMMI models provide guidance for developing or
improving processes that meet the business goals of an
organization. A CMMI model may also be used as a
framework for appraising the process maturity of the
organization
CMMI Level VS PMO Level (adhoc
Processes)
Maturity Level 1 - Initial
• At maturity level 1, processes are
usually ad hoc and chaotic. The
organization usually does not provide
a stable environment. Success in
these organizations depends on the
competence and heroics of the
people in the organization and not on
the use of proven processes.
• Maturity level 1 organizations often
produce products and services that
work; however, they frequently
exceed the budget and schedule of
their projects.
• Maturity level 1 organizations are
characterized by a tendency to over
commit, abandon processes in the
time of crisis, and not be able to
repeat their past successes.
Level 1: The Functional Project Office
Level 1 is the simplest Project Office
possible, in which project managers are
simply present in the organization and
available for projects.
• The Functional Project Office is a
functional unit responsible for
staffing the organization with capable
project managers to manage projects
within the functional units of the
organization. In addition to staffing
project managers, the Functional
Project Office is also responsible for
resource management activities for
project managers.
• The Functional Project Office does
not provide an approved set of
project management processes,
organizational management, or
oversight of projects
CMMi Level Vs PMO Level (Project
Process)Maturity Level 2 - Managed
• the projects of the organization have ensured
that requirements are managed and that
processes are planned, performed, measured,
and controlled.
• The process discipline reflected by maturity
level 2 helps to ensure that existing practices
are retained during times of stress. When these
practices are in place, projects are performed
and managed according to their documented
plans.
• At maturity level 2, requirements, processes,
work products, and services are managed. The
status of the work products and the delivery of
services are visible to management at defined
points.
• Commitments are established among relevant
stakeholders and are revised as needed. Work
products are reviewed with stakeholders and
are controlled.
• The work products and services satisfy their
specified requirements, standards, and
objectives
Level 1: The Functional Project Office
• project managers typically work in various
parts of the organization and often use
different project management processes; in
addition, project managers may use different
project documentation templates and may
even have different project documentation
criteria, which range from ad-hoc to highly
structured criteria.
CMMi Level Vs PMO level
(Organization Process)
Maturity Level 3 – Defined
• At maturity level 3, processes are well
characterized and understood, and
are described in standards,
procedures, tools, and methods
• the standards, process descriptions,
and procedures for a project are
tailored from the organization's set of
standard processes to suit a
particular project or organizational
unit.
• the processes that are performed
across the organization are consistent
except for the differences allowed by
the tailoring guidelines
• processes are managed more
proactively using an understanding of
the interrelationships of the process
activities and detailed measures of
the process, its work products, and
its services.
Level 2: The Support Project Office
• The components of the Support Project
Office add to the components of the
Functional Project Office. The Support
Project Office provides the organization
with a standardized set of project
processes; however, similar to the
Functional Project Office, the Support
Project Office does not provide any
organizational management, oversight, or
communication about projects.
• A standardized set of project processes
includes project tools, a project
methodology, and project templates.
• The Support Project Office also works to
gain acceptance and adoption of the
project processes throughout the
organization
CMMi Level Vs PMO level
(Information management)
Maturity Level 4 - Quantitatively Managed
• At maturity level 4 Subprocesses are selected
that significantly contribute to overall process
performance. These selected subprocesses are
controlled using statistical and other
quantitative techniques.
• Quantitative objectives for quality and process
performance are established and used as
criteria in managing processes. Quantitative
objectives are based on the needs of the
customer, end users, organization, and process
implementers. Quality and process performance
are understood in statistical terms and are
managed throughout the life of the processes.
• For these processes, detailed measures of
process performance are collected and
statistically analyzed. Special causes of process
variation are identified and, where appropriate,
the sources of special causes are corrected to
prevent future occurrences.
• Quality and process performance measures are
incorporated into the organization.s
measurement repository to support fact-based
decision making in the future.
Level 3: The Information Project Office
• The Information Project Office begins to
expand the role of the Project Office to
provide project information and status to the
organization. In addition to the roles of the
Functional and Support Project Offices, the
role of the Information Project Office is to
compile a complete project list for the
organization, collect project information,
consolidate and summarize the project
information, and then distribute the
information throughout the organization.
• The Information Project Office works with
the organization to identify a standardized
set of project information needed by the
organization. The project information
collected and provided by projects could
include project status, project life cycle
stages, project approval gates, total hours,
project documents, timelines, milestones,
estimated start and finish dates, actual start
and finish dates, and so forth.
Optimization
Maturity Level 5 - Optimizing
• Processes are continually improved based on a
quantitative understanding of the common
causes of variation inherent in processes.
• Maturity level 5 focuses on continually
improving process performance through both
incremental and innovative technological
improvements.
• Quantitative process-improvement objectives
for the organization are established, continually
revised to reflect changing business objectives,
and used as criteria in managing process
improvement.
• The effects of deployed process improvements
are measured and evaluated against the
quantitative process-improvement objectives.
Both the defined processes and the
organization's set of standard processes are
targets of measurable improvement activities
Level 5: The Enterprise Project
Management Office
• The Enterprise Project Management
Office is the culmination of all or most
of the previous levels, along with the
addition of any combination of the
components listed below. At level 5,
the Enterprise PMO brings greater
awareness to resource utilization and
conflicts, facilitates conversations
about effective resource management,
and uses resource time reporting
information to guide organizational
decisions.
• The Enterprise PMO focuses on
project success, continuous
improvement, and better project
resource management.
Conclusion
• By relating each level we can evolve PMO
components and it will help in driving PMO
setup as per Organization capabilities .
• PMO also should be evolve as per
Organizational maturity
• This paper will help to draw linkage between
Organizational maturity and PMO level and
will help to evolve right PMO model

More Related Content

What's hot

1.3 project management process groups & knowledge areas 1
1.3 project management process groups & knowledge areas 11.3 project management process groups & knowledge areas 1
1.3 project management process groups & knowledge areas 1
reddvise
 
Introduction to PMP Brief Presentation
Introduction to PMP Brief PresentationIntroduction to PMP Brief Presentation
Introduction to PMP Brief Presentation
jamilireifij
 
Inter national standards for project management - fitsilis
Inter national standards for project management - fitsilisInter national standards for project management - fitsilis
Inter national standards for project management - fitsilis
Panos Fitsilis
 
Project management
Project managementProject management
Project management
Sameer Kumar
 
Project management methodologies
Project management methodologiesProject management methodologies
Project management methodologies
Rosu Gabi
 

What's hot (20)

Project Management Methodology
Project Management MethodologyProject Management Methodology
Project Management Methodology
 
1.3 project management process groups & knowledge areas 1
1.3 project management process groups & knowledge areas 11.3 project management process groups & knowledge areas 1
1.3 project management process groups & knowledge areas 1
 
PMP PMBOK 6th
PMP PMBOK 6thPMP PMBOK 6th
PMP PMBOK 6th
 
Common Sense Project Management Methodology
Common Sense Project Management MethodologyCommon Sense Project Management Methodology
Common Sense Project Management Methodology
 
Introduction to PMP Brief Presentation
Introduction to PMP Brief PresentationIntroduction to PMP Brief Presentation
Introduction to PMP Brief Presentation
 
PMP Chapter 5 of 6 M & C Process Group (12- Processes) (Based on PMBOK 6th e...
PMP Chapter 5 of 6  M & C Process Group (12- Processes) (Based on PMBOK 6th e...PMP Chapter 5 of 6  M & C Process Group (12- Processes) (Based on PMBOK 6th e...
PMP Chapter 5 of 6 M & C Process Group (12- Processes) (Based on PMBOK 6th e...
 
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
 
PMP PMbok 5th CH1 - CH2
PMP PMbok 5th CH1 - CH2PMP PMbok 5th CH1 - CH2
PMP PMbok 5th CH1 - CH2
 
Project Management Methodology
Project Management MethodologyProject Management Methodology
Project Management Methodology
 
Project management process
Project management processProject management process
Project management process
 
PMP PMBOK5 Ch4 integration management
PMP PMBOK5 Ch4 integration managementPMP PMBOK5 Ch4 integration management
PMP PMBOK5 Ch4 integration management
 
PMP Certification Chapter one Summary of PMBOK
PMP Certification Chapter one Summary of PMBOKPMP Certification Chapter one Summary of PMBOK
PMP Certification Chapter one Summary of PMBOK
 
Project management professional (pmi) study guide
Project management professional (pmi) study guideProject management professional (pmi) study guide
Project management professional (pmi) study guide
 
Inter national standards for project management - fitsilis
Inter national standards for project management - fitsilisInter national standards for project management - fitsilis
Inter national standards for project management - fitsilis
 
7.0 Project Cost Management Overview
7.0 Project Cost Management Overview7.0 Project Cost Management Overview
7.0 Project Cost Management Overview
 
Project management
Project managementProject management
Project management
 
Project Management Plan
Project Management PlanProject Management Plan
Project Management Plan
 
PMI Project Management Model Overview (PMBOK 4th Edition)
PMI Project Management Model Overview (PMBOK 4th Edition)PMI Project Management Model Overview (PMBOK 4th Edition)
PMI Project Management Model Overview (PMBOK 4th Edition)
 
The Project Management Plan in 20 steps
The Project Management Plan in 20 stepsThe Project Management Plan in 20 steps
The Project Management Plan in 20 steps
 
Project management methodologies
Project management methodologiesProject management methodologies
Project management methodologies
 

Similar to Logical roadmap of creating pmo with cm mi prospective

Models of quality assessment
Models of quality assessmentModels of quality assessment
Models of quality assessment
Asila AL-harthi
 
Program & project management (pmo)
Program & project management (pmo)Program & project management (pmo)
Program & project management (pmo)
flexibleresources
 

Similar to Logical roadmap of creating pmo with cm mi prospective (20)

Integrated roadmap for Developing PMO with CMMi Prospective
Integrated roadmap for Developing PMO with CMMi ProspectiveIntegrated roadmap for Developing PMO with CMMi Prospective
Integrated roadmap for Developing PMO with CMMi Prospective
 
071 Maturity Assessment
071 Maturity Assessment071 Maturity Assessment
071 Maturity Assessment
 
Capability Maturity Model Integartion
Capability Maturity Model IntegartionCapability Maturity Model Integartion
Capability Maturity Model Integartion
 
PMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesPMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO Capabilities
 
Models of quality assessment
Models of quality assessmentModels of quality assessment
Models of quality assessment
 
CAPM Exam preparation - series 1
CAPM Exam preparation - series 1CAPM Exam preparation - series 1
CAPM Exam preparation - series 1
 
14. Developing Custom Processes For IT Projects
14. Developing Custom Processes For IT Projects14. Developing Custom Processes For IT Projects
14. Developing Custom Processes For IT Projects
 
Chap016-Oversight
Chap016-OversightChap016-Oversight
Chap016-Oversight
 
Capability Maturity Model Integration
Capability Maturity Model IntegrationCapability Maturity Model Integration
Capability Maturity Model Integration
 
Project Management Centre of Excellence
Project Management Centre of ExcellenceProject Management Centre of Excellence
Project Management Centre of Excellence
 
Program & project management (pmo)
Program & project management (pmo)Program & project management (pmo)
Program & project management (pmo)
 
PMO Handbook - How to Plan, Build, and Run a PMO
PMO Handbook - How to Plan, Build, and Run a PMOPMO Handbook - How to Plan, Build, and Run a PMO
PMO Handbook - How to Plan, Build, and Run a PMO
 
PMP PMBok 5th ch 5 scope management
PMP PMBok 5th ch 5 scope managementPMP PMBok 5th ch 5 scope management
PMP PMBok 5th ch 5 scope management
 
PMO (Project Management Office)
PMO (Project Management Office)PMO (Project Management Office)
PMO (Project Management Office)
 
Software process and characters
Software process and characters Software process and characters
Software process and characters
 
Article18
Article18Article18
Article18
 
Project Management Process
Project Management ProcessProject Management Process
Project Management Process
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project Management
 
Building Quality Into Your Technical Communications Department
Building Quality Into Your Technical Communications DepartmentBuilding Quality Into Your Technical Communications Department
Building Quality Into Your Technical Communications Department
 
How To Improve Your Organization's PPM Maturity Level
How To Improve Your Organization's PPM Maturity LevelHow To Improve Your Organization's PPM Maturity Level
How To Improve Your Organization's PPM Maturity Level
 

Recently uploaded

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Recently uploaded (20)

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 

Logical roadmap of creating pmo with cm mi prospective

  • 1. Logical roadmap of evolving PMO with Organizational Maturity
  • 2. Introduction • Nowadays lots of Organization are going for CMMi assessment to manage their capabilities. The PMO setup should also colloberate with Organization maturity level • This paper will help in driving PMO level as per Organization maturity level • Project management as well as process management will drive Organization maturity level • Establishing a project management office (PMO) today is considered one step forward in the maturity level of an organization,
  • 3. Overview PMO • A project management office (PMO) is a unit or department that specializes in project management concepts and uses those concepts to improve the overall project capability of an organization. Typically, the primary goal of a PMO is to improve project performance through standardization and process. Additionally, a PMO can also provide project support, information, guidance, and oversight to an organization.
  • 4. The Levels of a PMO.
  • 5. CMMi Overview • CMMI currently addresses three areas of interest: – Product and service development — CMMI for Development (CMMI-DEV), – Service establishment, management, — CMMI for Services (CMMI-SVC), and – Product and service acquisition — CMMI for Acquisition (CMMI-ACQ). • CMMI models provide guidance for developing or improving processes that meet the business goals of an organization. A CMMI model may also be used as a framework for appraising the process maturity of the organization
  • 6.
  • 7. CMMI Level VS PMO Level (adhoc Processes) Maturity Level 1 - Initial • At maturity level 1, processes are usually ad hoc and chaotic. The organization usually does not provide a stable environment. Success in these organizations depends on the competence and heroics of the people in the organization and not on the use of proven processes. • Maturity level 1 organizations often produce products and services that work; however, they frequently exceed the budget and schedule of their projects. • Maturity level 1 organizations are characterized by a tendency to over commit, abandon processes in the time of crisis, and not be able to repeat their past successes. Level 1: The Functional Project Office Level 1 is the simplest Project Office possible, in which project managers are simply present in the organization and available for projects. • The Functional Project Office is a functional unit responsible for staffing the organization with capable project managers to manage projects within the functional units of the organization. In addition to staffing project managers, the Functional Project Office is also responsible for resource management activities for project managers. • The Functional Project Office does not provide an approved set of project management processes, organizational management, or oversight of projects
  • 8. CMMi Level Vs PMO Level (Project Process)Maturity Level 2 - Managed • the projects of the organization have ensured that requirements are managed and that processes are planned, performed, measured, and controlled. • The process discipline reflected by maturity level 2 helps to ensure that existing practices are retained during times of stress. When these practices are in place, projects are performed and managed according to their documented plans. • At maturity level 2, requirements, processes, work products, and services are managed. The status of the work products and the delivery of services are visible to management at defined points. • Commitments are established among relevant stakeholders and are revised as needed. Work products are reviewed with stakeholders and are controlled. • The work products and services satisfy their specified requirements, standards, and objectives Level 1: The Functional Project Office • project managers typically work in various parts of the organization and often use different project management processes; in addition, project managers may use different project documentation templates and may even have different project documentation criteria, which range from ad-hoc to highly structured criteria.
  • 9. CMMi Level Vs PMO level (Organization Process) Maturity Level 3 – Defined • At maturity level 3, processes are well characterized and understood, and are described in standards, procedures, tools, and methods • the standards, process descriptions, and procedures for a project are tailored from the organization's set of standard processes to suit a particular project or organizational unit. • the processes that are performed across the organization are consistent except for the differences allowed by the tailoring guidelines • processes are managed more proactively using an understanding of the interrelationships of the process activities and detailed measures of the process, its work products, and its services. Level 2: The Support Project Office • The components of the Support Project Office add to the components of the Functional Project Office. The Support Project Office provides the organization with a standardized set of project processes; however, similar to the Functional Project Office, the Support Project Office does not provide any organizational management, oversight, or communication about projects. • A standardized set of project processes includes project tools, a project methodology, and project templates. • The Support Project Office also works to gain acceptance and adoption of the project processes throughout the organization
  • 10. CMMi Level Vs PMO level (Information management) Maturity Level 4 - Quantitatively Managed • At maturity level 4 Subprocesses are selected that significantly contribute to overall process performance. These selected subprocesses are controlled using statistical and other quantitative techniques. • Quantitative objectives for quality and process performance are established and used as criteria in managing processes. Quantitative objectives are based on the needs of the customer, end users, organization, and process implementers. Quality and process performance are understood in statistical terms and are managed throughout the life of the processes. • For these processes, detailed measures of process performance are collected and statistically analyzed. Special causes of process variation are identified and, where appropriate, the sources of special causes are corrected to prevent future occurrences. • Quality and process performance measures are incorporated into the organization.s measurement repository to support fact-based decision making in the future. Level 3: The Information Project Office • The Information Project Office begins to expand the role of the Project Office to provide project information and status to the organization. In addition to the roles of the Functional and Support Project Offices, the role of the Information Project Office is to compile a complete project list for the organization, collect project information, consolidate and summarize the project information, and then distribute the information throughout the organization. • The Information Project Office works with the organization to identify a standardized set of project information needed by the organization. The project information collected and provided by projects could include project status, project life cycle stages, project approval gates, total hours, project documents, timelines, milestones, estimated start and finish dates, actual start and finish dates, and so forth.
  • 11. Optimization Maturity Level 5 - Optimizing • Processes are continually improved based on a quantitative understanding of the common causes of variation inherent in processes. • Maturity level 5 focuses on continually improving process performance through both incremental and innovative technological improvements. • Quantitative process-improvement objectives for the organization are established, continually revised to reflect changing business objectives, and used as criteria in managing process improvement. • The effects of deployed process improvements are measured and evaluated against the quantitative process-improvement objectives. Both the defined processes and the organization's set of standard processes are targets of measurable improvement activities Level 5: The Enterprise Project Management Office • The Enterprise Project Management Office is the culmination of all or most of the previous levels, along with the addition of any combination of the components listed below. At level 5, the Enterprise PMO brings greater awareness to resource utilization and conflicts, facilitates conversations about effective resource management, and uses resource time reporting information to guide organizational decisions. • The Enterprise PMO focuses on project success, continuous improvement, and better project resource management.
  • 12. Conclusion • By relating each level we can evolve PMO components and it will help in driving PMO setup as per Organization capabilities . • PMO also should be evolve as per Organizational maturity • This paper will help to draw linkage between Organizational maturity and PMO level and will help to evolve right PMO model