SlideShare a Scribd company logo
1 of 5
Download to read offline
©ELMG Digital Power, Inc. 601 E Daily Drive, Ste 112, Camarillo CA 93010
www.elmgdigitalpower.com 805 764 2027
Why Power Converter Control Transfer Modeling wastes your time?
And what to do about it?
I remember back to control engineering class and recall seeing large numbers of rational polynomials in s. I was
young and naïve and believed that they were actually useful. Then I got to look at power converter control and
found things that just did not fit with the “rational function of s approach” that had been presented. This annoyed
me and so I spent the next ten years looking for ways to deal with real power converter control transfers. I found
that every modeling method I looked at relied on the model being validated by a measurement and so I got to the
point where the model was something where I’d spend lots of time getting the mathematics right only to find that
it did not in any way accurately predict the converter transfer in all operating conditions. So now I just do the
measurement.
It is, hopefully, obvious from the first part of this course that measuring transfers are the best way to get them for
any system including any power converter. It can be a frustrating and actually pointless exercise designing
controllers for power converters if the power converter transfer is not available or is inaccurate.
A “design first, measure second” approach leads to compensators that work most of the time but maybe do not
work when the input voltage is high or when the load is low. Murphy’s or Sod’s law makes it clear that this type of
Ad hoc controller design will be stable in all operating conditions except for the last one you test.
There has been and is significant effort to model power converters using averaging or small signal linearization.
These models are useful and are suitable for design. The key issue in using them is that they may not be accurate.
Verification of accuracy is done by measuring the transfer frequency response of the actual operating power
converter and comparing it to the model. In true empirical evidence fashion it is typical to say that when the
model matches the measurements then the model is accurate. The conclusion from this is that the measurements
confirm the model as accurate. A follow on conclusion is that the measurement is necessary. In the event that the
measurement does not match the model then the measurement is repeated. If the results are consistently
different from then it is the model that is typically declared inaccurate. At this point the measured response is
used in the design process in place of the model.
©ELMG Digital Power, Inc. 601 E Daily Drive, Ste 112, Camarillo CA 93010
www.elmgdigitalpower.com 805 764 2027
Figure 29 Problems with power converter model with bad estimate of capacitor ESR
©ELMG Digital Power, Inc. 601 E Daily Drive, Ste 112, Camarillo CA 93010
www.elmgdigitalpower.com 805 764 2027
Figure 30 Model problem fixed after measurement
Figure 31 Typical power converter model inaccuracy
©ELMG Digital Power, Inc. 601 E Daily Drive, Ste 112, Camarillo CA 93010
www.elmgdigitalpower.com 805 764 2027
In effect a measurement is considered more accurate than the model. The suspicion is always that there is
something missing from the model. This means that the way to get accurate converter transfers is to measure
them. It may be useful to have a model but that model needs to be verified by measurement.
Overall the time spent verifying the model is probably better spent measuring frequency responses of the transfers
and using these in the design of the compensator.
The solution to modeling inaccuracy is measurement.
The measurement of control transfers is not difficult and is not overly time consuming. It is extremely valuable
and the insight gained from doing it is instructive and informative.
So how do you make the measurements?
14. How to make Manual Measurements
If there is the possibility of measuring the frequency response of a power converter manually then it is always best
to do this. The insight into the power converter that comes from hands on manual measurement is invaluable.
One way to do this is to use a signal generator and an oscilloscope as an analyser.
Figure 32 Requirements for a network analyser are a signal source with variable signal frequency and magnitude and the
ability to measure the input and output.
©ELMG Digital Power, Inc. 601 E Daily Drive, Ste 112, Camarillo CA 93010
www.elmgdigitalpower.com 805 764 2027
Figure 33 Simple control transfer measurement tools. (The human brain provides the interface to the computer.)
This approach is best for power converters or other plants with analogue inputs. The signal generator is connected
into the controller through a capacitor with the feedback loop open and the controller bypassed or set to 1. It may
be that the point in the circuit where connection is best has a low impedance from the stage before. If this is the
case then it may be necessary to disconnect the previous stage.
It will be necessary to supply a DC voltage to set the base duty cycle or operating point. This is typically done using
a potentiometer.
It is usually useful to have some idea of the expected gain of the power converter and if you do then this will give
some indication of the size of the signal needed at the input. If you do not have an estimate of the gain set the
signal generator amplitude to zero. Set the signal generator frequency to 109 Hz. Put one scope probe on output
voltage and set that channel to AC couple. Make sure that the scope probe is rated for the DC voltage. Put the
other scope probe on the capacitor lead that is not connected to the signal generator. Run the power converter
and slowly increase the signal magnitude from the signal generator keeping an eye on the converter output
voltage and the signal from the signal generator. The 109 Hz will be apparent on the output as a sinusoidal
voltage. Adjust the scope vertical scale so you can see the 109Hz signal and increase the input signal also. Look at
the difference between the phase of the input and the output. This is the phase angle of the power converter
transfer at this frequency. The ratio of the output to the input is the gain of the converter transfer.

More Related Content

What's hot

Pre paid Energy meter
Pre paid Energy meterPre paid Energy meter
Pre paid Energy meterGourab Palui
 
Prepayment Metering System
Prepayment Metering SystemPrepayment Metering System
Prepayment Metering Systemkmhasanc
 
JAVED_ SUMMER INTERNSHIP 2014
JAVED_ SUMMER INTERNSHIP 2014JAVED_ SUMMER INTERNSHIP 2014
JAVED_ SUMMER INTERNSHIP 2014Muhammad Javed
 
Gsm based energy meter reading system and load control
Gsm based energy meter reading system and load controlGsm based energy meter reading system and load control
Gsm based energy meter reading system and load control9177995519
 
Smart Prepaid Energy Meter using ARM7 & and GSM
Smart Prepaid Energy Meter using ARM7 & and GSMSmart Prepaid Energy Meter using ARM7 & and GSM
Smart Prepaid Energy Meter using ARM7 & and GSMDarshak Patel
 
IRJET- Implementation of 16-Bit Pipelined ADC using 180nm CMOS Technology
IRJET-  	  Implementation of 16-Bit Pipelined ADC using 180nm CMOS TechnologyIRJET-  	  Implementation of 16-Bit Pipelined ADC using 180nm CMOS Technology
IRJET- Implementation of 16-Bit Pipelined ADC using 180nm CMOS TechnologyIRJET Journal
 
Powerwave G3L-1829-120
Powerwave G3L-1829-120Powerwave G3L-1829-120
Powerwave G3L-1829-120savomir
 
3 phase energy meter on Zigbee1
3 phase energy meter on Zigbee13 phase energy meter on Zigbee1
3 phase energy meter on Zigbee1Sumit Vyas
 
Gsm energy meter
Gsm energy meterGsm energy meter
Gsm energy meterikm104
 
PLS 2017: When will we have saved enough energy to start lighting for people?
PLS 2017: When will we have saved enough energy to start lighting for people?PLS 2017: When will we have saved enough energy to start lighting for people?
PLS 2017: When will we have saved enough energy to start lighting for people?Institution of Lighting Professionals
 

What's hot (14)

Energy merter
Energy merterEnergy merter
Energy merter
 
Pre paid Energy meter
Pre paid Energy meterPre paid Energy meter
Pre paid Energy meter
 
Prepayment Metering System
Prepayment Metering SystemPrepayment Metering System
Prepayment Metering System
 
JAVED_ SUMMER INTERNSHIP 2014
JAVED_ SUMMER INTERNSHIP 2014JAVED_ SUMMER INTERNSHIP 2014
JAVED_ SUMMER INTERNSHIP 2014
 
Gsm based energy meter reading system and load control
Gsm based energy meter reading system and load controlGsm based energy meter reading system and load control
Gsm based energy meter reading system and load control
 
Smart Prepaid Energy Meter using ARM7 & and GSM
Smart Prepaid Energy Meter using ARM7 & and GSMSmart Prepaid Energy Meter using ARM7 & and GSM
Smart Prepaid Energy Meter using ARM7 & and GSM
 
prepaid energymeter
prepaid energymeterprepaid energymeter
prepaid energymeter
 
Dharmesh_Resume
Dharmesh_ResumeDharmesh_Resume
Dharmesh_Resume
 
IRJET- Implementation of 16-Bit Pipelined ADC using 180nm CMOS Technology
IRJET-  	  Implementation of 16-Bit Pipelined ADC using 180nm CMOS TechnologyIRJET-  	  Implementation of 16-Bit Pipelined ADC using 180nm CMOS Technology
IRJET- Implementation of 16-Bit Pipelined ADC using 180nm CMOS Technology
 
Powerwave G3L-1829-120
Powerwave G3L-1829-120Powerwave G3L-1829-120
Powerwave G3L-1829-120
 
Power Supply Webinar
Power Supply WebinarPower Supply Webinar
Power Supply Webinar
 
3 phase energy meter on Zigbee1
3 phase energy meter on Zigbee13 phase energy meter on Zigbee1
3 phase energy meter on Zigbee1
 
Gsm energy meter
Gsm energy meterGsm energy meter
Gsm energy meter
 
PLS 2017: When will we have saved enough energy to start lighting for people?
PLS 2017: When will we have saved enough energy to start lighting for people?PLS 2017: When will we have saved enough energy to start lighting for people?
PLS 2017: When will we have saved enough energy to start lighting for people?
 

Similar to Measure Power Converter Transfers

Instrument Transformers - Following the Money: Best Practices in a Post AMI W...
Instrument Transformers - Following the Money: Best Practices in a Post AMI W...Instrument Transformers - Following the Money: Best Practices in a Post AMI W...
Instrument Transformers - Following the Money: Best Practices in a Post AMI W...TESCO - The Eastern Specialty Company
 
Dc motor modelling lab report
Dc motor modelling lab reportDc motor modelling lab report
Dc motor modelling lab reportAlexRobert25
 
D0363022039
D0363022039D0363022039
D0363022039theijes
 
Up/Down Converter Linear Model with Feed Forward and Feedback Stability Analysis
Up/Down Converter Linear Model with Feed Forward and Feedback Stability AnalysisUp/Down Converter Linear Model with Feed Forward and Feedback Stability Analysis
Up/Down Converter Linear Model with Feed Forward and Feedback Stability AnalysisCSCJournals
 
Concepts of predictive control
Concepts of predictive controlConcepts of predictive control
Concepts of predictive controlJARossiter
 
Real Coded Genetic Algorithm Based Improvement of Efficiency in Interleaved B...
Real Coded Genetic Algorithm Based Improvement of Efficiency in Interleaved B...Real Coded Genetic Algorithm Based Improvement of Efficiency in Interleaved B...
Real Coded Genetic Algorithm Based Improvement of Efficiency in Interleaved B...IJPEDS-IAES
 
Zero voltage switch - M.E Power Electronics projects
Zero voltage switch - M.E Power Electronics projects Zero voltage switch - M.E Power Electronics projects
Zero voltage switch - M.E Power Electronics projects Senthil Kumar
 
Fundamentals of Transformer-Rated Field Meter Testing and Site Verification
Fundamentals of Transformer-Rated Field Meter Testing and Site VerificationFundamentals of Transformer-Rated Field Meter Testing and Site Verification
Fundamentals of Transformer-Rated Field Meter Testing and Site VerificationTESCO - The Eastern Specialty Company
 
prepaid energy meter using gsm
prepaid energy meter using gsm prepaid energy meter using gsm
prepaid energy meter using gsm udaypallyreddy
 
Digital Energy Meter Project Report
Digital Energy Meter Project ReportDigital Energy Meter Project Report
Digital Energy Meter Project ReportVijayananda Mohire
 
MODELING, ANALYSIS AND SIMULATION OF POLY-PHASE BOOST CONVERTER
MODELING, ANALYSIS AND SIMULATION OF POLY-PHASE BOOST CONVERTERMODELING, ANALYSIS AND SIMULATION OF POLY-PHASE BOOST CONVERTER
MODELING, ANALYSIS AND SIMULATION OF POLY-PHASE BOOST CONVERTERijsrd.com
 
Analytical model of the half bridge series resonant inverter for improved pow...
Analytical model of the half bridge series resonant inverter for improved pow...Analytical model of the half bridge series resonant inverter for improved pow...
Analytical model of the half bridge series resonant inverter for improved pow...LeMeniz Infotech
 
Modeling approaches for dc–dc converters with switched capacitors
Modeling approaches for dc–dc converters with switched capacitorsModeling approaches for dc–dc converters with switched capacitors
Modeling approaches for dc–dc converters with switched capacitorsLeMeniz Infotech
 

Similar to Measure Power Converter Transfers (20)

Instrument Transformers - Following the Money: Best Practices in a Post AMI W...
Instrument Transformers - Following the Money: Best Practices in a Post AMI W...Instrument Transformers - Following the Money: Best Practices in a Post AMI W...
Instrument Transformers - Following the Money: Best Practices in a Post AMI W...
 
Variable Frequency Digital PWM Control for Low-Power Buck Converters
Variable Frequency Digital PWM Control for Low-Power Buck ConvertersVariable Frequency Digital PWM Control for Low-Power Buck Converters
Variable Frequency Digital PWM Control for Low-Power Buck Converters
 
Dc motor modelling lab report
Dc motor modelling lab reportDc motor modelling lab report
Dc motor modelling lab report
 
D0363022039
D0363022039D0363022039
D0363022039
 
Single Phase Meter Testing Overview
Single Phase Meter Testing OverviewSingle Phase Meter Testing Overview
Single Phase Meter Testing Overview
 
Up/Down Converter Linear Model with Feed Forward and Feedback Stability Analysis
Up/Down Converter Linear Model with Feed Forward and Feedback Stability AnalysisUp/Down Converter Linear Model with Feed Forward and Feedback Stability Analysis
Up/Down Converter Linear Model with Feed Forward and Feedback Stability Analysis
 
Concepts of predictive control
Concepts of predictive controlConcepts of predictive control
Concepts of predictive control
 
report
reportreport
report
 
Kf3517721775
Kf3517721775Kf3517721775
Kf3517721775
 
Applied automation apr2014
Applied automation apr2014Applied automation apr2014
Applied automation apr2014
 
C04111114
C04111114C04111114
C04111114
 
Real Coded Genetic Algorithm Based Improvement of Efficiency in Interleaved B...
Real Coded Genetic Algorithm Based Improvement of Efficiency in Interleaved B...Real Coded Genetic Algorithm Based Improvement of Efficiency in Interleaved B...
Real Coded Genetic Algorithm Based Improvement of Efficiency in Interleaved B...
 
Zero voltage switch - M.E Power Electronics projects
Zero voltage switch - M.E Power Electronics projects Zero voltage switch - M.E Power Electronics projects
Zero voltage switch - M.E Power Electronics projects
 
Digital meters
Digital metersDigital meters
Digital meters
 
Fundamentals of Transformer-Rated Field Meter Testing and Site Verification
Fundamentals of Transformer-Rated Field Meter Testing and Site VerificationFundamentals of Transformer-Rated Field Meter Testing and Site Verification
Fundamentals of Transformer-Rated Field Meter Testing and Site Verification
 
prepaid energy meter using gsm
prepaid energy meter using gsm prepaid energy meter using gsm
prepaid energy meter using gsm
 
Digital Energy Meter Project Report
Digital Energy Meter Project ReportDigital Energy Meter Project Report
Digital Energy Meter Project Report
 
MODELING, ANALYSIS AND SIMULATION OF POLY-PHASE BOOST CONVERTER
MODELING, ANALYSIS AND SIMULATION OF POLY-PHASE BOOST CONVERTERMODELING, ANALYSIS AND SIMULATION OF POLY-PHASE BOOST CONVERTER
MODELING, ANALYSIS AND SIMULATION OF POLY-PHASE BOOST CONVERTER
 
Analytical model of the half bridge series resonant inverter for improved pow...
Analytical model of the half bridge series resonant inverter for improved pow...Analytical model of the half bridge series resonant inverter for improved pow...
Analytical model of the half bridge series resonant inverter for improved pow...
 
Modeling approaches for dc–dc converters with switched capacitors
Modeling approaches for dc–dc converters with switched capacitorsModeling approaches for dc–dc converters with switched capacitors
Modeling approaches for dc–dc converters with switched capacitors
 

Recently uploaded

Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...RKavithamani
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 

Recently uploaded (20)

Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 

Measure Power Converter Transfers

  • 1. ©ELMG Digital Power, Inc. 601 E Daily Drive, Ste 112, Camarillo CA 93010 www.elmgdigitalpower.com 805 764 2027 Why Power Converter Control Transfer Modeling wastes your time? And what to do about it? I remember back to control engineering class and recall seeing large numbers of rational polynomials in s. I was young and naïve and believed that they were actually useful. Then I got to look at power converter control and found things that just did not fit with the “rational function of s approach” that had been presented. This annoyed me and so I spent the next ten years looking for ways to deal with real power converter control transfers. I found that every modeling method I looked at relied on the model being validated by a measurement and so I got to the point where the model was something where I’d spend lots of time getting the mathematics right only to find that it did not in any way accurately predict the converter transfer in all operating conditions. So now I just do the measurement. It is, hopefully, obvious from the first part of this course that measuring transfers are the best way to get them for any system including any power converter. It can be a frustrating and actually pointless exercise designing controllers for power converters if the power converter transfer is not available or is inaccurate. A “design first, measure second” approach leads to compensators that work most of the time but maybe do not work when the input voltage is high or when the load is low. Murphy’s or Sod’s law makes it clear that this type of Ad hoc controller design will be stable in all operating conditions except for the last one you test. There has been and is significant effort to model power converters using averaging or small signal linearization. These models are useful and are suitable for design. The key issue in using them is that they may not be accurate. Verification of accuracy is done by measuring the transfer frequency response of the actual operating power converter and comparing it to the model. In true empirical evidence fashion it is typical to say that when the model matches the measurements then the model is accurate. The conclusion from this is that the measurements confirm the model as accurate. A follow on conclusion is that the measurement is necessary. In the event that the measurement does not match the model then the measurement is repeated. If the results are consistently different from then it is the model that is typically declared inaccurate. At this point the measured response is used in the design process in place of the model.
  • 2. ©ELMG Digital Power, Inc. 601 E Daily Drive, Ste 112, Camarillo CA 93010 www.elmgdigitalpower.com 805 764 2027 Figure 29 Problems with power converter model with bad estimate of capacitor ESR
  • 3. ©ELMG Digital Power, Inc. 601 E Daily Drive, Ste 112, Camarillo CA 93010 www.elmgdigitalpower.com 805 764 2027 Figure 30 Model problem fixed after measurement Figure 31 Typical power converter model inaccuracy
  • 4. ©ELMG Digital Power, Inc. 601 E Daily Drive, Ste 112, Camarillo CA 93010 www.elmgdigitalpower.com 805 764 2027 In effect a measurement is considered more accurate than the model. The suspicion is always that there is something missing from the model. This means that the way to get accurate converter transfers is to measure them. It may be useful to have a model but that model needs to be verified by measurement. Overall the time spent verifying the model is probably better spent measuring frequency responses of the transfers and using these in the design of the compensator. The solution to modeling inaccuracy is measurement. The measurement of control transfers is not difficult and is not overly time consuming. It is extremely valuable and the insight gained from doing it is instructive and informative. So how do you make the measurements? 14. How to make Manual Measurements If there is the possibility of measuring the frequency response of a power converter manually then it is always best to do this. The insight into the power converter that comes from hands on manual measurement is invaluable. One way to do this is to use a signal generator and an oscilloscope as an analyser. Figure 32 Requirements for a network analyser are a signal source with variable signal frequency and magnitude and the ability to measure the input and output.
  • 5. ©ELMG Digital Power, Inc. 601 E Daily Drive, Ste 112, Camarillo CA 93010 www.elmgdigitalpower.com 805 764 2027 Figure 33 Simple control transfer measurement tools. (The human brain provides the interface to the computer.) This approach is best for power converters or other plants with analogue inputs. The signal generator is connected into the controller through a capacitor with the feedback loop open and the controller bypassed or set to 1. It may be that the point in the circuit where connection is best has a low impedance from the stage before. If this is the case then it may be necessary to disconnect the previous stage. It will be necessary to supply a DC voltage to set the base duty cycle or operating point. This is typically done using a potentiometer. It is usually useful to have some idea of the expected gain of the power converter and if you do then this will give some indication of the size of the signal needed at the input. If you do not have an estimate of the gain set the signal generator amplitude to zero. Set the signal generator frequency to 109 Hz. Put one scope probe on output voltage and set that channel to AC couple. Make sure that the scope probe is rated for the DC voltage. Put the other scope probe on the capacitor lead that is not connected to the signal generator. Run the power converter and slowly increase the signal magnitude from the signal generator keeping an eye on the converter output voltage and the signal from the signal generator. The 109 Hz will be apparent on the output as a sinusoidal voltage. Adjust the scope vertical scale so you can see the 109Hz signal and increase the input signal also. Look at the difference between the phase of the input and the output. This is the phase angle of the power converter transfer at this frequency. The ratio of the output to the input is the gain of the converter transfer.