GOVERNMENT OF PAKISTAN
PLANNING COMMISSION
Post-Flood Reconstruction / Replacement proiects
. Date of Preparation of PC-I:
Instructions to fill in PC-I are at Annex-II.
Sector specific Information to be provided in the pc-r is at Annex-Ill.
Simplified PC-I Format for
(Nov 2010)
PART'A'
ORI D
(Pre-flood Conditions of Proiect - Completelv / partiallv Damased)
(Please give information in Annex-I)
*,t(* d. *
PART'B'
J
3.
l. Name of project:
Location: (Tehsil I Taluka, District and Province - attach map of specific
area)
Authorities responsible for:
i. Sponsoring
ii. Execution
iii. Post-Completion operation and maintenance
iv. Concerned federal ministrv
4. Implementation Period :
o Commencement date:
r Completion date:
Project Objectives:
Scope of work:
Capital cost estimates
r Total Cost:
i. Local:
ii. FEC:
(In Rs. Million)
f,.
6.
7.
a) Loan (with source):
b) Grant (with source):
Community / NGO
or any other source:
lll.
8' Year-wise breakdown of Capital Cost covering the whole project period
as indicated below:
Financing Source:
o Federal pSDp
Provinciat ADp
Foreign Loan
(with name of donor)
Foreign Grant
(with name of donor)
Community / NGO
Total:
Annual operating and maintenance cost after completion of the project:
Proposed Activities with Timelines;
Sr. No. Activitv Timeline (Dates)
Starting Dates Endine Dates
9.
10.
11.
12. Performance
implementation and
Indicators (verifiable
post completion).
monitoring and evaluation during
Before Intervention After Intervention
13.
t4.
15.
PART'C'
Environmental f mpact Assessment:
Workforce Req uirements :
Date of Preparation of pC-I:
CERTIFICATE
certified that this is a replacement project of the original project which was
damaged during August - SeptemUel ZO1O flood and the project is located in
an area notified u, u calamity hit by the District / Provincial / Federal
Con.to-.ott. The PC-I has been piepared on the basis of Itestructions
provided by the Planning Commission for the preparation. of PC-I' The
information about originaf project (flood damaged) given in Annex-I is also
verified.
Prepared bv:
Signature, Name, Designation, Phone #
and Date.
Checked bv:
Signature, Name, Designation, Phone #
and Date.
Recommended bv:
Signature, Name, Designation, Phone #
and Date.
bv Chairman / ACS (Dev.). P&D Department'
(For Provincial Projects)
Signature, Name, Designation, Phone #
and Date.
bv Federal Secretarv / PAO.
@or Federal / Federally Funded Projects)
Signature, Name, Designation, Phone #
and Date.
Annex - I
INFORMATION ABOUT ORIGINAL (FLOOD DAMAGED) PROJECT
(Pre-flood Conditions of Proiect - Completelv / Partiallv Damaeed)
l. Name of the Project:
2. Name of Sponsoring Authority:
3. Name of Executing Agency:
4. Location:
(Should clearly mention the affected population in that particular locality and not total
population of the District/Tehsil)
5. Date of Approval
6. Approving Forum and Decision:
(Rs. Million)
7. Approved Total Cost:
i. Local:
ii. FEC:
a) Loan (with source):
b) Grant (with source):
8. Implementation Period: From _ To
9. Scope of Work:
10. Progress of Work:
o Physical: (%)
o Financial: Rs.
(expenditure incurred)
11. Source of Financing:
e Federal PSDP
o Provincial ADP
o Foreign Loan
(with name of donor)
. Foreign Grant
(with name of donor)
. Community / NGO
Million ( %)
Total:
t.
)
Annei-Il
Government of Pakistan i
Planning Commission
Instructions to fill-in PC-I form
Name of the Project:
Indicate name of the project.
Location: (attach map where applicable)
. Provide name of Tehsil / Taluka, District and Province.
o Attach a map of the area, cleaqly indicating the project location.
Authorities Responsible for:
Indicate name of the agency responsible for sponsoring, execution, post-
completion operation and maintenance of the project. For provincial projects, name of the
concerned federal ministry be provided.
Implementation Period:
Indicate expected starting and completion date of the project.
Project Objectives:
lndicate objectives of the project with link to DNA, if possible. Copy of objectives
in original PC-I to be attached. Extent / nature of damage due to floods along with
authentication of damage and anticipated benefits may be given.
Scope ofwork:
o Describe project scope in quantitative terms.
r Scope of project may include construction, equipment, machinery, training,
capacity building and provision of physical facilities etc required for the project.
r Sector specific information indicated in Annex-III be alsq provided.
Capital Cost Estimates:
o Indicate estimated total cost of the project with its break-up in local and foreign
exchange component.
o Basis of determining the capital cost be provided i.e. market survey, scheduled
rates, estimation on the basis of previous work done or any other basis.
r In determining the foreign exchange component of the project, latest foreign
exchange rate be used which should also be mentioned.
r In case of foreign loan / foreign grant, the name of donor country / agency along
with the status of commitment / agreement be indicated. In case of loan, the terms
and conditions be specifically indicated.
Give breakdown of Capital Cost (year-wise), covering the whole project period as
indicated below:
o Phasing of capital cost be worked out on the basis of physical activities to be
undertaken in each year covering the whole project.
Financing Source:
Indicate clearly the sources to finance local and foreign exchange cost of the
project i.e. how much to be provided from federal PSDP, provincial ADP, foreign loan,
foreign grant, community, NGO or Sponsoring agency's own resources.
3.
4.
f.
6.
1
8.
9.
r0.
ll.
t7.
13.
t4.
Annual operating and maintenance cost after completion of the project:
Indicate annual operating and maintenance cost after completion of the project and
sources of its financing.
Proposed activities with timelines:
Items to be procured or activities to be performed within the timelines are to be
mentioned for proper monitoring during implementation of the project.
Performance Indicators:
Indicate performance indicators according to which the project would be
monitored during its implementation and evaluated after completion. Thi; would include
specific physical and service delivery targets in quantitative terms. (Attach copy of
original PC-I, if same).
Performance Indicators should clearlv indicate
to the General Public of the area.
Environmental Impact Assessment:
This should include any environmental hazard feared and any steps taken to avoid
such hazards / mitigate the damage or replenish the environment and resettlement, if any.
Likely impacts separately on human life, animal life, forest and vegetation etc shourd be
provided. (Attach copy of original pC-I, if same).
Workforce Requirements:
A construction project which is to be contracted/outsourced ma1, no1 require any
workforce within the government. However, workforce may be required for'capacity
building, planning, execution and operation etc. of a service ditivery facility or institution
by way of full time/contractual employment or by way of consultincy fbi which details
may be given.
Technical workforce available with the implementing agency with other facilities
may also provided.
Date of preparation of PC-I:
Indicate date of preparation of pC-I.
the impact / benefits of the project
15.
Food & Asriculture-:
-Agri.ultureProduction:
oForfisheriesprojects:Giveareaforfishingandthelegalrightstothatarea;the
availabitity of trawlers;
".ouniu"ni
il";iffi likely to be available'
o For r"*,iiy p,oi""t,,'
,11.::1.:'#l-11f3::"",ffi':[?l"Ji:ljHl
-":"ilH:ff::
::L,tj;ti"i:' ;: H':lLlll
*
;;i; ;' """i
r"t ir i'v o r com p r ementary se rv ices' e g'
. n:t'#rl3:lTH:ll'11;".the livestock situation orthe countrv and mention anv
problems-;;;;Gd *,ere*iiii]
"PF;;;;; f';; herd size' their species ase
characteristics and production capacity'
o For '' qty: p]:::* and future crop yield' cropprng
intensity; land use pattern technological interventio"-*O ift" basis for calculation of
the future output' ride (i) transport, equipment &. fie.d
. l*"f,'l*'""i':iftiJ"*ffi'1f"'::f#;";;,"'ii'i:,''.,I5'r;;;
i';d" ;;J basis ror
pricing oi"utp"tt (iii) farm gate and international prlces'
Agriculture extension
r provide history of extensron work in and around project area and justify the extension
work'
oProvidetransport,equipmentandfieldmachineryetcavailablewiththedepartment.
Annex-III
to
ruction Project)'(On best effort bast:
and Trainins:
r Give student-teacher ratio for the project and the national average for the proposed
I
tvpe of transformers and other
l'.i." nroiects alongwith load
design,
level of education'
.Y.u,-*i'"p*"*aenrolmentoftheinstitutionfor5years'
*,*He environmental hazard feared and potentiavlikely l:n"::lJ*an
life' animal
lifb, vegetation/forest, ptyrrc.i'ii;;";r:1s;v,ell as resettlement, if any' etc' in detail'
All steps to be taLen to avoid suin r,ururo, i irpu"t, *iiigu*,1t" damage or replenish
the environment be provided rrrr."gr.r management pian with proper cost estimates'
Enerw:
l"*a";ro. rationale for selection of the specific technology
r provide data ."guraing
-ihe
.
avaiiability of
-g;ogi"uf
and hydrological
stud iel/re sou'"e s f6t hydroe lectri c p rojpcts'''
r provide the data of fuel
"ffiuiritl?.*ling
water etc, the criteria for selection
"tt"i""f"gy
f* tlgroatltgsls be'siles n'lant efficiencv'
. provide basis of design, fiffi-uuuility, load flow studies for transmission and
equipment for sub-stattons 'altq
"lniitiont
of the existing facilities in au." of extension'
Fuel:
oDetailofequipment'criteriaforse|ectionoftechnology.andthedetailsofprevious
work undertaken'
Education and Train
b)
c)
o Indicate whether the proposed facjlities are preventive or curative.e Bifurcate the facirities befween indoor, out door and department_wise.
Nutrition:
o Indicate the infrastructure and mechanism required for the project.o Measures taken for invorvement and participation oiirr"
"o,nn.,rnirv.
r Net improvement in the nutritional status of target groups in quantitative terms.
Family planning:
a
a
Provide information relating to motivation and distributi
Givebench';J;';;;'ft;;:ldl,:1""ffi#':J#I?"'i"l
y:::l :
f
:ontrac
ep1 i ves an d"oth er dev &;r; ;' ;,t,i ;
"#
couples to be approached and
vurlr u9ytu(is t() Dg ol
Mode/mechanism of advocacy and awareness.
ion /
Mention ult"rnut. ,Eilffiia'ing the
verses optic fiber cable, undeigrounA JuUl.
each ofthe alternatives means.
Provide Hardware specification
lt?.h Nerworking/LAN diagram
Software requirements
Availability of services (DSL, Dial-ups, wireless)
Provide instailed capacity, proposed expansion and avairabre technorogies, theselected technology and reason fo, ii, ,"i."tion.
Il1ff::t,f:S:',.':,iffiX: rb' (itl;port substiturion (ii) rneeting domesric
ln case of exports' give likely markets and their size. competitive prices and cost ol.producrion to justify the project.
l':l'fi1'kHifr:r" under with and without project condirions in case of BMR
same facilities (for example microwaves
versus overhead cable etc.) arrd the cost of
a
a
a
o
C
2)
Provide project
"*i"[uirteristics in terml,of popuration, crimate, georogy, soir,
illlilliha}:l :::l:.1,1"6;
;;i ;;;;.1rture (crops, yi e r ds etc )
ff;n:T:
t' rpose proj e"t', p.o;ia" ;"'";' ;ili "*'ll';i lff ,"TJ,*." n d i rrerenr
o Engineetine ptoil!11f,1 sunnorted.by technicar background data and each distinctsegment of the projecr be diicribed slparatety.
Me*N4roiuseffi
rnsrcate area and popuration to be covered bythe proposed project.
[:fii1n:l ortn" *lt*uuur.Foffiat projects wirh rourism.
P:..,:I..t
exisring Sporrs, Tourism I"o f"l'rir?;iil"' ";llltres in the area and theirbenefits, impact und our"nr".
Indicate benefits of the research to the economy.
Mention number of studies/puprrr ro i"-proOu""O.
Research:
a
a
o lndicate whether these studies would result in commercial application of the process
developed (if applicable).
Science & Technolow:
Education. trainine and manpower (Higher Education)
o Extent of damage to building (academic, laboratories, library, hostels), equipment,
electricity, roads etc.
. . Give student-teacher ratio for the project.
o Year-wise proposed enrolment of the institution for 5 years.
o Provide details of technical staff required for operation & maintenance of
laboratories.
Research
o Extent of damage to the research station/ laboratory building, equipment,
electricity, roads etc. (completely damaged or partially effected).
r Indicate whether the proposed research would result in development of process for
commercialization.
o Mention number of research papers to be produced nationally or internationally.
o Indicate benefits of research to the economv.
Transnort and Communications:
o Provide technical pararneters i.e. selected design features for the replacement facility
and capacity of the proposed facilities alongwith alternates available.
o For roads, provide information on existing and projected traffic data, design speed,
geometric and pavement design and classification of land for ROW etc.
. In case of improvement within the urban areas, sepiuate traffic counts within that area
should be given. Brief information regarding traffic and pavement width etc. in
adjoining sections should also be given.
. For bridges provide design discharge of river, location, total length of bridge, number
of spans with length of each span, width roadway and footpath, type of sub and
superstructure and load classification etc.
Water Supnlv. Seweraqe & Housins:
Provide information regarding existing situation in justification of proposed works
along with quantitative details of proposed works keeping in view the physical and
socio-economic conditions of the project site, its beneficiaries, weather conditions,
adopted space standards and Specifications ofthe civil works etc.

More Related Content

Similar to Pc 1 post-flood-reconstruction__replacement_project

Project in punjab
Project in punjabProject in punjab
Project in punjabHuma Ilyas
 
Proposal format
Proposal formatProposal format
Proposal formatAnand Nca
 
Pc i (social sector)
Pc i (social sector)Pc i (social sector)
Pc i (social sector)hayat alishah
 
MNRE-RnD_format_for_submission_of_proposal.pdf
MNRE-RnD_format_for_submission_of_proposal.pdfMNRE-RnD_format_for_submission_of_proposal.pdf
MNRE-RnD_format_for_submission_of_proposal.pdfHarinarayanaT1
 
Environmental clearance of airports
Environmental clearance of airportsEnvironmental clearance of airports
Environmental clearance of airportsAbhishek Kumar Sinha
 
Tpqma r5 to upload in slide share
Tpqma r5 to upload in slide shareTpqma r5 to upload in slide share
Tpqma r5 to upload in slide shareRajiva Gupta
 
Quarry business Plan
Quarry business PlanQuarry business Plan
Quarry business PlanAbdi Hussein
 
2-Format for Submission of Full Proposal-IPHEE.pdf
2-Format for Submission of Full Proposal-IPHEE.pdf2-Format for Submission of Full Proposal-IPHEE.pdf
2-Format for Submission of Full Proposal-IPHEE.pdfestevao16
 
Highway projects
Highway projects Highway projects
Highway projects Ajith Kumar
 
Preconstruction Activity in EPC Contract
Preconstruction Activity in EPC ContractPreconstruction Activity in EPC Contract
Preconstruction Activity in EPC ContractROHIT4772
 
Coastal Canal Grant Program BOCC Policy
Coastal Canal Grant Program BOCC PolicyCoastal Canal Grant Program BOCC Policy
Coastal Canal Grant Program BOCC Policymarygracekamis
 
Berwyn Wastewater Facility Plan 2014 (City and Depot District)
Berwyn Wastewater Facility Plan 2014 (City and Depot District)Berwyn Wastewater Facility Plan 2014 (City and Depot District)
Berwyn Wastewater Facility Plan 2014 (City and Depot District)Berwyn Residents
 
Proposal Format-CSRI.pdf
Proposal Format-CSRI.pdfProposal Format-CSRI.pdf
Proposal Format-CSRI.pdfMariaRayappanS
 
Infrastructure and Transportation Planning Study Notes
Infrastructure and Transportation Planning Study NotesInfrastructure and Transportation Planning Study Notes
Infrastructure and Transportation Planning Study NotesYash Shah
 

Similar to Pc 1 post-flood-reconstruction__replacement_project (20)

Pc iv-new
Pc iv-newPc iv-new
Pc iv-new
 
Project in punjab
Project in punjabProject in punjab
Project in punjab
 
Proposal format
Proposal formatProposal format
Proposal format
 
Pc i (social sector)
Pc i (social sector)Pc i (social sector)
Pc i (social sector)
 
MNRE-RnD_format_for_submission_of_proposal.pdf
MNRE-RnD_format_for_submission_of_proposal.pdfMNRE-RnD_format_for_submission_of_proposal.pdf
MNRE-RnD_format_for_submission_of_proposal.pdf
 
Pc i social sector
Pc i social sectorPc i social sector
Pc i social sector
 
Dpr
DprDpr
Dpr
 
Environmental clearance of airports
Environmental clearance of airportsEnvironmental clearance of airports
Environmental clearance of airports
 
Tpqma r5 to upload in slide share
Tpqma r5 to upload in slide shareTpqma r5 to upload in slide share
Tpqma r5 to upload in slide share
 
Quarry business Plan
Quarry business PlanQuarry business Plan
Quarry business Plan
 
2-Format for Submission of Full Proposal-IPHEE.pdf
2-Format for Submission of Full Proposal-IPHEE.pdf2-Format for Submission of Full Proposal-IPHEE.pdf
2-Format for Submission of Full Proposal-IPHEE.pdf
 
Highway projects
Highway projects Highway projects
Highway projects
 
Preconstruction Activity in EPC Contract
Preconstruction Activity in EPC ContractPreconstruction Activity in EPC Contract
Preconstruction Activity in EPC Contract
 
Coastal Canal Grant Program BOCC Policy
Coastal Canal Grant Program BOCC PolicyCoastal Canal Grant Program BOCC Policy
Coastal Canal Grant Program BOCC Policy
 
Berwyn Wastewater Facility Plan 2014 (City and Depot District)
Berwyn Wastewater Facility Plan 2014 (City and Depot District)Berwyn Wastewater Facility Plan 2014 (City and Depot District)
Berwyn Wastewater Facility Plan 2014 (City and Depot District)
 
Apprisal of Loan proposal
Apprisal of Loan proposal Apprisal of Loan proposal
Apprisal of Loan proposal
 
Apprisal of loan proposal .
Apprisal of loan proposal . Apprisal of loan proposal .
Apprisal of loan proposal .
 
Proposal Format-CSRI.pdf
Proposal Format-CSRI.pdfProposal Format-CSRI.pdf
Proposal Format-CSRI.pdf
 
Proposal Format-CSRI.pdf
Proposal Format-CSRI.pdfProposal Format-CSRI.pdf
Proposal Format-CSRI.pdf
 
Infrastructure and Transportation Planning Study Notes
Infrastructure and Transportation Planning Study NotesInfrastructure and Transportation Planning Study Notes
Infrastructure and Transportation Planning Study Notes
 

More from hayat alishah

1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)hayat alishah
 
1627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-20191627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-2019hayat alishah
 
Uniform specs updated copy
Uniform specs updated   copyUniform specs updated   copy
Uniform specs updated copyhayat alishah
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021hayat alishah
 
Psdp plus progress report updated
Psdp plus progress report updatedPsdp plus progress report updated
Psdp plus progress report updatedhayat alishah
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021hayat alishah
 
White paper safety_and_security_in_yucat
White paper safety_and_security_in_yucatWhite paper safety_and_security_in_yucat
White paper safety_and_security_in_yucathayat alishah
 
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreportdg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreporthayat alishah
 
Final projects tourism department
Final projects tourism departmentFinal projects tourism department
Final projects tourism departmenthayat alishah
 
Proposals15march2021
Proposals15march2021Proposals15march2021
Proposals15march2021hayat alishah
 
Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525hayat alishah
 
1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdfhayat alishah
 

More from hayat alishah (20)

Tourism policy
Tourism policyTourism policy
Tourism policy
 
Tourism policy 2015
Tourism policy 2015Tourism policy 2015
Tourism policy 2015
 
1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)
 
1627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-20191627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-2019
 
Uniform specs updated copy
Uniform specs updated   copyUniform specs updated   copy
Uniform specs updated copy
 
Tourism wing sdu
Tourism wing sduTourism wing sdu
Tourism wing sdu
 
Aip tourism
Aip tourismAip tourism
Aip tourism
 
Aip dev
Aip devAip dev
Aip dev
 
Progress report
Progress reportProgress report
Progress report
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021
 
Psdp plus progress report updated
Psdp plus progress report updatedPsdp plus progress report updated
Psdp plus progress report updated
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021
 
White paper safety_and_security_in_yucat
White paper safety_and_security_in_yucatWhite paper safety_and_security_in_yucat
White paper safety_and_security_in_yucat
 
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreportdg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
 
Member list
Member listMember list
Member list
 
Final projects tourism department
Final projects tourism departmentFinal projects tourism department
Final projects tourism department
 
Proposals15march2021
Proposals15march2021Proposals15march2021
Proposals15march2021
 
Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525
 
Document 26
Document 26Document 26
Document 26
 
1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf
 

Recently uploaded

DATA SUMMIT 24 Building Real-Time Pipelines With FLaNK
DATA SUMMIT 24  Building Real-Time Pipelines With FLaNKDATA SUMMIT 24  Building Real-Time Pipelines With FLaNK
DATA SUMMIT 24 Building Real-Time Pipelines With FLaNKTimothy Spann
 
High Profile Call Girls Service in Jalore { 9332606886 } VVIP NISHA Call Girl...
High Profile Call Girls Service in Jalore { 9332606886 } VVIP NISHA Call Girl...High Profile Call Girls Service in Jalore { 9332606886 } VVIP NISHA Call Girl...
High Profile Call Girls Service in Jalore { 9332606886 } VVIP NISHA Call Girl...kumargunjan9515
 
Top profile Call Girls In dimapur [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In dimapur [ 7014168258 ] Call Me For Genuine Models W...Top profile Call Girls In dimapur [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In dimapur [ 7014168258 ] Call Me For Genuine Models W...gajnagarg
 
Identify Customer Segments to Create Customer Offers for Each Segment - Appli...
Identify Customer Segments to Create Customer Offers for Each Segment - Appli...Identify Customer Segments to Create Customer Offers for Each Segment - Appli...
Identify Customer Segments to Create Customer Offers for Each Segment - Appli...ThinkInnovation
 
Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...nirzagarg
 
Top Call Girls in Balaghat 9332606886Call Girls Advance Cash On Delivery Ser...
Top Call Girls in Balaghat  9332606886Call Girls Advance Cash On Delivery Ser...Top Call Girls in Balaghat  9332606886Call Girls Advance Cash On Delivery Ser...
Top Call Girls in Balaghat 9332606886Call Girls Advance Cash On Delivery Ser...kumargunjan9515
 
Top profile Call Girls In Indore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Indore [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Indore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Indore [ 7014168258 ] Call Me For Genuine Models We...gajnagarg
 
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...nirzagarg
 
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi ArabiaIn Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabiaahmedjiabur940
 
Top profile Call Girls In Nandurbar [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Nandurbar [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In Nandurbar [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Nandurbar [ 7014168258 ] Call Me For Genuine Models...gajnagarg
 
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...HyderabadDolls
 
Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...
Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...
Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...HyderabadDolls
 
SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...
SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...
SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...Elaine Werffeli
 
Diamond Harbour \ Russian Call Girls Kolkata | Book 8005736733 Extreme Naught...
Diamond Harbour \ Russian Call Girls Kolkata | Book 8005736733 Extreme Naught...Diamond Harbour \ Russian Call Girls Kolkata | Book 8005736733 Extreme Naught...
Diamond Harbour \ Russian Call Girls Kolkata | Book 8005736733 Extreme Naught...HyderabadDolls
 
Introduction to Statistics Presentation.pptx
Introduction to Statistics Presentation.pptxIntroduction to Statistics Presentation.pptx
Introduction to Statistics Presentation.pptxAniqa Zai
 
💞 Safe And Secure Call Girls Agra Call Girls Service Just Call 🍑👄6378878445 🍑...
💞 Safe And Secure Call Girls Agra Call Girls Service Just Call 🍑👄6378878445 🍑...💞 Safe And Secure Call Girls Agra Call Girls Service Just Call 🍑👄6378878445 🍑...
💞 Safe And Secure Call Girls Agra Call Girls Service Just Call 🍑👄6378878445 🍑...vershagrag
 
Vastral Call Girls Book Now 7737669865 Top Class Escort Service Available
Vastral Call Girls Book Now 7737669865 Top Class Escort Service AvailableVastral Call Girls Book Now 7737669865 Top Class Escort Service Available
Vastral Call Girls Book Now 7737669865 Top Class Escort Service Availablegargpaaro
 
TrafficWave Generator Will Instantly drive targeted and engaging traffic back...
TrafficWave Generator Will Instantly drive targeted and engaging traffic back...TrafficWave Generator Will Instantly drive targeted and engaging traffic back...
TrafficWave Generator Will Instantly drive targeted and engaging traffic back...SOFTTECHHUB
 
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptxRESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptxronsairoathenadugay
 
Dubai Call Girls Peeing O525547819 Call Girls Dubai
Dubai Call Girls Peeing O525547819 Call Girls DubaiDubai Call Girls Peeing O525547819 Call Girls Dubai
Dubai Call Girls Peeing O525547819 Call Girls Dubaikojalkojal131
 

Recently uploaded (20)

DATA SUMMIT 24 Building Real-Time Pipelines With FLaNK
DATA SUMMIT 24  Building Real-Time Pipelines With FLaNKDATA SUMMIT 24  Building Real-Time Pipelines With FLaNK
DATA SUMMIT 24 Building Real-Time Pipelines With FLaNK
 
High Profile Call Girls Service in Jalore { 9332606886 } VVIP NISHA Call Girl...
High Profile Call Girls Service in Jalore { 9332606886 } VVIP NISHA Call Girl...High Profile Call Girls Service in Jalore { 9332606886 } VVIP NISHA Call Girl...
High Profile Call Girls Service in Jalore { 9332606886 } VVIP NISHA Call Girl...
 
Top profile Call Girls In dimapur [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In dimapur [ 7014168258 ] Call Me For Genuine Models W...Top profile Call Girls In dimapur [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In dimapur [ 7014168258 ] Call Me For Genuine Models W...
 
Identify Customer Segments to Create Customer Offers for Each Segment - Appli...
Identify Customer Segments to Create Customer Offers for Each Segment - Appli...Identify Customer Segments to Create Customer Offers for Each Segment - Appli...
Identify Customer Segments to Create Customer Offers for Each Segment - Appli...
 
Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...
 
Top Call Girls in Balaghat 9332606886Call Girls Advance Cash On Delivery Ser...
Top Call Girls in Balaghat  9332606886Call Girls Advance Cash On Delivery Ser...Top Call Girls in Balaghat  9332606886Call Girls Advance Cash On Delivery Ser...
Top Call Girls in Balaghat 9332606886Call Girls Advance Cash On Delivery Ser...
 
Top profile Call Girls In Indore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Indore [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Indore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Indore [ 7014168258 ] Call Me For Genuine Models We...
 
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
 
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi ArabiaIn Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
 
Top profile Call Girls In Nandurbar [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Nandurbar [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In Nandurbar [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Nandurbar [ 7014168258 ] Call Me For Genuine Models...
 
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
Sealdah % High Class Call Girls Kolkata - 450+ Call Girl Cash Payment 8005736...
 
Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...
Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...
Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...
 
SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...
SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...
SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...
 
Diamond Harbour \ Russian Call Girls Kolkata | Book 8005736733 Extreme Naught...
Diamond Harbour \ Russian Call Girls Kolkata | Book 8005736733 Extreme Naught...Diamond Harbour \ Russian Call Girls Kolkata | Book 8005736733 Extreme Naught...
Diamond Harbour \ Russian Call Girls Kolkata | Book 8005736733 Extreme Naught...
 
Introduction to Statistics Presentation.pptx
Introduction to Statistics Presentation.pptxIntroduction to Statistics Presentation.pptx
Introduction to Statistics Presentation.pptx
 
💞 Safe And Secure Call Girls Agra Call Girls Service Just Call 🍑👄6378878445 🍑...
💞 Safe And Secure Call Girls Agra Call Girls Service Just Call 🍑👄6378878445 🍑...💞 Safe And Secure Call Girls Agra Call Girls Service Just Call 🍑👄6378878445 🍑...
💞 Safe And Secure Call Girls Agra Call Girls Service Just Call 🍑👄6378878445 🍑...
 
Vastral Call Girls Book Now 7737669865 Top Class Escort Service Available
Vastral Call Girls Book Now 7737669865 Top Class Escort Service AvailableVastral Call Girls Book Now 7737669865 Top Class Escort Service Available
Vastral Call Girls Book Now 7737669865 Top Class Escort Service Available
 
TrafficWave Generator Will Instantly drive targeted and engaging traffic back...
TrafficWave Generator Will Instantly drive targeted and engaging traffic back...TrafficWave Generator Will Instantly drive targeted and engaging traffic back...
TrafficWave Generator Will Instantly drive targeted and engaging traffic back...
 
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptxRESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
 
Dubai Call Girls Peeing O525547819 Call Girls Dubai
Dubai Call Girls Peeing O525547819 Call Girls DubaiDubai Call Girls Peeing O525547819 Call Girls Dubai
Dubai Call Girls Peeing O525547819 Call Girls Dubai
 

Pc 1 post-flood-reconstruction__replacement_project

  • 1. GOVERNMENT OF PAKISTAN PLANNING COMMISSION Post-Flood Reconstruction / Replacement proiects . Date of Preparation of PC-I: Instructions to fill in PC-I are at Annex-II. Sector specific Information to be provided in the pc-r is at Annex-Ill. Simplified PC-I Format for (Nov 2010)
  • 2. PART'A' ORI D (Pre-flood Conditions of Proiect - Completelv / partiallv Damased) (Please give information in Annex-I) *,t(* d. * PART'B' J 3. l. Name of project: Location: (Tehsil I Taluka, District and Province - attach map of specific area) Authorities responsible for: i. Sponsoring ii. Execution iii. Post-Completion operation and maintenance iv. Concerned federal ministrv 4. Implementation Period : o Commencement date: r Completion date: Project Objectives: Scope of work: Capital cost estimates r Total Cost: i. Local: ii. FEC: (In Rs. Million) f,. 6. 7. a) Loan (with source): b) Grant (with source): Community / NGO or any other source: lll.
  • 3. 8' Year-wise breakdown of Capital Cost covering the whole project period as indicated below: Financing Source: o Federal pSDp Provinciat ADp Foreign Loan (with name of donor) Foreign Grant (with name of donor) Community / NGO Total: Annual operating and maintenance cost after completion of the project: Proposed Activities with Timelines; Sr. No. Activitv Timeline (Dates) Starting Dates Endine Dates 9. 10. 11. 12. Performance implementation and Indicators (verifiable post completion). monitoring and evaluation during Before Intervention After Intervention 13. t4. 15. PART'C' Environmental f mpact Assessment: Workforce Req uirements : Date of Preparation of pC-I:
  • 4. CERTIFICATE certified that this is a replacement project of the original project which was damaged during August - SeptemUel ZO1O flood and the project is located in an area notified u, u calamity hit by the District / Provincial / Federal Con.to-.ott. The PC-I has been piepared on the basis of Itestructions provided by the Planning Commission for the preparation. of PC-I' The information about originaf project (flood damaged) given in Annex-I is also verified. Prepared bv: Signature, Name, Designation, Phone # and Date. Checked bv: Signature, Name, Designation, Phone # and Date. Recommended bv: Signature, Name, Designation, Phone # and Date. bv Chairman / ACS (Dev.). P&D Department' (For Provincial Projects) Signature, Name, Designation, Phone # and Date. bv Federal Secretarv / PAO. @or Federal / Federally Funded Projects) Signature, Name, Designation, Phone # and Date.
  • 5. Annex - I INFORMATION ABOUT ORIGINAL (FLOOD DAMAGED) PROJECT (Pre-flood Conditions of Proiect - Completelv / Partiallv Damaeed) l. Name of the Project: 2. Name of Sponsoring Authority: 3. Name of Executing Agency: 4. Location: (Should clearly mention the affected population in that particular locality and not total population of the District/Tehsil) 5. Date of Approval 6. Approving Forum and Decision: (Rs. Million) 7. Approved Total Cost: i. Local: ii. FEC: a) Loan (with source): b) Grant (with source): 8. Implementation Period: From _ To 9. Scope of Work: 10. Progress of Work: o Physical: (%) o Financial: Rs. (expenditure incurred) 11. Source of Financing: e Federal PSDP o Provincial ADP o Foreign Loan (with name of donor) . Foreign Grant (with name of donor) . Community / NGO Million ( %) Total:
  • 6. t. ) Annei-Il Government of Pakistan i Planning Commission Instructions to fill-in PC-I form Name of the Project: Indicate name of the project. Location: (attach map where applicable) . Provide name of Tehsil / Taluka, District and Province. o Attach a map of the area, cleaqly indicating the project location. Authorities Responsible for: Indicate name of the agency responsible for sponsoring, execution, post- completion operation and maintenance of the project. For provincial projects, name of the concerned federal ministry be provided. Implementation Period: Indicate expected starting and completion date of the project. Project Objectives: lndicate objectives of the project with link to DNA, if possible. Copy of objectives in original PC-I to be attached. Extent / nature of damage due to floods along with authentication of damage and anticipated benefits may be given. Scope ofwork: o Describe project scope in quantitative terms. r Scope of project may include construction, equipment, machinery, training, capacity building and provision of physical facilities etc required for the project. r Sector specific information indicated in Annex-III be alsq provided. Capital Cost Estimates: o Indicate estimated total cost of the project with its break-up in local and foreign exchange component. o Basis of determining the capital cost be provided i.e. market survey, scheduled rates, estimation on the basis of previous work done or any other basis. r In determining the foreign exchange component of the project, latest foreign exchange rate be used which should also be mentioned. r In case of foreign loan / foreign grant, the name of donor country / agency along with the status of commitment / agreement be indicated. In case of loan, the terms and conditions be specifically indicated. Give breakdown of Capital Cost (year-wise), covering the whole project period as indicated below: o Phasing of capital cost be worked out on the basis of physical activities to be undertaken in each year covering the whole project. Financing Source: Indicate clearly the sources to finance local and foreign exchange cost of the project i.e. how much to be provided from federal PSDP, provincial ADP, foreign loan, foreign grant, community, NGO or Sponsoring agency's own resources. 3. 4. f. 6. 1 8. 9.
  • 7. r0. ll. t7. 13. t4. Annual operating and maintenance cost after completion of the project: Indicate annual operating and maintenance cost after completion of the project and sources of its financing. Proposed activities with timelines: Items to be procured or activities to be performed within the timelines are to be mentioned for proper monitoring during implementation of the project. Performance Indicators: Indicate performance indicators according to which the project would be monitored during its implementation and evaluated after completion. Thi; would include specific physical and service delivery targets in quantitative terms. (Attach copy of original PC-I, if same). Performance Indicators should clearlv indicate to the General Public of the area. Environmental Impact Assessment: This should include any environmental hazard feared and any steps taken to avoid such hazards / mitigate the damage or replenish the environment and resettlement, if any. Likely impacts separately on human life, animal life, forest and vegetation etc shourd be provided. (Attach copy of original pC-I, if same). Workforce Requirements: A construction project which is to be contracted/outsourced ma1, no1 require any workforce within the government. However, workforce may be required for'capacity building, planning, execution and operation etc. of a service ditivery facility or institution by way of full time/contractual employment or by way of consultincy fbi which details may be given. Technical workforce available with the implementing agency with other facilities may also provided. Date of preparation of PC-I: Indicate date of preparation of pC-I. the impact / benefits of the project 15.
  • 8. Food & Asriculture-: -Agri.ultureProduction: oForfisheriesprojects:Giveareaforfishingandthelegalrightstothatarea;the availabitity of trawlers; ".ouniu"ni il";iffi likely to be available' o For r"*,iiy p,oi""t,,' ,11.::1.:'#l-11f3::"",ffi':[?l"Ji:ljHl -":"ilH:ff:: ::L,tj;ti"i:' ;: H':lLlll * ;;i; ;' """i r"t ir i'v o r com p r ementary se rv ices' e g' . n:t'#rl3:lTH:ll'11;".the livestock situation orthe countrv and mention anv problems-;;;;Gd *,ere*iiii] "PF;;;;; f';; herd size' their species ase characteristics and production capacity' o For '' qty: p]:::* and future crop yield' cropprng intensity; land use pattern technological interventio"-*O ift" basis for calculation of the future output' ride (i) transport, equipment &. fie.d . l*"f,'l*'""i':iftiJ"*ffi'1f"'::f#;";;,"'ii'i:,''.,I5'r;;; i';d" ;;J basis ror pricing oi"utp"tt (iii) farm gate and international prlces' Agriculture extension r provide history of extensron work in and around project area and justify the extension work' oProvidetransport,equipmentandfieldmachineryetcavailablewiththedepartment. Annex-III to ruction Project)'(On best effort bast: and Trainins: r Give student-teacher ratio for the project and the national average for the proposed I tvpe of transformers and other l'.i." nroiects alongwith load design, level of education' .Y.u,-*i'"p*"*aenrolmentoftheinstitutionfor5years' *,*He environmental hazard feared and potentiavlikely l:n"::lJ*an life' animal lifb, vegetation/forest, ptyrrc.i'ii;;";r:1s;v,ell as resettlement, if any' etc' in detail' All steps to be taLen to avoid suin r,ururo, i irpu"t, *iiigu*,1t" damage or replenish the environment be provided rrrr."gr.r management pian with proper cost estimates' Enerw: l"*a";ro. rationale for selection of the specific technology r provide data ."guraing -ihe . avaiiability of -g;ogi"uf and hydrological stud iel/re sou'"e s f6t hydroe lectri c p rojpcts''' r provide the data of fuel "ffiuiritl?.*ling water etc, the criteria for selection "tt"i""f"gy f* tlgroatltgsls be'siles n'lant efficiencv' . provide basis of design, fiffi-uuuility, load flow studies for transmission and equipment for sub-stattons 'altq "lniitiont of the existing facilities in au." of extension' Fuel: oDetailofequipment'criteriaforse|ectionoftechnology.andthedetailsofprevious work undertaken' Education and Train
  • 9. b) c) o Indicate whether the proposed facjlities are preventive or curative.e Bifurcate the facirities befween indoor, out door and department_wise. Nutrition: o Indicate the infrastructure and mechanism required for the project.o Measures taken for invorvement and participation oiirr" "o,nn.,rnirv. r Net improvement in the nutritional status of target groups in quantitative terms. Family planning: a a Provide information relating to motivation and distributi Givebench';J;';;;'ft;;:ldl,:1""ffi#':J#I?"'i"l y:::l : f :ontrac ep1 i ves an d"oth er dev &;r; ;' ;,t,i ; "# couples to be approached and vurlr u9ytu(is t() Dg ol Mode/mechanism of advocacy and awareness. ion / Mention ult"rnut. ,Eilffiia'ing the verses optic fiber cable, undeigrounA JuUl. each ofthe alternatives means. Provide Hardware specification lt?.h Nerworking/LAN diagram Software requirements Availability of services (DSL, Dial-ups, wireless) Provide instailed capacity, proposed expansion and avairabre technorogies, theselected technology and reason fo, ii, ,"i."tion. Il1ff::t,f:S:',.':,iffiX: rb' (itl;port substiturion (ii) rneeting domesric ln case of exports' give likely markets and their size. competitive prices and cost ol.producrion to justify the project. l':l'fi1'kHifr:r" under with and without project condirions in case of BMR same facilities (for example microwaves versus overhead cable etc.) arrd the cost of a a a o C 2) Provide project "*i"[uirteristics in terml,of popuration, crimate, georogy, soir, illlilliha}:l :::l:.1,1"6; ;;i ;;;;.1rture (crops, yi e r ds etc ) ff;n:T: t' rpose proj e"t', p.o;ia" ;"'";' ;ili "*'ll';i lff ,"TJ,*." n d i rrerenr o Engineetine ptoil!11f,1 sunnorted.by technicar background data and each distinctsegment of the projecr be diicribed slparatety. Me*N4roiuseffi rnsrcate area and popuration to be covered bythe proposed project. [:fii1n:l ortn" *lt*uuur.Foffiat projects wirh rourism. P:..,:I..t exisring Sporrs, Tourism I"o f"l'rir?;iil"' ";llltres in the area and theirbenefits, impact und our"nr". Indicate benefits of the research to the economy. Mention number of studies/puprrr ro i"-proOu""O. Research: a a
  • 10. o lndicate whether these studies would result in commercial application of the process developed (if applicable). Science & Technolow: Education. trainine and manpower (Higher Education) o Extent of damage to building (academic, laboratories, library, hostels), equipment, electricity, roads etc. . . Give student-teacher ratio for the project. o Year-wise proposed enrolment of the institution for 5 years. o Provide details of technical staff required for operation & maintenance of laboratories. Research o Extent of damage to the research station/ laboratory building, equipment, electricity, roads etc. (completely damaged or partially effected). r Indicate whether the proposed research would result in development of process for commercialization. o Mention number of research papers to be produced nationally or internationally. o Indicate benefits of research to the economv. Transnort and Communications: o Provide technical pararneters i.e. selected design features for the replacement facility and capacity of the proposed facilities alongwith alternates available. o For roads, provide information on existing and projected traffic data, design speed, geometric and pavement design and classification of land for ROW etc. . In case of improvement within the urban areas, sepiuate traffic counts within that area should be given. Brief information regarding traffic and pavement width etc. in adjoining sections should also be given. . For bridges provide design discharge of river, location, total length of bridge, number of spans with length of each span, width roadway and footpath, type of sub and superstructure and load classification etc. Water Supnlv. Seweraqe & Housins: Provide information regarding existing situation in justification of proposed works along with quantitative details of proposed works keeping in view the physical and socio-economic conditions of the project site, its beneficiaries, weather conditions, adopted space standards and Specifications ofthe civil works etc.