m Not started
                                                                                                                                                   nOn Plan
                          Project Plan mnu                                                                                                         Complete
                                                                                                                                                   u Issues
       Date of Report             jun 30, 2005

           Name                Client Performance Management System                                                   Sponsor       Bill Praxton, CFO
         Start Date                  10/1/04                                                       End Date         3/28/06

                                                            Balanced Scorecard Design and Development Plan
                                                                                  Impact on
                                                    Actual Start    Tentative    Completion    Target Completion
                      Task                                                                                                      Comments                           Deliverables              Lead
                                                       Date         Start Date   (Actual vs.     date & Status
                                                                                   Target)
1. Refresh the Strategic Plan                         12/1/04                                  4/30/05
 Review current strategic planning documents
 and determine if the current plan is appropriate     11/15/04                                  3/31/05       n
 for the Balanced Scorecard

 Prepare for Strategic Planning Off-site               2/1/05                                   4/15/05       
 Strategic Planning working group to develop
                                                                                                                                                          1) Kick off meeting of technical
 draft revised Strategic Plan - See Planning          3/22/05                                                 m                                           group
 Workshop Coordinator for more details
 Senior Leadership approves revised Strategic
 Plan
                                                    After Phase 3                                             m
 Communicate Strategic Plan and Balanced                                                                                                                  1) Strategic Plan booklet
 Scorecard in printed and electronic format
                                                    After Phase 3                                             m                                           2) Strategy Map Draft

2. Strategy Map / Strategic Plan                       3/1/05
 Preliminary Draft Map with no extras for Gap
                                                                                                                                                          3) Very Basic Strategy Map
 Analysis only
                                                                                                                                                          4) Gap Analysis Results and
 Isolate holes / gaps between draft strategic
                                                                                                                                                          recommendations to fill out S-
 plan vs. Draft Strategy Map
                                                                                                                                                          Plan
 Make revisions to lower level objectives in
 Draft Strategic Plan and fill-out Strategy Map                                                                                                           5) Revised Strategic Plan
 for all components - themes, narrative add-on's                                                                                                          6) Revised Strategy Map
 and complete cause-effect flows.

 Approval of Revised Strategic Plan and Final                                                                      May have to schedule at joint
                                                                                                                                                          7) Briefing Session
 and Complete Strategy Map                                                                                         leadership off-site
 Develop Communication Plan for Strategic
                                                                                                                                                          8) Communication Plan
 Plan

 Launch Action Plan Steps for Strategic Plan                                                                       May require meetings and other         9) Action Plan for
 with Strategy Map                                                                                                 events per the Communication Plan      Communication Plan




     DRAFT                                                                                                    Page 1 of 14
m Not started
                                                                                                                                                   nOn Plan
                           Project Plan mnu                                                                                                        Complete
                                                                                                                                                   u Issues
       Date of Report              jun 30, 2005

            Name                Client Performance Management System                                                  Sponsor        Bill Praxton, CFO
         Start Date                   10/1/04                                                      End Date         3/28/06

                                                             Balanced Scorecard Design and Development Plan
                                                                                  Impact on
                                                     Actual Start   Tentative    Completion    Target Completion
                      Task                                                                                                       Comments                           Deliverables           Lead
                                                        Date        Start Date   (Actual vs.     date & Status
                                                                                   Target)
 Centralize feedback and comments for next                                                                         Output from this step does not get
                                                                                                                                                         10) Feedback Collection
 planning cycle. Collect and recommend for next                                                                    acted upon until next annual planning
                                                                                                                                                         System and Reports
 planning session cycle.                                                                                           cycle.
3. Measurements and Targets
 Create measurement and target development
                                                                                                                                                            11) Performance measurement
 workplan complete with templates and
                                                                                                                                                            training, tools, methodology
 methodology

                                                                                                                                                            Final set of tools to
 Quality control review to refine and improve
                                                                                                                                                            development enterprise wide
 complete measurement approach for client
                                                                                                                                                            performance measurements

 Extend each objective on the Strategy Map into
                                                                                                                   Follow the methodology and training
 one to three performance measurements
 Solicit input and feedback from functional leads                                                                                                           Revised set of performance
 and line and staff personnel                                                                                                                               measurements
 Establish a set of targets in accordance with
 operational goals that are linked to the                                                                                                                   Targets for each measurement
 Strategic Plan
 Identify initiatives and projects related to
                                                                                                                                                            Scorecard Model
 execution of each objective. Extend the Map
 Prototype test Scorecard Model for data points                                                                    Make sure model is tight / fits across
 that use existing measurement data                                                                                all components

 Complete a comprehensive measurement                                                                                                                       Performance measurement
 template for database development                                                                                                                          development template

4. Initiative Mapping and Budgeting
   Extend Initiative and Projects that are part of
                                                                                                                   Extended Scorecard Model ensures
   Scorecard Model into Action Plans or                                                                                                                     Extended Scorecard Model
                                                                                                                   execution of the Strategic Plan
   document with existing plans

   Link the Initiative / Projects within the
   Scorecard Model to the Budgeting Process




     DRAFT                                                                                                    Page 2 of 14
m Not started
                                                                                                                                                nOn Plan
                           Project Plan mnu                                                                                                     Complete
                                                                                                                                                u Issues
       Date of Report               jun 30, 2005

            Name                 Client Performance Management System                                                Sponsor       Bill Praxton, CFO
          Start Date                   10/1/04                                                    End Date         3/28/06

                                                            Balanced Scorecard Design and Development Plan
                                                                                 Impact on
                                                    Actual Start   Tentative    Completion    Target Completion
                       Task                                                                                                    Comments                          Deliverables            Lead
                                                       Date        Start Date   (Actual vs.     date & Status
                                                                                  Target)

  Identify gaps and short coming with linking                                                                                                           Recommended Changes to
  and make recommendations to improve                                                                                                                   Link Processes Together

  Cross walk all major initiatives against the
                                                                                                                                                        Graph of what should get
  Strategic Objectives - Pareto Chart the
                                                                                                                                                        resourced vs. what should not
  initiatives / projects
  Work back upstream from initiatives / projects
  not linked and document any missing lower                                                                                                             Operating Plan / Sub Objective
  level objectives in strategic plan and / or                                                                                                           Additions
  strategy map



5. Reporting Framework (Database)
 Map and build a framework structure from the
                                                                                                                  See other similar models from other   Visual prototype framework for
 highest organizational level down to the
                                                                                                                  performance management projects       review
 managerial level

 Align and link lower level components by
 through objective setting - upper to lower by
 organizational level / reporting units
 Assign performance measurements for lower
 level objectives. Index across common
 reporting units for the same objective.
 Complete a comprehensive measurement
 template for database development for this
 reporting level (lower objectives)
                                                                                                                  NOTE: The IT Design and
                                                                                                                                                     Various automated tools, such
                                                                                                                  Development Plan covers automation
                                                                                                                                                     as data collection forms,
 Prototype test and revise database design of                                                                     of the Enterprise Strategic
                                                                                                                                                     reporting tools, etc.
 Balanced Scorecard System - (ESMS                                                                                Management System

 Roll out test modules at pilot sites - flush out
 lessons learned and update IT Plans




     DRAFT                                                                                                   Page 3 of 14
m Not started
                                                                                                                                        nOn Plan
                       Project Plan mnu                                                                                                 Complete
                                                                                                                                        u Issues
     Date of Report            jun 30, 2005

         Name                Client Performance Management System                                             Sponsor      Bill Praxton, CFO
       Start Date                10/1/04                                                    End Date         3/28/06

                                                      Balanced Scorecard Design and Development Plan
                                                                           Impact on
                                              Actual Start   Tentative    Completion    Target Completion
                    Task                                                                                                Comments                        Deliverables     Lead
                                                 Date        Start Date   (Actual vs.     date & Status
                                                                            Target)
Cascade and development plan for Enterprise                                                                                                    ESMS Design and
Strategic Management System (ESMS)                                                                                                             Development Plan


                                                                                                                         Baseline End Date                     3/28/06
                                                                                Major Issues
               Description                                                                                  Comments                                            Status




   DRAFT                                                                                               Page 4 of 14
All Measurements Used in the ESMS Database

                         PM #                   Performance Measure                   BSC Framework            Strategic Goal or Objective per Major Organizational Unit          Function / Dept / Sub Group         Service or Product Line (if        Type of Measure     Measure Justification               Definition             Data Elements To Be            Data Source     Data Collection Frequency    PM Calculation Formula        Actual FY 03
                                                                                                                    BSC or Strategic Plan                                                                                    applicable)                                                                                                     Collected                                       D/W/M/Q/SA/A




             What is the PM number for      What metric(s) should we use to   Is this measure a Customer,      Insert major goals or objectives in Insert a list of the major     Insert a Link here to reference   Insert the Operating Area such    Is this measure a    Why are we using this     How do we define this measure?   What are the data elements Where does the data   How frequently should the   What is the formula for    What is the actual
             referencing. Could be LMR # or measure whether we have met our   Process, Learn & Grow or         this box as a reference in          organizational unit names in   back a list of Functions /        as Product or Service Line - To   1) Strategic         metric?                                                    for caclulating the measure? reside?             data be collected?          calculating the measure?   result of this measure
             a unique number for local      requirements?                     Resources measure based on the   completing this template            this box for reference in      Departments and other             be used for Product               2) Operational                                                                                                                                                                          for the Year 2003?
             metrics?                                                         BSC framework?                                                       completing this template       organizational units in           Performance Analysis              3) Tactical
Definition




                                                                                                                                                                                  completing this template                                            4) Individual




1

2

3

4

5

6




                                                                                                                                                                                                                                                 5 of 110
All Measurements Used in the ESMS Database

                         PM #                    Performance Measure              Actual FY 04         Green Standard    Amber Standard      Red Standard    Primary Functional POC Data Available?                        Notes




             What is the PM number for      What metric(s) should we use to What is the actual       What is the Green   What is the Amber What is the Red   Who is the primary owner     Y/N         Are there any additional notes regarding the
             referencing. Could be LMR # or measure whether we have met our result of this measure   Threshold?          Threshold?        Threshold?        for the measure and their                measure?
             a unique number for local      requirements?                   for the Year 2004?                                                               email address?
             metrics?
Definition




1

2

3

4

5

6




                                                                                                                                                                                                                                   6 of 110
Degree of Reliability
                                                                                     Update Frequency /
Balanced Scorecard Project




                                                                 Graded Attributes




                                                                                                                vs.Subjective)
                                                                                        Repeatable
Quality Review of Metrics




                                                                                                                 (Hard Data
Review and score all measurements used in your scorecard model

                       F1.1   % Revenue Growth                                                            4                       4
Financial Objective    F1.2
       (F1)            F1.3
                       F1.4
                       F2.1
Financial Objective    F2.2
       (F2)            F2.3
                       F2.4
                       F3.1
Financial Objective    F3.2
       (F3)            F3.3
                       F3.4
                       C1.1
Customer Objective     C1.2
      (C1)             C1.3
                       C1.4
                       C2.1
Customer Objective     C2.2
      (P2)             C2.3
                       C2.4
                       P1.1
 Process Objective     P1.2
       (P1)            P1.3
                       P1.4
                       P2.1
 Process Objective     P2.2
       (P2)            P2.3
                       P2.4
                       P3.1
 Process Objective     P3.2
       (P5)            P3.3
                       P3.4
                       P4.1
 Process Objective     P4.2
       (P4)            P4.3
                       P4.4
                       L1.1
L & G Objective (L1)
                       L1.2
                       L1.3
                       L1.4
                       L2.1
L & G Objective (L2)
                       L2.2
                       L2.3
                       L2.4
                       L3.1
L & G Objective (L3)
                       L3.2
                       L3.3
                       L3.4
Instructions:
Rate each Measurement for these attributes on a scale of 1 to 5:
1. Update Frequency: Measurement can get updated on a regular basis; M for Monthly, Q for Quarterly, A for Annual, etc.
2. Degree of Reliability: Can you easily measure the performance objective or is it too subjective when it comes to measura
3. Encourages the right behavior: Measurements should not confuse, distort, or create the wrong performance behavior wit
4. Degree of Fit: Measurement fits with the culture and processes of Organization and flows well from Lower Level to Uppe
5. Degree of Support: Client has existing procedures and processes that can support the measurement (such as available d

                  Maximum Score                    25
Degree of Support /




                                                                                                               Leading or Lagging
                      Degree of Fit with
Encourages the




                       Client's Culture




                                                                                                                                       Single or Index
 right behavior




                                                 Available Info




                                                                                             NonGraded
                                                                                              Attributes




                                                                                                                                           Metric
                                                                         Total     Overall
                                                                         Points    Grade
                  3                        4                         5        20       80%                 Lagging                  Single
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
                                                                               0        0%
Quarterly, A for Annual, etc.
 ve when it comes to measurability.
ong performance behavior within the Organization. Controllable?
 ell from Lower Level to Upper Level. (MACRO FIT - ORGANIZATIONAL)
 surement (such as available data is in place)
PROYECT Performance management plan

More Related Content

Viewers also liked (6)

What Makes a Good Performance Management Plan? A new tool for managers
 What Makes a Good Performance Management Plan? A new tool for managers What Makes a Good Performance Management Plan? A new tool for managers
What Makes a Good Performance Management Plan? A new tool for managers
 
Project Management Cycle: Tackling Implementation Challenges
Project Management Cycle: Tackling Implementation ChallengesProject Management Cycle: Tackling Implementation Challenges
Project Management Cycle: Tackling Implementation Challenges
 
Performance management system
Performance management systemPerformance management system
Performance management system
 
Chapter 8 - Performance Management
Chapter 8 - Performance ManagementChapter 8 - Performance Management
Chapter 8 - Performance Management
 
Performance Management System
Performance Management SystemPerformance Management System
Performance Management System
 
Performance Management
Performance ManagementPerformance Management
Performance Management
 

Similar to PROYECT Performance management plan

Mastertempstrategicplan
MastertempstrategicplanMastertempstrategicplan
Mastertempstrategicplan
Dereje Abebe
 
Smith.donnie
Smith.donnieSmith.donnie
Smith.donnie
NASAPMC
 
Changemangement Plan12 15(3)
Changemangement Plan12 15(3)Changemangement Plan12 15(3)
Changemangement Plan12 15(3)
Peter Johnson
 
Na ps 17th january 2013 (1)
Na ps  17th january 2013 (1)Na ps  17th january 2013 (1)
Na ps 17th january 2013 (1)
Manjeet Dhakal
 
Budget reforms, program budgeting and sub national budgeting in Afghanistan
Budget reforms, program budgeting and sub national budgeting in AfghanistanBudget reforms, program budgeting and sub national budgeting in Afghanistan
Budget reforms, program budgeting and sub national budgeting in Afghanistan
Jean-Marc Lepain
 
PLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docx
PLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docxPLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docx
PLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docx
infantsuk
 
HEAL Intro to the Process, 03.13.12
HEAL Intro to the Process, 03.13.12HEAL Intro to the Process, 03.13.12
HEAL Intro to the Process, 03.13.12
Erin Farahi
 

Similar to PROYECT Performance management plan (20)

Mastertempstrategicplan
MastertempstrategicplanMastertempstrategicplan
Mastertempstrategicplan
 
Guidence M& E
Guidence  M& EGuidence  M& E
Guidence M& E
 
Project Initiation Document for Management of Neighbourhood Plans in Complian...
Project Initiation Document for Management of Neighbourhood Plans in Complian...Project Initiation Document for Management of Neighbourhood Plans in Complian...
Project Initiation Document for Management of Neighbourhood Plans in Complian...
 
Plannin gss
Plannin gssPlannin gss
Plannin gss
 
Program Management Dashboards
Program Management DashboardsProgram Management Dashboards
Program Management Dashboards
 
Smith.donnie
Smith.donnieSmith.donnie
Smith.donnie
 
Changemangement Plan12 15(3)
Changemangement Plan12 15(3)Changemangement Plan12 15(3)
Changemangement Plan12 15(3)
 
Marillac Strategic Planning Process Workplan
Marillac Strategic Planning Process WorkplanMarillac Strategic Planning Process Workplan
Marillac Strategic Planning Process Workplan
 
Project implimentation
Project implimentationProject implimentation
Project implimentation
 
Project implimentation
Project implimentationProject implimentation
Project implimentation
 
Project Management Skills unit-4 Notes
Project Management Skills unit-4 NotesProject Management Skills unit-4 Notes
Project Management Skills unit-4 Notes
 
Lecture 2 30-01-2020.pdf
Lecture 2 30-01-2020.pdfLecture 2 30-01-2020.pdf
Lecture 2 30-01-2020.pdf
 
Improving DOE Project Performance Using the DOD Integrated Master Plan
Improving DOE Project Performance Using the DOD Integrated Master PlanImproving DOE Project Performance Using the DOD Integrated Master Plan
Improving DOE Project Performance Using the DOD Integrated Master Plan
 
Improving Project Performance in the DOE
Improving Project Performance in the DOEImproving Project Performance in the DOE
Improving Project Performance in the DOE
 
Na ps 17th january 2013 (1)
Na ps  17th january 2013 (1)Na ps  17th january 2013 (1)
Na ps 17th january 2013 (1)
 
PROJECT PLANNING
PROJECT PLANNINGPROJECT PLANNING
PROJECT PLANNING
 
Budget reforms, program budgeting and sub national budgeting in Afghanistan
Budget reforms, program budgeting and sub national budgeting in AfghanistanBudget reforms, program budgeting and sub national budgeting in Afghanistan
Budget reforms, program budgeting and sub national budgeting in Afghanistan
 
PLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docx
PLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docxPLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docx
PLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docx
 
ppt for primevera
ppt for primeverappt for primevera
ppt for primevera
 
HEAL Intro to the Process, 03.13.12
HEAL Intro to the Process, 03.13.12HEAL Intro to the Process, 03.13.12
HEAL Intro to the Process, 03.13.12
 

PROYECT Performance management plan

  • 1. m Not started nOn Plan Project Plan mnu  Complete u Issues Date of Report jun 30, 2005 Name Client Performance Management System Sponsor Bill Praxton, CFO Start Date 10/1/04 End Date 3/28/06 Balanced Scorecard Design and Development Plan Impact on Actual Start Tentative Completion Target Completion Task Comments Deliverables Lead Date Start Date (Actual vs. date & Status Target) 1. Refresh the Strategic Plan 12/1/04 4/30/05 Review current strategic planning documents and determine if the current plan is appropriate 11/15/04 3/31/05 n for the Balanced Scorecard Prepare for Strategic Planning Off-site 2/1/05 4/15/05  Strategic Planning working group to develop 1) Kick off meeting of technical draft revised Strategic Plan - See Planning 3/22/05 m group Workshop Coordinator for more details Senior Leadership approves revised Strategic Plan After Phase 3 m Communicate Strategic Plan and Balanced 1) Strategic Plan booklet Scorecard in printed and electronic format After Phase 3 m 2) Strategy Map Draft 2. Strategy Map / Strategic Plan 3/1/05 Preliminary Draft Map with no extras for Gap 3) Very Basic Strategy Map Analysis only 4) Gap Analysis Results and Isolate holes / gaps between draft strategic recommendations to fill out S- plan vs. Draft Strategy Map Plan Make revisions to lower level objectives in Draft Strategic Plan and fill-out Strategy Map 5) Revised Strategic Plan for all components - themes, narrative add-on's 6) Revised Strategy Map and complete cause-effect flows. Approval of Revised Strategic Plan and Final May have to schedule at joint 7) Briefing Session and Complete Strategy Map leadership off-site Develop Communication Plan for Strategic 8) Communication Plan Plan Launch Action Plan Steps for Strategic Plan May require meetings and other 9) Action Plan for with Strategy Map events per the Communication Plan Communication Plan DRAFT Page 1 of 14
  • 2. m Not started nOn Plan Project Plan mnu  Complete u Issues Date of Report jun 30, 2005 Name Client Performance Management System Sponsor Bill Praxton, CFO Start Date 10/1/04 End Date 3/28/06 Balanced Scorecard Design and Development Plan Impact on Actual Start Tentative Completion Target Completion Task Comments Deliverables Lead Date Start Date (Actual vs. date & Status Target) Centralize feedback and comments for next Output from this step does not get 10) Feedback Collection planning cycle. Collect and recommend for next acted upon until next annual planning System and Reports planning session cycle. cycle. 3. Measurements and Targets Create measurement and target development 11) Performance measurement workplan complete with templates and training, tools, methodology methodology Final set of tools to Quality control review to refine and improve development enterprise wide complete measurement approach for client performance measurements Extend each objective on the Strategy Map into Follow the methodology and training one to three performance measurements Solicit input and feedback from functional leads Revised set of performance and line and staff personnel measurements Establish a set of targets in accordance with operational goals that are linked to the Targets for each measurement Strategic Plan Identify initiatives and projects related to Scorecard Model execution of each objective. Extend the Map Prototype test Scorecard Model for data points Make sure model is tight / fits across that use existing measurement data all components Complete a comprehensive measurement Performance measurement template for database development development template 4. Initiative Mapping and Budgeting Extend Initiative and Projects that are part of Extended Scorecard Model ensures Scorecard Model into Action Plans or Extended Scorecard Model execution of the Strategic Plan document with existing plans Link the Initiative / Projects within the Scorecard Model to the Budgeting Process DRAFT Page 2 of 14
  • 3. m Not started nOn Plan Project Plan mnu  Complete u Issues Date of Report jun 30, 2005 Name Client Performance Management System Sponsor Bill Praxton, CFO Start Date 10/1/04 End Date 3/28/06 Balanced Scorecard Design and Development Plan Impact on Actual Start Tentative Completion Target Completion Task Comments Deliverables Lead Date Start Date (Actual vs. date & Status Target) Identify gaps and short coming with linking Recommended Changes to and make recommendations to improve Link Processes Together Cross walk all major initiatives against the Graph of what should get Strategic Objectives - Pareto Chart the resourced vs. what should not initiatives / projects Work back upstream from initiatives / projects not linked and document any missing lower Operating Plan / Sub Objective level objectives in strategic plan and / or Additions strategy map 5. Reporting Framework (Database) Map and build a framework structure from the See other similar models from other Visual prototype framework for highest organizational level down to the performance management projects review managerial level Align and link lower level components by through objective setting - upper to lower by organizational level / reporting units Assign performance measurements for lower level objectives. Index across common reporting units for the same objective. Complete a comprehensive measurement template for database development for this reporting level (lower objectives) NOTE: The IT Design and Various automated tools, such Development Plan covers automation as data collection forms, Prototype test and revise database design of of the Enterprise Strategic reporting tools, etc. Balanced Scorecard System - (ESMS Management System Roll out test modules at pilot sites - flush out lessons learned and update IT Plans DRAFT Page 3 of 14
  • 4. m Not started nOn Plan Project Plan mnu  Complete u Issues Date of Report jun 30, 2005 Name Client Performance Management System Sponsor Bill Praxton, CFO Start Date 10/1/04 End Date 3/28/06 Balanced Scorecard Design and Development Plan Impact on Actual Start Tentative Completion Target Completion Task Comments Deliverables Lead Date Start Date (Actual vs. date & Status Target) Cascade and development plan for Enterprise ESMS Design and Strategic Management System (ESMS) Development Plan Baseline End Date 3/28/06 Major Issues Description Comments Status DRAFT Page 4 of 14
  • 5. All Measurements Used in the ESMS Database PM # Performance Measure BSC Framework Strategic Goal or Objective per Major Organizational Unit Function / Dept / Sub Group Service or Product Line (if Type of Measure Measure Justification Definition Data Elements To Be Data Source Data Collection Frequency PM Calculation Formula Actual FY 03 BSC or Strategic Plan applicable) Collected D/W/M/Q/SA/A What is the PM number for What metric(s) should we use to Is this measure a Customer, Insert major goals or objectives in Insert a list of the major Insert a Link here to reference Insert the Operating Area such Is this measure a Why are we using this How do we define this measure? What are the data elements Where does the data How frequently should the What is the formula for What is the actual referencing. Could be LMR # or measure whether we have met our Process, Learn & Grow or this box as a reference in organizational unit names in back a list of Functions / as Product or Service Line - To 1) Strategic metric? for caclulating the measure? reside? data be collected? calculating the measure? result of this measure a unique number for local requirements? Resources measure based on the completing this template this box for reference in Departments and other be used for Product 2) Operational for the Year 2003? metrics? BSC framework? completing this template organizational units in Performance Analysis 3) Tactical Definition completing this template 4) Individual 1 2 3 4 5 6 5 of 110
  • 6. All Measurements Used in the ESMS Database PM # Performance Measure Actual FY 04 Green Standard Amber Standard Red Standard Primary Functional POC Data Available? Notes What is the PM number for What metric(s) should we use to What is the actual What is the Green What is the Amber What is the Red Who is the primary owner Y/N Are there any additional notes regarding the referencing. Could be LMR # or measure whether we have met our result of this measure Threshold? Threshold? Threshold? for the measure and their measure? a unique number for local requirements? for the Year 2004? email address? metrics? Definition 1 2 3 4 5 6 6 of 110
  • 7. Degree of Reliability Update Frequency / Balanced Scorecard Project Graded Attributes vs.Subjective) Repeatable Quality Review of Metrics (Hard Data Review and score all measurements used in your scorecard model F1.1 % Revenue Growth 4 4 Financial Objective F1.2 (F1) F1.3 F1.4 F2.1 Financial Objective F2.2 (F2) F2.3 F2.4 F3.1 Financial Objective F3.2 (F3) F3.3 F3.4 C1.1 Customer Objective C1.2 (C1) C1.3 C1.4 C2.1 Customer Objective C2.2 (P2) C2.3 C2.4 P1.1 Process Objective P1.2 (P1) P1.3 P1.4 P2.1 Process Objective P2.2 (P2) P2.3 P2.4 P3.1 Process Objective P3.2 (P5) P3.3 P3.4 P4.1 Process Objective P4.2 (P4) P4.3 P4.4 L1.1 L & G Objective (L1) L1.2 L1.3 L1.4 L2.1 L & G Objective (L2) L2.2 L2.3 L2.4 L3.1 L & G Objective (L3) L3.2 L3.3 L3.4
  • 8. Instructions: Rate each Measurement for these attributes on a scale of 1 to 5: 1. Update Frequency: Measurement can get updated on a regular basis; M for Monthly, Q for Quarterly, A for Annual, etc. 2. Degree of Reliability: Can you easily measure the performance objective or is it too subjective when it comes to measura 3. Encourages the right behavior: Measurements should not confuse, distort, or create the wrong performance behavior wit 4. Degree of Fit: Measurement fits with the culture and processes of Organization and flows well from Lower Level to Uppe 5. Degree of Support: Client has existing procedures and processes that can support the measurement (such as available d Maximum Score 25
  • 9. Degree of Support / Leading or Lagging Degree of Fit with Encourages the Client's Culture Single or Index right behavior Available Info NonGraded Attributes Metric Total Overall Points Grade 3 4 5 20 80% Lagging Single 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0%
  • 10. Quarterly, A for Annual, etc. ve when it comes to measurability. ong performance behavior within the Organization. Controllable? ell from Lower Level to Upper Level. (MACRO FIT - ORGANIZATIONAL) surement (such as available data is in place)