SlideShare a Scribd company logo
1 of 3
Curriculum Vitae
“Aim is not to be biggest but to be acknowledged as the best”
Name : Jabbar Singh Shekhawat
Qualification : B.E (Electronics Instrumentation &Control)
Designation : Control & Instrumentation Manager
Company : Reliance Utility & Power PVT. Ltd. Job Exp. : 5.10 Years
C.T.C :7.00 Lac /Anm. Email id : jabbar.shekhawat@gmail.com
Industry : Thermal power plant
Notice Period : 3 Months
Mo No :7600174639
Objective
Intend to build a career with leading corporate of hi-tech environment with committed & dedicated people, which will
help me to explore myself and realize my potential.
Profile
I am working in thermal power plant from last 5.6 years as a Control & Instrumentation Manager.
Career Abstracts & Education Details
Skills
➢ Knowledge of following D.C.S :-
1. A.B.B(PM866 ,PM 861 ,800XA)
2. Honeywell (C-300,200 & E.P.K.S 311.1) ,
3. Metso (MAX DNA 4F )
 Fine knowledge of open & closed loops with elements used for additional benefits for Auto & Cascade
controls like- feed forward, lead lag compensation & gain adjustment.
 Fine knowledge of process loops like -
1. Auto Combustion for Boiler
2. Furnace draft controls,
3. 3 Elements or 1 Element.
 Implement logic's as per process requirement.
 Done FAT & SAT on ABB D.C.S. for project of thermal power plant 5*500 TPH
EMPLOYER TIME FRAME DURATION Thermal Power Plant
RELIANCE ULTILITY & POWER PVT. LTD FEB 2016-TILL NOW 6 MONTHS 5*500 TPH BOILER CFB(THERMAX) & 4*93.5
MW TG (BHEL)
WARTSILA INDIA Ltd. JUNE-2014-JAN-2016 1.8 YEARS 1*80 MW PF BOILER(BHEL)
THERMAX INDIA Ltd. SEP 2011-JUNE-2014 2.9 YEARS 1*80 MW PF BOILER(BHEL)
MACABER BEEKAY Pvt. Ltd. OCT 2010 –SEP 2011 1 YEAR 6*210MW ASH HANDLING SYSTEM
 Knowledge of F.S.S.S.(Furnace safeguard& supervisory system), B.M.S (Burner management system),
governing console of BHEL Turbine ,A.H.P (ash handling & process control).
Job Profile
My basic work is to troubleshoot & control the process parameters from either field instrumentation or
programing portion of D.C.S.
 DCS & PLC PORTION FOLLOWING ACTIVITIES ARE CARRIED OUT:-
1. Back-up of history ,events, alarms ,database ,HMI displays ,SQL data base ,logic & network database, are taken
Quarterly or when modification is done .
2. Updating the I/O list & wiring diagram after modification at DCS or in field .
3. P.I.D tuning is done for Closed loops at regular intervals for better plant efficiency.
4. Loop testing, logic's modification & integrating hardware of D.C.S for process requirement.
5. Signal ground & Panel ground are checked at regular intervals to avoid leakage current interference.
6. For monitoring DCS healthiness, checklist is filed on daily basis.
7. Creation of Control module, channel assignment, scale assignment or any graphics designing are done when
required.
 FIELD INSTRUMENTATION PORTION FOLLOWING ACTIVITIES ARE CARRIED OUT:-
1. Commissioning of field instruments like control valve, transmitters ,switches ,Thermocouple , R.T.D, Solenoid
valves, Gauges , Motorized Valve limits adjustment etc. Also calibration or installation carried out whenever
required.
2. Spare planning is done as per 10% demand.
3. Logics are checked as per logic sheets, also modified as per process & field requirement
4. Safety instructions & standard maintenance procedures for any activity are followed in proper manner. .
5. Trouble shout’s critical cases in online & offline condition.
Achievements
1. Implementation of d/dt logic to avoid malfunction by temperature measuring devices.
2. Maintenance mode for ID & FD Fan online maintenance, without stopping the whole series.
I hereby declare that above-mentioned details are true and best on behalf of my knowledge.
Date :-- Signature( )
JABBAR SINGH SHEKHAWAT

More Related Content

What's hot (19)

rakesh resume_10.03.2016
rakesh resume_10.03.2016rakesh resume_10.03.2016
rakesh resume_10.03.2016
 
MM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEERMM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEER
 
Waste to Energy
Waste to EnergyWaste to Energy
Waste to Energy
 
Project Arsenal
Project ArsenalProject Arsenal
Project Arsenal
 
Ac installation justin tx
Ac installation justin txAc installation justin tx
Ac installation justin tx
 
Resume' 2015
Resume' 2015Resume' 2015
Resume' 2015
 
ALBARICK POWER PLANT NEW CV
ALBARICK POWER PLANT NEW CVALBARICK POWER PLANT NEW CV
ALBARICK POWER PLANT NEW CV
 
Alhalak Subhi
Alhalak SubhiAlhalak Subhi
Alhalak Subhi
 
TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016
 
comising
comisingcomising
comising
 
V O Keeffe
V O KeeffeV O Keeffe
V O Keeffe
 
ugandhar CompEx resume
ugandhar CompEx resumeugandhar CompEx resume
ugandhar CompEx resume
 
William Resume
William ResumeWilliam Resume
William Resume
 
Resume - Chris Massey
Resume - Chris MasseyResume - Chris Massey
Resume - Chris Massey
 
new resume 2016c
new resume 2016cnew resume 2016c
new resume 2016c
 
DARIUS RODRIGUEZ ANGELES 2016 resume
DARIUS RODRIGUEZ ANGELES 2016 resumeDARIUS RODRIGUEZ ANGELES 2016 resume
DARIUS RODRIGUEZ ANGELES 2016 resume
 
rajesh remsu
rajesh remsurajesh remsu
rajesh remsu
 
CoreCV
CoreCVCoreCV
CoreCV
 
UPDATED CV-1
UPDATED CV-1UPDATED CV-1
UPDATED CV-1
 

Similar to CV 2016 INSTRIMENTATION

Similar to CV 2016 INSTRIMENTATION (20)

resume
resumeresume
resume
 
VEERA JANGA CV
VEERA JANGA CV VEERA JANGA CV
VEERA JANGA CV
 
ROHIT JOSHI JI
ROHIT JOSHI JIROHIT JOSHI JI
ROHIT JOSHI JI
 
Cv tapan kumar prusty updated
Cv tapan kumar prusty updatedCv tapan kumar prusty updated
Cv tapan kumar prusty updated
 
Cv
CvCv
Cv
 
RESUME
RESUMERESUME
RESUME
 
prakash_final
prakash_finalprakash_final
prakash_final
 
Ashutosh CV
Ashutosh CVAshutosh CV
Ashutosh CV
 
Palanikumar Resume
Palanikumar ResumePalanikumar Resume
Palanikumar Resume
 
TPCIL VIVEK
TPCIL VIVEKTPCIL VIVEK
TPCIL VIVEK
 
Hari Shankar
Hari ShankarHari Shankar
Hari Shankar
 
CV bharat new
CV    bharat newCV    bharat new
CV bharat new
 
comising
comisingcomising
comising
 
Amit Resume
Amit ResumeAmit Resume
Amit Resume
 
Cv hardik chauhan
Cv hardik chauhanCv hardik chauhan
Cv hardik chauhan
 
CV_HARDIK_CHAUHAN
CV_HARDIK_CHAUHANCV_HARDIK_CHAUHAN
CV_HARDIK_CHAUHAN
 
Nitesh 1 pager CV Green
Nitesh 1 pager CV GreenNitesh 1 pager CV Green
Nitesh 1 pager CV Green
 
Chandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer new
 
CV Nagashiva
CV Nagashiva CV Nagashiva
CV Nagashiva
 
social profile _sachin soni_220715
social profile _sachin soni_220715social profile _sachin soni_220715
social profile _sachin soni_220715
 

CV 2016 INSTRIMENTATION

  • 1. Curriculum Vitae “Aim is not to be biggest but to be acknowledged as the best” Name : Jabbar Singh Shekhawat Qualification : B.E (Electronics Instrumentation &Control) Designation : Control & Instrumentation Manager Company : Reliance Utility & Power PVT. Ltd. Job Exp. : 5.10 Years C.T.C :7.00 Lac /Anm. Email id : jabbar.shekhawat@gmail.com Industry : Thermal power plant Notice Period : 3 Months Mo No :7600174639 Objective Intend to build a career with leading corporate of hi-tech environment with committed & dedicated people, which will help me to explore myself and realize my potential. Profile I am working in thermal power plant from last 5.6 years as a Control & Instrumentation Manager. Career Abstracts & Education Details Skills ➢ Knowledge of following D.C.S :- 1. A.B.B(PM866 ,PM 861 ,800XA) 2. Honeywell (C-300,200 & E.P.K.S 311.1) , 3. Metso (MAX DNA 4F )  Fine knowledge of open & closed loops with elements used for additional benefits for Auto & Cascade controls like- feed forward, lead lag compensation & gain adjustment.  Fine knowledge of process loops like - 1. Auto Combustion for Boiler 2. Furnace draft controls, 3. 3 Elements or 1 Element.  Implement logic's as per process requirement.  Done FAT & SAT on ABB D.C.S. for project of thermal power plant 5*500 TPH EMPLOYER TIME FRAME DURATION Thermal Power Plant RELIANCE ULTILITY & POWER PVT. LTD FEB 2016-TILL NOW 6 MONTHS 5*500 TPH BOILER CFB(THERMAX) & 4*93.5 MW TG (BHEL) WARTSILA INDIA Ltd. JUNE-2014-JAN-2016 1.8 YEARS 1*80 MW PF BOILER(BHEL) THERMAX INDIA Ltd. SEP 2011-JUNE-2014 2.9 YEARS 1*80 MW PF BOILER(BHEL) MACABER BEEKAY Pvt. Ltd. OCT 2010 –SEP 2011 1 YEAR 6*210MW ASH HANDLING SYSTEM
  • 2.  Knowledge of F.S.S.S.(Furnace safeguard& supervisory system), B.M.S (Burner management system), governing console of BHEL Turbine ,A.H.P (ash handling & process control). Job Profile My basic work is to troubleshoot & control the process parameters from either field instrumentation or programing portion of D.C.S.  DCS & PLC PORTION FOLLOWING ACTIVITIES ARE CARRIED OUT:- 1. Back-up of history ,events, alarms ,database ,HMI displays ,SQL data base ,logic & network database, are taken Quarterly or when modification is done . 2. Updating the I/O list & wiring diagram after modification at DCS or in field . 3. P.I.D tuning is done for Closed loops at regular intervals for better plant efficiency. 4. Loop testing, logic's modification & integrating hardware of D.C.S for process requirement. 5. Signal ground & Panel ground are checked at regular intervals to avoid leakage current interference. 6. For monitoring DCS healthiness, checklist is filed on daily basis. 7. Creation of Control module, channel assignment, scale assignment or any graphics designing are done when required.  FIELD INSTRUMENTATION PORTION FOLLOWING ACTIVITIES ARE CARRIED OUT:- 1. Commissioning of field instruments like control valve, transmitters ,switches ,Thermocouple , R.T.D, Solenoid valves, Gauges , Motorized Valve limits adjustment etc. Also calibration or installation carried out whenever required. 2. Spare planning is done as per 10% demand. 3. Logics are checked as per logic sheets, also modified as per process & field requirement 4. Safety instructions & standard maintenance procedures for any activity are followed in proper manner. . 5. Trouble shout’s critical cases in online & offline condition. Achievements 1. Implementation of d/dt logic to avoid malfunction by temperature measuring devices. 2. Maintenance mode for ID & FD Fan online maintenance, without stopping the whole series. I hereby declare that above-mentioned details are true and best on behalf of my knowledge. Date :-- Signature( )