SlideShare a Scribd company logo
1 of 23
Download to read offline
Seite 1 
Menaxhimi i thatësirës nga perspektiva e KRU Hidromorova,Gjilan
Seite 2 
Disafjaleper KRU HidromoravaGjilan 
Kooperation FMB - Klimavorhaben westl. Balkan 
20.12.2012 
Ø 400 
Liqeni Përilepnica 
Zona Urbane e Gjilanit 
FPU 
Burimi Guri Hoxhës 
Burimi Baja 
Kodra e Ddëshmorve 500 m3 
Spitali 
Shillova 
Përlepnica 
Reservuari Përlepnica1050 m3 
Velekinca 
FPU
Seite 3 
Kapacitetimesatardhemaksimaliprodhimit 
Kooperation FMB - Klimavorhaben westl. Balkan 
20.12.2012 
Burimet e ujit 
Kapaciteti i prodhimit mesatar 
Kapaciteti max i prodhimit 
AkumulacioniiPerlepnices 
130 lit/sec 
150 lit/sec 
Kaptazha ”GuriiHoxhes” 
60 lit/sec 
90 lit/sec 
Burimi”Baja” 
30 lit/sec 
40 lit/sec 
BurimiMalisheve 
10 lit/sec 
15 lit/sec 
BurimiDoberqan 
8 lit/sec 
12 lit/sec 
FPU Velekince-fushae puseve 
50 lit/sec 
80 lit/sec 
Stacionete pompimitI, II dheIII ne Kamenice 
25 lit/sec 
30 lit/sec 
BurimiLetnica-Viti 
20 lit/sec 
25 lit/sec 
TOTALI 
333 lit/sec 
442 lit/sec
Seite 4 
Karakteristikate pellgutdheakumulacionitPerlepnica 
Kooperation FMB - Klimavorhaben westl. Balkan 
20.12.2012 
•Siperfaqja e pellgut ujembledhes te akumulacionit 62.0km2 
•Siperfaqja e pasqyresse ujit 18.24 ha 
•Vellimi maksimal i ujit ne akumulacion4Mm3 
•Vellimi normal i ujit 3.6 Mm3 
•Vellimi shfrytezues i ujit ne akumulacion 2.62 Mm3 
•Vellimi i pashfrytezuar apo i vdekur 0.94Mm3
Seite 5 
Aktivitetete KRU Hidromoravaper Menaxhimine thatesisresper periudhen2013/14 
Kooperation FMB - Klimavorhaben westl. Balkan 
20.12.2012 
Mungesaereshjevedhesipasojeuljaenivelitteakumulacionitnekuotenminimale13.20mkashkaktuarprobleminmetemadhetefurnizimitmeujeqengaperiudhaendertimittependesnevitin1982.Njesituateenjejteishteregjistruardhenevitin1994. 
MonitorimiivetemqebehejgjatekesajperiudheishteniveliIujitneakumulacionsidhepercjelljaeburimevetetjerafurnizuesepermesleximitteujematesve. 
KrahasimiIsituatesaktualeneliqedheburimevetetjeramevitetparaprakedhemarrjaevendimevesipasrrethanavetekrijuara.
Seite 6 
Aktivitetete KRU Hidromoravaper Menaxhimine thatesisresper periudhen2013/14 
Kooperation FMB - Klimavorhaben westl. Balkan 
20.12.2012 
Situatae krijuarpas mungesesse reshjeve: 
Uljae nivelitteujitne akumulacioninPerlepnicanga30.20m ne 13.20m, ose17 m uljenganivelimaximal. 
Neburimin“GuriiHoxhës”sasiaeujitështëzvogëluarnga330m3ujeneorenevetëm110m3/oreujëmepakapoeshprehurnel/s,nga90l/sne30l/s. 
Nestac.Pomp.“Baja”neqytetsasiaeujitështëzvogëluarnga40l/snemepakse20l/s. 
DerisakapaciteteteujitnepusetneVelekinceishinnegjendjetemirepandikimtemadhendajthatesise.
Seite 7 
Aktivitetete KRU Hidromoravaper Menaxhimine thatesisresper periudhen2013/14 
Kooperation FMB - Klimavorhaben westl. Balkan 
20.12.2012 
Aktivitetekryesoretendermarraper tejkalimine thatesise: 
•NgaNentori2013eshtezvogeluarprodhimiIujitngaFPUnePerlepnicedukeunderprerplotesishtprodhimiIujitprej23hnembremjederi05hnemengjes. 
•EshtehartuarPlanistrategjikpermenagjiminekrizesseujitIcilikaparapareinvestimepertriperiudhakohore:periudhenafatshkurteapoemergjente,periudhaafatmesmedheperiudhaafatgjate. 
•Ngadata03.02.2014pershkakteuljessevazhdueshmetenivelitteujitkompaniakafilluarmeredukimeteujitperGjilanindukevazhduarderinefundtemuajitPrill2014.KyaktivitetishteinderlidhuredhemezvogelimiiprodhimitteujitneFPUnePerlepnicenga140l/sne55l/smeqkaishtearritqeteruhetniveliiujitneliqenekuoten13.20mpergati3muaj. 
•NeketesituatetekrizesrolinkyqperfurnizimmeujeperGjilaninekishteFPUneVelekince.Ngakjopikefurnizuesejaneshrytezuar65l/s.FurnizimimaksimalngakjopikeishtebereemundurvetempasrehabilitimitteFPU-sneVelekinceqeishteberengaQeveriaZvicerane.
Seite 8 
Kordinimiiaktiviteteveme Komunenper Menaxhimine thatesisresper periudhen2013/14 
20.12.2012 
VendimiiKryetaritteKomunesperkufizimineujittepijesnekohensadotezgjasekrizaeujit.Meketevendimparandalohejperdorimiiujitperautolarje,pervaditje,keqperdorimeteujit,etj. 
VendimiiKryetaritteKomunesperformimineTaskForcespermenaxhiminekrizesseujit.MeqellimtekordinimitteaktivitetevenekuaderteTaskForcaishteedheanetaringaKRUHidromorava. 
Aktiviteteteshtuarnegjetjeneburimevealternativepershtiminekapaciteteveteujit(livadheteKoretishtesdheaferFSK-s).
Seite 9 
Mbushjae akumulacionittePerlepnices 
20.12.2012 
Reshjete medhateshiutndikuanqevetembrenda2 javevetekeminjengritjetenivelitteujitneakumulacionnga13.20 ne 30.20
Seite 10 
Projektiper menaxhimine thatesiresngaGIZ 
20.12.2012 
Projektika filluarne kohenshumetenevoshmeper KRU Hidromorava: 
•VendosjaeShimatesitnelokacionineFPU-sneVelekince. 
•MonitorimidheregjistrimiItedhenaveperreshjetqdoditeneora7h. 
•TedhenateregjistruaradoteperdorenperSPI-nqenevoitenperplaninethatesissidheparalajmriminehershem. 
•PlanitotisherbejKompanisnjemenaxhimmeefikastesituateskurkemitebejmemekrizeneujitsipasojeeparaqitjessethatesis.
Seite 11 
Çka përmbanne tevertetenjë Plan perthatësirën? 
•Kornizë të thjeshtë dhe logjike 
•Tregues të qartë të definuar të thatësirës 
•Fazat e lidhura ngushtë me Treguesit 
•Masat e qarta të definuar për Furnizim, Kërkesë dhe Komunikim
Seite 12 19.11.2014 
Përdorimi i teknologjive të reja monitoruese –caktimi i kufinjve përveprim
Seite 13 
Plotesimiitedhenavengareshjetteregjistruarane shimatesin 
20.12.2012
Seite 14 
Plotesimiitedhenavebazeper burimetekzistuese 
20.12.2012
Seite 15 
Masate furnizimitdhekerkesesne situate normaletefurnizimitme uje 
19.11.2014
Seite 16 
Masate komunikimitne situate normaletefurnizimitme uje 
19.11.2014
Seite 17 
Masate furnizimitdhekerkesesne situate tethatesiresse moderuar 
19.11.2014
Seite 18 
Masate komunikimitne situate tethatesiresse moderuar 
19.11.2014
Seite 19 
Masate furnizimitdhekerkesesne situate tethatesiresse rende 
19.11.2014
Seite 20 
Masate komunikimitne situate tethatesiresse rende 
19.11.2014
Seite 21 
Masate furnizimitdhetekerkesesne situate tethatesiresekstreme 
19.11.2014
Seite 22 
Masate komunikimitne situate tethatesiresekstreme 
19.11.2014
Seite 23 
•Faleminderitper vemendjenTuaj 
19.11.2014

More Related Content

Viewers also liked

2010 Mobile Trends, Mobile Development Strategy, Mobile User Experience - Rea...
2010 Mobile Trends, Mobile Development Strategy, Mobile User Experience - Rea...2010 Mobile Trends, Mobile Development Strategy, Mobile User Experience - Rea...
2010 Mobile Trends, Mobile Development Strategy, Mobile User Experience - Rea...Shay Rosen (שי רוזן)
 
ARM - From social media activity to social relationship
ARM - From social media activity to social relationshipARM - From social media activity to social relationship
ARM - From social media activity to social relationshipShay Rosen (שי רוזן)
 

Viewers also liked (20)

Third IDMP CEE workshop: Compendium of good practices by Gregor Gregorič and ...
Third IDMP CEE workshop: Compendium of good practices by Gregor Gregorič and ...Third IDMP CEE workshop: Compendium of good practices by Gregor Gregorič and ...
Third IDMP CEE workshop: Compendium of good practices by Gregor Gregorič and ...
 
Joint GWP CEE/DMCSEE training: Communication and Drought by Robert Stefanski
Joint GWP CEE/DMCSEE training: Communication and Drought by Robert StefanskiJoint GWP CEE/DMCSEE training: Communication and Drought by Robert Stefanski
Joint GWP CEE/DMCSEE training: Communication and Drought by Robert Stefanski
 
TAC Background Paper No 4 in Romanian
TAC Background Paper No 4 in RomanianTAC Background Paper No 4 in Romanian
TAC Background Paper No 4 in Romanian
 
3 drought r&spi-van lanen
3 drought r&spi-van lanen3 drought r&spi-van lanen
3 drought r&spi-van lanen
 
Fourth IDMP CEE workshop: Increasing soil water holding capacity by Pavol Bi...
Fourth IDMP CEE workshop: Increasing soil water holding capacity by  Pavol Bi...Fourth IDMP CEE workshop: Increasing soil water holding capacity by  Pavol Bi...
Fourth IDMP CEE workshop: Increasing soil water holding capacity by Pavol Bi...
 
1 idmp cee overview_bokal
1 idmp cee overview_bokal1 idmp cee overview_bokal
1 idmp cee overview_bokal
 
GWP South Asia by Pervaiz Amir, Regional Panel of Experts, GWP South Asia
GWP South Asia by Pervaiz Amir, Regional Panel of Experts, GWP South AsiaGWP South Asia by Pervaiz Amir, Regional Panel of Experts, GWP South Asia
GWP South Asia by Pervaiz Amir, Regional Panel of Experts, GWP South Asia
 
Assessment of Damages Caused by the Drought by Pavol Bielek, Slovak Agricultu...
Assessment of Damages Caused by the Drought by Pavol Bielek, Slovak Agricultu...Assessment of Damages Caused by the Drought by Pavol Bielek, Slovak Agricultu...
Assessment of Damages Caused by the Drought by Pavol Bielek, Slovak Agricultu...
 
IDMP CEE follow-up workshop: Adriatic Ionic Strategy by Martina Zupan
IDMP CEE follow-up workshop: Adriatic Ionic Strategy by Martina ZupanIDMP CEE follow-up workshop: Adriatic Ionic Strategy by Martina Zupan
IDMP CEE follow-up workshop: Adriatic Ionic Strategy by Martina Zupan
 
Joint GWP CEE/DMCSEE training: Drought management principles in UK by Trevor ...
Joint GWP CEE/DMCSEE training: Drought management principles in UK by Trevor ...Joint GWP CEE/DMCSEE training: Drought management principles in UK by Trevor ...
Joint GWP CEE/DMCSEE training: Drought management principles in UK by Trevor ...
 
Evidence of Droughts in Agriculture by Attila Nagy, Debrecen University, Hungary
Evidence of Droughts in Agriculture by Attila Nagy, Debrecen University, HungaryEvidence of Droughts in Agriculture by Attila Nagy, Debrecen University, Hungary
Evidence of Droughts in Agriculture by Attila Nagy, Debrecen University, Hungary
 
2010 Mobile Trends, Mobile Development Strategy, Mobile User Experience - Rea...
2010 Mobile Trends, Mobile Development Strategy, Mobile User Experience - Rea...2010 Mobile Trends, Mobile Development Strategy, Mobile User Experience - Rea...
2010 Mobile Trends, Mobile Development Strategy, Mobile User Experience - Rea...
 
IDMP CEE 2nd workshop: Activity 5.4 by Tamara Tokarczyk
IDMP CEE 2nd workshop: Activity 5.4 by Tamara TokarczykIDMP CEE 2nd workshop: Activity 5.4 by Tamara Tokarczyk
IDMP CEE 2nd workshop: Activity 5.4 by Tamara Tokarczyk
 
ARM - From social media activity to social relationship
ARM - From social media activity to social relationshipARM - From social media activity to social relationship
ARM - From social media activity to social relationship
 
GWP CEE Integrated Drought Management Programme by Sabina Bokal
GWP CEE Integrated Drought Management Programme by Sabina BokalGWP CEE Integrated Drought Management Programme by Sabina Bokal
GWP CEE Integrated Drought Management Programme by Sabina Bokal
 
IDMP CEE Activity 5.5 by Janos Tamás
IDMP CEE Activity 5.5 by Janos TamásIDMP CEE Activity 5.5 by Janos Tamás
IDMP CEE Activity 5.5 by Janos Tamás
 
Study of alternative solutions for waste water treatment in Richnava local mu...
Study of alternative solutions for waste water treatment in Richnava local mu...Study of alternative solutions for waste water treatment in Richnava local mu...
Study of alternative solutions for waste water treatment in Richnava local mu...
 
Joint GWP CEE/DMCSEE training: UNCCD global framework on Drought Management a...
Joint GWP CEE/DMCSEE training: UNCCD global framework on Drought Management a...Joint GWP CEE/DMCSEE training: UNCCD global framework on Drought Management a...
Joint GWP CEE/DMCSEE training: UNCCD global framework on Drought Management a...
 
Danube Art Master 2011 Fact Sheet
Danube Art Master 2011 Fact SheetDanube Art Master 2011 Fact Sheet
Danube Art Master 2011 Fact Sheet
 
Latvian version: Sustainable Sanitation in Central and Eastern Europe
Latvian version: Sustainable Sanitation in Central and Eastern EuropeLatvian version: Sustainable Sanitation in Central and Eastern Europe
Latvian version: Sustainable Sanitation in Central and Eastern Europe
 

More from Global Water Partnership Central and Eastern Europe

More from Global Water Partnership Central and Eastern Europe (20)

Treatment Wetlands for Sustainable Sanitation in Central and Eastern Europe b...
Treatment Wetlands for Sustainable Sanitation in Central and Eastern Europe b...Treatment Wetlands for Sustainable Sanitation in Central and Eastern Europe b...
Treatment Wetlands for Sustainable Sanitation in Central and Eastern Europe b...
 
IDMP CEE follow-up workshop:
IDMP CEE follow-up workshop: IDMP CEE follow-up workshop:
IDMP CEE follow-up workshop:
 
IDMP CEE follow-up workshop: Rresearch needs and vision for follow up program...
IDMP CEE follow-up workshop: Rresearch needs and vision for follow up program...IDMP CEE follow-up workshop: Rresearch needs and vision for follow up program...
IDMP CEE follow-up workshop: Rresearch needs and vision for follow up program...
 
10 eu strategy for the danube region feher
10 eu strategy for the danube region feher10 eu strategy for the danube region feher
10 eu strategy for the danube region feher
 
9 fundraising mapping bokal
9 fundraising mapping bokal9 fundraising mapping bokal
9 fundraising mapping bokal
 
8 eodc status mistelbauer
8 eodc status mistelbauer8 eodc status mistelbauer
8 eodc status mistelbauer
 
7 satida mistelbauer
7 satida mistelbauer7 satida mistelbauer
7 satida mistelbauer
 
6 g wadi network for see-zlatanović&dimkić
6 g wadi network for see-zlatanović&dimkić6 g wadi network for see-zlatanović&dimkić
6 g wadi network for see-zlatanović&dimkić
 
5 drought in romania mateescu
5 drought in romania mateescu5 drought in romania mateescu
5 drought in romania mateescu
 
4 intersucho zalud
4 intersucho zalud4 intersucho zalud
4 intersucho zalud
 
2 dmcsee gregorič
2 dmcsee gregorič2 dmcsee gregorič
2 dmcsee gregorič
 
1 idmp help desk stefanski
1 idmp help desk stefanski1 idmp help desk stefanski
1 idmp help desk stefanski
 
Fourth IDMP CEE workshop: Follow-up on Natural Small Water Retention Measures...
Fourth IDMP CEE workshop: Follow-up on Natural Small Water Retention Measures...Fourth IDMP CEE workshop: Follow-up on Natural Small Water Retention Measures...
Fourth IDMP CEE workshop: Follow-up on Natural Small Water Retention Measures...
 
Fourth IDMP CEE workshop: Water and Drought Management and in the Adriatic S...
Fourth IDMP CEE workshop: Water and Drought Management and  in the Adriatic S...Fourth IDMP CEE workshop: Water and Drought Management and  in the Adriatic S...
Fourth IDMP CEE workshop: Water and Drought Management and in the Adriatic S...
 
Fourth IDMP CEE workshop: Proposed Follow-up pilot projects in forests by Urs...
Fourth IDMP CEE workshop: Proposed Follow-up pilot projects in forests by Urs...Fourth IDMP CEE workshop: Proposed Follow-up pilot projects in forests by Urs...
Fourth IDMP CEE workshop: Proposed Follow-up pilot projects in forests by Urs...
 
Fourth IDMP CEE workshop: IDMP CEE Communications by Gergana Majercakova
Fourth IDMP CEE workshop: IDMP CEE Communications by Gergana MajercakovaFourth IDMP CEE workshop: IDMP CEE Communications by Gergana Majercakova
Fourth IDMP CEE workshop: IDMP CEE Communications by Gergana Majercakova
 
Fourth IDMP CEE workshop: Assessment of drought impact on forests by Galia Ba...
Fourth IDMP CEE workshop: Assessment of drought impact on forests by Galia Ba...Fourth IDMP CEE workshop: Assessment of drought impact on forests by Galia Ba...
Fourth IDMP CEE workshop: Assessment of drought impact on forests by Galia Ba...
 
Fourth IDMP CEE workshop: Natural Small Water Retention Measures by Anja Potokar
Fourth IDMP CEE workshop: Natural Small Water Retention Measures by Anja PotokarFourth IDMP CEE workshop: Natural Small Water Retention Measures by Anja Potokar
Fourth IDMP CEE workshop: Natural Small Water Retention Measures by Anja Potokar
 
Fourth IDMP CEE workshop: Development of GIS Based Communication Technology P...
Fourth IDMP CEE workshop: Development of GIS Based Communication Technology P...Fourth IDMP CEE workshop: Development of GIS Based Communication Technology P...
Fourth IDMP CEE workshop: Development of GIS Based Communication Technology P...
 
Fourth IDMP CEE workshop: Upgrading agricultural drought monitoring and forec...
Fourth IDMP CEE workshop: Upgrading agricultural drought monitoring and forec...Fourth IDMP CEE workshop: Upgrading agricultural drought monitoring and forec...
Fourth IDMP CEE workshop: Upgrading agricultural drought monitoring and forec...
 

Guidance on Preparation of Water Company Drought Risk Management Plans in Kosova by Mumin Morina

  • 1. Seite 1 Menaxhimi i thatësirës nga perspektiva e KRU Hidromorova,Gjilan
  • 2. Seite 2 Disafjaleper KRU HidromoravaGjilan Kooperation FMB - Klimavorhaben westl. Balkan 20.12.2012 Ø 400 Liqeni Përilepnica Zona Urbane e Gjilanit FPU Burimi Guri Hoxhës Burimi Baja Kodra e Ddëshmorve 500 m3 Spitali Shillova Përlepnica Reservuari Përlepnica1050 m3 Velekinca FPU
  • 3. Seite 3 Kapacitetimesatardhemaksimaliprodhimit Kooperation FMB - Klimavorhaben westl. Balkan 20.12.2012 Burimet e ujit Kapaciteti i prodhimit mesatar Kapaciteti max i prodhimit AkumulacioniiPerlepnices 130 lit/sec 150 lit/sec Kaptazha ”GuriiHoxhes” 60 lit/sec 90 lit/sec Burimi”Baja” 30 lit/sec 40 lit/sec BurimiMalisheve 10 lit/sec 15 lit/sec BurimiDoberqan 8 lit/sec 12 lit/sec FPU Velekince-fushae puseve 50 lit/sec 80 lit/sec Stacionete pompimitI, II dheIII ne Kamenice 25 lit/sec 30 lit/sec BurimiLetnica-Viti 20 lit/sec 25 lit/sec TOTALI 333 lit/sec 442 lit/sec
  • 4. Seite 4 Karakteristikate pellgutdheakumulacionitPerlepnica Kooperation FMB - Klimavorhaben westl. Balkan 20.12.2012 •Siperfaqja e pellgut ujembledhes te akumulacionit 62.0km2 •Siperfaqja e pasqyresse ujit 18.24 ha •Vellimi maksimal i ujit ne akumulacion4Mm3 •Vellimi normal i ujit 3.6 Mm3 •Vellimi shfrytezues i ujit ne akumulacion 2.62 Mm3 •Vellimi i pashfrytezuar apo i vdekur 0.94Mm3
  • 5. Seite 5 Aktivitetete KRU Hidromoravaper Menaxhimine thatesisresper periudhen2013/14 Kooperation FMB - Klimavorhaben westl. Balkan 20.12.2012 Mungesaereshjevedhesipasojeuljaenivelitteakumulacionitnekuotenminimale13.20mkashkaktuarprobleminmetemadhetefurnizimitmeujeqengaperiudhaendertimittependesnevitin1982.Njesituateenjejteishteregjistruardhenevitin1994. MonitorimiivetemqebehejgjatekesajperiudheishteniveliIujitneakumulacionsidhepercjelljaeburimevetetjerafurnizuesepermesleximitteujematesve. KrahasimiIsituatesaktualeneliqedheburimevetetjeramevitetparaprakedhemarrjaevendimevesipasrrethanavetekrijuara.
  • 6. Seite 6 Aktivitetete KRU Hidromoravaper Menaxhimine thatesisresper periudhen2013/14 Kooperation FMB - Klimavorhaben westl. Balkan 20.12.2012 Situatae krijuarpas mungesesse reshjeve: Uljae nivelitteujitne akumulacioninPerlepnicanga30.20m ne 13.20m, ose17 m uljenganivelimaximal. Neburimin“GuriiHoxhës”sasiaeujitështëzvogëluarnga330m3ujeneorenevetëm110m3/oreujëmepakapoeshprehurnel/s,nga90l/sne30l/s. Nestac.Pomp.“Baja”neqytetsasiaeujitështëzvogëluarnga40l/snemepakse20l/s. DerisakapaciteteteujitnepusetneVelekinceishinnegjendjetemirepandikimtemadhendajthatesise.
  • 7. Seite 7 Aktivitetete KRU Hidromoravaper Menaxhimine thatesisresper periudhen2013/14 Kooperation FMB - Klimavorhaben westl. Balkan 20.12.2012 Aktivitetekryesoretendermarraper tejkalimine thatesise: •NgaNentori2013eshtezvogeluarprodhimiIujitngaFPUnePerlepnicedukeunderprerplotesishtprodhimiIujitprej23hnembremjederi05hnemengjes. •EshtehartuarPlanistrategjikpermenagjiminekrizesseujitIcilikaparapareinvestimepertriperiudhakohore:periudhenafatshkurteapoemergjente,periudhaafatmesmedheperiudhaafatgjate. •Ngadata03.02.2014pershkakteuljessevazhdueshmetenivelitteujitkompaniakafilluarmeredukimeteujitperGjilanindukevazhduarderinefundtemuajitPrill2014.KyaktivitetishteinderlidhuredhemezvogelimiiprodhimitteujitneFPUnePerlepnicenga140l/sne55l/smeqkaishtearritqeteruhetniveliiujitneliqenekuoten13.20mpergati3muaj. •NeketesituatetekrizesrolinkyqperfurnizimmeujeperGjilaninekishteFPUneVelekince.Ngakjopikefurnizuesejaneshrytezuar65l/s.FurnizimimaksimalngakjopikeishtebereemundurvetempasrehabilitimitteFPU-sneVelekinceqeishteberengaQeveriaZvicerane.
  • 8. Seite 8 Kordinimiiaktiviteteveme Komunenper Menaxhimine thatesisresper periudhen2013/14 20.12.2012 VendimiiKryetaritteKomunesperkufizimineujittepijesnekohensadotezgjasekrizaeujit.Meketevendimparandalohejperdorimiiujitperautolarje,pervaditje,keqperdorimeteujit,etj. VendimiiKryetaritteKomunesperformimineTaskForcespermenaxhiminekrizesseujit.MeqellimtekordinimitteaktivitetevenekuaderteTaskForcaishteedheanetaringaKRUHidromorava. Aktiviteteteshtuarnegjetjeneburimevealternativepershtiminekapaciteteveteujit(livadheteKoretishtesdheaferFSK-s).
  • 9. Seite 9 Mbushjae akumulacionittePerlepnices 20.12.2012 Reshjete medhateshiutndikuanqevetembrenda2 javevetekeminjengritjetenivelitteujitneakumulacionnga13.20 ne 30.20
  • 10. Seite 10 Projektiper menaxhimine thatesiresngaGIZ 20.12.2012 Projektika filluarne kohenshumetenevoshmeper KRU Hidromorava: •VendosjaeShimatesitnelokacionineFPU-sneVelekince. •MonitorimidheregjistrimiItedhenaveperreshjetqdoditeneora7h. •TedhenateregjistruaradoteperdorenperSPI-nqenevoitenperplaninethatesissidheparalajmriminehershem. •PlanitotisherbejKompanisnjemenaxhimmeefikastesituateskurkemitebejmemekrizeneujitsipasojeeparaqitjessethatesis.
  • 11. Seite 11 Çka përmbanne tevertetenjë Plan perthatësirën? •Kornizë të thjeshtë dhe logjike •Tregues të qartë të definuar të thatësirës •Fazat e lidhura ngushtë me Treguesit •Masat e qarta të definuar për Furnizim, Kërkesë dhe Komunikim
  • 12. Seite 12 19.11.2014 Përdorimi i teknologjive të reja monitoruese –caktimi i kufinjve përveprim
  • 14. Seite 14 Plotesimiitedhenavebazeper burimetekzistuese 20.12.2012
  • 15. Seite 15 Masate furnizimitdhekerkesesne situate normaletefurnizimitme uje 19.11.2014
  • 16. Seite 16 Masate komunikimitne situate normaletefurnizimitme uje 19.11.2014
  • 17. Seite 17 Masate furnizimitdhekerkesesne situate tethatesiresse moderuar 19.11.2014
  • 18. Seite 18 Masate komunikimitne situate tethatesiresse moderuar 19.11.2014
  • 19. Seite 19 Masate furnizimitdhekerkesesne situate tethatesiresse rende 19.11.2014
  • 20. Seite 20 Masate komunikimitne situate tethatesiresse rende 19.11.2014
  • 21. Seite 21 Masate furnizimitdhetekerkesesne situate tethatesiresekstreme 19.11.2014
  • 22. Seite 22 Masate komunikimitne situate tethatesiresekstreme 19.11.2014
  • 23. Seite 23 •Faleminderitper vemendjenTuaj 19.11.2014