ROLES & RESPONSIBILITIES
1) Analyse survey reports, maps, drawings, blueprints, aerial photography, and
other topographical or geologic data to plan projects.
2) Plan and design transportation or hydraulic systems and structures, following
construction and government standards, using design software and drawing
tools.
3) Compute load and grade requirements, water flow rates, and material stress
factors to determine design specifications.
4) Inspect project sites to monitor progress and ensure conformance to design
specifications and safety or sanitation standards.
5) Direct construction, operations, and maintenance activities at project site.
6) Direct or participate in surveying to lay out installations and establish
reference points, grades, and elevations to guide construction.
ROLES AND RESPONSIBILITIESROLES AND RESPONSIBILITIES
Maps Topographical data
Blueprints Aerial Photographs Site Drawings
SCOPE OF WORK
• DEALS WITHDEALS WITH DESIGNDESIGN,, CONSTRUCTIONCONSTRUCTION ANDAND MAINTENANCEMAINTENANCE
• ENGAGES IN THE DESIGN OFENGAGES IN THE DESIGN OF CONSTRUCTIONCONSTRUCTION
MANAGEMENTSMANAGEMENTS
planning scheduling
TASKS IN DIFFERENT STAGES OF
CONSTRUCTION
BRIEFING STAGE
DESIGNING STAGEDESIGNING STAGE
TENDERING STAGETENDERING STAGE
CONSTRUCTION STAGECONSTRUCTION STAGE
COMMISSIONING STAGECOMMISSIONING STAGE
BRIEFING STAGE
• APPOINT A PROJECT MANAGERAPPOINT A PROJECT MANAGER
• CARRY OUT TECHNICAL AND NON-TECHNICALCARRY OUT TECHNICAL AND NON-TECHNICAL
INVESTIGATIONSINVESTIGATIONS( soil investigation , roads, topographical( soil investigation , roads, topographical
data, etc )data, etc )
• STUDY VARIOUS ALTERNATIVES TO MAKE SUBSTANTIALSTUDY VARIOUS ALTERNATIVES TO MAKE SUBSTANTIAL
COST SAVINGS EASIERCOST SAVINGS EASIER
• PREPARE REPORT ON INVESTIGATIONS CARRIED OUT ANDPREPARE REPORT ON INVESTIGATIONS CARRIED OUT AND
THE SOLUTIONS.THE SOLUTIONS.
DESIGNING STAGE
FINALISE PROJECT SUMMARYFINALISE PROJECT SUMMARY
CARRY OUT TECHNICAL INVESTIGATIONCARRY OUT TECHNICAL INVESTIGATION
PREPARE SCHEME AND DETAILED DESIGNSPREPARE SCHEME AND DETAILED DESIGNS
PREPARE WORKING DRAWINGS & SPECIFICATIONSPREPARE WORKING DRAWINGS & SPECIFICATIONS
PREPARE FINAL COST ESTIMATEPREPARE FINAL COST ESTIMATE
PREPARE CONSTRUCTION PROGRAMME SCHEDULEPREPARE CONSTRUCTION PROGRAMME SCHEDULE
TENDERINGTENDERING
STAGESTAGE
TENDERS ARE CALLED &TENDERS ARE CALLED &
CONTRACT IS AWARDEDCONTRACT IS AWARDED
UNDER BEST AVAILABLEUNDER BEST AVAILABLE
TERMS AGREED BETWEENTERMS AGREED BETWEEN
OWNER’S TEAM ANDOWNER’S TEAM AND
CONTRACTORSCONTRACTORS
CONSTRUCTION STAGECONSTRUCTION STAGE
EXECUTION OF CONSTRUCTION WORK AS PER
DESIGN WITHIN AGREED COST, TIME AND
SPECIFIED QUALITY.
COMMISSIONING STAGECOMMISSIONING STAGE
 PERFORMANCE OF STRUCTURE IS EVALUATED ANDPERFORMANCE OF STRUCTURE IS EVALUATED AND
PROPOSED NATURE OF REPAIR AND MAINTENACEPROPOSED NATURE OF REPAIR AND MAINTENACE
ARE CONSIDEREDARE CONSIDERED
 VARIOUS RECORDS ACTUAL WORK ARE KEPTVARIOUS RECORDS ACTUAL WORK ARE KEPT
 INSPECTION OF CONSTRUCTION WORK ANDINSPECTION OF CONSTRUCTION WORK AND
REMOVAL OF DEFECTSREMOVAL OF DEFECTS
 OPERATING INTRUCTIONS AND MANUAL AREOPERATING INTRUCTIONS AND MANUAL ARE
PREPAREDPREPARED
 TESTS OF PERFORMANCE ARE CARRIED OUTTESTS OF PERFORMANCE ARE CARRIED OUT
TYPES OF DRAWINGS (CIVIL)TYPES OF DRAWINGS (CIVIL)
tender drawingstender drawings
contract drawingscontract drawings
working drawingsworking drawings
completion drawingscompletion drawings
TENDER DRAWINGSTENDER DRAWINGS
•PREPARED EARLYPREPARED EARLY
DURING BRIEFING STAGEDURING BRIEFING STAGE
•ALONG WITH TENDERALONG WITH TENDER
DOCUMENTSDOCUMENTS
•USED FOR BIDS BYUSED FOR BIDS BY
CONTRACTORSCONTRACTORS
•INFOINFORRMATION IS CLEARLYMATION IS CLEARLY
STATEDSTATED
CONTRACTCONTRACT
DRAWINGSDRAWINGS
• MORE DETAILED DESIGNMORE DETAILED DESIGN CANCAN
ONLY BE DONE AFTERONLY BE DONE AFTER
COMPLETION OF TENDERINGCOMPLETION OF TENDERING
DRAWINGSDRAWINGS
• USED FOR LEGALLY BINDINGUSED FOR LEGALLY BINDING
THE CONTRACTTHE CONTRACT
• PRINTED ON GOOD QUALITYPRINTED ON GOOD QUALITY
PAPERPAPER
• MEANT TO WITHSTAND LONGMEANT TO WITHSTAND LONG
TERMTERM
• CONTRACT DRAWINGS WILLCONTRACT DRAWINGS WILL
BE THE SAME IF THERE AREBE THE SAME IF THERE ARE
NO ALTERNATIVENO ALTERNATIVE
PROPOSALS DURINGPROPOSALS DURING
TENDERING STAGETENDERING STAGE
WORKINGWORKING
DRAWINGSDRAWINGS
• PREPARED DURING THEPREPARED DURING THE
DESIGNING STAGEDESIGNING STAGE
• REPRESENTSREPRESENTS ENGINEER’SENGINEER’S
FINAL DECISIONSFINAL DECISIONS ANDAND
DESIGNSDESIGNS
• USED FORUSED FOR
WORKING,MANUFACTURING,WORKING,MANUFACTURING,
CONSTRUCTING ANDCONSTRUCTING AND
BUILDING PURPOSESBUILDING PURPOSES
• INFORM THE ACTUAL WORKINFORM THE ACTUAL WORK
• SHOWS DETAIL DRAWINGSSHOWS DETAIL DRAWINGS
OF PARTSOF PARTS
COMPLETIONCOMPLETION
DRAWINGDRAWING
• PREPARED UPON COMPLETION STAGEPREPARED UPON COMPLETION STAGE
• ALSO KNOWN AS RECORD DRAWINGS AND AS-BUILTALSO KNOWN AS RECORD DRAWINGS AND AS-BUILT
DRAWINGSDRAWINGS
• ADDITIONS AND ALTERATIONS THAT ARE MADE DUE TOADDITIONS AND ALTERATIONS THAT ARE MADE DUE TO
UNFORESEEN SITE CONDITIONS ARE RECORDEDUNFORESEEN SITE CONDITIONS ARE RECORDED
TYPES OF DRAWINGSTYPES OF DRAWINGS
(STRUCTURAL)(STRUCTURAL)
STRUCTURAL DRAWINGSSTRUCTURAL DRAWINGS
REINFORCEMENT DRAWINGSREINFORCEMENT DRAWINGS
RECORD DRAWINGSRECORD DRAWINGS
STRUCTURAL DRAWINGSSTRUCTURAL DRAWINGS
USED TO PROGRESSUSED TO PROGRESS
ARCHITECT’SARCHITECT’S
CONCEPT BYCONCEPT BY
SPECIFYING SHAPESSPECIFYING SHAPES
& POSITIONS OF& POSITIONS OF
PARTS OFPARTS OF
STRUCTURESSTRUCTURES Parts ofParts of
structuresstructures
Example of structural drawing
REINFORCEMENT DRAWINGSREINFORCEMENT DRAWINGS
• FULLY DESCRIBE AND LOCATE ALL REINFORCEMENT INFULLY DESCRIBE AND LOCATE ALL REINFORCEMENT IN
RELATION TO THE FINISHED SURFACE OF CONCRETE ANDRELATION TO THE FINISHED SURFACE OF CONCRETE AND
TO ANY HOLES AND FIXINGSTO ANY HOLES AND FIXINGS
Example of steelExample of steel
reinforcement drawingreinforcement drawing
RECORD DRAWINGSRECORD DRAWINGS
• MODIFICATIONS TO BE MADE TO THEMODIFICATIONS TO BE MADE TO THE
ORIGINAL DRAWINGS TO CATERORIGINAL DRAWINGS TO CATER
UNFORESEEN DIFFICULTIESUNFORESEEN DIFFICULTIES ..
• SUFFIX MUST BE ADDED TO THE DRAWINGSUFFIX MUST BE ADDED TO THE DRAWING
NUMBER TO INDICATE IS A “ RECORDNUMBER TO INDICATE IS A “ RECORD
DRAWING ”DRAWING ”
REFLECTION
Through this project given by our lecturers,Through this project given by our lecturers,
we got the chance to understand who are civilwe got the chance to understand who are civil
and structural engineers, and their roles andand structural engineers, and their roles and
responsibilities in the construction fields. Notresponsibilities in the construction fields. Not
only that, we also got to know more about theonly that, we also got to know more about the
drawings they prepare in every constructiondrawings they prepare in every construction
stage. Now we know how important are civilstage. Now we know how important are civil
and structural engineers in constructing a safeand structural engineers in constructing a safe
and stable building.and stable building.
REFERENREFEREN
CESCES
WEBSITESWEBSITES
• Praveenniru (2014, October 7 ),Classification of Civil Engineering Drawings & Interpreting
Engineering Drawings, Retrieved March 9, 2015 from hubpages,
www.praveenniru.hubpages.com/hub/classification-of-civil-engineering-drawings-and-
importance-of-engineering-drawings
• Tony Cecutti P. ( 2015, January),Sample tender document, Retrieved March 9, 2015 from
Sudbury, www.greatersudbury.ca/business/engineering-standards/tender-sample-document/
• Cheryl Cairns ( 2014, March) Structural engineer Job Description, Retrieved March 9, 2015
from prospects, www.prospects.ac.uk/structural_engineer_job_&_description.htm.
• Jamshaia Sawab (-), Types of drawings by structural engineers, Retrieved March 9, 2015 from
the constructor: Civil Engineer home, www.the constructor.org/practical-guide/types-of-
drawings-by-structural-engineers/8594/
BOOKBOOK
• P.S.Gahloe Bin Dhir, (1992) Construction: Planning & Management, Daryagani, New Delhi;
NEW AGE INTERNATIONAL.

More Related Content

Viewers also liked

El porque_del_calor.ppt_
 El porque_del_calor.ppt_ El porque_del_calor.ppt_
El porque_del_calor.ppt_adalid1414
 
Rigging and focusing evaluation
Rigging and focusing evaluationRigging and focusing evaluation
Rigging and focusing evaluationdaniellaeverett
 
Elegant diamonds jewellery from sunny d iamonds
Elegant diamonds jewellery from sunny d iamondsElegant diamonds jewellery from sunny d iamonds
Elegant diamonds jewellery from sunny d iamondsSunny Diamonds
 
Design and Implementation Security Model for Sudanese E-government
Design and Implementation Security Model for Sudanese E-governmentDesign and Implementation Security Model for Sudanese E-government
Design and Implementation Security Model for Sudanese E-governmentEditor IJCATR
 
Plexus - Apresentação da Empresa
Plexus - Apresentação da EmpresaPlexus - Apresentação da Empresa
Plexus - Apresentação da EmpresaDavid Pires
 
20090424 Bom Vl Driver
20090424 Bom Vl Driver20090424 Bom Vl Driver
20090424 Bom Vl DriverFARO
 
Big Data? Big Issues: Degradation in Longitudinal Data and Implications for ...
Big Data? Big Issues:  Degradation in Longitudinal Data and Implications for ...Big Data? Big Issues:  Degradation in Longitudinal Data and Implications for ...
Big Data? Big Issues: Degradation in Longitudinal Data and Implications for ...mwe400
 

Viewers also liked (13)

El porque_del_calor.ppt_
 El porque_del_calor.ppt_ El porque_del_calor.ppt_
El porque_del_calor.ppt_
 
Sweet child o
Sweet child oSweet child o
Sweet child o
 
Rigging and focusing evaluation
Rigging and focusing evaluationRigging and focusing evaluation
Rigging and focusing evaluation
 
Resume2015
Resume2015Resume2015
Resume2015
 
Cidades a beira do precipício
Cidades a beira do precipícioCidades a beira do precipício
Cidades a beira do precipício
 
Elegant diamonds jewellery from sunny d iamonds
Elegant diamonds jewellery from sunny d iamondsElegant diamonds jewellery from sunny d iamonds
Elegant diamonds jewellery from sunny d iamonds
 
Design and Implementation Security Model for Sudanese E-government
Design and Implementation Security Model for Sudanese E-governmentDesign and Implementation Security Model for Sudanese E-government
Design and Implementation Security Model for Sudanese E-government
 
Demonstratives
DemonstrativesDemonstratives
Demonstratives
 
Pag 114
Pag 114Pag 114
Pag 114
 
Plexus - Apresentação da Empresa
Plexus - Apresentação da EmpresaPlexus - Apresentação da Empresa
Plexus - Apresentação da Empresa
 
20090424 Bom Vl Driver
20090424 Bom Vl Driver20090424 Bom Vl Driver
20090424 Bom Vl Driver
 
Big Data? Big Issues: Degradation in Longitudinal Data and Implications for ...
Big Data? Big Issues:  Degradation in Longitudinal Data and Implications for ...Big Data? Big Issues:  Degradation in Longitudinal Data and Implications for ...
Big Data? Big Issues: Degradation in Longitudinal Data and Implications for ...
 
La pc 2
La pc 2La pc 2
La pc 2
 

Similar to Integrated project

Estimation (power point)
Estimation (power point)Estimation (power point)
Estimation (power point)Waqas Aslam
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviromentjuwes
 
Construction phases
Construction phasesConstruction phases
Construction phasesMeesum Zaidi
 
Hds Laser Scanning
Hds Laser ScanningHds Laser Scanning
Hds Laser Scanningbenchmarklag
 
Ibe quantity surveyor 2013
Ibe quantity surveyor 2013Ibe quantity surveyor 2013
Ibe quantity surveyor 2013nurun2010
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020MTAF
 
Presentation 1.pdf
Presentation 1.pdfPresentation 1.pdf
Presentation 1.pdfAng Averllen
 
FNBE 0814 Introduction To Construction Industry Project 1
FNBE 0814 Introduction To Construction Industry Project 1FNBE 0814 Introduction To Construction Industry Project 1
FNBE 0814 Introduction To Construction Industry Project 1kaiwenyeo
 

Similar to Integrated project (20)

ITD project.pdf
ITD project.pdfITD project.pdf
ITD project.pdf
 
Scope of work
Scope of workScope of work
Scope of work
 
Estimation
EstimationEstimation
Estimation
 
Estimation (power point)
Estimation (power point)Estimation (power point)
Estimation (power point)
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
 
Construction phases
Construction phasesConstruction phases
Construction phases
 
landscape
landscapelandscape
landscape
 
Ici magazine
Ici magazine Ici magazine
Ici magazine
 
Ici magazine
Ici magazineIci magazine
Ici magazine
 
Hds Laser Scanning
Hds Laser ScanningHds Laser Scanning
Hds Laser Scanning
 
Ibe quantity surveyor 2013
Ibe quantity surveyor 2013Ibe quantity surveyor 2013
Ibe quantity surveyor 2013
 
N3 Inc 060203
N3 Inc 060203N3 Inc 060203
N3 Inc 060203
 
BAFFOUR CV
BAFFOUR CVBAFFOUR CV
BAFFOUR CV
 
Highway Engineering
Highway EngineeringHighway Engineering
Highway Engineering
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020
 
NAKO_LBE_Profile_email
NAKO_LBE_Profile_emailNAKO_LBE_Profile_email
NAKO_LBE_Profile_email
 
Presentation 1.pdf
Presentation 1.pdfPresentation 1.pdf
Presentation 1.pdf
 
Presentation 1
Presentation 1Presentation 1
Presentation 1
 
136 work planning and programming
136 work planning and programming136 work planning and programming
136 work planning and programming
 
FNBE 0814 Introduction To Construction Industry Project 1
FNBE 0814 Introduction To Construction Industry Project 1FNBE 0814 Introduction To Construction Industry Project 1
FNBE 0814 Introduction To Construction Industry Project 1
 

More from isyroc

Cnc final review
Cnc final reviewCnc final review
Cnc final reviewisyroc
 
Enbe final project journal
Enbe final project journalEnbe final project journal
Enbe final project journalisyroc
 
Enbe finall
Enbe finallEnbe finall
Enbe finallisyroc
 
Itd intro jan2015
Itd intro jan2015Itd intro jan2015
Itd intro jan2015isyroc
 
Essay english
Essay englishEssay english
Essay englishisyroc
 
8bb42b 3917665c9d764a16bfe41914dd206073
8bb42b 3917665c9d764a16bfe41914dd2060738bb42b 3917665c9d764a16bfe41914dd206073
8bb42b 3917665c9d764a16bfe41914dd206073isyroc
 
Project 1 integration january 2015_revised
Project 1 integration january 2015_revisedProject 1 integration january 2015_revised
Project 1 integration january 2015_revisedisyroc
 

More from isyroc (7)

Cnc final review
Cnc final reviewCnc final review
Cnc final review
 
Enbe final project journal
Enbe final project journalEnbe final project journal
Enbe final project journal
 
Enbe finall
Enbe finallEnbe finall
Enbe finall
 
Itd intro jan2015
Itd intro jan2015Itd intro jan2015
Itd intro jan2015
 
Essay english
Essay englishEssay english
Essay english
 
8bb42b 3917665c9d764a16bfe41914dd206073
8bb42b 3917665c9d764a16bfe41914dd2060738bb42b 3917665c9d764a16bfe41914dd206073
8bb42b 3917665c9d764a16bfe41914dd206073
 
Project 1 integration january 2015_revised
Project 1 integration january 2015_revisedProject 1 integration january 2015_revised
Project 1 integration january 2015_revised
 

Recently uploaded

定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一lvtagr7
 
Call Girl in Low Price Delhi Punjabi Bagh 9711199012
Call Girl in Low Price Delhi Punjabi Bagh  9711199012Call Girl in Low Price Delhi Punjabi Bagh  9711199012
Call Girl in Low Price Delhi Punjabi Bagh 9711199012sapnasaifi408
 
How to Find the Best NEET Coaching in Indore (2).pdf
How to Find the Best NEET Coaching in Indore (2).pdfHow to Find the Best NEET Coaching in Indore (2).pdf
How to Find the Best NEET Coaching in Indore (2).pdfmayank158542
 
阿德莱德大学本科毕业证成绩单咨询(书英文硕士学位证)
阿德莱德大学本科毕业证成绩单咨询(书英文硕士学位证)阿德莱德大学本科毕业证成绩单咨询(书英文硕士学位证)
阿德莱德大学本科毕业证成绩单咨询(书英文硕士学位证)obuhobo
 
加利福尼亚艺术学院毕业证文凭证书( 咨询 )证书双学位
加利福尼亚艺术学院毕业证文凭证书( 咨询 )证书双学位加利福尼亚艺术学院毕业证文凭证书( 咨询 )证书双学位
加利福尼亚艺术学院毕业证文凭证书( 咨询 )证书双学位obuhobo
 
Black and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdfBlack and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdfpadillaangelina0023
 
Issues in the Philippines (Unemployment and Underemployment).pptx
Issues in the Philippines (Unemployment and Underemployment).pptxIssues in the Philippines (Unemployment and Underemployment).pptx
Issues in the Philippines (Unemployment and Underemployment).pptxJenniferPeraro1
 
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一A SSS
 
Storytelling, Ethics and Workflow in Documentary Photography
Storytelling, Ethics and Workflow in Documentary PhotographyStorytelling, Ethics and Workflow in Documentary Photography
Storytelling, Ethics and Workflow in Documentary PhotographyOrtega Alikwe
 
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证obuhobo
 
frfefeferfefqfeferc2012 Report Out Slides Final.ppt
frfefeferfefqfeferc2012 Report Out Slides Final.pptfrfefeferfefqfeferc2012 Report Out Slides Final.ppt
frfefeferfefqfeferc2012 Report Out Slides Final.pptSURYAKANTSAHDEO
 
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证nhjeo1gg
 
加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf
加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf
加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdfobuhobo
 
PM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring ChapterPM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring ChapterHector Del Castillo, CPM, CPMM
 
VIP Call Girls Service Saharanpur Aishwarya 8250192130 Independent Escort Ser...
VIP Call Girls Service Saharanpur Aishwarya 8250192130 Independent Escort Ser...VIP Call Girls Service Saharanpur Aishwarya 8250192130 Independent Escort Ser...
VIP Call Girls Service Saharanpur Aishwarya 8250192130 Independent Escort Ser...Suhani Kapoor
 
Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012
Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012
Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012rehmti665
 
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...Suhani Kapoor
 
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一F La
 
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改yuu sss
 

Recently uploaded (20)

定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
 
Call Girl in Low Price Delhi Punjabi Bagh 9711199012
Call Girl in Low Price Delhi Punjabi Bagh  9711199012Call Girl in Low Price Delhi Punjabi Bagh  9711199012
Call Girl in Low Price Delhi Punjabi Bagh 9711199012
 
How to Find the Best NEET Coaching in Indore (2).pdf
How to Find the Best NEET Coaching in Indore (2).pdfHow to Find the Best NEET Coaching in Indore (2).pdf
How to Find the Best NEET Coaching in Indore (2).pdf
 
阿德莱德大学本科毕业证成绩单咨询(书英文硕士学位证)
阿德莱德大学本科毕业证成绩单咨询(书英文硕士学位证)阿德莱德大学本科毕业证成绩单咨询(书英文硕士学位证)
阿德莱德大学本科毕业证成绩单咨询(书英文硕士学位证)
 
加利福尼亚艺术学院毕业证文凭证书( 咨询 )证书双学位
加利福尼亚艺术学院毕业证文凭证书( 咨询 )证书双学位加利福尼亚艺术学院毕业证文凭证书( 咨询 )证书双学位
加利福尼亚艺术学院毕业证文凭证书( 咨询 )证书双学位
 
Black and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdfBlack and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdf
 
Issues in the Philippines (Unemployment and Underemployment).pptx
Issues in the Philippines (Unemployment and Underemployment).pptxIssues in the Philippines (Unemployment and Underemployment).pptx
Issues in the Philippines (Unemployment and Underemployment).pptx
 
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
 
Storytelling, Ethics and Workflow in Documentary Photography
Storytelling, Ethics and Workflow in Documentary PhotographyStorytelling, Ethics and Workflow in Documentary Photography
Storytelling, Ethics and Workflow in Documentary Photography
 
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
 
frfefeferfefqfeferc2012 Report Out Slides Final.ppt
frfefeferfefqfeferc2012 Report Out Slides Final.pptfrfefeferfefqfeferc2012 Report Out Slides Final.ppt
frfefeferfefqfeferc2012 Report Out Slides Final.ppt
 
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
 
加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf
加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf
加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf
 
PM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring ChapterPM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring Chapter
 
VIP Call Girls Service Saharanpur Aishwarya 8250192130 Independent Escort Ser...
VIP Call Girls Service Saharanpur Aishwarya 8250192130 Independent Escort Ser...VIP Call Girls Service Saharanpur Aishwarya 8250192130 Independent Escort Ser...
VIP Call Girls Service Saharanpur Aishwarya 8250192130 Independent Escort Ser...
 
Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012
Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012
Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012
 
FULL ENJOY Call Girls In Gautam Nagar (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In Gautam Nagar (Delhi) Call Us 9953056974FULL ENJOY Call Girls In Gautam Nagar (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In Gautam Nagar (Delhi) Call Us 9953056974
 
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
 
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
 
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
 

Integrated project

  • 1. CIVCIVIL & STRUCTURALIL & STRUCTURAL ENGINEERINGENGINEERING LEE FONG YENLEE FONG YEN ISYRAQ NASIRISYRAQ NASIR MELANIE SOON YU XINMELANIE SOON YU XIN YANG JING LOOYANG JING LOO HASSANHASSAN AZRIAZRI LOO SIAH MONLOO SIAH MONGG
  • 2. ROLES & RESPONSIBILITIES 1) Analyse survey reports, maps, drawings, blueprints, aerial photography, and other topographical or geologic data to plan projects. 2) Plan and design transportation or hydraulic systems and structures, following construction and government standards, using design software and drawing tools. 3) Compute load and grade requirements, water flow rates, and material stress factors to determine design specifications. 4) Inspect project sites to monitor progress and ensure conformance to design specifications and safety or sanitation standards. 5) Direct construction, operations, and maintenance activities at project site. 6) Direct or participate in surveying to lay out installations and establish reference points, grades, and elevations to guide construction.
  • 3. ROLES AND RESPONSIBILITIESROLES AND RESPONSIBILITIES Maps Topographical data Blueprints Aerial Photographs Site Drawings
  • 4. SCOPE OF WORK • DEALS WITHDEALS WITH DESIGNDESIGN,, CONSTRUCTIONCONSTRUCTION ANDAND MAINTENANCEMAINTENANCE • ENGAGES IN THE DESIGN OFENGAGES IN THE DESIGN OF CONSTRUCTIONCONSTRUCTION MANAGEMENTSMANAGEMENTS planning scheduling
  • 5. TASKS IN DIFFERENT STAGES OF CONSTRUCTION BRIEFING STAGE DESIGNING STAGEDESIGNING STAGE TENDERING STAGETENDERING STAGE CONSTRUCTION STAGECONSTRUCTION STAGE COMMISSIONING STAGECOMMISSIONING STAGE
  • 6. BRIEFING STAGE • APPOINT A PROJECT MANAGERAPPOINT A PROJECT MANAGER • CARRY OUT TECHNICAL AND NON-TECHNICALCARRY OUT TECHNICAL AND NON-TECHNICAL INVESTIGATIONSINVESTIGATIONS( soil investigation , roads, topographical( soil investigation , roads, topographical data, etc )data, etc ) • STUDY VARIOUS ALTERNATIVES TO MAKE SUBSTANTIALSTUDY VARIOUS ALTERNATIVES TO MAKE SUBSTANTIAL COST SAVINGS EASIERCOST SAVINGS EASIER • PREPARE REPORT ON INVESTIGATIONS CARRIED OUT ANDPREPARE REPORT ON INVESTIGATIONS CARRIED OUT AND THE SOLUTIONS.THE SOLUTIONS.
  • 7. DESIGNING STAGE FINALISE PROJECT SUMMARYFINALISE PROJECT SUMMARY CARRY OUT TECHNICAL INVESTIGATIONCARRY OUT TECHNICAL INVESTIGATION PREPARE SCHEME AND DETAILED DESIGNSPREPARE SCHEME AND DETAILED DESIGNS PREPARE WORKING DRAWINGS & SPECIFICATIONSPREPARE WORKING DRAWINGS & SPECIFICATIONS PREPARE FINAL COST ESTIMATEPREPARE FINAL COST ESTIMATE PREPARE CONSTRUCTION PROGRAMME SCHEDULEPREPARE CONSTRUCTION PROGRAMME SCHEDULE
  • 8. TENDERINGTENDERING STAGESTAGE TENDERS ARE CALLED &TENDERS ARE CALLED & CONTRACT IS AWARDEDCONTRACT IS AWARDED UNDER BEST AVAILABLEUNDER BEST AVAILABLE TERMS AGREED BETWEENTERMS AGREED BETWEEN OWNER’S TEAM ANDOWNER’S TEAM AND CONTRACTORSCONTRACTORS
  • 9.
  • 10. CONSTRUCTION STAGECONSTRUCTION STAGE EXECUTION OF CONSTRUCTION WORK AS PER DESIGN WITHIN AGREED COST, TIME AND SPECIFIED QUALITY.
  • 11. COMMISSIONING STAGECOMMISSIONING STAGE  PERFORMANCE OF STRUCTURE IS EVALUATED ANDPERFORMANCE OF STRUCTURE IS EVALUATED AND PROPOSED NATURE OF REPAIR AND MAINTENACEPROPOSED NATURE OF REPAIR AND MAINTENACE ARE CONSIDEREDARE CONSIDERED  VARIOUS RECORDS ACTUAL WORK ARE KEPTVARIOUS RECORDS ACTUAL WORK ARE KEPT  INSPECTION OF CONSTRUCTION WORK ANDINSPECTION OF CONSTRUCTION WORK AND REMOVAL OF DEFECTSREMOVAL OF DEFECTS  OPERATING INTRUCTIONS AND MANUAL AREOPERATING INTRUCTIONS AND MANUAL ARE PREPAREDPREPARED  TESTS OF PERFORMANCE ARE CARRIED OUTTESTS OF PERFORMANCE ARE CARRIED OUT
  • 12. TYPES OF DRAWINGS (CIVIL)TYPES OF DRAWINGS (CIVIL) tender drawingstender drawings contract drawingscontract drawings working drawingsworking drawings completion drawingscompletion drawings
  • 13. TENDER DRAWINGSTENDER DRAWINGS •PREPARED EARLYPREPARED EARLY DURING BRIEFING STAGEDURING BRIEFING STAGE •ALONG WITH TENDERALONG WITH TENDER DOCUMENTSDOCUMENTS •USED FOR BIDS BYUSED FOR BIDS BY CONTRACTORSCONTRACTORS •INFOINFORRMATION IS CLEARLYMATION IS CLEARLY STATEDSTATED
  • 14.
  • 15. CONTRACTCONTRACT DRAWINGSDRAWINGS • MORE DETAILED DESIGNMORE DETAILED DESIGN CANCAN ONLY BE DONE AFTERONLY BE DONE AFTER COMPLETION OF TENDERINGCOMPLETION OF TENDERING DRAWINGSDRAWINGS • USED FOR LEGALLY BINDINGUSED FOR LEGALLY BINDING THE CONTRACTTHE CONTRACT • PRINTED ON GOOD QUALITYPRINTED ON GOOD QUALITY PAPERPAPER • MEANT TO WITHSTAND LONGMEANT TO WITHSTAND LONG TERMTERM • CONTRACT DRAWINGS WILLCONTRACT DRAWINGS WILL BE THE SAME IF THERE AREBE THE SAME IF THERE ARE NO ALTERNATIVENO ALTERNATIVE PROPOSALS DURINGPROPOSALS DURING TENDERING STAGETENDERING STAGE
  • 16. WORKINGWORKING DRAWINGSDRAWINGS • PREPARED DURING THEPREPARED DURING THE DESIGNING STAGEDESIGNING STAGE • REPRESENTSREPRESENTS ENGINEER’SENGINEER’S FINAL DECISIONSFINAL DECISIONS ANDAND DESIGNSDESIGNS • USED FORUSED FOR WORKING,MANUFACTURING,WORKING,MANUFACTURING, CONSTRUCTING ANDCONSTRUCTING AND BUILDING PURPOSESBUILDING PURPOSES • INFORM THE ACTUAL WORKINFORM THE ACTUAL WORK • SHOWS DETAIL DRAWINGSSHOWS DETAIL DRAWINGS OF PARTSOF PARTS
  • 17.
  • 18.
  • 19. COMPLETIONCOMPLETION DRAWINGDRAWING • PREPARED UPON COMPLETION STAGEPREPARED UPON COMPLETION STAGE • ALSO KNOWN AS RECORD DRAWINGS AND AS-BUILTALSO KNOWN AS RECORD DRAWINGS AND AS-BUILT DRAWINGSDRAWINGS • ADDITIONS AND ALTERATIONS THAT ARE MADE DUE TOADDITIONS AND ALTERATIONS THAT ARE MADE DUE TO UNFORESEEN SITE CONDITIONS ARE RECORDEDUNFORESEEN SITE CONDITIONS ARE RECORDED
  • 20.
  • 21. TYPES OF DRAWINGSTYPES OF DRAWINGS (STRUCTURAL)(STRUCTURAL) STRUCTURAL DRAWINGSSTRUCTURAL DRAWINGS REINFORCEMENT DRAWINGSREINFORCEMENT DRAWINGS RECORD DRAWINGSRECORD DRAWINGS
  • 22. STRUCTURAL DRAWINGSSTRUCTURAL DRAWINGS USED TO PROGRESSUSED TO PROGRESS ARCHITECT’SARCHITECT’S CONCEPT BYCONCEPT BY SPECIFYING SHAPESSPECIFYING SHAPES & POSITIONS OF& POSITIONS OF PARTS OFPARTS OF STRUCTURESSTRUCTURES Parts ofParts of structuresstructures
  • 23.
  • 25. REINFORCEMENT DRAWINGSREINFORCEMENT DRAWINGS • FULLY DESCRIBE AND LOCATE ALL REINFORCEMENT INFULLY DESCRIBE AND LOCATE ALL REINFORCEMENT IN RELATION TO THE FINISHED SURFACE OF CONCRETE ANDRELATION TO THE FINISHED SURFACE OF CONCRETE AND TO ANY HOLES AND FIXINGSTO ANY HOLES AND FIXINGS
  • 26. Example of steelExample of steel reinforcement drawingreinforcement drawing
  • 27. RECORD DRAWINGSRECORD DRAWINGS • MODIFICATIONS TO BE MADE TO THEMODIFICATIONS TO BE MADE TO THE ORIGINAL DRAWINGS TO CATERORIGINAL DRAWINGS TO CATER UNFORESEEN DIFFICULTIESUNFORESEEN DIFFICULTIES .. • SUFFIX MUST BE ADDED TO THE DRAWINGSUFFIX MUST BE ADDED TO THE DRAWING NUMBER TO INDICATE IS A “ RECORDNUMBER TO INDICATE IS A “ RECORD DRAWING ”DRAWING ”
  • 28.
  • 29. REFLECTION Through this project given by our lecturers,Through this project given by our lecturers, we got the chance to understand who are civilwe got the chance to understand who are civil and structural engineers, and their roles andand structural engineers, and their roles and responsibilities in the construction fields. Notresponsibilities in the construction fields. Not only that, we also got to know more about theonly that, we also got to know more about the drawings they prepare in every constructiondrawings they prepare in every construction stage. Now we know how important are civilstage. Now we know how important are civil and structural engineers in constructing a safeand structural engineers in constructing a safe and stable building.and stable building.
  • 31. WEBSITESWEBSITES • Praveenniru (2014, October 7 ),Classification of Civil Engineering Drawings & Interpreting Engineering Drawings, Retrieved March 9, 2015 from hubpages, www.praveenniru.hubpages.com/hub/classification-of-civil-engineering-drawings-and- importance-of-engineering-drawings • Tony Cecutti P. ( 2015, January),Sample tender document, Retrieved March 9, 2015 from Sudbury, www.greatersudbury.ca/business/engineering-standards/tender-sample-document/ • Cheryl Cairns ( 2014, March) Structural engineer Job Description, Retrieved March 9, 2015 from prospects, www.prospects.ac.uk/structural_engineer_job_&_description.htm. • Jamshaia Sawab (-), Types of drawings by structural engineers, Retrieved March 9, 2015 from the constructor: Civil Engineer home, www.the constructor.org/practical-guide/types-of- drawings-by-structural-engineers/8594/ BOOKBOOK • P.S.Gahloe Bin Dhir, (1992) Construction: Planning & Management, Daryagani, New Delhi; NEW AGE INTERNATIONAL.