MTAP 2 – Motor Test Access Panel
1


                           Offers
                Increased Safety For Testing
                       Energized AC
                       Electric Motors

          Reduces
           Testing
          time per
            motor

          Reduces
           labour
             cost


          Increases
           Savings

                                      Avenir Technologies/Iqbal Ibrahim
NFPA 70E
2




          For making connections on
          live electrical circuits as per
          NFPA 70E you have to wear
          these PPE

                                            Avenir Technologies/Iqbal Ibrahim
Spider Bite Near Ankle
3




                             Thermal Image of the
                             temperature of the ankle
                             after a spider bite



                               No body loves to be
                                bitten by a spider




                              Avenir Technologies/Iqbal Ibrahim
Why are we afraid of this?
4




                             Avenir Technologies/Iqbal Ibrahim
But not this?
5




                        Picture of a Low Voltage
                        Metering panel after Arc
                        flash.




                    Avenir Technologies/Iqbal Ibrahim
And not this?
6




                    Fingers burnt by Arc flash




                          Avenir Technologies/Iqbal Ibrahim
Arc Flash Explosion Damage
7




                            Result of an Arc
                            Flash Explosion




                           Avenir Technologies/Iqbal Ibrahim
Arch Flash: Clothes Burned
8




                                     Think about the
                                     person who
                                     was in it




                             Avenir Technologies/Iqbal Ibrahim
Arc Flashes
9




     • Mainly occur in electrical devices that are
     480 volt and up.



     • Motor control centers and substations are a
     great source of faults.



                                        Avenir Technologies/Iqbal Ibrahim
Arc Flash Explosion
10




      • Vaporized metal and ionized        • – Forms the arc path through air
      air:                                 • – Expands to form blast wave


      • Temperatures reach 35,000°F+

      • Energy levels can reach 20-100
      Cal/cm2

      • Duration is less than 7/10ths of
      a second

      • Proportional to energy and
      distance.


                                                          Avenir Technologies/Iqbal Ibrahim
Damages from Arc Flash
11




      • High temperatures burns to skin

      • Melting of synthetic clothing to skin

      • UV and IR burns to eyes and skin

      • Temporary or permanent blindness

      • Pressure Wave can knock you down

      • Decibel can reach 160 DB

      • Neurological effect of a magnetic field

      • Temporary or permanent personality changes

                                                     UETS/ AVERNR/Iqbal Ibrahim
The End Results
12




                       Avenir Technologies/Iqbal Ibrahim
Solution: Install MTAP
13




                                                    Time consuming tag
                                                    out and lock out
                                                    procedures are
                                                    eliminated and in
                                                    seconds you can
                                                    connect and collect
                                                    accurate data to
                                                    determine your motor
                                                    health.




       MTAP2 meets both OSHA and NFP 70E
           definitions for safe voltage
                                           Avenir Technologies/Iqbal Ibrahim
No More Direct Connection
14




                        Tester Voltage Leads and
                          current probes direct
                               connections




                             Avenir Technologies/Iqbal Ibrahim
No More Direct Connection
15




      Voltage Leads




             Current
             Probes



                        MCC

                          Avenir Technologies/Iqbal Ibrahim
MTAP 2 – Motor Test Access Panel
16




     MTAP 2 Board




                             Avenir Technologies/Iqbal Ibrahim
PdMA’s Answer to Safe Testing
                                        Voltage connections




                                     CT Cable Connections

                                                                  Port connection
Direct connection to MCEmax Tester / MTAP2 One time Installation
                                                 Avenir Technologies/Iqbal Ibrahim
PdMA’s Answer to Safe Testing




 Without MTAP2                  With MTAP2 Installed
MTAP 2 Installation
19




          All MTAP 2 Installed in a separate panel


                                         Avenir Technologies/Iqbal Ibrahim
MTAP 2 Installation
20




                                 MTAP 2 Installed in a
                                   separate panel




                           Avenir Technologies/Iqbal Ibrahim
MTAP 2 Provides protection from Arc Flash
21

                                          Before MTAP2 you need PPE to protect against Arc Flash
                                          while connecting test leads & current probes




                After installing MTAP2 there is no need to open the MCC door to make connections.
                Test cable is connected to the connector installed on MCC Door

                                                              Avenir Technologies/Iqbal Ibrahim
MTAP 2 Installation
22




                                         MTAP 2 Test Port
                                         to connect
                                         MCEmax




                           Avenir Technologies/Iqbal Ibrahim
MTAP 2 Specifications
23




      Specifications

       Voltage at MCC test port: 30V RMS nominal, <50V peak

       Input voltages (select one when ordering): 120, 240, 480, 600 VAC

       Motors rated over 600V, require the 120V/5A model and existing metering
        PT’s and CT’s

       Current input terminal strip (0-3V RMS input), current represented by voltage
        Signal

       MCC test port: Circular military style, 1-inch diameter, extends out ½ inch




                                                               Avenir Technologies/Iqbal Ibrahim
MTAP 2 Specifications
24




      Physical Dimensions

       Size: 7.25 x 5.6 inches x 3.5 inches deep

       Weight: less than 3 lbs.

       Mounts to DIN rail via 2 mounting brackets

       Mounting brackets provided, DIN rail not provided

       Optional Mounting: Mount circuit board directly to MCC

       4 mounting feet (must specify if required)


                                                      Avenir Technologies/Iqbal Ibrahim
MTAP 2 Specifications
25




     Circuit Protection and Isolation

      3 primary and 3 secondary fast-acting fuses on potential
     transformer

      Transorbs used to limit voltage for current and voltage signals to
     test port

      Electrical Isolation: potential transformer rated 2000V DC High Potential
     test




                                                          Avenir Technologies/Iqbal Ibrahim
MTAP 2 Specifications
26




     Standards and Certifications

      Designed to UL508, UL845, and CSA 22.2 #14 standards

      CSAus certification

      Meets NFPA 70E guidelines for safe voltage level




                                                          Avenir Technologies/Iqbal Ibrahim
MTAP 2 Specifications – CT Information
27


      CT Primary Current Rating            5A               100 A                      400 A

      CT Opening Size (inside              0.3               1.25                       1.25
      diameter in inches)
      Design                          Iron Core Donut   Iron Core Donut            Iron Core Donut

      Voltage Class (max continuous       600V              600V                       600V
      voltage)
      Burden Resistor                     Built-in          Built-in                   Built-in

      Output (mV/A)                    66.7 mV / A        3.3 mV / A                0.833 mV / A

      Burden in VA at rated               0.003              0.04                       0.14
      current
      Burden in VA at 10X rated            0.28              3.63                       14.5
      current
      Wire Length                          8 ft              8 ft                       8 ft

      ANSI / IEEE Standard #           IEEE-C57.13       IEEE-C57.13                 IEEE-C57.13

      CSA Standard #                  CAN3-C13-M83      CAN3-C13-M83               CAN3-C13-M83


                                                                       Avenir Technologies/Iqbal Ibrahim
MTAP 2 – Information Required when ordering
28




      When requesting a quote for MTAP 2 or Placing order, please provide the
      following information:

      Specify Motor Voltage, FLA and HP

      Specify input voltage and CT current rating.

      Requires one external cable to connect MCC test port

      Cable Part Number ASY-00321




                                                              UETS/ AVERNR/Iqbal Ibrahim
MTAP 3
29




     Full range of MCEmax online tests including Power, Inrush / Start-
     up, Demod, Rotor Evaluation and Eccentricity

                                                      Avenir Technologies/Iqbal Ibrahim
MTAP 3 – Current Only
30




      MTAP3 offers the ability to safely capture data in many of the smallest
      enclosures where the MTAP2 cannot be installed or the PT’s are not available
      at the motor MCC.

      FEATURES
      • In seconds you are able to collect accurate data to determine your motor
      health
      • Eliminate time consuming tag-out and lock-out procedures
      • Nomex PPE NOT required
      • Full range of MCEMAX online tests including Power, In-Rush/Start-Up, Demod,
      Rotor Evaluation, and Eccentricity
      • Meets OSHA and NFPA 70E definition for safe voltage
      • Meets UL 508 and CSA 22.2 #14 standards .


                                                             Avenir Technologies/Iqbal Ibrahim
MTAP 3 – Current Only
31



     With the current-only MTAP3, you can choose from one of four standard
     ranges of CT’s – MTAP 3 CT’s are ordered as a separate line item
      CT Primary Current Rating             5A               100A                 400A
      CT Opening Size (inside
      diameter in inches)                   0.3              1.25                 1.25

      Design                          Iron Core Donut   Iron Core Donut         Split-Core
      Voltage Class (max
      continuous voltage)                  600V              600V                 600V

      Burden Resistor                     Built in          Built in             Built in
      Output (mV/A)                     66.7 mV / A       3.3 mV / A           0.833 mV / A
      Burden in VA at rated current       0.003              0.04                0.0177
      Burden in VA at 10X rated
      current                              0.28              3.63                 1.778

      Wire Length                           8 ft              8 ft                 8 ft
      ANSI / IEEE Standard #           IEEE-C57.13       IEEE-C57.13           IEEE-C57.13
      CSA Standard #                  CAN3-C13-M83      CAN3-C13-M83          CAN3-C13-M83



                                                                          Avenir Technologies/Iqbal Ibrahim

More Related Content

Similar to Mtap 2 Presentation Pdf

NXP Functional Safety High Voltage Low voltage
NXP Functional Safety High Voltage Low voltageNXP Functional Safety High Voltage Low voltage
NXP Functional Safety High Voltage Low voltage
ssuser57b3e5
 
Mini Power Station Product Brochure - Salevo Pty Ltd
Mini Power Station Product Brochure - Salevo Pty LtdMini Power Station Product Brochure - Salevo Pty Ltd
Mini Power Station Product Brochure - Salevo Pty Ltd
Christopher Panopoulos
 
Dc power plants for telecom and data
Dc power plants for telecom and dataDc power plants for telecom and data
Dc power plants for telecom and data
Anil Upadhyay
 
Current Technology CaPs
Current Technology CaPsCurrent Technology CaPs
Current Technology CaPs
scottburge
 
2-Circuit Breakers and Type Tested Assembly (X-Energy)
2-Circuit Breakers and Type Tested Assembly (X-Energy)2-Circuit Breakers and Type Tested Assembly (X-Energy)
2-Circuit Breakers and Type Tested Assembly (X-Energy)
Eng. Ahmed Lotfy
 

Similar to Mtap 2 Presentation Pdf (20)

L.v tech presentation 2
L.v tech presentation 2L.v tech presentation 2
L.v tech presentation 2
 
Mersen Intelligent Fuse Technology Medium Voltage Controllable Fuse
Mersen Intelligent Fuse Technology Medium Voltage Controllable FuseMersen Intelligent Fuse Technology Medium Voltage Controllable Fuse
Mersen Intelligent Fuse Technology Medium Voltage Controllable Fuse
 
MV Switchgear from IEEE
MV Switchgear from IEEEMV Switchgear from IEEE
MV Switchgear from IEEE
 
conf-type-test-2007-03.ppt
conf-type-test-2007-03.pptconf-type-test-2007-03.ppt
conf-type-test-2007-03.ppt
 
OPAL-RT RT14 Conference: HIL testing using HYPERSIM
OPAL-RT RT14 Conference: HIL testing using HYPERSIMOPAL-RT RT14 Conference: HIL testing using HYPERSIM
OPAL-RT RT14 Conference: HIL testing using HYPERSIM
 
NXP Functional Safety High Voltage Low voltage
NXP Functional Safety High Voltage Low voltageNXP Functional Safety High Voltage Low voltage
NXP Functional Safety High Voltage Low voltage
 
2010 Arc Flash Hazard and Power Distribution Modeling
2010 Arc Flash Hazard and Power Distribution Modeling2010 Arc Flash Hazard and Power Distribution Modeling
2010 Arc Flash Hazard and Power Distribution Modeling
 
Arc Flash Hazards
Arc Flash HazardsArc Flash Hazards
Arc Flash Hazards
 
Manual tvoc 2
Manual tvoc 2Manual tvoc 2
Manual tvoc 2
 
244109578 estandar-iec-60947-2-pdf
244109578 estandar-iec-60947-2-pdf244109578 estandar-iec-60947-2-pdf
244109578 estandar-iec-60947-2-pdf
 
yuyyualogue.pdf
yuyyualogue.pdfyuyyualogue.pdf
yuyyualogue.pdf
 
Numerical analysis of short circuit testing & verification of a MCCB.
Numerical analysis of short circuit testing & verification of a MCCB.Numerical analysis of short circuit testing & verification of a MCCB.
Numerical analysis of short circuit testing & verification of a MCCB.
 
How to protect electronic systems against esd
How to protect electronic systems against esdHow to protect electronic systems against esd
How to protect electronic systems against esd
 
Mini Power Station Product Brochure - Salevo Pty Ltd
Mini Power Station Product Brochure - Salevo Pty LtdMini Power Station Product Brochure - Salevo Pty Ltd
Mini Power Station Product Brochure - Salevo Pty Ltd
 
Dc power plants for telecom and data
Dc power plants for telecom and dataDc power plants for telecom and data
Dc power plants for telecom and data
 
Current Technology CaPs
Current Technology CaPsCurrent Technology CaPs
Current Technology CaPs
 
2-Circuit Breakers and Type Tested Assembly (X-Energy)
2-Circuit Breakers and Type Tested Assembly (X-Energy)2-Circuit Breakers and Type Tested Assembly (X-Energy)
2-Circuit Breakers and Type Tested Assembly (X-Energy)
 
arc-flash-analysis-done-right.pdf
arc-flash-analysis-done-right.pdfarc-flash-analysis-done-right.pdf
arc-flash-analysis-done-right.pdf
 
ETAP - Arc flash analysis etap
ETAP - Arc flash analysis etapETAP - Arc flash analysis etap
ETAP - Arc flash analysis etap
 
ETAP - Arc flash analysis done Right
ETAP - Arc flash analysis done RightETAP - Arc flash analysis done Right
ETAP - Arc flash analysis done Right
 

Mtap 2 Presentation Pdf

  • 1. MTAP 2 – Motor Test Access Panel 1 Offers Increased Safety For Testing Energized AC Electric Motors Reduces Testing time per motor Reduces labour cost Increases Savings Avenir Technologies/Iqbal Ibrahim
  • 2. NFPA 70E 2 For making connections on live electrical circuits as per NFPA 70E you have to wear these PPE Avenir Technologies/Iqbal Ibrahim
  • 3. Spider Bite Near Ankle 3 Thermal Image of the temperature of the ankle after a spider bite No body loves to be bitten by a spider Avenir Technologies/Iqbal Ibrahim
  • 4. Why are we afraid of this? 4 Avenir Technologies/Iqbal Ibrahim
  • 5. But not this? 5 Picture of a Low Voltage Metering panel after Arc flash. Avenir Technologies/Iqbal Ibrahim
  • 6. And not this? 6 Fingers burnt by Arc flash Avenir Technologies/Iqbal Ibrahim
  • 7. Arc Flash Explosion Damage 7 Result of an Arc Flash Explosion Avenir Technologies/Iqbal Ibrahim
  • 8. Arch Flash: Clothes Burned 8 Think about the person who was in it Avenir Technologies/Iqbal Ibrahim
  • 9. Arc Flashes 9 • Mainly occur in electrical devices that are 480 volt and up. • Motor control centers and substations are a great source of faults. Avenir Technologies/Iqbal Ibrahim
  • 10. Arc Flash Explosion 10 • Vaporized metal and ionized • – Forms the arc path through air air: • – Expands to form blast wave • Temperatures reach 35,000°F+ • Energy levels can reach 20-100 Cal/cm2 • Duration is less than 7/10ths of a second • Proportional to energy and distance. Avenir Technologies/Iqbal Ibrahim
  • 11. Damages from Arc Flash 11 • High temperatures burns to skin • Melting of synthetic clothing to skin • UV and IR burns to eyes and skin • Temporary or permanent blindness • Pressure Wave can knock you down • Decibel can reach 160 DB • Neurological effect of a magnetic field • Temporary or permanent personality changes UETS/ AVERNR/Iqbal Ibrahim
  • 12. The End Results 12 Avenir Technologies/Iqbal Ibrahim
  • 13. Solution: Install MTAP 13 Time consuming tag out and lock out procedures are eliminated and in seconds you can connect and collect accurate data to determine your motor health. MTAP2 meets both OSHA and NFP 70E definitions for safe voltage Avenir Technologies/Iqbal Ibrahim
  • 14. No More Direct Connection 14 Tester Voltage Leads and current probes direct connections Avenir Technologies/Iqbal Ibrahim
  • 15. No More Direct Connection 15 Voltage Leads Current Probes MCC Avenir Technologies/Iqbal Ibrahim
  • 16. MTAP 2 – Motor Test Access Panel 16 MTAP 2 Board Avenir Technologies/Iqbal Ibrahim
  • 17. PdMA’s Answer to Safe Testing Voltage connections CT Cable Connections Port connection Direct connection to MCEmax Tester / MTAP2 One time Installation Avenir Technologies/Iqbal Ibrahim
  • 18. PdMA’s Answer to Safe Testing Without MTAP2 With MTAP2 Installed
  • 19. MTAP 2 Installation 19 All MTAP 2 Installed in a separate panel Avenir Technologies/Iqbal Ibrahim
  • 20. MTAP 2 Installation 20 MTAP 2 Installed in a separate panel Avenir Technologies/Iqbal Ibrahim
  • 21. MTAP 2 Provides protection from Arc Flash 21 Before MTAP2 you need PPE to protect against Arc Flash while connecting test leads & current probes After installing MTAP2 there is no need to open the MCC door to make connections. Test cable is connected to the connector installed on MCC Door Avenir Technologies/Iqbal Ibrahim
  • 22. MTAP 2 Installation 22 MTAP 2 Test Port to connect MCEmax Avenir Technologies/Iqbal Ibrahim
  • 23. MTAP 2 Specifications 23 Specifications  Voltage at MCC test port: 30V RMS nominal, <50V peak  Input voltages (select one when ordering): 120, 240, 480, 600 VAC  Motors rated over 600V, require the 120V/5A model and existing metering PT’s and CT’s  Current input terminal strip (0-3V RMS input), current represented by voltage Signal  MCC test port: Circular military style, 1-inch diameter, extends out ½ inch Avenir Technologies/Iqbal Ibrahim
  • 24. MTAP 2 Specifications 24 Physical Dimensions  Size: 7.25 x 5.6 inches x 3.5 inches deep  Weight: less than 3 lbs.  Mounts to DIN rail via 2 mounting brackets  Mounting brackets provided, DIN rail not provided  Optional Mounting: Mount circuit board directly to MCC  4 mounting feet (must specify if required) Avenir Technologies/Iqbal Ibrahim
  • 25. MTAP 2 Specifications 25 Circuit Protection and Isolation  3 primary and 3 secondary fast-acting fuses on potential transformer  Transorbs used to limit voltage for current and voltage signals to test port  Electrical Isolation: potential transformer rated 2000V DC High Potential test Avenir Technologies/Iqbal Ibrahim
  • 26. MTAP 2 Specifications 26 Standards and Certifications  Designed to UL508, UL845, and CSA 22.2 #14 standards  CSAus certification  Meets NFPA 70E guidelines for safe voltage level Avenir Technologies/Iqbal Ibrahim
  • 27. MTAP 2 Specifications – CT Information 27 CT Primary Current Rating 5A 100 A 400 A CT Opening Size (inside 0.3 1.25 1.25 diameter in inches) Design Iron Core Donut Iron Core Donut Iron Core Donut Voltage Class (max continuous 600V 600V 600V voltage) Burden Resistor Built-in Built-in Built-in Output (mV/A) 66.7 mV / A 3.3 mV / A 0.833 mV / A Burden in VA at rated 0.003 0.04 0.14 current Burden in VA at 10X rated 0.28 3.63 14.5 current Wire Length 8 ft 8 ft 8 ft ANSI / IEEE Standard # IEEE-C57.13 IEEE-C57.13 IEEE-C57.13 CSA Standard # CAN3-C13-M83 CAN3-C13-M83 CAN3-C13-M83 Avenir Technologies/Iqbal Ibrahim
  • 28. MTAP 2 – Information Required when ordering 28 When requesting a quote for MTAP 2 or Placing order, please provide the following information: Specify Motor Voltage, FLA and HP Specify input voltage and CT current rating. Requires one external cable to connect MCC test port Cable Part Number ASY-00321 UETS/ AVERNR/Iqbal Ibrahim
  • 29. MTAP 3 29 Full range of MCEmax online tests including Power, Inrush / Start- up, Demod, Rotor Evaluation and Eccentricity Avenir Technologies/Iqbal Ibrahim
  • 30. MTAP 3 – Current Only 30 MTAP3 offers the ability to safely capture data in many of the smallest enclosures where the MTAP2 cannot be installed or the PT’s are not available at the motor MCC. FEATURES • In seconds you are able to collect accurate data to determine your motor health • Eliminate time consuming tag-out and lock-out procedures • Nomex PPE NOT required • Full range of MCEMAX online tests including Power, In-Rush/Start-Up, Demod, Rotor Evaluation, and Eccentricity • Meets OSHA and NFPA 70E definition for safe voltage • Meets UL 508 and CSA 22.2 #14 standards . Avenir Technologies/Iqbal Ibrahim
  • 31. MTAP 3 – Current Only 31 With the current-only MTAP3, you can choose from one of four standard ranges of CT’s – MTAP 3 CT’s are ordered as a separate line item CT Primary Current Rating 5A 100A 400A CT Opening Size (inside diameter in inches) 0.3 1.25 1.25 Design Iron Core Donut Iron Core Donut Split-Core Voltage Class (max continuous voltage) 600V 600V 600V Burden Resistor Built in Built in Built in Output (mV/A) 66.7 mV / A 3.3 mV / A 0.833 mV / A Burden in VA at rated current 0.003 0.04 0.0177 Burden in VA at 10X rated current 0.28 3.63 1.778 Wire Length 8 ft 8 ft 8 ft ANSI / IEEE Standard # IEEE-C57.13 IEEE-C57.13 IEEE-C57.13 CSA Standard # CAN3-C13-M83 CAN3-C13-M83 CAN3-C13-M83 Avenir Technologies/Iqbal Ibrahim