SlideShare a Scribd company logo
1 of 49
Download to read offline
Corrective And Preventive
Action
CAPA: A Risk Mitigating Quality
System
Conducted by Gamal Amer, Ph.D.
PrincipalPrincipal
Premier Compliance Services, Inc.
Ā© All rights reserved. Do not copy without permission. 1
FDA Initiative August 2002
Pharmaceutical CGMP for the 21st Century:
A Risk-based Approach
A science and risk-based approach to product quality regulation
incorporating an integrated quality system approach
Ā© All rights reserved. Do not copy without permission. 2
Mitigating Risk
FDA Progress Reports discusses three
QA systems to mitigate risk:QA systems to mitigate risk:
1. Process Analytical Technology (PAT)
2. Corrective and Preventive Action (CAPA)
3. Quality by Design (QbD)
Ā© All rights reserved. Do not copy without permission. 3
Risk
What Is Risk?
What Causes It?
Risk to Whom?Risk to Whom?
Risk Manifestation?
Risk Level?
Ā© All rights reserved. Do not copy without permission. 4
Quality Events Which May CauseQu y ve s W c y C use
Increased Risk
ā€¢ A problem occurs during clinical trials (patient
complains/suffers)complains/suffers)
ā€¢ A deviation occurs during the manufacturing
A i f i t f il hil thā€¢ A piece of equipment fails while the process
is engaged.
ā€¢ Analytical result is not what was expected
Ā© All rights reserved. Do not copy without permission. 5
E t P t ti ll I iEvents Potentially Increasing
Risk
No negative quality event occurred, but:g q y
ā€¢ Patient complaints show a negative trend.
i d if i / di d iā€¢ Operation drifting/trending towards action
limit.
ā€¢ Analytical data trending towards
unacceptable.
Ā© All rights reserved. Do not copy without permission. 6
These Events Pose:
ā€¢ Risk to the patient/public
ā€¢ Risk to the productRisk to the product
ā€¢ Risk to the personnel
Ri k h iā€¢ Risk to the environement
ā€¢ Risk to the company
Ā© All rights reserved. Do not copy without permission. 7
What Is Risk?
The combination of the probability ofThe combination of the probability of
occurrence of harm and the severity of that
harm.*
*Guidance for Industry; ICH Q9 Quality Risk Management; June 2006
Ā© All rights reserved. Do not copy without permission. 8
What Is The Risk?What Is The Risk?
ā€¢ In Drug Application:
ā€“ The pros and cons of the treatment
ā€¢ In Process Design:
ā€“ Failure to recognize source of variability and how CPP
affect CQA of product
ā€¢ In Process Qualification:In Process Qualification:
ā€“ Failure to qualify a critical (high risk) portion of the
process.
ā€¢ In Manufacturing:
ā€“ Quality events occurring as the process is engaged
Ā© All rights reserved. Do not copy without permission. 9
Some Sources of Increased Risk
in Manufacturing?
ā€¢ Processing Deviations and Non Conformance
A ti P iā€¢ Aseptic Processing
ā€¢ Labeling Errors (Majority of drug recalls due to
mislabeling)mislabeling)
ā€¢ Analytical and Measuring Errors
D li ith t t dā€¢ Dealing with potent compounds
ā€¢ People Errors
Ā© All rights reserved. Do not copy without permission. 10
Defining Level of RiskDefining Level of Risk
F i fFunction of:
ā€“ Severity
Fā€“ Frequency
ā€“ Detectability
ā€¢ These three factors determine the numerical
Risk Priority Number (RPN)Risk Priority Number (RPN)
ā€¢ Qualitative risk (low, medium, and high)
Ā© All rights reserved. Do not copy without permission. 11
CAPA = Corrective Action /CAPA Corrective Action /
Preventive Action
Ā© All rights reserved. Do not copy without permission. 12
Risk Within the Context ofRisk Within the Context of
CAPA Systemy
ā€¢ A non-conformance or deviation occurs or a potential
problem is identified.p
ā€¢ These pose risk.
ā€¢ CAPA should define the risk, its level, and means to
mitigate itmitigate it.
ā€¢ CAPA should then implement the actions to mitigate
the risk and track to ensure closure.
M i i i ff i d didā€¢ Monitor to ensure action is effective and did not
introduced new risk(s).
Ā© All rights reserved. Do not copy without permission. 13
Non-conformance and Deviation
Non-Conformance:
Failure to meet a specified requirement.p q
Deviation:
Failure to follow or implement an establishedFailure to follow or implement an established
requirement. Typically this term is used
relevant to processes (as in a ā€œprocessrelevant to processes (as in a process
deviationā€).
Ā© All rights reserved. Do not copy without permission. 14
Risk Level Factors: Severity
ā€¢ What are the consequences of the non-conformanceq
or deviation?
ā€¢ How deleterious is that non-conformance or
deviation to the consistent quality of the product?
ā€¢ How high is the risk to the patientā€™s well being?
Ā© All rights reserved. Do not copy without permission. 15
Risk Level Factors: Frequency
ā€¢ What are the probability of the reoccurrence
of the non-conformance or deviation?
ā€¢ Were attempts made to reduce such
frequency and how effective?frequency and how effective?
ā€¢ Review process history to determine.
Ā© All rights reserved. Do not copy without permission. 16
Risk Level Factors: Detectability
ā€¢ What is the probability of the non-conformance or
d i i b i d d?deviation being detected?
ā€¢ Can the effect/result of the non-conformance or
d i ti b dil d/ ?deviation be readily measured/seen?
Ā© All rights reserved. Do not copy without permission. 17
Change Control is an ImportantChange Control is an Important
Component of CAPA
Ā© All rights reserved. Do not copy without permission. 18
Change Control: A Regulatory
I iImperative
ā€¢ Is a regulatory requirementIs a regulatory requirement
ā€¢ 211.68(b) Appropriate controls shall be exercised
over computer or related systems to assure thatp y
changes....
ā€¢ 211.100 (a) ....written procedures, including any( ) p , g y
changes, shall be drafted, reviewed, and approved
by the appropriate organizational units and
reviewed and approved by the quality control unit.
Ā© All rights reserved. Do not copy without permission. 19
211 160( ) h i h ifi tiā€¢ 211.160(a) change in such specifications,
standards, sampling plans, test procedures, or
other laboratory control mechanisms shall beother laboratory control mechanisms, shall be
drafted by the appropriate organizational unit and
reviewed and approved by the quality control unit.
ā€¢ Guidance to Industry on Process Validation: The
qualification plan for the facility and utilities
should identify 1) studies.... 2)Criteria to assess
outcome...It should also include the firm's
i t f th l ti f hrequirements for the evaluation of changes.
Ā© All rights reserved. Do not copy without permission. 20
ā€¢ ICH Q7-API GMP (13) A formal change control
system should be established to evaluate all
changes that could affect the production and
control of the intermediate or API.
A l f GMP l h h ldā€¢ Any proposals for GMP relevant changes should
be drafted, reviewed, and approved by the
appropriate organizational units and reviewed andappropriate organizational units and reviewed and
approved by the quality unit(s).
Ā© All rights reserved. Do not copy without permission. 21
What is a Change ControlWhat is a Change Control
System?
It is a formal system which is designed not to
prevent change but rather document and control itprevent change, but rather document and control it.
Its main purpose is to ensure that a
system/process/operation is always in a GMPy p p y
compliant and validated state, regardless of changes
made to it. It is usually implemented using a
procedure.
Ā© All rights reserved. Do not copy without permission. 2222
What is a Change ControlWhat is a Change Control
System?
ICH Q9 ā€“ Quality Risk Management
T h b d k l d dā€¢ To manage changes based on knowledge and
information accumulated in pharmaceutical
development and during manufacturingdevelopment and during manufacturing.
ā€¢ To evaluate the impact of the changes on the
availability of the final product.availability of the final product.
Ā© All rights reserved. Do not copy without permission. 2323
What is a Change ControlWhat is a Change Control
System?
ā€¢ To evaluate the impact on product quality of
changes to facility equipment materialchanges to facility, equipment, material,
manufacturing process or conducting technical
transfers.
ā€¢ To determine appropriate actions preceding the
implementation of a change, e.g., additional testing,
(re)qualification, (re)validation, communication
with regulators.
Ā© All rights reserved. Do not copy without permission. 2424
The Compliance/Validationp
Life Cycle-
Compliant &
Validated System
Implement ChangeChange Control
SystemSystem
Modified System
Ā© All rights reserved. Do not copy without permission. 2525
Importance of Change ControlImportance of Change Control
ā€¢ Not to prevent changeā€¢ Not to prevent change.
ā€¢ To control and document change.
ā€¢ Required by the regulations.
ā€¢ Identify GMP and validation implications.y p
ā€¢ Ascertain process remains in a state of
controlcontrol.
ā€¢ Must be implemented using a procedure.
Ā© All rights reserved. Do not copy without permission. 2626
Change Control procedure
Change requiredChange required
GenerateGenerate
Change Request
End
GMP
Implications?
No
Yes
Implement Change
Maintenance
NoRequalification?
Revalidation?
Yes
Implement Change
& Insure GMP
Requirements Done
Issue GMP
Report
Obtain Approval
Yes
Change is
Permanent
Requalify
Revalidate &
Issue Reports
Obtain
Approvals
Change is
Permanent
Ā© All rights reserved. Do not copy without permission. 2727
End
CAPA: Mitigating Risk
The degree of corrective and preventive
action taken to eliminate or minimize actual
or potential nonconformities must be
appropriate to the magnitude of the problempp p g p
and commensurate with the risks
encountered. (ICH Q9)( Q )
Ā© All rights reserved. Do not copy without permission. 28
Risk Level and Appropriate Corrective Action
Risk Level
(RPN) Low Medium HighCorrective Action
No Further Investigation ,
No Corrective action
required
No Further Investigation
(Cause Evident),
Corrective action required
Further Investigation (Root
Cause Analysis), Correctivey ),
action required (Immediate;
e.g.. Recall), Prevent Cause
Ā© All rights reserved. Do not copy without permission. 29
What Is CAPA?
Ā© All rights reserved. Do not copy without permission. 30
CAPA Is:
ā€¢ A quality based systemā€¢ A quality based system
ā€¢ Uses Non-conformance, Deviations and/or an
Expectation of such as inputExpectation of such as input
ā€¢ Uses many of the quality systems in place as tools:
ā€“ Historical Quality Issues and Audit Reports
ā€“ Environmental and Process Monitoring Data
ā€“ Product Complaints
ā€“ Equipment Service & Maintenance Records
ā€“ Process and scientific Knowledge
ā€“ Operating Procedures and Methodology
Ā© All rights reserved. Do not copy without permission. 31
CAPA Uses:
ā€¢ Policies and proced res to in estigateā€¢ Policies and procedures to investigate
quality problems.
ā€¢ Policies and procedures to identify andā€¢ Policies and procedures to identify and
implement corrective and preventive
actionsactions.
ā€¢ A tracking mechanism to ensure
investigation and proper corrective actionsinvestigation and proper corrective actions
are conducted and implemented on a timely
basis.
Ā© All rights reserved. Do not copy without permission. 32
CAPA InvestigationCAPA Investigation
ā€¢ Investigate the cause of non-conformity or
deviation as it relates to the product, processes,
and the quality system. (reactive)
I ti t t ti l i k f t dā€¢ Investigate potential risk of an expected or
anticipated event. (proactive)
ā€¢ Depending on risk severity the investigation mayDepending on risk severity, the investigation may
need to define the ā€œRoot Cause.ā€
ā€¢ Use tools such as HAZOP, HACCP, Failure Mode, ,
& Effect Analysis, Fault Tree Analysis, What If,
etc.
Ā© All rights reserved. Do not copy without permission. 33
CAPA Identification
ā€¢ Identify the action needed to correct, reduce, or
prevent recurrence of nonconformance of productp p
and other quality problems.
ā€¢ Identify the action needed to correct and preventIdentify the action needed to correct and prevent
recurrence of the deviation in the process.
ā€¢ Identify the action needed to prevent the potentialā€¢ Identify the action needed to prevent the potential
occurrence of an anticipated quality event.
Ā© All rights reserved. Do not copy without permission. 34
Possible Corrective Actions
ā€¢ Design Changes*
ā€¢ Manufacturing Process Changes*
ā€¢ Removal of product from the market through
recall
ā€¢ Operator Trainingā€¢ Operator Training
ā€¢ Labeling changes*
ā€¢ Patient educationā€¢ Patient education
________________________________________________________________________________
* Keep in mind that making changes must be managed using change control in order to
avoid introducing additional risk.
Ā© All rights reserved. Do not copy without permission. 35
Tracking CAPA Activities
ā€¢ What to track?
ā€“ The quality event and timing for initiating an investigation
ā€“ Timing for completing assessment
ā€“ Timing for developing action plan
ā€“ Timing for implementing all necessary actions (changes,
training, document modification, etc.)
ā€“ Timing for completing the necessary documentationTiming for completing the necessary documentation
ā€“ Completion of the actions and closure of the deviation or
nonconformance
Ā© All rights reserved. Do not copy without permission. 36
Tracking CAPA Activities
ā€¢ How to track?
ā€“ Manual TrackingManual Tracking
ā€¢ Too much paper
ā€¢ Very cumbersome and time consuming
ā€¢ Limited Access
ā€“ Software Packages (Part 11 compliant)
ā€¢ Trackwise (MS Outlook)
ā€¢ Livelink (Lotus)
Ā© All rights reserved. Do not copy without permission. 37
Post CAPA Monitoring
ā€¢ Ensures actions were effective in mitigating
the risk.
ā€¢ Ensure actions were effective in
correcting/preventive the problem.
ā€¢ Ensures no additional risks were introduced
due to the actions taken.
ā€¢ Required as part of GMP compliance and
process validation (FDA Guidance 1/2011).
Ā© All rights reserved. Do not copy without permission. 38
Typical CAPA Overall Approach
Quality Event
Ri k
Quality Event
Identify Risk Risk
Acceptance Document
History
Monitoring
Analyze Risk Risk Reduction
Track&
Monitor
Complaints
Science &
Evaluate Risk
A i RPN
Risk
Elimination/
Communicate
Review
Knowledge
Procedures, Service
& Maintenance
Assign RPN
Risk
Assessment/
Investigate
prevention
Review
Identify &
l A i
Document, Track,
Monitor &
Ā© All rights reserved. Do not copy without permission. 39
Implement Actions
Monitor &
Communicate
System Components
D i ti ti d i ti ti dā€¢ Deviation reporting and investigation procedure.
ā€¢ Rework Procedures.
M i d hi i l D li diā€¢ Maintenance records, historical Data, quality audit
results, etc.
P d i t l it iā€¢ Process and environmental monitoring programs.
ā€¢ Change Control Procedure.
Ri k A l i P d h HAZOPā€¢ Risk Analysis Procedures such as HAZOP,
HACCP, Fault Tree Analysis, etc.
Ā© All rights reserved. Do not copy without permission. 40
CAPA
Steps to Be Taken
Ā© All rights reserved. Do not copy without permission. 41
Label and Segregate Non-Label and Segregate Non-
conforming Product
ā€¢ Ensure nonconforming product is properly
labeled (for example HOLD REJECTlabeled (for example, HOLD, REJECT,
QUARANTINE).
E t f i d tā€¢ Ensure suspect or non-conforming product
is properly labeled and segregated (not
d) t t f th diused) to prevent further use pending
disposition.
Ā© All rights reserved. Do not copy without permission. 42
Document The Issue
ā€¢ Record nonconformance on a
Nonconforming Materials Report.g p
ā€¢ Record Deviation on a Deviation Reporting
FormForm.
ā€¢ Document all studies and decisions made
during the investigation of the quality eventduring the investigation of the quality event.
Ā© All rights reserved. Do not copy without permission. 43
Segregate Material & Equipment
A h i l ( d ) iā€¢ Assure that suspect materials (non-product) is
segregated and labeled.
ā€¢ Assure all suspect lots batches units materialsā€¢ Assure all suspect lots, batches, units, materials,
etc are identified and segregated.
ā€¢ Assure that the segregation (who, what, where,g g ( , , ,
when, how) is documented on the
nonconformance report.
T d l k ll i d f hā€¢ Tag and lock all equipment and parts of the
process which maybe suspect.
Ā© All rights reserved. Do not copy without permission. 44
Evaluate
ā€¢ Review the event, the circumstances surrounding the event.
ā€¢ Document relevant details as part of the nonconformance
or deviation reportor deviation report.
ā€¢ Risk to quality should be linked to protecting the patient.
ā€¢ Use RPN to help determine need for in-depth investigation
and Corrective/Preventive Action (in other words: the
effort, formality and documentation should be
commensurate with the level of risk and be based on
science*).
__________________________________________________________________________
*Guidance for Industry; ICH Q9 Quality Risk Management; June 2006
Ā© All rights reserved. Do not copy without permission. 45
Risk Level and Appropriate Corrective Action
Risk Level
(RPN) Low Medium HighCorrective Action
Further Investigation (Root
Cause Analysis), Corrective
action required (Immediate;
e Re ll) P e e t C ee.g.. Recall), Prevent Cause
No Further Investigation
(Cause Evident),
Corrective action required
No Further Investigation , NoNo Further Investigation , No
Corrective action required
Ā© All rights reserved. Do not copy without permission. 46
Take Action
M k h d i kā€¢ Make necessary changes to reduce risk or
eliminate it.
ā€¢ Invoke Change Controlā€¢ Invoke Change Control.
ā€¢ Track to ensure CAPA closure in a timely fashion.
ā€¢ Evaluate the actions to ensure they were effectiveEvaluate the actions to ensure they were effective
in mitigating the risk as intended.
ā€¢ Monitor the process to ensure it has not beenp
negatively affected by changes and that no
additional or different risks were introduced.
Ā© All rights reserved. Do not copy without permission. 47
Benefits of a Robust CAPA
System
ā€¢ Fulfills the promise of continuous improvement
ā€¢ Leads to better customer satisfaction and less risk
h blito the public.
ā€¢ Better use of resources through a structured QA
systemsystem.
ā€¢ Facilitate better and more informed decisions by
manufacturers.
ā€¢ Makes good business and financial sense.
ā€¢ Increasing your compliance quotient.
Ā© All rights reserved. Do not copy without permission. 48
g y p q
Summaryy
ā€¢ CAPA is a regulatory requirement which makes business sense.
ā€¢ CAPA is a risk mitigating approach, which fulfills the promise of
continuous improvementcontinuous improvement.
ā€¢ Non-conformances, deviations or anticipated quality events are
input to the CAPA program.
ā€¢ All aspects of the CAPA program should be thoroughlyā€¢ All aspects of the CAPA program should be thoroughly
documented.
ā€¢ Risk level assessment, as part of CAPA:
provides the means for rationalizing the scope andp g p
extent of investigation and/or corrective action
necessary.
helps management assign resources to tasks providing
the most al e and ha ing the biggest impact onthe most value and having the biggest impact on
quality and customer satisfaction.
ā€¢ Tracking, reviewing, and monitoring CAPA related activities is an
important aspect of the program.
Ā© All rights reserved. Do not copy without permission. 49
important aspect of the program.

More Related Content

What's hot

FAILURE MODE AND EFFECT ANALYSIS (FMEA) FOR IMPLEMENTATION OF CLINICAL PRACTI...
FAILURE MODE AND EFFECT ANALYSIS (FMEA) FOR IMPLEMENTATION OF CLINICAL PRACTI...FAILURE MODE AND EFFECT ANALYSIS (FMEA) FOR IMPLEMENTATION OF CLINICAL PRACTI...
FAILURE MODE AND EFFECT ANALYSIS (FMEA) FOR IMPLEMENTATION OF CLINICAL PRACTI...Yasser Sami Abdel Dayem Amer
Ā 
Computerized System Validation Business Intelligence Solutions
Computerized System Validation Business Intelligence SolutionsComputerized System Validation Business Intelligence Solutions
Computerized System Validation Business Intelligence SolutionsDigital-360
Ā 
Computer system validation
Computer system validationComputer system validation
Computer system validationGaurav Kr
Ā 
Corretive & Preventive Action (CAPA) 101
Corretive & Preventive Action (CAPA) 101Corretive & Preventive Action (CAPA) 101
Corretive & Preventive Action (CAPA) 101jscover
Ā 
Anomalies, complaints and non-compliances
Anomalies, complaints and non-compliancesAnomalies, complaints and non-compliances
Anomalies, complaints and non-compliancesTim Sandle, Ph.D.
Ā 
CAPA for FDA regulated industries
CAPA for FDA regulated industriesCAPA for FDA regulated industries
CAPA for FDA regulated industriessundaybizsys
Ā 
Computerized System Validation-basics
Computerized System Validation-basicsComputerized System Validation-basics
Computerized System Validation-basicsJayaKrishna161
Ā 
Corrective & Preventive Action
Corrective & Preventive Action Corrective & Preventive Action
Corrective & Preventive Action Praneet Surti
Ā 
Preventive Maintenance Best Practices workshop Brochure
Preventive Maintenance Best Practices workshop BrochurePreventive Maintenance Best Practices workshop Brochure
Preventive Maintenance Best Practices workshop BrochureRicky Smith CMRP, CMRT
Ā 
Gamp 5 overview by jaya prakash ra
Gamp 5 overview by jaya prakash raGamp 5 overview by jaya prakash ra
Gamp 5 overview by jaya prakash raJAYA PRAKASH VELUCHURI
Ā 
Managing Validation.3
Managing Validation.3Managing Validation.3
Managing Validation.3nenalandim
Ā 
Codex validation Group presentation
Codex validation Group presentationCodex validation Group presentation
Codex validation Group presentationWalter Acevedo
Ā 
Quality risk management sop
Quality risk management sopQuality risk management sop
Quality risk management sopselinasimpson1301
Ā 
NON CONFORMANCE REPORTING (1)
NON CONFORMANCE REPORTING (1)NON CONFORMANCE REPORTING (1)
NON CONFORMANCE REPORTING (1)Ahsan Ghori
Ā 

What's hot (20)

FAILURE MODE AND EFFECT ANALYSIS (FMEA) FOR IMPLEMENTATION OF CLINICAL PRACTI...
FAILURE MODE AND EFFECT ANALYSIS (FMEA) FOR IMPLEMENTATION OF CLINICAL PRACTI...FAILURE MODE AND EFFECT ANALYSIS (FMEA) FOR IMPLEMENTATION OF CLINICAL PRACTI...
FAILURE MODE AND EFFECT ANALYSIS (FMEA) FOR IMPLEMENTATION OF CLINICAL PRACTI...
Ā 
Computerized System Validation Business Intelligence Solutions
Computerized System Validation Business Intelligence SolutionsComputerized System Validation Business Intelligence Solutions
Computerized System Validation Business Intelligence Solutions
Ā 
Computer system validation
Computer system validationComputer system validation
Computer system validation
Ā 
Application of Quality Risk Management in Commissioning & Qualifcation
Application of Quality Risk Management in Commissioning & QualifcationApplication of Quality Risk Management in Commissioning & Qualifcation
Application of Quality Risk Management in Commissioning & Qualifcation
Ā 
Corretive & Preventive Action (CAPA) 101
Corretive & Preventive Action (CAPA) 101Corretive & Preventive Action (CAPA) 101
Corretive & Preventive Action (CAPA) 101
Ā 
Application of Q R M in Manufacturing Operations
Application of Q R M in Manufacturing Operations Application of Q R M in Manufacturing Operations
Application of Q R M in Manufacturing Operations
Ā 
Medical device reliability program
Medical device reliability program Medical device reliability program
Medical device reliability program
Ā 
Anomalies, complaints and non-compliances
Anomalies, complaints and non-compliancesAnomalies, complaints and non-compliances
Anomalies, complaints and non-compliances
Ā 
CAPA for FDA regulated industries
CAPA for FDA regulated industriesCAPA for FDA regulated industries
CAPA for FDA regulated industries
Ā 
Quality Facilities HVAC and Water Systems
Quality Facilities HVAC and Water SystemsQuality Facilities HVAC and Water Systems
Quality Facilities HVAC and Water Systems
Ā 
Computerized System Validation-basics
Computerized System Validation-basicsComputerized System Validation-basics
Computerized System Validation-basics
Ā 
Corrective & Preventive Action
Corrective & Preventive Action Corrective & Preventive Action
Corrective & Preventive Action
Ā 
Design fmea
Design fmeaDesign fmea
Design fmea
Ā 
Preventive Maintenance Best Practices workshop Brochure
Preventive Maintenance Best Practices workshop BrochurePreventive Maintenance Best Practices workshop Brochure
Preventive Maintenance Best Practices workshop Brochure
Ā 
Gamp 5 overview by jaya prakash ra
Gamp 5 overview by jaya prakash raGamp 5 overview by jaya prakash ra
Gamp 5 overview by jaya prakash ra
Ā 
Managing Validation.3
Managing Validation.3Managing Validation.3
Managing Validation.3
Ā 
Codex validation Group presentation
Codex validation Group presentationCodex validation Group presentation
Codex validation Group presentation
Ā 
Quality risk management sop
Quality risk management sopQuality risk management sop
Quality risk management sop
Ā 
Discussion through Scenarios and Events
Discussion through Scenarios and EventsDiscussion through Scenarios and Events
Discussion through Scenarios and Events
Ā 
NON CONFORMANCE REPORTING (1)
NON CONFORMANCE REPORTING (1)NON CONFORMANCE REPORTING (1)
NON CONFORMANCE REPORTING (1)
Ā 

Similar to CAPA Risk Mitigation System

App. Of Stat. Tools
App. Of Stat. ToolsApp. Of Stat. Tools
App. Of Stat. ToolsDenny Thayil
Ā 
validationandcalibrationmasterplan-190223191733.pptx
validationandcalibrationmasterplan-190223191733.pptxvalidationandcalibrationmasterplan-190223191733.pptx
validationandcalibrationmasterplan-190223191733.pptxTanmayPanigrahy
Ā 
Validation and calibration master plan
Validation and calibration master planValidation and calibration master plan
Validation and calibration master planBharatlal Sain
Ā 
Risk minor major critical
Risk minor major criticalRisk minor major critical
Risk minor major criticalyasser mekky
Ā 
Quality_in_the_Coag_Lab_082819.pdf
Quality_in_the_Coag_Lab_082819.pdfQuality_in_the_Coag_Lab_082819.pdf
Quality_in_the_Coag_Lab_082819.pdfSubhaShree852628
Ā 
GMP Training: Handling of deviation
GMP Training: Handling of deviationGMP Training: Handling of deviation
GMP Training: Handling of deviationDr. Amsavel A
Ā 
BMT GxP Training 10-22-2021 1.pptx
BMT GxP Training 10-22-2021 1.pptxBMT GxP Training 10-22-2021 1.pptx
BMT GxP Training 10-22-2021 1.pptxhaploidentical
Ā 
Six system inspection model pharmaceutical D-Astar.pptx
Six system inspection model pharmaceutical D-Astar.pptxSix system inspection model pharmaceutical D-Astar.pptx
Six system inspection model pharmaceutical D-Astar.pptxDevaPundkar
Ā 
Control charts in statistical quality control
Control charts in statistical quality controlControl charts in statistical quality control
Control charts in statistical quality controlrakheechhibber1971
Ā 
Building a QMS for Your SaMD
Building a QMS for Your SaMDBuilding a QMS for Your SaMD
Building a QMS for Your SaMDEMMAIntl
Ā 
Focus on FDA cGMPs inspections
Focus on FDA cGMPs inspections Focus on FDA cGMPs inspections
Focus on FDA cGMPs inspections JinalPrajapati13
Ā 
Apply Risk Management to Computerized and Automated Systems
Apply Risk Management to Computerized and Automated SystemsApply Risk Management to Computerized and Automated Systems
Apply Risk Management to Computerized and Automated SystemsInstitute of Validation Technology
Ā 
Pharmaceutical-Quality-Systems-ICH-Q10-Concepts-Implementation.ppt
Pharmaceutical-Quality-Systems-ICH-Q10-Concepts-Implementation.pptPharmaceutical-Quality-Systems-ICH-Q10-Concepts-Implementation.ppt
Pharmaceutical-Quality-Systems-ICH-Q10-Concepts-Implementation.pptkamaleshprajapat
Ā 
160702-JC-Auditing
160702-JC-Auditing160702-JC-Auditing
160702-JC-AuditingJohn Cuspilich
Ā 
concept of validation
concept of validationconcept of validation
concept of validationprashik shimpi
Ā 

Similar to CAPA Risk Mitigation System (20)

Quality facilities hvac and water systems
Quality facilities hvac and water systemsQuality facilities hvac and water systems
Quality facilities hvac and water systems
Ā 
TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)
Ā 
Implementing risk management
Implementing risk managementImplementing risk management
Implementing risk management
Ā 
Implementing Risk Management
Implementing Risk ManagementImplementing Risk Management
Implementing Risk Management
Ā 
App. Of Stat. Tools
App. Of Stat. ToolsApp. Of Stat. Tools
App. Of Stat. Tools
Ā 
validationandcalibrationmasterplan-190223191733.pptx
validationandcalibrationmasterplan-190223191733.pptxvalidationandcalibrationmasterplan-190223191733.pptx
validationandcalibrationmasterplan-190223191733.pptx
Ā 
Validation and calibration master plan
Validation and calibration master planValidation and calibration master plan
Validation and calibration master plan
Ā 
Risk minor major critical
Risk minor major criticalRisk minor major critical
Risk minor major critical
Ā 
Quality_in_the_Coag_Lab_082819.pdf
Quality_in_the_Coag_Lab_082819.pdfQuality_in_the_Coag_Lab_082819.pdf
Quality_in_the_Coag_Lab_082819.pdf
Ā 
ASTM Standard E 2500 for Commissioning and Qualifications
ASTM Standard E 2500 for Commissioning and QualificationsASTM Standard E 2500 for Commissioning and Qualifications
ASTM Standard E 2500 for Commissioning and Qualifications
Ā 
GMP Training: Handling of deviation
GMP Training: Handling of deviationGMP Training: Handling of deviation
GMP Training: Handling of deviation
Ā 
BMT GxP Training 10-22-2021 1.pptx
BMT GxP Training 10-22-2021 1.pptxBMT GxP Training 10-22-2021 1.pptx
BMT GxP Training 10-22-2021 1.pptx
Ā 
Six system inspection model pharmaceutical D-Astar.pptx
Six system inspection model pharmaceutical D-Astar.pptxSix system inspection model pharmaceutical D-Astar.pptx
Six system inspection model pharmaceutical D-Astar.pptx
Ā 
Control charts in statistical quality control
Control charts in statistical quality controlControl charts in statistical quality control
Control charts in statistical quality control
Ā 
Building a QMS for Your SaMD
Building a QMS for Your SaMDBuilding a QMS for Your SaMD
Building a QMS for Your SaMD
Ā 
Focus on FDA cGMPs inspections
Focus on FDA cGMPs inspections Focus on FDA cGMPs inspections
Focus on FDA cGMPs inspections
Ā 
Apply Risk Management to Computerized and Automated Systems
Apply Risk Management to Computerized and Automated SystemsApply Risk Management to Computerized and Automated Systems
Apply Risk Management to Computerized and Automated Systems
Ā 
Pharmaceutical-Quality-Systems-ICH-Q10-Concepts-Implementation.ppt
Pharmaceutical-Quality-Systems-ICH-Q10-Concepts-Implementation.pptPharmaceutical-Quality-Systems-ICH-Q10-Concepts-Implementation.ppt
Pharmaceutical-Quality-Systems-ICH-Q10-Concepts-Implementation.ppt
Ā 
160702-JC-Auditing
160702-JC-Auditing160702-JC-Auditing
160702-JC-Auditing
Ā 
concept of validation
concept of validationconcept of validation
concept of validation
Ā 

More from Fasika Alemu

Guide for insvestment in developing countires
Guide for insvestment in developing countiresGuide for insvestment in developing countires
Guide for insvestment in developing countiresFasika Alemu
Ā 
Chemical parks (1)
Chemical parks (1)Chemical parks (1)
Chemical parks (1)Fasika Alemu
Ā 
Progress international guidelines for industrial parks
Progress international guidelines for industrial parksProgress international guidelines for industrial parks
Progress international guidelines for industrial parksFasika Alemu
Ā 
Pharmaceutical industry design (1)
Pharmaceutical industry design (1)Pharmaceutical industry design (1)
Pharmaceutical industry design (1)Fasika Alemu
Ā 
7.5.9.5.8 methods-of-sterilization
7.5.9.5.8 methods-of-sterilization7.5.9.5.8 methods-of-sterilization
7.5.9.5.8 methods-of-sterilizationFasika Alemu
Ā 
International law in hcwm
International law in hcwmInternational law in hcwm
International law in hcwmFasika Alemu
Ā 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validationFasika Alemu
Ā 
Gmp inspection for medicinal product
Gmp inspection for medicinal productGmp inspection for medicinal product
Gmp inspection for medicinal productFasika Alemu
Ā 
Hygeine and sanitation
Hygeine and sanitationHygeine and sanitation
Hygeine and sanitationFasika Alemu
Ā 
2 4 process-validation
2 4 process-validation2 4 process-validation
2 4 process-validationFasika Alemu
Ā 
Presentation cleaning-validation
Presentation cleaning-validationPresentation cleaning-validation
Presentation cleaning-validationFasika Alemu
Ā 
Introductiontogoodstoragepracticesfull 100702102420-phpapp02
Introductiontogoodstoragepracticesfull 100702102420-phpapp02Introductiontogoodstoragepracticesfull 100702102420-phpapp02
Introductiontogoodstoragepracticesfull 100702102420-phpapp02Fasika Alemu
Ā 
Assessment report of ethiopian somali region
Assessment report of ethiopian somali regionAssessment report of ethiopian somali region
Assessment report of ethiopian somali regionFasika Alemu
Ā 
analysis of a cross over design
analysis of a cross over designanalysis of a cross over design
analysis of a cross over designFasika Alemu
Ā 
Strategy for enhanced marketing authorization final docx
Strategy for enhanced marketing authorization final docxStrategy for enhanced marketing authorization final docx
Strategy for enhanced marketing authorization final docxFasika Alemu
Ā 

More from Fasika Alemu (18)

Guide for insvestment in developing countires
Guide for insvestment in developing countiresGuide for insvestment in developing countires
Guide for insvestment in developing countires
Ā 
Chemical parks (1)
Chemical parks (1)Chemical parks (1)
Chemical parks (1)
Ā 
Progress international guidelines for industrial parks
Progress international guidelines for industrial parksProgress international guidelines for industrial parks
Progress international guidelines for industrial parks
Ā 
Pharmaceutical industry design (1)
Pharmaceutical industry design (1)Pharmaceutical industry design (1)
Pharmaceutical industry design (1)
Ā 
7.5.9.5.8 methods-of-sterilization
7.5.9.5.8 methods-of-sterilization7.5.9.5.8 methods-of-sterilization
7.5.9.5.8 methods-of-sterilization
Ā 
Capa system
Capa systemCapa system
Capa system
Ā 
Hvac
HvacHvac
Hvac
Ā 
International law in hcwm
International law in hcwmInternational law in hcwm
International law in hcwm
Ā 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validation
Ā 
Gmp inspection for medicinal product
Gmp inspection for medicinal productGmp inspection for medicinal product
Gmp inspection for medicinal product
Ā 
Hygeine and sanitation
Hygeine and sanitationHygeine and sanitation
Hygeine and sanitation
Ā 
2 4 process-validation
2 4 process-validation2 4 process-validation
2 4 process-validation
Ā 
Presentation cleaning-validation
Presentation cleaning-validationPresentation cleaning-validation
Presentation cleaning-validation
Ā 
Introductiontogoodstoragepracticesfull 100702102420-phpapp02
Introductiontogoodstoragepracticesfull 100702102420-phpapp02Introductiontogoodstoragepracticesfull 100702102420-phpapp02
Introductiontogoodstoragepracticesfull 100702102420-phpapp02
Ā 
Assessment report of ethiopian somali region
Assessment report of ethiopian somali regionAssessment report of ethiopian somali region
Assessment report of ethiopian somali region
Ā 
analysis of a cross over design
analysis of a cross over designanalysis of a cross over design
analysis of a cross over design
Ā 
Study types
Study typesStudy types
Study types
Ā 
Strategy for enhanced marketing authorization final docx
Strategy for enhanced marketing authorization final docxStrategy for enhanced marketing authorization final docx
Strategy for enhanced marketing authorization final docx
Ā 

Recently uploaded

Dehradun Call Girls Service ā¤ļøšŸ‘ 9675010100 šŸ‘„šŸ«¦Independent Escort Service Dehradun
Dehradun Call Girls Service ā¤ļøšŸ‘ 9675010100 šŸ‘„šŸ«¦Independent Escort Service DehradunDehradun Call Girls Service ā¤ļøšŸ‘ 9675010100 šŸ‘„šŸ«¦Independent Escort Service Dehradun
Dehradun Call Girls Service ā¤ļøšŸ‘ 9675010100 šŸ‘„šŸ«¦Independent Escort Service DehradunNiamh verma
Ā 
Vip sexy Call Girls Service In Sector 137,9999965857 Young Female Escorts Ser...
Vip sexy Call Girls Service In Sector 137,9999965857 Young Female Escorts Ser...Vip sexy Call Girls Service In Sector 137,9999965857 Young Female Escorts Ser...
Vip sexy Call Girls Service In Sector 137,9999965857 Young Female Escorts Ser...Call Girls Noida
Ā 
Call Girls Kukatpally 7001305949 all area service COD available Any Time
Call Girls Kukatpally 7001305949 all area service COD available Any TimeCall Girls Kukatpally 7001305949 all area service COD available Any Time
Call Girls Kukatpally 7001305949 all area service COD available Any Timedelhimodelshub1
Ā 
Russian Call Girls Hyderabad Saloni 9907093804 Independent Escort Service Hyd...
Russian Call Girls Hyderabad Saloni 9907093804 Independent Escort Service Hyd...Russian Call Girls Hyderabad Saloni 9907093804 Independent Escort Service Hyd...
Russian Call Girls Hyderabad Saloni 9907093804 Independent Escort Service Hyd...delhimodelshub1
Ā 
Russian Call Girls in Raipur 9873940964 Book Hot And Sexy Girls
Russian Call Girls in Raipur 9873940964 Book Hot And Sexy GirlsRussian Call Girls in Raipur 9873940964 Book Hot And Sexy Girls
Russian Call Girls in Raipur 9873940964 Book Hot And Sexy Girlsddev2574
Ā 
Call Girls in Hyderabad Lavanya 9907093804 Independent Escort Service Hyderabad
Call Girls in Hyderabad Lavanya 9907093804 Independent Escort Service HyderabadCall Girls in Hyderabad Lavanya 9907093804 Independent Escort Service Hyderabad
Call Girls in Hyderabad Lavanya 9907093804 Independent Escort Service Hyderabaddelhimodelshub1
Ā 
Basics of Anatomy- Language of Anatomy.pptx
Basics of Anatomy- Language of Anatomy.pptxBasics of Anatomy- Language of Anatomy.pptx
Basics of Anatomy- Language of Anatomy.pptxAyush Gupta
Ā 
Call Girl Raipur 9873940964 Book Hot And Sexy Girls
Call Girl Raipur 9873940964 Book Hot And Sexy GirlsCall Girl Raipur 9873940964 Book Hot And Sexy Girls
Call Girl Raipur 9873940964 Book Hot And Sexy Girlsddev2574
Ā 
No Advance 9053900678 Chandigarh Call Girls , Indian Call Girls For Full Ni...
No Advance 9053900678 Chandigarh  Call Girls , Indian Call Girls  For Full Ni...No Advance 9053900678 Chandigarh  Call Girls , Indian Call Girls  For Full Ni...
No Advance 9053900678 Chandigarh Call Girls , Indian Call Girls For Full Ni...Vip call girls In Chandigarh
Ā 
Call Girls in Mohali Surbhi ā¤ļøšŸ‘ 9907093804 šŸ‘„šŸ«¦ Independent Escort Service Mohali
Call Girls in Mohali Surbhi ā¤ļøšŸ‘ 9907093804 šŸ‘„šŸ«¦ Independent Escort Service MohaliCall Girls in Mohali Surbhi ā¤ļøšŸ‘ 9907093804 šŸ‘„šŸ«¦ Independent Escort Service Mohali
Call Girls in Mohali Surbhi ā¤ļøšŸ‘ 9907093804 šŸ‘„šŸ«¦ Independent Escort Service MohaliHigh Profile Call Girls Chandigarh Aarushi
Ā 
indian Call Girl Panchkula ā¤ļøšŸ‘ 9907093804 Low Rate Call Girls Ludhiana Tulsi
indian Call Girl Panchkula ā¤ļøšŸ‘ 9907093804 Low Rate Call Girls Ludhiana Tulsiindian Call Girl Panchkula ā¤ļøšŸ‘ 9907093804 Low Rate Call Girls Ludhiana Tulsi
indian Call Girl Panchkula ā¤ļøšŸ‘ 9907093804 Low Rate Call Girls Ludhiana TulsiHigh Profile Call Girls Chandigarh Aarushi
Ā 
Jalandhar Female Call Girls Contact Number 9053900678 šŸ’šJalandhar Female Call...
Jalandhar  Female Call Girls Contact Number 9053900678 šŸ’šJalandhar Female Call...Jalandhar  Female Call Girls Contact Number 9053900678 šŸ’šJalandhar Female Call...
Jalandhar Female Call Girls Contact Number 9053900678 šŸ’šJalandhar Female Call...Call Girls Service Chandigarh Ayushi
Ā 
Call Girls Service Chandigarh Grishma ā¤ļøšŸ‘ 9907093804 šŸ‘„šŸ«¦ Independent Escort Se...
Call Girls Service Chandigarh Grishma ā¤ļøšŸ‘ 9907093804 šŸ‘„šŸ«¦ Independent Escort Se...Call Girls Service Chandigarh Grishma ā¤ļøšŸ‘ 9907093804 šŸ‘„šŸ«¦ Independent Escort Se...
Call Girls Service Chandigarh Grishma ā¤ļøšŸ‘ 9907093804 šŸ‘„šŸ«¦ Independent Escort Se...High Profile Call Girls Chandigarh Aarushi
Ā 
Call Girl Chandigarh Mallika ā¤ļøšŸ‘ 9907093804 šŸ‘„šŸ«¦ Independent Escort Service Cha...
Call Girl Chandigarh Mallika ā¤ļøšŸ‘ 9907093804 šŸ‘„šŸ«¦ Independent Escort Service Cha...Call Girl Chandigarh Mallika ā¤ļøšŸ‘ 9907093804 šŸ‘„šŸ«¦ Independent Escort Service Cha...
Call Girl Chandigarh Mallika ā¤ļøšŸ‘ 9907093804 šŸ‘„šŸ«¦ Independent Escort Service Cha...High Profile Call Girls Chandigarh Aarushi
Ā 
Russian Escorts Aishbagh Road * 9548273370 Naughty Call Girls Service in Lucknow
Russian Escorts Aishbagh Road * 9548273370 Naughty Call Girls Service in LucknowRussian Escorts Aishbagh Road * 9548273370 Naughty Call Girls Service in Lucknow
Russian Escorts Aishbagh Road * 9548273370 Naughty Call Girls Service in Lucknowgragteena
Ā 

Recently uploaded (20)

#9711199012# African Student Escorts in Delhi šŸ˜˜ Call Girls Delhi
#9711199012# African Student Escorts in Delhi šŸ˜˜ Call Girls Delhi#9711199012# African Student Escorts in Delhi šŸ˜˜ Call Girls Delhi
#9711199012# African Student Escorts in Delhi šŸ˜˜ Call Girls Delhi
Ā 
Call Girl Dehradun Aashi šŸ” 7001305949 šŸ” šŸ’ƒ Independent Escort Service Dehradun
Call Girl Dehradun Aashi šŸ” 7001305949 šŸ” šŸ’ƒ Independent Escort Service DehradunCall Girl Dehradun Aashi šŸ” 7001305949 šŸ” šŸ’ƒ Independent Escort Service Dehradun
Call Girl Dehradun Aashi šŸ” 7001305949 šŸ” šŸ’ƒ Independent Escort Service Dehradun
Ā 
Dehradun Call Girls Service ā¤ļøšŸ‘ 9675010100 šŸ‘„šŸ«¦Independent Escort Service Dehradun
Dehradun Call Girls Service ā¤ļøšŸ‘ 9675010100 šŸ‘„šŸ«¦Independent Escort Service DehradunDehradun Call Girls Service ā¤ļøšŸ‘ 9675010100 šŸ‘„šŸ«¦Independent Escort Service Dehradun
Dehradun Call Girls Service ā¤ļøšŸ‘ 9675010100 šŸ‘„šŸ«¦Independent Escort Service Dehradun
Ā 
Vip sexy Call Girls Service In Sector 137,9999965857 Young Female Escorts Ser...
Vip sexy Call Girls Service In Sector 137,9999965857 Young Female Escorts Ser...Vip sexy Call Girls Service In Sector 137,9999965857 Young Female Escorts Ser...
Vip sexy Call Girls Service In Sector 137,9999965857 Young Female Escorts Ser...
Ā 
Call Girls Kukatpally 7001305949 all area service COD available Any Time
Call Girls Kukatpally 7001305949 all area service COD available Any TimeCall Girls Kukatpally 7001305949 all area service COD available Any Time
Call Girls Kukatpally 7001305949 all area service COD available Any Time
Ā 
Russian Call Girls Hyderabad Saloni 9907093804 Independent Escort Service Hyd...
Russian Call Girls Hyderabad Saloni 9907093804 Independent Escort Service Hyd...Russian Call Girls Hyderabad Saloni 9907093804 Independent Escort Service Hyd...
Russian Call Girls Hyderabad Saloni 9907093804 Independent Escort Service Hyd...
Ā 
Call Girls in Lucknow Esha šŸ” 8923113531 šŸ” šŸŽ¶ Independent Escort Service Lucknow
Call Girls in Lucknow Esha šŸ” 8923113531  šŸ” šŸŽ¶ Independent Escort Service LucknowCall Girls in Lucknow Esha šŸ” 8923113531  šŸ” šŸŽ¶ Independent Escort Service Lucknow
Call Girls in Lucknow Esha šŸ” 8923113531 šŸ” šŸŽ¶ Independent Escort Service Lucknow
Ā 
Russian Call Girls in Raipur 9873940964 Book Hot And Sexy Girls
Russian Call Girls in Raipur 9873940964 Book Hot And Sexy GirlsRussian Call Girls in Raipur 9873940964 Book Hot And Sexy Girls
Russian Call Girls in Raipur 9873940964 Book Hot And Sexy Girls
Ā 
Call Girls in Hyderabad Lavanya 9907093804 Independent Escort Service Hyderabad
Call Girls in Hyderabad Lavanya 9907093804 Independent Escort Service HyderabadCall Girls in Hyderabad Lavanya 9907093804 Independent Escort Service Hyderabad
Call Girls in Hyderabad Lavanya 9907093804 Independent Escort Service Hyderabad
Ā 
Basics of Anatomy- Language of Anatomy.pptx
Basics of Anatomy- Language of Anatomy.pptxBasics of Anatomy- Language of Anatomy.pptx
Basics of Anatomy- Language of Anatomy.pptx
Ā 
Call Girl Raipur 9873940964 Book Hot And Sexy Girls
Call Girl Raipur 9873940964 Book Hot And Sexy GirlsCall Girl Raipur 9873940964 Book Hot And Sexy Girls
Call Girl Raipur 9873940964 Book Hot And Sexy Girls
Ā 
No Advance 9053900678 Chandigarh Call Girls , Indian Call Girls For Full Ni...
No Advance 9053900678 Chandigarh  Call Girls , Indian Call Girls  For Full Ni...No Advance 9053900678 Chandigarh  Call Girls , Indian Call Girls  For Full Ni...
No Advance 9053900678 Chandigarh Call Girls , Indian Call Girls For Full Ni...
Ā 
VIP Call Girls Lucknow Isha šŸ” 9719455033 šŸ” šŸŽ¶ Independent Escort Service Lucknow
VIP Call Girls Lucknow Isha šŸ” 9719455033 šŸ” šŸŽ¶ Independent Escort Service LucknowVIP Call Girls Lucknow Isha šŸ” 9719455033 šŸ” šŸŽ¶ Independent Escort Service Lucknow
VIP Call Girls Lucknow Isha šŸ” 9719455033 šŸ” šŸŽ¶ Independent Escort Service Lucknow
Ā 
Call Girls in Mohali Surbhi ā¤ļøšŸ‘ 9907093804 šŸ‘„šŸ«¦ Independent Escort Service Mohali
Call Girls in Mohali Surbhi ā¤ļøšŸ‘ 9907093804 šŸ‘„šŸ«¦ Independent Escort Service MohaliCall Girls in Mohali Surbhi ā¤ļøšŸ‘ 9907093804 šŸ‘„šŸ«¦ Independent Escort Service Mohali
Call Girls in Mohali Surbhi ā¤ļøšŸ‘ 9907093804 šŸ‘„šŸ«¦ Independent Escort Service Mohali
Ā 
indian Call Girl Panchkula ā¤ļøšŸ‘ 9907093804 Low Rate Call Girls Ludhiana Tulsi
indian Call Girl Panchkula ā¤ļøšŸ‘ 9907093804 Low Rate Call Girls Ludhiana Tulsiindian Call Girl Panchkula ā¤ļøšŸ‘ 9907093804 Low Rate Call Girls Ludhiana Tulsi
indian Call Girl Panchkula ā¤ļøšŸ‘ 9907093804 Low Rate Call Girls Ludhiana Tulsi
Ā 
Call Girl Lucknow Gauri šŸ” 8923113531 šŸ” šŸŽ¶ Independent Escort Service Lucknow
Call Girl Lucknow Gauri šŸ” 8923113531  šŸ” šŸŽ¶ Independent Escort Service LucknowCall Girl Lucknow Gauri šŸ” 8923113531  šŸ” šŸŽ¶ Independent Escort Service Lucknow
Call Girl Lucknow Gauri šŸ” 8923113531 šŸ” šŸŽ¶ Independent Escort Service Lucknow
Ā 
Jalandhar Female Call Girls Contact Number 9053900678 šŸ’šJalandhar Female Call...
Jalandhar  Female Call Girls Contact Number 9053900678 šŸ’šJalandhar Female Call...Jalandhar  Female Call Girls Contact Number 9053900678 šŸ’šJalandhar Female Call...
Jalandhar Female Call Girls Contact Number 9053900678 šŸ’šJalandhar Female Call...
Ā 
Call Girls Service Chandigarh Grishma ā¤ļøšŸ‘ 9907093804 šŸ‘„šŸ«¦ Independent Escort Se...
Call Girls Service Chandigarh Grishma ā¤ļøšŸ‘ 9907093804 šŸ‘„šŸ«¦ Independent Escort Se...Call Girls Service Chandigarh Grishma ā¤ļøšŸ‘ 9907093804 šŸ‘„šŸ«¦ Independent Escort Se...
Call Girls Service Chandigarh Grishma ā¤ļøšŸ‘ 9907093804 šŸ‘„šŸ«¦ Independent Escort Se...
Ā 
Call Girl Chandigarh Mallika ā¤ļøšŸ‘ 9907093804 šŸ‘„šŸ«¦ Independent Escort Service Cha...
Call Girl Chandigarh Mallika ā¤ļøšŸ‘ 9907093804 šŸ‘„šŸ«¦ Independent Escort Service Cha...Call Girl Chandigarh Mallika ā¤ļøšŸ‘ 9907093804 šŸ‘„šŸ«¦ Independent Escort Service Cha...
Call Girl Chandigarh Mallika ā¤ļøšŸ‘ 9907093804 šŸ‘„šŸ«¦ Independent Escort Service Cha...
Ā 
Russian Escorts Aishbagh Road * 9548273370 Naughty Call Girls Service in Lucknow
Russian Escorts Aishbagh Road * 9548273370 Naughty Call Girls Service in LucknowRussian Escorts Aishbagh Road * 9548273370 Naughty Call Girls Service in Lucknow
Russian Escorts Aishbagh Road * 9548273370 Naughty Call Girls Service in Lucknow
Ā 

CAPA Risk Mitigation System

  • 1. Corrective And Preventive Action CAPA: A Risk Mitigating Quality System Conducted by Gamal Amer, Ph.D. PrincipalPrincipal Premier Compliance Services, Inc. Ā© All rights reserved. Do not copy without permission. 1
  • 2. FDA Initiative August 2002 Pharmaceutical CGMP for the 21st Century: A Risk-based Approach A science and risk-based approach to product quality regulation incorporating an integrated quality system approach Ā© All rights reserved. Do not copy without permission. 2
  • 3. Mitigating Risk FDA Progress Reports discusses three QA systems to mitigate risk:QA systems to mitigate risk: 1. Process Analytical Technology (PAT) 2. Corrective and Preventive Action (CAPA) 3. Quality by Design (QbD) Ā© All rights reserved. Do not copy without permission. 3
  • 4. Risk What Is Risk? What Causes It? Risk to Whom?Risk to Whom? Risk Manifestation? Risk Level? Ā© All rights reserved. Do not copy without permission. 4
  • 5. Quality Events Which May CauseQu y ve s W c y C use Increased Risk ā€¢ A problem occurs during clinical trials (patient complains/suffers)complains/suffers) ā€¢ A deviation occurs during the manufacturing A i f i t f il hil thā€¢ A piece of equipment fails while the process is engaged. ā€¢ Analytical result is not what was expected Ā© All rights reserved. Do not copy without permission. 5
  • 6. E t P t ti ll I iEvents Potentially Increasing Risk No negative quality event occurred, but:g q y ā€¢ Patient complaints show a negative trend. i d if i / di d iā€¢ Operation drifting/trending towards action limit. ā€¢ Analytical data trending towards unacceptable. Ā© All rights reserved. Do not copy without permission. 6
  • 7. These Events Pose: ā€¢ Risk to the patient/public ā€¢ Risk to the productRisk to the product ā€¢ Risk to the personnel Ri k h iā€¢ Risk to the environement ā€¢ Risk to the company Ā© All rights reserved. Do not copy without permission. 7
  • 8. What Is Risk? The combination of the probability ofThe combination of the probability of occurrence of harm and the severity of that harm.* *Guidance for Industry; ICH Q9 Quality Risk Management; June 2006 Ā© All rights reserved. Do not copy without permission. 8
  • 9. What Is The Risk?What Is The Risk? ā€¢ In Drug Application: ā€“ The pros and cons of the treatment ā€¢ In Process Design: ā€“ Failure to recognize source of variability and how CPP affect CQA of product ā€¢ In Process Qualification:In Process Qualification: ā€“ Failure to qualify a critical (high risk) portion of the process. ā€¢ In Manufacturing: ā€“ Quality events occurring as the process is engaged Ā© All rights reserved. Do not copy without permission. 9
  • 10. Some Sources of Increased Risk in Manufacturing? ā€¢ Processing Deviations and Non Conformance A ti P iā€¢ Aseptic Processing ā€¢ Labeling Errors (Majority of drug recalls due to mislabeling)mislabeling) ā€¢ Analytical and Measuring Errors D li ith t t dā€¢ Dealing with potent compounds ā€¢ People Errors Ā© All rights reserved. Do not copy without permission. 10
  • 11. Defining Level of RiskDefining Level of Risk F i fFunction of: ā€“ Severity Fā€“ Frequency ā€“ Detectability ā€¢ These three factors determine the numerical Risk Priority Number (RPN)Risk Priority Number (RPN) ā€¢ Qualitative risk (low, medium, and high) Ā© All rights reserved. Do not copy without permission. 11
  • 12. CAPA = Corrective Action /CAPA Corrective Action / Preventive Action Ā© All rights reserved. Do not copy without permission. 12
  • 13. Risk Within the Context ofRisk Within the Context of CAPA Systemy ā€¢ A non-conformance or deviation occurs or a potential problem is identified.p ā€¢ These pose risk. ā€¢ CAPA should define the risk, its level, and means to mitigate itmitigate it. ā€¢ CAPA should then implement the actions to mitigate the risk and track to ensure closure. M i i i ff i d didā€¢ Monitor to ensure action is effective and did not introduced new risk(s). Ā© All rights reserved. Do not copy without permission. 13
  • 14. Non-conformance and Deviation Non-Conformance: Failure to meet a specified requirement.p q Deviation: Failure to follow or implement an establishedFailure to follow or implement an established requirement. Typically this term is used relevant to processes (as in a ā€œprocessrelevant to processes (as in a process deviationā€). Ā© All rights reserved. Do not copy without permission. 14
  • 15. Risk Level Factors: Severity ā€¢ What are the consequences of the non-conformanceq or deviation? ā€¢ How deleterious is that non-conformance or deviation to the consistent quality of the product? ā€¢ How high is the risk to the patientā€™s well being? Ā© All rights reserved. Do not copy without permission. 15
  • 16. Risk Level Factors: Frequency ā€¢ What are the probability of the reoccurrence of the non-conformance or deviation? ā€¢ Were attempts made to reduce such frequency and how effective?frequency and how effective? ā€¢ Review process history to determine. Ā© All rights reserved. Do not copy without permission. 16
  • 17. Risk Level Factors: Detectability ā€¢ What is the probability of the non-conformance or d i i b i d d?deviation being detected? ā€¢ Can the effect/result of the non-conformance or d i ti b dil d/ ?deviation be readily measured/seen? Ā© All rights reserved. Do not copy without permission. 17
  • 18. Change Control is an ImportantChange Control is an Important Component of CAPA Ā© All rights reserved. Do not copy without permission. 18
  • 19. Change Control: A Regulatory I iImperative ā€¢ Is a regulatory requirementIs a regulatory requirement ā€¢ 211.68(b) Appropriate controls shall be exercised over computer or related systems to assure thatp y changes.... ā€¢ 211.100 (a) ....written procedures, including any( ) p , g y changes, shall be drafted, reviewed, and approved by the appropriate organizational units and reviewed and approved by the quality control unit. Ā© All rights reserved. Do not copy without permission. 19
  • 20. 211 160( ) h i h ifi tiā€¢ 211.160(a) change in such specifications, standards, sampling plans, test procedures, or other laboratory control mechanisms shall beother laboratory control mechanisms, shall be drafted by the appropriate organizational unit and reviewed and approved by the quality control unit. ā€¢ Guidance to Industry on Process Validation: The qualification plan for the facility and utilities should identify 1) studies.... 2)Criteria to assess outcome...It should also include the firm's i t f th l ti f hrequirements for the evaluation of changes. Ā© All rights reserved. Do not copy without permission. 20
  • 21. ā€¢ ICH Q7-API GMP (13) A formal change control system should be established to evaluate all changes that could affect the production and control of the intermediate or API. A l f GMP l h h ldā€¢ Any proposals for GMP relevant changes should be drafted, reviewed, and approved by the appropriate organizational units and reviewed andappropriate organizational units and reviewed and approved by the quality unit(s). Ā© All rights reserved. Do not copy without permission. 21
  • 22. What is a Change ControlWhat is a Change Control System? It is a formal system which is designed not to prevent change but rather document and control itprevent change, but rather document and control it. Its main purpose is to ensure that a system/process/operation is always in a GMPy p p y compliant and validated state, regardless of changes made to it. It is usually implemented using a procedure. Ā© All rights reserved. Do not copy without permission. 2222
  • 23. What is a Change ControlWhat is a Change Control System? ICH Q9 ā€“ Quality Risk Management T h b d k l d dā€¢ To manage changes based on knowledge and information accumulated in pharmaceutical development and during manufacturingdevelopment and during manufacturing. ā€¢ To evaluate the impact of the changes on the availability of the final product.availability of the final product. Ā© All rights reserved. Do not copy without permission. 2323
  • 24. What is a Change ControlWhat is a Change Control System? ā€¢ To evaluate the impact on product quality of changes to facility equipment materialchanges to facility, equipment, material, manufacturing process or conducting technical transfers. ā€¢ To determine appropriate actions preceding the implementation of a change, e.g., additional testing, (re)qualification, (re)validation, communication with regulators. Ā© All rights reserved. Do not copy without permission. 2424
  • 25. The Compliance/Validationp Life Cycle- Compliant & Validated System Implement ChangeChange Control SystemSystem Modified System Ā© All rights reserved. Do not copy without permission. 2525
  • 26. Importance of Change ControlImportance of Change Control ā€¢ Not to prevent changeā€¢ Not to prevent change. ā€¢ To control and document change. ā€¢ Required by the regulations. ā€¢ Identify GMP and validation implications.y p ā€¢ Ascertain process remains in a state of controlcontrol. ā€¢ Must be implemented using a procedure. Ā© All rights reserved. Do not copy without permission. 2626
  • 27. Change Control procedure Change requiredChange required GenerateGenerate Change Request End GMP Implications? No Yes Implement Change Maintenance NoRequalification? Revalidation? Yes Implement Change & Insure GMP Requirements Done Issue GMP Report Obtain Approval Yes Change is Permanent Requalify Revalidate & Issue Reports Obtain Approvals Change is Permanent Ā© All rights reserved. Do not copy without permission. 2727 End
  • 28. CAPA: Mitigating Risk The degree of corrective and preventive action taken to eliminate or minimize actual or potential nonconformities must be appropriate to the magnitude of the problempp p g p and commensurate with the risks encountered. (ICH Q9)( Q ) Ā© All rights reserved. Do not copy without permission. 28
  • 29. Risk Level and Appropriate Corrective Action Risk Level (RPN) Low Medium HighCorrective Action No Further Investigation , No Corrective action required No Further Investigation (Cause Evident), Corrective action required Further Investigation (Root Cause Analysis), Correctivey ), action required (Immediate; e.g.. Recall), Prevent Cause Ā© All rights reserved. Do not copy without permission. 29
  • 30. What Is CAPA? Ā© All rights reserved. Do not copy without permission. 30
  • 31. CAPA Is: ā€¢ A quality based systemā€¢ A quality based system ā€¢ Uses Non-conformance, Deviations and/or an Expectation of such as inputExpectation of such as input ā€¢ Uses many of the quality systems in place as tools: ā€“ Historical Quality Issues and Audit Reports ā€“ Environmental and Process Monitoring Data ā€“ Product Complaints ā€“ Equipment Service & Maintenance Records ā€“ Process and scientific Knowledge ā€“ Operating Procedures and Methodology Ā© All rights reserved. Do not copy without permission. 31
  • 32. CAPA Uses: ā€¢ Policies and proced res to in estigateā€¢ Policies and procedures to investigate quality problems. ā€¢ Policies and procedures to identify andā€¢ Policies and procedures to identify and implement corrective and preventive actionsactions. ā€¢ A tracking mechanism to ensure investigation and proper corrective actionsinvestigation and proper corrective actions are conducted and implemented on a timely basis. Ā© All rights reserved. Do not copy without permission. 32
  • 33. CAPA InvestigationCAPA Investigation ā€¢ Investigate the cause of non-conformity or deviation as it relates to the product, processes, and the quality system. (reactive) I ti t t ti l i k f t dā€¢ Investigate potential risk of an expected or anticipated event. (proactive) ā€¢ Depending on risk severity the investigation mayDepending on risk severity, the investigation may need to define the ā€œRoot Cause.ā€ ā€¢ Use tools such as HAZOP, HACCP, Failure Mode, , & Effect Analysis, Fault Tree Analysis, What If, etc. Ā© All rights reserved. Do not copy without permission. 33
  • 34. CAPA Identification ā€¢ Identify the action needed to correct, reduce, or prevent recurrence of nonconformance of productp p and other quality problems. ā€¢ Identify the action needed to correct and preventIdentify the action needed to correct and prevent recurrence of the deviation in the process. ā€¢ Identify the action needed to prevent the potentialā€¢ Identify the action needed to prevent the potential occurrence of an anticipated quality event. Ā© All rights reserved. Do not copy without permission. 34
  • 35. Possible Corrective Actions ā€¢ Design Changes* ā€¢ Manufacturing Process Changes* ā€¢ Removal of product from the market through recall ā€¢ Operator Trainingā€¢ Operator Training ā€¢ Labeling changes* ā€¢ Patient educationā€¢ Patient education ________________________________________________________________________________ * Keep in mind that making changes must be managed using change control in order to avoid introducing additional risk. Ā© All rights reserved. Do not copy without permission. 35
  • 36. Tracking CAPA Activities ā€¢ What to track? ā€“ The quality event and timing for initiating an investigation ā€“ Timing for completing assessment ā€“ Timing for developing action plan ā€“ Timing for implementing all necessary actions (changes, training, document modification, etc.) ā€“ Timing for completing the necessary documentationTiming for completing the necessary documentation ā€“ Completion of the actions and closure of the deviation or nonconformance Ā© All rights reserved. Do not copy without permission. 36
  • 37. Tracking CAPA Activities ā€¢ How to track? ā€“ Manual TrackingManual Tracking ā€¢ Too much paper ā€¢ Very cumbersome and time consuming ā€¢ Limited Access ā€“ Software Packages (Part 11 compliant) ā€¢ Trackwise (MS Outlook) ā€¢ Livelink (Lotus) Ā© All rights reserved. Do not copy without permission. 37
  • 38. Post CAPA Monitoring ā€¢ Ensures actions were effective in mitigating the risk. ā€¢ Ensure actions were effective in correcting/preventive the problem. ā€¢ Ensures no additional risks were introduced due to the actions taken. ā€¢ Required as part of GMP compliance and process validation (FDA Guidance 1/2011). Ā© All rights reserved. Do not copy without permission. 38
  • 39. Typical CAPA Overall Approach Quality Event Ri k Quality Event Identify Risk Risk Acceptance Document History Monitoring Analyze Risk Risk Reduction Track& Monitor Complaints Science & Evaluate Risk A i RPN Risk Elimination/ Communicate Review Knowledge Procedures, Service & Maintenance Assign RPN Risk Assessment/ Investigate prevention Review Identify & l A i Document, Track, Monitor & Ā© All rights reserved. Do not copy without permission. 39 Implement Actions Monitor & Communicate
  • 40. System Components D i ti ti d i ti ti dā€¢ Deviation reporting and investigation procedure. ā€¢ Rework Procedures. M i d hi i l D li diā€¢ Maintenance records, historical Data, quality audit results, etc. P d i t l it iā€¢ Process and environmental monitoring programs. ā€¢ Change Control Procedure. Ri k A l i P d h HAZOPā€¢ Risk Analysis Procedures such as HAZOP, HACCP, Fault Tree Analysis, etc. Ā© All rights reserved. Do not copy without permission. 40
  • 41. CAPA Steps to Be Taken Ā© All rights reserved. Do not copy without permission. 41
  • 42. Label and Segregate Non-Label and Segregate Non- conforming Product ā€¢ Ensure nonconforming product is properly labeled (for example HOLD REJECTlabeled (for example, HOLD, REJECT, QUARANTINE). E t f i d tā€¢ Ensure suspect or non-conforming product is properly labeled and segregated (not d) t t f th diused) to prevent further use pending disposition. Ā© All rights reserved. Do not copy without permission. 42
  • 43. Document The Issue ā€¢ Record nonconformance on a Nonconforming Materials Report.g p ā€¢ Record Deviation on a Deviation Reporting FormForm. ā€¢ Document all studies and decisions made during the investigation of the quality eventduring the investigation of the quality event. Ā© All rights reserved. Do not copy without permission. 43
  • 44. Segregate Material & Equipment A h i l ( d ) iā€¢ Assure that suspect materials (non-product) is segregated and labeled. ā€¢ Assure all suspect lots batches units materialsā€¢ Assure all suspect lots, batches, units, materials, etc are identified and segregated. ā€¢ Assure that the segregation (who, what, where,g g ( , , , when, how) is documented on the nonconformance report. T d l k ll i d f hā€¢ Tag and lock all equipment and parts of the process which maybe suspect. Ā© All rights reserved. Do not copy without permission. 44
  • 45. Evaluate ā€¢ Review the event, the circumstances surrounding the event. ā€¢ Document relevant details as part of the nonconformance or deviation reportor deviation report. ā€¢ Risk to quality should be linked to protecting the patient. ā€¢ Use RPN to help determine need for in-depth investigation and Corrective/Preventive Action (in other words: the effort, formality and documentation should be commensurate with the level of risk and be based on science*). __________________________________________________________________________ *Guidance for Industry; ICH Q9 Quality Risk Management; June 2006 Ā© All rights reserved. Do not copy without permission. 45
  • 46. Risk Level and Appropriate Corrective Action Risk Level (RPN) Low Medium HighCorrective Action Further Investigation (Root Cause Analysis), Corrective action required (Immediate; e Re ll) P e e t C ee.g.. Recall), Prevent Cause No Further Investigation (Cause Evident), Corrective action required No Further Investigation , NoNo Further Investigation , No Corrective action required Ā© All rights reserved. Do not copy without permission. 46
  • 47. Take Action M k h d i kā€¢ Make necessary changes to reduce risk or eliminate it. ā€¢ Invoke Change Controlā€¢ Invoke Change Control. ā€¢ Track to ensure CAPA closure in a timely fashion. ā€¢ Evaluate the actions to ensure they were effectiveEvaluate the actions to ensure they were effective in mitigating the risk as intended. ā€¢ Monitor the process to ensure it has not beenp negatively affected by changes and that no additional or different risks were introduced. Ā© All rights reserved. Do not copy without permission. 47
  • 48. Benefits of a Robust CAPA System ā€¢ Fulfills the promise of continuous improvement ā€¢ Leads to better customer satisfaction and less risk h blito the public. ā€¢ Better use of resources through a structured QA systemsystem. ā€¢ Facilitate better and more informed decisions by manufacturers. ā€¢ Makes good business and financial sense. ā€¢ Increasing your compliance quotient. Ā© All rights reserved. Do not copy without permission. 48 g y p q
  • 49. Summaryy ā€¢ CAPA is a regulatory requirement which makes business sense. ā€¢ CAPA is a risk mitigating approach, which fulfills the promise of continuous improvementcontinuous improvement. ā€¢ Non-conformances, deviations or anticipated quality events are input to the CAPA program. ā€¢ All aspects of the CAPA program should be thoroughlyā€¢ All aspects of the CAPA program should be thoroughly documented. ā€¢ Risk level assessment, as part of CAPA: provides the means for rationalizing the scope andp g p extent of investigation and/or corrective action necessary. helps management assign resources to tasks providing the most al e and ha ing the biggest impact onthe most value and having the biggest impact on quality and customer satisfaction. ā€¢ Tracking, reviewing, and monitoring CAPA related activities is an important aspect of the program. Ā© All rights reserved. Do not copy without permission. 49 important aspect of the program.