You need to enable JavaScript to run this app.
SafeAssign Originality ReportWaldorf SafeAssign Plagiarism Check Tool•SafeAssign Originality Report Generator IView Originality Report - Old Design
Nicole SamuelsTotal Score:
highRisk
Created with Sketch.
High risk53%Submission UUID: e8487087-e7f0-37dd-dff6-2f98c9703661Total Score
Total Number of Reports
1
Highest Match
53 %
Reflection Paper.docx
Average Match
53 %
Submitted on
02/24/20
01:29 PM EST
Average Word Count
691
Highest: Reflection Paper.docx
highRisk
Created with Sketch.
Attachment 153%Word Count: 691
Reflection Paper.docx
Global database (2)
52%
1
Student paper2
Student paperInstitutional database (1)
1%
3
Student paperTop sources (3)
1
Student paper2
Student paper3
Student paperExcluded sources (0)
Running Head:
ARTICLE REVIEW 1
Title:
Article Review Nicole Samuels Waldorf University 02/25/2020
1
Main issues in the Article There are given here in the four categories as a board of spring for the considering of once self-work in the four categories.
First is the development of long-life habit learning;
continually enhance and develop competencies moving flexible orders among several required rules of the consultant OD (Kail & Cavanaugh, 2018).
1
Developing a development of relationships with professionals and peers where the perspectives were checked, and talk about strategies and challenges, and practices and values alignment. Seek actively colleagues and clients feedback.
Building knowledge that is based in the field even if it seems both critical and urgent.
1
Take risks responsible for stretching proficiency and comfort zone.
Working through power issues, acknowled.
social pharmacy d-pharm 1st year by Pragati K. Mahajan
You need to enable JavaScript to run this app..docx
1. You need to enable JavaScript to run this app.
SafeAssign Originality ReportWaldorf SafeAssign Plagiarism
Check Tool•SafeAssign Originality Report Generator IView
Originality Report - Old Design
Nicole SamuelsTotal Score:
highRisk
Created with Sketch.
2. High risk53%Submission UUID: e8487087-e7f0-37dd-dff6-
2f98c9703661Total Score
Total Number of Reports
1
Highest Match
53 %
Reflection Paper.docx
Average Match
53 %
5. Student paper3
Student paperExcluded sources (0)
Running Head:
ARTICLE REVIEW 1
Title:
Article Review Nicole Samuels Waldorf University 02/25/2020
1
Main issues in the Article There are given here in the four
categories as a board of spring for the considering of once self-
work in the four categories.
First is the development of long-life habit learning;
continually enhance and develop competencies moving flexible
orders among several required rules of the consultant OD (Kail
& Cavanaugh, 2018).
1
Developing a development of relationships with professionals
and peers where the perspectives were checked, and talk about
strategies and challenges, and practices and values alignment.
Seek actively colleagues and clients feedback.
Building knowledge that is based in the field even if it seems
both critical and urgent.
1
Take risks responsible for stretching proficiency and comfort
zone.
Working through power issues, acknowledge the issues that are
personal around control and power and attuning yourself in
recognizing their triggers emotional.
Developing a strategy of managing yourself and others
dynamics power.
1
Develop habits that are effective to maintain and establishing
boundaries that are appropriate with clients and colleagues.
Clarifying values are personal and what is vital in life. Practice
6. first putting things fast. Build intuitive and emotional self-
awareness; integrate your family and personal history and make
it a strength source. Know about the fears you have, comfort
zone and blind spots.
Using your comfort emotional as a choice of making data about
the work you are doing and the way you interact in the system
of the client (Hose & Schenker, 2020).
1
Develop managing habit anxiety.
Committing yourself to self-care, organizing your calendar and
have time included for integration and reflection, and a recharge
the emotional and intellectual energy.
1
Book regularly time to cater to your mind, soul, and body. Have
effective packaging self-care, knowing that a machine can’t
deliver a long-haul service without work maintenance. Using
meditation or other practices to maintain and develop inner
knowledge and awareness. Have a consideration of the
following OD characterizations.
Have a plan intervention to increase the effectiveness of
organization and health.
Maintain and build the organization's health as a total system.
1
Revitalization that is achieved by an organization by individual
synthesizing, organizational and group goals to give service that
is effective to community and client while quality furthering of
work-life and product. The development of an organization's
primary emphasis is on processes and relationships among and
between groups and individuals. It is the primary influence
intervention on individuals and groups relationships to reflect
the organization as a system impact.
Resource estimation:
2
the judgment that is expert means bringing the experts that have
done the sort of work before and having their opinions on the
needed resources.
7. The alternative of the analysis means having consideration of a
few options that are different on the way of assigning resources.
This is the varying of the number of resources and also the type
of resources to use.
Most of the time, there are many ways of accomplishing an
activity and analysis that is alternative helps to decide between
the possibilities.
Published estimation of data is one thing that the manager of a
project in many industries uses them to help them in figuring
out the number of resources that are needed.
The software of the management of the project, the project often
have designed features of helping the manager of the project
estimate needs of the resource and constraints and have a good
combination of the project assignments (Blokdyk, 2019).
2
Estimating of bottom-up means break down of activities that are
complex into pieces and work out the assignment's resources for
every piece. It is an estimating individual process resource of
activity cost or need and also adds them together to have a total
estimate. Estimating of bottom-up is so accurate estimating
means, give the estimates at the activity level schedule that are
accurate.
References
Blokdyk, G.
(2019).
2-plan Project Management Software A Complete Guide - 2019
Edition.
NJ:
5starcooks.
Hose, M., & Schenker, D.
(2020).
A Companion to Greek Literature.
Hoboken, NJ:
3
John Wiley & Sons.
Kail, R.
8. V., & Cavanaugh, J.
C.
(2018).
Human Development:
A Life-Span View.
Boston, MA:
Cengage Learning.
Source Matches (11)
1Student paper65%
Student paper
Main issues in the Article There are given here in the four
categories as a board of spring for the considering of once self-
work in the four categories.
Original source
They are offered here—in four categories—as a springboard for
readers in considering your own self- work in four categories
1Student paper81%
Student paper
Developing a development of relationships with professionals
and peers where the perspectives were checked, and talk about
strategies and challenges, and practices and values alignment.
Seek actively colleagues and clients feedback.
Original source
» Develop relationships with peers and professionals with whom
to check perspectives, talk through challenges and strategies,
and align values and practices » Actively seek feedback from
clients and colleagues 1Student paper72%
9. Student paper
Take risks responsible for stretching proficiency and comfort
zone.
Original source
» Take responsible risks that stretch your professional comfort
zone and proficiency 1Student paper77%
Student paper
Develop habits that are effective to maintain and establishing
boundaries that are appropriate with clients and colleagues.
Clarifying values are personal and what is vital in life. Practice
first putting things fast. Build intuitive and emotional self-
awareness;
Original source
» Develop effective habits for establishing and maintaining
appropriate boundar- ies with colleagues and clients » Clarify
personal values and what is important in life Practice “putting
first things first.” Build Emotional and Intuitive Self-Awareness
1Student paper75%
Student paper
integrate your family and personal history and make it a
strength source. Know about the fears you have, comfort zone
and blind spots.
Original source
» Integrate your personal and family history and turn it into a
source of strength » Get to know your fears, blind spots and
comfort zones 1Student paper67%
10. Student paper
Develop managing habit anxiety.
Original source
» Develop habits for managing anxiety 1Student paper76%
Student paper
Book regularly time to cater to your mind, soul, and body. Have
effective packaging self-care, knowing that a machine can’t
deliver a long-haul service without work maintenance. Using
meditation or other practices to maintain and develop inner
knowledge and awareness. Have a consideration of the
following OD characterizations.
Original source
» Book regular time off to cater to body, mind, and soul » Have
an effective self-care package, knowing that – like a machine-
we can- not keep delivering a long-haul service without
maintenance work » Use meditation or other practices to
develop and maintain inner awareness and knowledge Consider
the following characterizations of OD 1Student paper75%
Student paper
Revitalization that is achieved by an organization by individual
synthesizing, organizational and group goals to give service that
is effective to community and client while quality furthering of
work-life and product. The development of an organization's
primary emphasis is on processes and relationships among and
between groups and individuals. It is the primary influence
intervention on individuals and groups relationships to reflect
the organization as a system impact.
Original source
» Organization revitalization achieved through synthesizing
11. individual, group and organizational goals so as to pro- vide
effective service to the client and community while furthering
quality of Organization development’s pri- mary emphasis is on
relationships and processes between and among individuals and
groups Its primary intervention is influence on the rela- tionship
of individuals and groups to reflect the impact on the
organization as a system 2Student paper72%
Student paper
the judgment that is expert means bringing the experts that have
done the sort of work before and having their opinions on the
needed resources.
Original source
bringing in experts who have done this sort of work before and
getting their opinions on what resources are needed 2Student
paper76%
Student paper
Estimating of bottom-up means break down of activities that are
complex into pieces and work out the assignment's resources for
every piece. It is an estimating individual process resource of
activity cost or need and also adds them together to have a total
estimate. Estimating of bottom-up is so accurate estimating
means, give the estimates at the activity level schedule that are
accurate.
Original source
Bottom-up estimating means breaking down complex activities
into pieces and working out the resource assignments for each
piece It is a process of estimating individual activity resource
need or cost and then adding these up together to come up with
a total estimate Bottom-up estimating is a very accurate means
of estimating, provided the estimates at the schedule activity
12. level are accurate 3Student paper84%
Student paper
John Wiley & Sons.
Original source
John Wiley & Sons, Inc
Sheet1PC Purchase DataProcessorScreen SizeMemoryHard
DriveRecordIntel Core i3Intel Core i5Intel Core i710 inch
screen12 inch screen15 inch screen2 GB 4 GB8 GB320 GB500
GB750
GB10100100100102010001001001301001001010041000100010
10500100100100160010100100017001001001001810001001001
09010100100010100100100010101101000110000112010001010
00113010100010010140100101000101501010010001016001001
00100117100100100010181000100100011901000110001020100
01001000121010010001001220100100100102301000101010024
01001001001025010001100010261000100101002710001010000
12810010001010029001010001010301001000101003110010010
00103210010010010033010010001010340100010100103500101
00100013610001010010037100100001001380101000101003901
00010010104000101000101041100100010100420100010101004
30010010010014400101001001045010001010100460100010101
00470100100100104801001010001049100010010010500101000
10100511000010101005201000101001053100010010010540101
00010100550010100100105610001010000157100100010010580
10010100010590100101001006010010001001061001001010001
62010100010010630100101001006401001001001065001010010
0016610001011010067100001010100
AssocRules_OutputXLMiner : Association RulesOutput
NavigatorElapsed Times in MillisecondsInputsList of
RulesAssocRules TimeReport TimeTotal16016InputsData#
Transactions in Input Data67# Columns in Input Data12# Items
in Input Data12# Association Rules40Minimum
13. Support7Minimum Confidence50.00%List of RulesRule: If all
Antecedent items are purchased, then with Confidence
percentage Consequent items will also be purchased.Row
IDConfidence %Antecedent (A)Consequent (C)Support for
ASupport for CSupport for A & CLift
Ratio166.6666666667Intel Core i7750
GB121782.6274509804253.84615384628 GB750
GB131772.1221719457350Intel Core i3 & 4 GB320
GB141971.7631578947456.2510 inch screenIntel Core
i3162291.7130681818577.77777777782 GB & 500 GBIntel
Core i593371.5791245791671.4285714286Intel Core i5 & 12
inch screen500 GB1431101.5437788018770Intel Core i5 & 2
GB500 GB103171.512903225887015 inch screen & 4 GBIntel
Core i5103371.4212121212980Intel Core i5 & 320 GB4
GB103881.41052631581078.9473684211320 GB4
GB1938151.3919667591177.7777777778Intel Core i3 & 320
GB4 GB93871.37134502921262.54 GB & 500 GB12 inch
screen1632101.308593751363.157894736815 inch screenIntel
Core i51933121.28229665071461.2903225806500 GBIntel Core
i53133191.24437927661557.5757575758Intel Core i5500
GB3331191.24437927661658.3333333333Intel Core i712 inch
screen123271.22135416671758.064516129500 GB12 inch
screen3132181.21572580651856.2512 inch screen500
GB3231181.21572580651955.555555555612 inch screen & 4
GB500 GB1831101.20071684592058.82352941182 GBIntel
Core i51733101.19429590022152.94117647062 GB500
GB173191.14421252372256.254 GB & 500 GBIntel Core
i5163391.14204545452355.555555555612 inch screen & 500
GBIntel Core i51833101.12794612792463.6363636364Intel
Core i34 GB2238141.12200956942563.6363636364Intel Core i3
& 12 inch screen4 GB113871.12200956942652.94117647062
GB12 inch screen173291.10845588242762.510 inch screen4
GB1638101.10197368422852.6315789474Intel Core i5 & 500
GB12 inch screen1932101.10197368422953.33333333334 GB &
320 GBIntel Core i5153381.0828282828305010 inch screen500
GB163181.08064516133150Intel Core i5 & 4 GB500
24. Highest Match
53 %
Reflection Paper.docx
Average Match
53 %
Submitted on
02/24/20
01:29 PM EST
Average Word Count
691
Highest: Reflection Paper.docx
highRisk
26. Attachment 153%Word Count: 691
Reflection Paper.docx
Global database (2)
52%
1
Student paper2
Student paperInstitutional database (1)
1%
3
Student paperTop sources (3)
1
Student paper2
Student paper3
Student paperExcluded sources (0)
Running Head:
ARTICLE REVIEW 1
Title:
Article Review Nicole Samuels Waldorf University 02/25/2020
1
Main issues in the Article There are given here in the four
categories as a board of spring for the considering of once self-
work in the four categories.
First is the development of long-life habit learning;
continually enhance and develop competencies moving flexible
orders among several required rules of the consultant OD (Kail
& Cavanaugh, 2018).
1
Developing a development of relationships with professionals
and peers where the perspectives were checked, and talk about
27. strategies and challenges, and practices and values alignment.
Seek actively colleagues and clients feedback.
Building knowledge that is based in the field even if it seems
both critical and urgent.
1
Take risks responsible for stretching proficiency and comfort
zone.
Working through power issues, acknowledge the issues that are
personal around control and power and attuning yourself in
recognizing their triggers emotional.
Developing a strategy of managing yourself and others
dynamics power.
1
Develop habits that are effective to maintain and establishing
boundaries that are appropriate with clients and colleagues.
Clarifying values are personal and what is vital in life. Practice
first putting things fast. Build intuitive and emotional self-
awareness; integrate your family and personal history and make
it a strength source. Know about the fears you have, comfort
zone and blind spots.
Using your comfort emotional as a choice of making data about
the work you are doing and the way you interact in the system
of the client (Hose & Schenker, 2020).
1
Develop managing habit anxiety.
Committing yourself to self-care, organizing your calendar and
have time included for integration and reflection, and a recharge
the emotional and intellectual energy.
1
Book regularly time to cater to your mind, soul, and body. Have
effective packaging self-care, knowing that a machine can’t
deliver a long-haul service without work maintenance. Using
meditation or other practices to maintain and develop inner
knowledge and awareness. Have a consideration of the
following OD characterizations.
Have a plan intervention to increase the effectiveness of
28. organization and health.
Maintain and build the organization's health as a total system.
1
Revitalization that is achieved by an organization by individual
synthesizing, organizational and group goals to give service that
is effective to community and client while quality furthering of
work-life and product. The development of an organization's
primary emphasis is on processes and relationships among and
between groups and individuals. It is the primary influence
intervention on individuals and groups relationships to reflect
the organization as a system impact.
Resource estimation:
2
the judgment that is expert means bringing the experts that have
done the sort of work before and having their opinions on the
needed resources.
The alternative of the analysis means having consideration of a
few options that are different on the way of assigning resources.
This is the varying of the number of resources and also the type
of resources to use.
Most of the time, there are many ways of accomplishing an
activity and analysis that is alternative helps to decide between
the possibilities.
Published estimation of data is one thing that the manager of a
project in many industries uses them to help them in figuring
out the number of resources that are needed.
The software of the management of the project, the project often
have designed features of helping the manager of the project
estimate needs of the resource and constraints and have a good
combination of the project assignments (Blokdyk, 2019).
2
Estimating of bottom-up means break down of activities that are
complex into pieces and work out the assignment's resources for
every piece. It is an estimating individual process resource of
activity cost or need and also adds them together to have a total
estimate. Estimating of bottom-up is so accurate estimating
29. means, give the estimates at the activity level schedule that are
accurate.
References
Blokdyk, G.
(2019).
2-plan Project Management Software A Complete Guide - 2019
Edition.
NJ:
5starcooks.
Hose, M., & Schenker, D.
(2020).
A Companion to Greek Literature.
Hoboken, NJ:
3
John Wiley & Sons.
Kail, R.
V., & Cavanaugh, J.
C.
(2018).
Human Development:
A Life-Span View.
Boston, MA:
Cengage Learning.
Source Matches (11)
1Student paper65%
Student paper
Main issues in the Article There are given here in the four
categories as a board of spring for the considering of once self-
work in the four categories.
Original source
They are offered here—in four categories—as a springboard for
30. readers in considering your own self- work in four categories
1Student paper81%
Student paper
Developing a development of relationships with professionals
and peers where the perspectives were checked, and talk about
strategies and challenges, and practices and values alignment.
Seek actively colleagues and clients feedback.
Original source
» Develop relationships with peers and professionals with whom
to check perspectives, talk through challenges and strategies,
and align values and practices » Actively seek feedback from
clients and colleagues 1Student paper72%
Student paper
Take risks responsible for stretching proficiency and comfort
zone.
Original source
» Take responsible risks that stretch your professional comfort
zone and proficiency 1Student paper77%
Student paper
Develop habits that are effective to maintain and establishing
boundaries that are appropriate with clients and colleagues.
Clarifying values are personal and what is vital in life. Practice
first putting things fast. Build intuitive and emotional self-
awareness;
Original source
» Develop effective habits for establishing and maintaining
appropriate boundar- ies with colleagues and clients » Clarify
31. personal values and what is important in life Practice “putting
first things first.” Build Emotional and Intuitive Self-Awareness
1Student paper75%
Student paper
integrate your family and personal history and make it a
strength source. Know about the fears you have, comfort zone
and blind spots.
Original source
» Integrate your personal and family history and turn it into a
source of strength » Get to know your fears, blind spots and
comfort zones 1Student paper67%
Student paper
Develop managing habit anxiety.
Original source
» Develop habits for managing anxiety 1Student paper76%
Student paper
Book regularly time to cater to your mind, soul, and body. Have
effective packaging self-care, knowing that a machine can’t
deliver a long-haul service without work maintenance. Using
meditation or other practices to maintain and develop inner
knowledge and awareness. Have a consideration of the
following OD characterizations.
Original source
» Book regular time off to cater to body, mind, and soul » Have
an effective self-care package, knowing that – like a machine-
we can- not keep delivering a long-haul service without
maintenance work » Use meditation or other practices to
32. develop and maintain inner awareness and knowledge Consider
the following characterizations of OD 1Student paper75%
Student paper
Revitalization that is achieved by an organization by individual
synthesizing, organizational and group goals to give service that
is effective to community and client while quality furthering of
work-life and product. The development of an organization's
primary emphasis is on processes and relationships among and
between groups and individuals. It is the primary influence
intervention on individuals and groups relationships to reflect
the organization as a system impact.
Original source
» Organization revitalization achieved through synthesizing
individual, group and organizational goals so as to pro- vide
effective service to the client and community while furthering
quality of Organization development’s pri- mary emphasis is on
relationships and processes between and among individuals and
groups Its primary intervention is influence on the rela- tionship
of individuals and groups to reflect the impact on the
organization as a system 2Student paper72%
Student paper
the judgment that is expert means bringing the experts that have
done the sort of work before and having their opinions on the
needed resources.
Original source
bringing in experts who have done this sort of work before and
getting their opinions on what resources are needed 2Student
paper76%
33. Student paper
Estimating of bottom-up means break down of activities that are
complex into pieces and work out the assignment's resources for
every piece. It is an estimating individual process resource of
activity cost or need and also adds them together to have a total
estimate. Estimating of bottom-up is so accurate estimating
means, give the estimates at the activity level schedule that are
accurate.
Original source
Bottom-up estimating means breaking down complex activities
into pieces and working out the resource assignments for each
piece It is a process of estimating individual activity resource
need or cost and then adding these up together to come up with
a total estimate Bottom-up estimating is a very accurate means
of estimating, provided the estimates at the schedule activity
level are accurate 3Student paper84%
Student paper
John Wiley & Sons.
Original source
John Wiley & Sons, Inc