1. Sukari Gold Project
Field Training
ISMAIL MOHAMED ISMAIL
AHMED MOHAMED ABDEEN
AHMED HUSSIEN EDREES
MOHAMED EZZAT ABBAS
AHMED ABDALLAH MOHAMED
Geology Department
2. Sukari Gold Project
Sukari Gold Mine
Sukari Gold Mine (SGM), owned and operated by
Pharaoh Gold Mines (PGM) and Egyptian Minerals
Resources Authority (EMRA).
Introduction
3. Sukari Gold Project
• Location
• Regional Setting
• License
• History of mining
• Zones
4. Sukari Gold Project
Health Protection
Safety Tools
HSE (Health , Safety
and Environment)
Safety
5. Sukari Gold Project
Geo tech
Wall Stability
Crack measuring
Failure warning
Movement of the walls
Mapping
Structure
Lithology
Modeling the pit
Ground water level
measurement
11. Sukari Gold Project
Blasting
Pre-split.
• Every 1.3 m.
• Using Gel explosives to split the
wall from the Explosion area, so
it won’t be affected.
Production shoot.
• Center-lift.
• Echelon.
Trim.
• Cut the edges to make it shorter.
o Blasting enable us to convert
blocks to small fragmented
materials which we can feed the
crusher
12. Sukari Gold Project
Ore marking:
After the blast , the
blocks are marked by
different colors for
different grades .
• Green for low grade.
• Orange for medium
grade .
• Red for high grade.
13. Sukari Gold Project
• Excavators (RH120) with 30T bucket.
• Face shovel (RH170) with 45T bucket.
Load and Haul
16. Sukari Gold Project
Surveyor carry out the following
Measuring the co-ordination of RC hole before &after
drilling .
Detect the Location RC holes..
Correlation designs before & after the drilling to
make sure that each hole in situ.
If there is any obstacle front of drilling hole it will be
changed its position .
Survey