SlideShare a Scribd company logo
1 of 7
Integrals:
      -Juan Daniel Cano Quintero
      -Stephania Marín Giraldo
      -Guillermo León Serna
      -Johan Esneider Ocampo
      -Daniel Estiven Suarez

The use again of water
1.5 Esmated time of execution of the proyect (months):
  three months.
1.6 companies or institutions that take part in his formulation or
financing ( if exist )
IETIS Simona Duque-Explorer park.
1.7 key words of search:
Water, saving, use again




2.1 approaching the problem:
Has estrategies can bet hought so that the Marinilla
municipality cissumes and manege a colture of saving of
water?
2.2 justification of the proyect:
¿ because ? We want to make this proyect so people learn a
saving the water for mean a culture of water.
2.3 general objetive:
To inform people so that they assume and manage a culture
off saving of water.
2.4 specific objetive:
-to desing a proyect that it proposes the concientizacion of the
saving of water.
-to outline as keeping in mind the important thing that it is the
saving of water installing thrifty and other mouth pieces.
-to capture the proyect well participating in the park explores
and waves.
-to work in the mechanics an desingn of the proyect in the
technology room.
2.5 scope:
To sabe and improve the use of all the people is water.
2.5.1 beneficiaries of the proyect:
That people would no longer waster drincable or treated so much
water.
2.5.2 impac:
Social: it could be big since the water rains gone to give are
reasonable use since bepore he as not very healthy.
Economic: it would be very comfortable since the use again of the
water rain would be seen.
Enviromental: it is very healthy since the use of the water rain use
again is chosen in but of a cyde.
Technological: serious an aduance thet but he is ahead it could
improve being something successfull.
2.5.3 restrictions or associated risks:
They can have problems in momments of dreught and summer, it
would lack the rain water, the fundamental matter of the proyect.
2.5.4 products or results of the proyect:
Bigger saving of water, use again whit the use of the washing
machine and without voting the water of this, to empty the
bathrooms.
2.6.1innovation/technologicalmanagement
the project addresses a need of the productive sector                          yes
the projetct improves the process/product/service exists?                      yes
the project involves the use of new techniques and process technologies        yes
the end products are susceptible to industrial prtection and/ or copyright     no
the products obtained in the project can be positioned in the market?          yes
productive assessment
with the development of the project can meet the need for a potential customer yes
feasibility of project busininess plan                                         yes
Junior ingles

More Related Content

Similar to Junior ingles

Similar to Junior ingles (20)

Formato sena ingles 2013
Formato sena ingles 2013Formato sena ingles 2013
Formato sena ingles 2013
 
Formato sena ingles 2013
Formato sena ingles 2013Formato sena ingles 2013
Formato sena ingles 2013
 
Formatosenaingles2013 131028142854-phpapp01
Formatosenaingles2013 131028142854-phpapp01Formatosenaingles2013 131028142854-phpapp01
Formatosenaingles2013 131028142854-phpapp01
 
Santa
SantaSanta
Santa
 
Formato sena ingles 2013
Formato sena ingles 2013Formato sena ingles 2013
Formato sena ingles 2013
 
Formato Sena EspañOl Ingles Carlos
Formato Sena EspañOl Ingles  CarlosFormato Sena EspañOl Ingles  Carlos
Formato Sena EspañOl Ingles Carlos
 
Formato
FormatoFormato
Formato
 
trabajo de tecnologia en ingles
trabajo de tecnologia en inglestrabajo de tecnologia en ingles
trabajo de tecnologia en ingles
 
John diegoo
John diegooJohn diegoo
John diegoo
 
Proyecto en ingles.
Proyecto en ingles.Proyecto en ingles.
Proyecto en ingles.
 
Formato SENA Ingles
Formato SENA InglesFormato SENA Ingles
Formato SENA Ingles
 
Formato sena ingles 2013 (2)
Formato sena ingles 2013 (2)Formato sena ingles 2013 (2)
Formato sena ingles 2013 (2)
 
Andres 2
Andres 2Andres 2
Andres 2
 
Formato sena ingles 2013
Formato sena ingles 2013Formato sena ingles 2013
Formato sena ingles 2013
 
Design Engineering-2 Report
Design Engineering-2 ReportDesign Engineering-2 Report
Design Engineering-2 Report
 
Documentoespañolsara2completeo
Documentoespañolsara2completeoDocumentoespañolsara2completeo
Documentoespañolsara2completeo
 
Formato sena ingles 2013 (2)
Formato sena ingles 2013 (2)Formato sena ingles 2013 (2)
Formato sena ingles 2013 (2)
 
Formato sena ingles 2013 (2)
Formato sena ingles 2013 (2)Formato sena ingles 2013 (2)
Formato sena ingles 2013 (2)
 
Formato sena ingles 2013
Formato sena ingles 2013Formato sena ingles 2013
Formato sena ingles 2013
 
Estefania jaramillo
Estefania jaramilloEstefania jaramillo
Estefania jaramillo
 

Junior ingles

  • 1. Integrals: -Juan Daniel Cano Quintero -Stephania Marín Giraldo -Guillermo León Serna -Johan Esneider Ocampo -Daniel Estiven Suarez The use again of water
  • 2. 1.5 Esmated time of execution of the proyect (months): three months. 1.6 companies or institutions that take part in his formulation or financing ( if exist ) IETIS Simona Duque-Explorer park. 1.7 key words of search: Water, saving, use again 2.1 approaching the problem: Has estrategies can bet hought so that the Marinilla municipality cissumes and manege a colture of saving of water?
  • 3. 2.2 justification of the proyect: ¿ because ? We want to make this proyect so people learn a saving the water for mean a culture of water. 2.3 general objetive: To inform people so that they assume and manage a culture off saving of water. 2.4 specific objetive: -to desing a proyect that it proposes the concientizacion of the saving of water. -to outline as keeping in mind the important thing that it is the saving of water installing thrifty and other mouth pieces. -to capture the proyect well participating in the park explores and waves. -to work in the mechanics an desingn of the proyect in the technology room.
  • 4. 2.5 scope: To sabe and improve the use of all the people is water. 2.5.1 beneficiaries of the proyect: That people would no longer waster drincable or treated so much water. 2.5.2 impac: Social: it could be big since the water rains gone to give are reasonable use since bepore he as not very healthy. Economic: it would be very comfortable since the use again of the water rain would be seen. Enviromental: it is very healthy since the use of the water rain use again is chosen in but of a cyde. Technological: serious an aduance thet but he is ahead it could improve being something successfull.
  • 5. 2.5.3 restrictions or associated risks: They can have problems in momments of dreught and summer, it would lack the rain water, the fundamental matter of the proyect. 2.5.4 products or results of the proyect: Bigger saving of water, use again whit the use of the washing machine and without voting the water of this, to empty the bathrooms.
  • 6. 2.6.1innovation/technologicalmanagement the project addresses a need of the productive sector yes the projetct improves the process/product/service exists? yes the project involves the use of new techniques and process technologies yes the end products are susceptible to industrial prtection and/ or copyright no the products obtained in the project can be positioned in the market? yes productive assessment with the development of the project can meet the need for a potential customer yes feasibility of project busininess plan yes